Method for arranging overhanging outer frame hanging ring

文档序号:1445026 发布日期:2020-02-18 浏览:18次 中文

阅读说明:本技术 一种悬挑外架吊环设置方法 (Method for arranging overhanging outer frame hanging ring ) 是由 谭万春 竹勇 潘永光 于 2019-11-08 设计创作,主要内容包括:本发明涉及房建工程领域,具体涉及一种悬挑外架吊环设置方法,其步骤如下:步骤1,设置预埋件,在楼层混凝土浇筑时,在预定位置安设预埋件,待楼层混凝土初步凝固后,拆除所述预埋件,在楼层侧面形成安装通孔;步骤2,安装吊环,在所述步骤1中形成的安装通孔安装吊环,所述吊环与所述安装通孔可拆卸连接。在楼层混凝土浇筑时安设预埋件,使固化成型后的楼层侧面形成用于安装吊环的安装通孔,然后通过安装通孔可拆卸的安装吊环,一方面使得吊环在使用完成后可以从楼层中拆卸,不仅提高了吊环的拆除效率,而且吊环能够重复利用节约的材料成本,另一方面通过对预埋件的精确定位,可实现安装通孔的预留准确,从而提升吊环安装位置的精确度。(The invention relates to the field of building engineering, in particular to a method for arranging a hanging ring of an overhanging outer frame, which comprises the following steps: step 1, arranging an embedded part, installing the embedded part at a preset position when building layer concrete is poured, dismantling the embedded part after the building layer concrete is preliminarily solidified, and forming an installation through hole on the side surface of a building layer; and 2, installing a hanging ring, installing the hanging ring in the installation through hole formed in the step 1, and detachably connecting the hanging ring with the installation through hole. Install the built-in fitting when floor concrete placement, make the floor side after the solidification shaping form the installation through-hole that is used for installing rings, then through installation through-hole detachable installation rings, make rings can follow the floor after the use is accomplished and dismantle on the one hand, not only improved demolish efficiency of rings, rings can reuse the material cost of saving moreover, and on the other hand is through the accurate positioning to the built-in fitting, can realize that the reservation of installation through-hole is accurate, thereby promote rings mounted position's accuracy.)

1. A method for arranging a hanging ring of an overhanging outer frame is characterized by comprising the following steps:

step 1, arranging an embedded part (1), installing the embedded part (1) at a preset position when building concrete is poured, dismantling the embedded part (1) after the building concrete is primarily solidified, and forming an installation through hole on the side surface of a floor;

and 2, installing a hanging ring (2), installing the hanging ring (2) in the installation through hole formed in the step 1, and detachably connecting the hanging ring (2) with the installation through hole.

2. The setting method of the overhanging outer frame hanging ring according to claim 1, wherein the hanging ring (2) comprises a mounting ring (201) and a mounting screw (202) which is connected with the mounting ring (201) into a whole, a fixing nut (203) is arranged on the mounting screw (202), the mounting screw (202) is used for being mounted in the mounting through hole, and the fixing nut (203) is sleeved on a part of the mounting screw (202) which passes through the mounting through hole, so that the mounting screw (202) is fixed in the mounting through hole.

3. The setting method of the overhanging outer frame hanging ring according to claim 1, wherein the embedded part (1) comprises a fixed plate (101), a plurality of embedded rods (102) are arranged on the fixed plate (101), and a fixed structure for fixing with a floor pouring template is arranged on the fixed plate (101).

4. The setting method of the overhanging outer frame hanging ring as claimed in claim 3, wherein a plurality of the embedded rods (102) are arranged at equal intervals along the length direction of the fixed plate (101).

5. The setting method of the overhanging outer frame hanging ring as claimed in claim 3, wherein a plurality of the embedded rods (102) are arranged at equal intervals along the length direction of the fixed plate (101).

6. The setting method of the overhanging outer frame ring of claim 5, wherein a plurality of the connecting holes (1011) are uniformly arranged along the length direction of the fixing plate (101).

7. The method for setting the overhanging outer frame hanging ring according to any one of claims 4 to 6, wherein the distance between the adjacent embedded rods (102) is at most 1500 mm.

Technical Field

The invention relates to the field of building engineering, in particular to a method for arranging a hanging ring of an overhanging outer frame.

Background

The outrigger is often adopted to construct in current building, the outrigger stay cord will be encorbelmented the outrigger and be connected between the outrigger and the floor main part through rings, and then form the safety insurance rope of outrigger, consequently, play crucial effect, traditional rings comprise erection rod and collar, pour the in-process at the floor and install the erection rod in waiting to pour the region, take the floor shaping back rings and fix in the floor, this kind of mode leads to rings to become disposable article, when dismantling the outrigger in the later stage, the collar of the rings of leaving over on the floor need be got rid of through the mode of cutting, cause material cost high and also do not benefit to and improve work efficiency, direct region installation rings of waiting to pour simultaneously can lead to the rings off normal, be unfavorable for the installation of outrigger stay cord.

In summary, a technical scheme is urgently needed at present, and the problems that in the prior art, when the overhanging outer frame lifting ring is installed, the lifting ring is embedded in concrete, the lifting ring cannot be repeatedly used, the lifting ring is difficult to detach in the later period, and the lifting ring is prone to deviation in the concrete pouring process are solved. Is not beneficial to the installation of the overhanging outer frame.

Disclosure of Invention

The invention aims to: when having the installation outrigger outer frame rings to prior art, adopt the mode with rings pre-buried in the concrete, lead to the unable reuse of rings, the later stage is difficult to dismantle, and rings easily appear the condition of off normal at the concrete placement in-process moreover. The technical problem that the installation of the overhanging outer frame is not facilitated is that the method for setting the overhanging outer frame lifting ring is provided, on one hand, the lifting ring can be detached from a floor after the use is completed, the dismounting efficiency of the lifting ring is improved, the lifting ring can be repeatedly used, the saved material cost is saved, on the other hand, the reservation of the installation through hole can be accurately realized through the accurate positioning of the embedded part, the accuracy of the installation position of the lifting ring is improved, and the lifting ring is further ensured to be normally connected with the pull rope of the overhanging outer frame.

In order to achieve the purpose, the invention adopts the technical scheme that:

a method for setting a hanging ring of an overhanging outer frame comprises the following steps:

step 1, arranging an embedded part, installing the embedded part at a preset position when building layer concrete is poured, dismantling the embedded part after the building layer concrete is preliminarily solidified, and forming an installation through hole on the side surface of a building layer;

and 2, installing a hanging ring, installing the hanging ring in the installation through hole formed in the step 1, and detachably connecting the hanging ring with the installation through hole.

According to the setting method of the hanging ring of the overhanging outer frame, the embedded part is installed according to the pre-measurement result when the floor concrete is poured, the embedded part is detached after the floor concrete is preliminarily molded, the mounting through hole for mounting the hanging ring is formed on the side surface of the floor after curing molding, and then the hanging ring is detachably mounted through the mounting through hole, so that the hanging ring can be detached from the floor after use, the dismounting efficiency of the hanging ring is improved, the hanging ring can be reused, the saved material cost is saved, the accurate reservation of the mounting through hole can be realized through accurate positioning of the embedded part, the accuracy of the mounting position of the hanging ring is improved, and the normal connection of the hanging ring and the overhanging outer frame is further ensured.

As a preferable scheme of the present invention, the hanging ring includes a mounting ring and a mounting screw integrally connected to the mounting ring, a fixing nut is provided on the mounting screw, the mounting screw is used for being mounted to the mounting through hole, and the fixing nut is sleeved on a portion of the mounting screw passing through the mounting through hole, so that the mounting screw is fixed in the mounting through hole. The threaded mounting screw rod is adopted to replace a conventional mounting rod, the mounting screw rod penetrates through a mounting through hole reserved in the embedded part, and the mounting screw rod is locked by the fixing nut on the position where the mounting screw rod penetrates through the mounting through hole, so that detachable connection between the mounting screw rod and the mounting through hole is realized, and then quick detachment of the hanging ring and reuse of the hanging ring are realized.

According to the preferable scheme, the embedded part comprises a fixed plate, a plurality of embedded rods are arranged on the fixed plate, and a fixed structure used for being fixed with the floor pouring template is arranged on the fixed plate. Fixed mounting between the template is pour through fixed plate and floor on the built-in fitting, has realized the rigidity of built-in fitting to guaranteed that the mounting hole's that the pre-buried pole on the fixed plate was reserved position accuracy, and then realized the accurate positioning to rings mounted position, in order to guarantee the stay cord installation of the outer gimbal of encorbelmenting in later stage.

As the preferable scheme of the invention, a plurality of embedded rods are arranged at equal intervals along the length direction of the fixing plate. A plurality of pre-buried poles are equidistant to be arranged, can pour the floor and form simultaneously a plurality ofly the installation through-hole, the installation of rings of being convenient for.

As a preferable scheme of the present invention, the fixing structure includes a plurality of connection holes provided on the fixing plate. The fixing plate is fixed to the floor pouring template by penetrating the connecting holes in the fixing plate through iron nails or other connecting pieces, so that the fixing of the fixing plate is realized.

As a preferable aspect of the present invention, the plurality of connection holes are uniformly arranged along a length direction of the fixing plate. A plurality of connecting holes are evenly distributed on the fixed plate, so that stable connection between the fixed plate and the pouring template is facilitated, and the influence on the positioning accuracy of the embedded rod due to the fact that local connection is not firm is avoided.

As a preferable scheme of the invention, the distance between the adjacent embedded rods is 1500mm at most.

In summary, due to the adoption of the technical scheme, the invention has the beneficial effects that:

1. according to the setting method of the overhanging outrigger hanging ring, the embedded part is installed when the concrete of the floor is poured, the installation through hole for installing the hanging ring is formed on the side surface of the floor after solidification and molding, and then the hanging ring is detachably installed through the installation through hole, so that the hanging ring can be detached from the floor after use, the dismounting efficiency of the hanging ring is improved, the hanging ring can repeatedly utilize the saved material cost, and accurate reservation of the installation through hole can be realized through accurate positioning of the embedded part, so that the accuracy of the installation position of the hanging ring is improved.

2. The threaded mounting screw rod is adopted to replace a conventional mounting rod, the mounting screw rod penetrates through a mounting through hole reserved in the embedded part, and the part penetrating through the mounting screw rod and penetrating through the mounting through hole is locked by a fixing nut, so that the mounting screw rod and the mounting through hole are detachably connected, and the quick detachment of the hanging ring and the reuse of the hanging ring are further realized;

3. fixed mounting between the template is pour through fixed plate and floor on the built-in fitting, has realized the rigidity of built-in fitting to guaranteed that the mounting hole's that the pre-buried pole on the fixed plate was reserved position accuracy, and then realized the accurate positioning to rings mounted position, in order to guarantee the stay cord installation of the outer gimbal of encorbelmenting in later stage.

Drawings

FIG. 1 is an operational view of a method of installing an overhanging outrigger hoist link of the present invention;

FIG. 2 is a schematic structural diagram of an embedded part involved in a specific operation process of the method for setting the overhanging outer frame hanging ring of the invention;

FIG. 3 is a left side view of FIG. 2;

FIG. 4 is a schematic structural view of the flying ring of FIG. 1;

the labels in the figure are: 1-embedded part, 101-fixing plate, 1011-connecting hole, 102-embedded rod, 2-hanging ring, 201-mounting ring, 202-mounting screw, 203-fixing nut and 3-concrete pouring floor structure.

Detailed Description

The present invention will be described in detail below with reference to the accompanying drawings.

In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention is described in further detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.

7页详细技术资料下载
上一篇:一种医用注射器针头装配设备
下一篇:外脚手架连墙结构及施工方法

网友询问留言

已有0条留言

还没有人留言评论。精彩留言会获得点赞!

精彩留言,会给你点赞!