Portable high-place scaffold for building

文档序号:1517712 发布日期:2020-02-11 浏览:16次 中文

阅读说明:本技术 一种便携式建筑用高处施工架 (Portable high-place scaffold for building ) 是由 杨立妮 于 2019-11-19 设计创作,主要内容包括:本发明公开了一种便携式建筑用高处施工架,包括工作台,所述工作台的下端外表面固定安装有连接扣,所述连接扣的下端活动连接有立柱支架,所述立柱支架的一侧下方安装有高度调节锁扣,所述立柱支架的下端活动连接有伸缩架,所述立柱支架的中间外表面固定安装有加固杆,所述立柱支架的一侧外表面位于高度调节锁扣的上方的位置固定连接有牵引绳,所述加固杆的上端外表面固定安装有一号铰链,所述一号铰链的上端活动连接有支撑杆,所述支撑杆的上端位于工作台的下端外表面的位置安装有二号铰链,所述工作台的两端均安装有放物板。本发明能够提高施工架的使用效果,并能提高施工架的安全性能,具有实用性。(The invention discloses a portable high-place construction frame for buildings, which comprises a workbench, wherein a connecting buckle is fixedly arranged on the outer surface of the lower end of the workbench, the lower end of the connecting buckle is movably connected with a stand column support, a height adjusting lock catch is arranged below one side of the stand column support, an expansion bracket is movably connected with the lower end of the stand column support, a reinforcing rod is fixedly arranged on the outer surface of the middle of the stand column support, a traction rope is fixedly connected to the position, located above the height adjusting lock catch, of the outer surface of one side of the stand column support, a first hinge is fixedly arranged on the outer surface of the upper end of the reinforcing rod, a supporting rod is movably connected to the upper end of the first hinge, a second hinge is arranged at the position, located on the outer surface of the lower end of the workbench, and object. The invention can improve the use effect of the scaffold, can improve the safety performance of the scaffold and has practicability.)

1. The utility model provides a portable eminence scaffold for building, includes workstation (1), its characterized in that, lower extreme external fixed surface of workstation (1) installs connector link (2), the lower extreme swing joint of connector link (2) has stand support (3), altitude mixture control hasp (4) is installed to one side below of stand support (3), the lower extreme swing joint of stand support (3) has expansion bracket (5), the middle external fixed surface of stand support (3) installs anchor strut (7), one side surface of stand support (3) is located the position fixedly connected with haulage rope (8) of the top of altitude mixture control hasp (4), the upper end external fixed surface of anchor strut (7) installs hinge (9) No. one, the upper end swing joint of hinge (9) has bracing piece (10), the position that the upper end of bracing piece (10) is located the lower extreme surface of workstation (1) installs hinge No. two (11) The utility model discloses a hinge (16) is installed in the upper end the place ahead of workstation (1), the both ends of workstation (1) are all installed and are put thing board (13), the equal fixed mounting in both sides surface of putting thing board (13) has draw runner (14), the one end fixed surface of putting thing board (13) installs handle (15), No. three hinge (16) are installed in the upper end the place ahead of workstation (1), the upper end swing joint of No. three hinge (16) has railing (17), install hinge (18) in the middle of the lower extreme of workstation (1).

2. A portable high place scaffold for construction as claimed in claim 1, wherein said connector links (2) are four groups, and said column support (3) is movably connected to the working platform (1) through the connector links (2).

3. A portable construction high place scaffold according to claim 1, wherein the number of said hauling rope (8) is two groups, and both ends of said hauling rope (8) of two groups are fixedly connected with the outer surface of the pillar stand (3).

4. A portable high place scaffold for construction as claimed in claim 1, wherein the lower end of the support rod (10) is movably connected to the reinforcing rod (7) by a first hinge (9), and the upper end of the support rod (10) is movably connected to the working platform (1) by a second hinge (11).

5. A portable construction high place scaffold for building according to claim 1, wherein said putting boards (13) are movably connected with the working platform (1) by means of sliding bars (14), and the number of the putting boards (13) is two.

6. A portable high place scaffold for construction as claimed in claim 1, wherein the foot pad (6) is fixedly installed on the outer surface of the lower end of the telescopic frame (5), and the handle (12) is installed on the outer surface of the front end of the working platform (1).

Technical Field

The invention relates to the technical field of construction frames, in particular to a portable high-place construction frame for buildings.

Background

A high-altitude scaffold for building is a working platform which is erected for ensuring the smooth operation of a high-altitude construction process and is used for construction at a high altitude. However, the existing portable high-altitude construction frame for buildings has certain defects when in use, the using effect of the construction frame is not good enough, the safety performance of the construction frame is not good, and certain influence is brought to the using process, so that the portable high-altitude construction frame for buildings is improved at present.

Disclosure of Invention

The invention aims to solve the defects in the prior art and provides a portable high-rise scaffold for buildings.

In order to achieve the purpose, the invention adopts the following technical scheme:

a portable high-place construction frame for buildings comprises a workbench, wherein a connecting buckle is fixedly arranged on the outer surface of the lower end of the workbench, the lower end of the connecting buckle is movably connected with a stand column support, a height adjusting lock catch is arranged below one side of the stand column support, a telescopic frame is movably connected with the lower end of the stand column support, a reinforcing rod is fixedly arranged on the outer surface of the middle of the stand column support, a traction rope is fixedly connected with the position, above the height adjusting lock catch, of the outer surface of one side of the stand column support, a first hinge is fixedly arranged on the outer surface of the upper end of the reinforcing rod, a support rod is movably connected with the upper end of the first hinge, a second hinge is arranged at the position, above the outer surface of the lower end of the workbench, object placing plates are respectively arranged at the two ends of the workbench, sliding strips are respectively, put the one end fixed surface of thing board and install the handle, No. three hinges are installed in the upper end the place ahead of workstation, the upper end swing joint of No. three hinges has the railing, install the hinge in the middle of the lower extreme of workstation.

Preferably, the number of the connecting buckles is four, and the upright post bracket is movably connected with the workbench through the connecting buckles.

Preferably, the number of the hauling ropes is two, and two ends of the hauling ropes are fixedly connected with the outer surface of the upright post bracket.

Preferably, the lower end of the supporting rod is movably connected with the reinforcing rod through a first hinge, and the upper end of the supporting rod is movably connected with the workbench through a second hinge.

Preferably, the object placing plates are movably connected with the workbench through sliding strips, and the number of the object placing plates is two.

Preferably, the outer surface of the lower end of the telescopic frame is fixedly provided with a foot pad, and the outer surface of the front end of the workbench is provided with a handle.

Compared with the prior art, the invention has the beneficial effects that:

1. according to the invention, the object placing plate, the sliding strip and the handle are arranged, so that the object placing plate can be pulled out for use when the scaffold is used, and some construction tools are placed on the object placing plate, so that the utilization efficiency of the scaffold is higher, and the use effect of the scaffold is improved;

2. according to the invention, through the third hinge and the handrail, when a worker uses the scaffold for construction, the handrail can be pulled up through the hinge, so that the worker on the scaffold is safer, people are prevented from falling off the scaffold, and the safety performance of the scaffold is improved;

in conclusion, the invention can improve the use effect of the scaffold, can improve the safety performance of the scaffold and has practicability.

Drawings

Fig. 1 is a front view of a portable high construction frame for construction according to the present invention;

fig. 2 is a side view of a portable high construction rack for construction according to the present invention.

In the figure: 1 workstation, 2 connector link, 3 stand supports, 4 altitude mixture control hasp, 5 expansion bracket, 6 callus on the sole, 7 anchor rods, 8 haulage ropes, No. 9 hinges, 10 bracing pieces, No. 11 hinges, No. 12 handles, 13 boards of putting things, 14 draw slips, 15 handles, No. 16 hinges, 17 railing, 18 hinges.

Detailed Description

The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.

Referring to fig. 1-2, a portable high construction frame for buildings comprises a workbench 1, a connecting buckle 2 is fixedly arranged on the outer surface of the lower end of the workbench 1, a column support 3 is folded through the connecting buckle 2, the lower end of the connecting buckle 2 is movably connected with a column support 3, a height adjusting buckle 4 is arranged below one side of the column support 3, the lower end of the column support 3 is movably connected with a telescopic frame 5, the telescopic frame 5 is fixed through the height adjusting buckle 4 after the telescopic frame 5 is highly extended, a reinforcing rod 7 is fixedly arranged on the outer surface of the middle of the column support 3, a traction rope 8 is fixedly connected to the position of the outer surface of one side of the column support 3 above the height adjusting buckle 4, the traction rope 8 plays a role in traction and reinforcement, the support angle of the column supports 3 on two sides is prevented from being increased, a hinge 9 is fixedly arranged on the, hinge 9's upper end swing joint has bracing piece 10, No. two hinges 11 are installed to the position that the upper end of bracing piece 10 is located the lower extreme surface of workstation 1, bracing piece 10 is folded with No. two hinges 11 through a hinge 9, put thing board 13 all is installed at the both ends of workstation 1, it is used for placing the construction tool to put thing board 13, the equal fixed mounting in both sides surface of putting thing board 13 has draw runner 14, the one end fixed surface who puts thing board 13 installs handle 15, No. three hinges 16 are installed in the upper end the place ahead of workstation 1, the upper end swing joint of No. three hinges 16 has railing 17, railing 17 can avoid the staff on the scaffold to fall, install hinge 18 in the middle of the lower extreme of workstation 1.

The quantity of connector link 2 is four groups, stand support 3 passes through connector link 2 and 1 swing joint of workstation, the quantity of haulage rope 8 is two sets of, the both ends of two sets of haulage rope 8 all are connected with stand support 3's external fixed surface, the lower extreme of bracing piece 10 is through a hinge 9 and anchor strut 7 swing joint, the upper end of bracing piece 10 is through No. two hinges 11 and 1 swing joint of workstation, it passes through draw runner 14 and 1 swing joint of workstation to put thing board 13, the quantity of putting thing board 13 is two sets of, the lower extreme external fixed surface of expansion bracket 5 installs callus on the sole 6, the front end surface mounting of workstation 1 has handle 12.

The working principle is as follows: the scaffold is firmly placed through the foot pad 6 under the upright post bracket 3, the lower end of the upright post bracket 3 is connected with the expansion bracket 5, four feet of the scaffold can be randomly expanded through the expansion bracket 5, the scaffold is conveniently placed on planes with different levels, the expansion bracket 5 is fixed through the height adjusting lock catch 4 after being adjusted, after the scaffold is fixed, a user stands on the workbench 1, the railing 17 is pulled up through the third hinge 16, the worker is prevented from falling off the workbench 1, the object placing plates 13 on two sides are pulled out of the workbench 1 through the handle 15, the construction tool is placed on the object placing plate 13, then high-place construction can be carried out through the scaffold, after the scaffold is used, the upright post bracket 3 is folded through the connecting buckle 2, the support rod 10 is folded under the action of the first hinge 9 and the second hinge 11, the workbench 1 is folded through the hinge 18, the whole scaffold is folded into a cuboid structure, and the scaffold can be lifted up and carried through the lifting handle 12, so that the scaffold is convenient to carry; the invention can improve the use effect of the scaffold, can improve the safety performance of the scaffold and has practicability.

The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and the technical solutions and the inventive concepts thereof according to the present invention should be equivalent or changed within the scope of the present invention.

6页详细技术资料下载
上一篇:一种医用注射器针头装配设备
下一篇:一种用于焦炉放散管仪表安装的平台

网友询问留言

已有0条留言

还没有人留言评论。精彩留言会获得点赞!

精彩留言,会给你点赞!

技术分类