Method and system for improving peak shaving power supply energy efficiency by using vertical pipe to charge and discharge seawater for energy storage

文档序号:1518062 发布日期:2020-02-11 浏览:19次 中文

阅读说明:本技术 一种竖管充排海水蓄能提升调峰电源能效的方法与系统 (Method and system for improving peak shaving power supply energy efficiency by using vertical pipe to charge and discharge seawater for energy storage ) 是由 杨承 彭远超 罗力文 马晓茜 于 2019-10-16 设计创作,主要内容包括:本发明公开了一种竖管充排海水蓄能提升调峰电源能效的方法与系统,包括竖管群、电动机组、可逆式水泵水轮机组和发电机组,竖管群的上端封闭且沿竖直方向伸出海平面外,竖管群的下端伸入海中后,与可逆式水泵水轮机组连接,可逆式水泵水轮机组并联有进水截止阀和排水截止阀,可逆式水泵水轮机组和发电机组连接并置于海底,电动机组两端分别连接至可逆式水泵水轮机组和燃气—蒸汽联合循环机组。在用电谷期,燃气—蒸汽联合循环机组中过剩的输出电力驱使电动机组转动,可逆式水泵水轮机组将竖管群内的水排出,在竖管群内蓄能,减少了能源浪费。竖管群的一端露出海面,通气孔与竖管群的竖管内部连通,竖管群的管壁承受压力小,对材质要求低,建造成本低。(The invention discloses a method and a system for improving the energy efficiency of a peak shaving power supply by using a vertical pipe for charging and discharging seawater energy storage, which comprises a vertical pipe group, a motor unit, a reversible water pump turbine unit and a generator unit, wherein the upper end of the vertical pipe group is closed and extends out of a sea plane along the vertical direction, the lower end of the vertical pipe group extends into the sea and then is connected with the reversible water pump turbine unit, the reversible water pump turbine unit is connected with a water inlet stop valve and a water discharge stop valve in parallel, the reversible water pump turbine unit is connected with the generator unit and is arranged on the sea floor, and two ends of the motor unit are respectively connected with the reversible water pump turbine unit and a gas-steam combined cycle unit. In the valley period of power utilization, the surplus output power in the gas-steam combined cycle unit drives the motor unit to rotate, the reversible water pump turbine unit discharges water in the vertical pipe group, energy is stored in the vertical pipe group, and energy waste is reduced. One end of the vertical pipe group is exposed out of the sea surface, the vent hole is communicated with the interior of the vertical pipe group, the pipe wall of the vertical pipe group bears small pressure, the requirement on materials is low, and the construction cost is low.)

1. The utility model provides a system for standpipe fills row's sea water energy storage and promotes peak shaver power efficiency which characterized in that: the gas-steam combined cycle power generation system comprises a vertical pipe group, a motor unit, a reversible water pump turbine unit and a generator unit, wherein the reversible water pump turbine unit and the generator unit are arranged on the sea bottom, one end of the motor unit is connected with a power source of the reversible water pump turbine unit, the other end of the motor unit is connected to a gas-steam combined cycle unit, the generator unit is connected with a power generation output end of the reversible water pump turbine unit, the lower end of the vertical pipe group extends into the sea and then is connected with a first water port of the reversible water pump turbine unit through a water inlet and a water outlet, the upper end of the vertical pipe group is provided with a vent hole, the upper end of the vertical pipe group extends out of the sea plane in the vertical direction, and a water inlet stop valve and a water discharge stop valve are connected in parallel with.

2. The system for improving the energy efficiency of the peak shaver power supply by charging and discharging seawater through the vertical pipe according to claim 1, wherein: the vertical pipe group and/or the reversible water pump turbine unit are/is built in a shallow offshore area close to the shore.

3. The system for improving the energy efficiency of the peak shaver power supply by charging and discharging seawater through the vertical pipe according to claim 1, wherein: and the part of the pipe body exposed at sea level in the vertical pipe group is provided with an access hole and an access door for sealing the access hole.

4. The system for improving the energy efficiency of the peak shaver power supply by charging and discharging seawater through the vertical pipe according to claim 1, wherein: and a water quantity regulating valve is arranged at a second water opening of the reversible water pump turbine unit.

5. The system for improving the energy efficiency of the peak shaver power supply by charging and discharging seawater through the vertical pipe according to claim 1, wherein: and a water level indicator is arranged in the vertical pipe of the vertical pipe group.

6. The system for improving the energy efficiency of the peak shaver power supply by charging and discharging seawater through the vertical pipe according to claim 1, wherein: the gas-steam combined cycle unit comprises a gas turbine unit and a steam cycle unit, wherein the gas turbine unit mainly comprises a gas compressor, a combustion chamber and a gas turbine, the combustion chamber is connected with the outlet end of the gas compressor through a pipeline, the inlet end of the combustion chamber is connected with a fuel pipeline, the gas turbine is connected with the outlet end of the combustion chamber through a pipeline, the steam cycle unit is connected with the exhaust steam outlet end of the gas turbine through a pipeline, the gas turbine is provided with a user electricity output end and an energy storage output end, and the energy storage output end is connected with the motor unit.

7. The system for improving the energy efficiency of the peak shaver power supply by charging and discharging seawater through the vertical pipe according to claim 6, wherein: an air flow valve is installed at the inlet of the air compressor, and a fuel flow valve is arranged at the inlet of the combustion chamber.

8. The system for improving the energy efficiency of the peak shaver power supply by charging and discharging seawater through the vertical pipe according to claim 1, wherein: and a filter screen is installed at the water inlet end of the water inlet stop valve.

9. A method for improving the energy efficiency of a peak-shaving power supply by charging and discharging seawater in a vertical pipe is characterized by comprising the following steps: in the valley period, the surplus output power in the gas-steam combined cycle unit drives the motor unit to rotate, and the reversible water pump turbine unit discharges water in the vertical pipe group and stores energy in the vertical pipe group; during the peak period of power consumption, seawater enters the vertical pipe group along the pipeline and the reversible water pump turbine unit, and the reversible water pump turbine unit drives the generator set to generate power and output the power.

10. The method for improving the energy efficiency of the peak shaver power supply by charging and discharging seawater through the vertical pipe according to claim 9, wherein the method comprises the following steps: and the control center detects the data of the opening of the air flow valve, the opening of the fuel flow valve, the opening of the water quantity regulating valve, the distribution proportion of the power supply power of the gas turbine and the distribution proportion of the power supply power of the steam cycle according to the detected data, and controls the opening of the air flow valve, the opening of the fuel flow valve, the opening of the water quantity regulating valve, the distribution proportion of the power supply power of the gas turbine and the distribution proportion of the power supply power of the steam cycle according to the detected data.

Technical Field

The invention relates to the technical field of electric power energy storage regulation and control, further relates to the technical field of fuel gas-steam combined cycle peak regulation, and particularly relates to a method and a system for improving the energy efficiency of a peak regulation power supply by charging and discharging seawater through a vertical pipe for energy storage.

Background

The electricity is produced, transported and used simultaneously, and the electricity cannot be directly stored on a large scale generally; in practical engineering application, the fluctuation of the load on the demand side is greatly influenced by day, night and seasons, and the load is often not matched with the electric power output by the cogeneration system; power load demand is constantly changing, for example, during a day, the power demand during the lower midnight valley period is often half or even less than the power demand during the day and the upper midnight peak period; therefore, the power station needs to take a series of measures to coordinate the related power generation equipment to realize reasonable power supply and demand balance; for combined gas-steam cycle units, such peak-to-valley regulation sensitivity is often limited by operating facilities; in the practical engineering application process, problems of surplus power, low system efficiency and the like are often caused. Therefore, a reasonable regulation and control mode and a reasonable and feasible energy storage mode are needed to improve the energy efficiency of the peak shaving power supply, reduce energy waste and realize better effective utilization of energy.

At present, the seawater pumping energy storage technology is mature day by day and is applied more and more widely. The seawater pumped storage system is a plateau reservoir built at a certain distance on the basis of a traditional pumped storage system by using seawater as a novel pumped storage form as a high-level reservoir system and using ocean as a low reservoir; the seawater pumped storage power station is a new type of pumped storage power station, and is an energy storage technology capable of realizing large-scale and long-time electric energy storage. However, in the traditional seawater pumping energy storage, a plateau reservoir is generally established at a relatively high position; resulting in huge construction engineering and high cost.

At present, the invention design idea of storing surplus power by using ocean as an energy storage and release place is available; in the reference documents: the application publication number is CN 105927455A, the application date is 2016, 6 and 29, and a patent document named as a water storage and power generation system utilizing seabed pressure energy is disclosed, which mainly comprises a storage container, a seawater pumped storage unit and a pressure pipeline; the problems of dependence of traditional pumped storage on fresh water resources and excessive power storage are solved to a certain extent. However, the reference does not disclose a method for improving the energy efficiency of the peak shaving power supply, and in addition, because the storage container is arranged on the seabed, the construction and maintenance costs are high, and the method is not suitable for large-scale popularization.

Disclosure of Invention

The invention aims to at least solve one of the technical problems in the prior art, and provides a method and a system for improving the energy efficiency of a peak shaving power supply by using a vertical pipe for charging and discharging seawater for energy storage, so that the combined cycle peak shaving performance is improved, and the energy waste is reduced.

According to the embodiment of the first aspect of the invention, the system for improving the peak shaving power efficiency by charging and discharging seawater through the vertical pipe comprises a vertical pipe group, a motor unit, a reversible water pump turbine unit and a generator unit, wherein the reversible water pump turbine unit and the generator unit are arranged on the sea bottom, one end of the motor unit is connected with a power source of the reversible water pump turbine unit, the other end of the motor unit is connected to a gas-steam combined cycle unit, the generator unit is connected with a power generation output end of the reversible water pump turbine unit, the lower end of the vertical pipe group extends into the sea and then is connected with a first water gap of the reversible water pump turbine unit through a water inlet and outlet, the upper end of the vertical pipe group is provided with a vent hole, the upper end of the vertical pipe group extends out of the sea level in the vertical direction, and a second water inlet stop valve and a water outlet stop valve are connected in parallel with the reversible water.

The system at least has the following beneficial effects: in the power consumption valley period, the surplus output power in the gas-steam combined cycle unit drives the motor unit to rotate, the reversible water pump turbine unit discharges water in the vertical pipe group, and the energy is stored in the vertical pipe group, so that the energy waste is reduced, the operating efficiency and the energy utilization rate of a gas turbine in the gas-steam combined cycle unit are improved, and the problem of surplus power is solved to a great extent; during the peak period of power utilization, seawater enters the vertical pipe group along the pipeline and the reversible water pump turbine unit, the reversible water pump turbine unit drives the generator set to generate power and outputs the power, the adaptability to external load change is strong, the peak regulation speed is high, and the start and stop are simple and rapid. One end of the vertical pipe group is exposed out of the sea surface and is communicated with the interior of the vertical pipe group through the vent hole, the pipe wall of the vertical pipe group bears small pressure, the requirement on materials is low, and the construction cost is low.

According to the system of the embodiment of the first aspect of the invention, the vertical pipe group and/or the reversible water pump turbine unit are/is built in a shallow offshore area close to the shore. The vertical pipe group and/or the reversible water pump turbine set are built on the basis of the offshore shallow sea surface sea area, the building difficulty is low, the pipe wall of the vertical pipe group bears low pressure, the requirements on materials are lower, and the building cost is low.

According to the system of the embodiment of the first aspect of the invention, the part of the pipe body exposed to the sea level in the vertical pipe group is provided with an access opening and an access door for closing the access opening. The access hole is positioned on the sea level, so that the maintenance is more convenient at regular intervals, and the problem troubleshooting is facilitated.

According to the system of the embodiment of the first aspect of the invention, the second water port of the reversible water pump turbine unit is provided with a water quantity regulating valve. The water quantity regulating valve is used for controlling the water inlet quantity or the water discharge quantity, and particularly controlling the flow of water in the pipeline in the valley period or the peak period of power consumption.

According to the system of the embodiment of the first aspect of the present invention, a water level indicator is installed in the vertical pipes of the vertical pipe group. The water level indicator is used for displaying the height of the water surface in the vertical pipe group, and the data of the water level indicator is transmitted to the display screen to realize visual monitoring.

According to the system of the first aspect of the present invention, the gas-steam combined cycle unit includes a gas turbine unit and a steam cycle unit, the gas turbine unit mainly includes a gas compressor, a combustion chamber and a gas turbine, the combustion chamber is connected to an outlet end of the gas compressor through a pipeline, an inlet end of the combustion chamber is connected to a fuel pipeline, the gas turbine is connected to an outlet end of the combustion chamber through a pipeline, the steam cycle unit is connected to a waste steam outlet end of the gas turbine through a pipeline, the gas turbine has a user electricity output end and an energy storage output end, and the energy storage output end is connected to the motor unit. After ambient air enters the air compressor, the ambient air is compressed into high-pressure air, the high-pressure air enters the combustion chamber to be mixed with fuel and is combusted to generate high-temperature high-pressure fuel gas, the fuel gas enters the gas turbine to expand to do work and output electric power, exhaust steam from the gas turbine enters a waste heat boiler in the steam cycle unit, the exhaust steam utilizes the waste heat of the exhaust steam to heat water in the waste heat boiler to generate high-temperature steam, part of the high-temperature steam pushes the steam turbine to do work and generate power to be supplied to users, and part of the high-temperature steam directly supplies heat.

According to the system in the embodiment of the first aspect of the invention, the air flow valve is installed at the inlet of the compressor, and the fuel flow valve is installed at the inlet of the combustion chamber. The air flow valve is used for controlling the air quantity entering the air compressor, the fuel flow valve is used for controlling the gas quantity entering the combustion chamber, and the air flow valve and the fuel flow valve are matched for controlling the power generation output quantity of the gas turbine set, so that the power generation output quantity can be flexibly adjusted in the power consumption valley period or the power consumption peak period.

According to the system in the embodiment of the first aspect of the invention, the water inlet end of the water inlet stop valve is provided with the filter screen. The filter screen prevents marine organisms or marine wastes from entering the reversible water pump turbine unit and the vertical pipe group through the water inlet stop valve.

According to the embodiment of the second aspect of the invention, a method for improving the energy efficiency of a peak shaving power supply by charging and discharging seawater in a vertical pipe is provided, in a power consumption valley period, surplus output power in a gas-steam combined cycle unit drives a motor unit to rotate, and a reversible water pump turbine unit discharges water in a vertical pipe group and stores the water in the vertical pipe group; during the peak period of power consumption, seawater enters the vertical pipe group along the pipeline and the reversible water pump turbine unit, and the reversible water pump turbine unit drives the generator set to generate power and output the power.

The method at least has the following beneficial effects: in the power consumption valley period, the surplus output power in the gas-steam combined cycle unit drives the motor unit to rotate, the reversible water pump turbine unit discharges water in the vertical pipe group, and the energy is stored in the vertical pipe group, so that the energy waste is reduced, the operating efficiency and the energy utilization rate of a gas turbine in the gas-steam combined cycle unit are improved, and the problem of surplus power is solved to a great extent; during the peak period of power utilization, seawater enters the vertical pipe group along the pipeline and the reversible water pump turbine unit, the reversible water pump turbine unit drives the generator set to generate power and outputs the power, the adaptability to external load change is strong, the peak regulation speed is high, and the start and stop are simple and rapid.

According to the method of the embodiment of the second aspect of the invention, the control center detects data of the opening degree of the air flow valve, the opening degree of the fuel flow valve, the opening degree of the water quantity regulating valve, the distribution ratio of the gas turbine power supply power and the distribution ratio of the steam cycle power supply power in the power consumption valley period and/or the power consumption peak period, and controls the opening degree of the air flow valve, the opening degree of the fuel flow valve, the opening degree of the water quantity regulating valve, the distribution ratio of the gas turbine power supply power and the distribution ratio of the steam cycle power supply power according to the detected data. The regulation and control center detects a plurality of data in real time, and comprehensively processes and analyzes the data according to the detected real-time power consumption and heat demand change and trend of the user side, and comprehensively regulates and controls the air flow valve, the fuel flow valve, the water quantity regulating valve opening degree, the gas permeation and the steam circulation in proportion of supplying power to the user side and the motor unit under the condition that the indexes of the system unit can be regulated and matched, so that the peak regulation of the combined cycle unit is realized more comprehensively, stably and efficiently, and the energy waste is effectively avoided or reduced.

Drawings

In order to more clearly illustrate the technical solution in the embodiments of the present invention, the drawings used in the description of the embodiments will be briefly described below. It is clear that the described figures are only some embodiments of the invention, not all embodiments, and that a person skilled in the art can also derive other designs and figures from them without inventive effort.

FIG. 1 is a schematic structural diagram of an embodiment of the present invention;

FIG. 2(a) is a schematic block diagram of a regulation method when the power demand of the user side is gradually reduced;

FIG. 2(b) is a schematic block diagram of a regulation method when the power demand of the user side is gradually increased;

fig. 2(c) is a schematic block diagram of the regulation method when sudden cooling weather occurs, the electricity consumption and the heat demand of the user side suddenly increase, and the heat demand increases more strongly.

Detailed Description

Reference will now be made in detail to the present preferred embodiments of the present invention, examples of which are illustrated in the accompanying drawings, wherein like reference numerals refer to like elements throughout.

In the description of the present invention, it should be understood that the orientation or positional relationship referred to in the description of the orientation, such as the upper, lower, front, rear, left, right, etc., is based on the orientation or positional relationship shown in the drawings, and is only for convenience of description and simplification of description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention.

In the description of the present invention, the meaning of a plurality of means is one or more, the meaning of a plurality of means is two or more, and larger, smaller, larger, etc. are understood as excluding the number, and larger, smaller, inner, etc. are understood as including the number. If the first and second are described for the purpose of distinguishing technical features, they are not to be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated or implicitly indicating the precedence of the technical features indicated.