Vegetation restoration process and structure of high and steep slope

文档序号:1550059 发布日期:2020-01-21 浏览:22次 中文

阅读说明:本技术 一种高陡边坡的植被恢复工艺及结构 (Vegetation restoration process and structure of high and steep slope ) 是由 朱浩文 谢君利 杨海洪 熊峰 于 2019-11-21 设计创作,主要内容包括:本发明提供一种高陡边坡的植被恢复工艺及结构,属于植被恢复治理领域,工艺包括以下步骤:在边坡本体表面设置的加筋网片上铺设植物秸秆层,并在加筋网片的网孔内间隔插设固定插片以增加客土的附着力。结构包括:加筋网片,设置在边坡本体表面并固定;植物秸秆层,通过将植物秸秆缠设在加筋网片上、并铺满加筋网片形成;固定插片,间隔插设在所述加筋网片的网孔内。本发明在加筋网片上缠绕植物秸秆形成植物秸秆层,能够增加附着力,使客土厚度得以保障;在加筋网片的网孔内插设固定插片,进一步增加附着力,避免客土因自身重力而脱落,解决了现有技术土壤与石壁粘连不稳的缺陷,能够用于60°-85°高陡边坡。(The invention provides a vegetation recovery process and a structure of a high and steep slope, belonging to the field of vegetation recovery treatment, and the process comprises the following steps: plant straw layers are laid on the ribbed mesh sheets arranged on the surface of the side slope body, and fixing insertion sheets are inserted into meshes of the ribbed mesh sheets at intervals to increase the adhesive force of the soil. The structure includes: the reinforced net sheets are arranged on the surface of the slope body and are fixed; the plant straw layer is formed by winding plant straws on the reinforced net sheets and fully spreading the reinforced net sheets; and the fixed inserting pieces are inserted into the meshes of the reinforced net sheet at intervals. According to the invention, the plant straws are wound on the ribbed mesh sheet to form the plant straw layer, so that the adhesive force can be increased, and the thickness of the soil dressing can be ensured; the fixing insertion pieces are inserted into the meshes of the reinforced net piece, so that the adhesive force is further increased, the foreign soil is prevented from falling off due to the self gravity, the defect that the adhesion of the soil and the stone wall is unstable in the prior art is overcome, and the method can be used for 60-85-degree high and steep slopes.)

1. A vegetation restoration process for a high and steep slope is characterized in that a plant straw layer is laid on a ribbed mesh arranged on the surface of a slope body, and fixing inserting pieces are inserted into meshes of the ribbed mesh at intervals to increase the adhesive force of soil dressing.

2. The process for recovering vegetation on the high and steep slope according to claim 1, wherein the slurry is sprayed on the plant straw layer to wet the rock wall, and then the growth substrate and the plant seeds are sequentially sprayed, and finally the non-woven fabric is covered to preserve the soil moisture.

3. A vegetation restoration structure for a high and steep slope comprises,

the reinforced net sheets are arranged on the surface of the slope body and are fixed; it is characterized by also comprising:

the plant straw layer is formed by winding plant straws on the reinforced net sheets and fully spreading the reinforced net sheets;

and the fixed inserting pieces are inserted into the meshes of the reinforced net sheet at intervals.

4. A vegetation restoration structure for a high and steep slope according to claim 3, wherein the arrangement interval of said plant straws is 10-40cm, the arrangement interval of said fixing insertion pieces is 4-10cm, and the length of said fixing insertion pieces is 40-80 cm.

5. A vegetation restoration structure for a high and steep slope according to claim 3, wherein said plant stalks are selected from one or more of wheat stalks, rice stalks, corn stalks, rape stalks, sugar cane stalks, cotton stalks; the fixing insertion sheet is selected from one or more of bamboo sheets, wood sheets and metal sheets.

6. A vegetation restoration structure for a high and steep slope according to claim 3, further comprising:

the bottom mud layer is formed by spraying mud on the side slope body and is used for wetting the rock wall;

a growth substrate layer sprayed on the bottom mud layer;

and the plant seed layer is sprayed on the growth substrate layer.

7. The vegetation restoration structure for the high and steep slope according to claim 6, wherein a non-woven fabric layer is further laid on the plant seed layer for preserving soil moisture.

8. A vegetation restoration structure for high and steep slopes as claimed in claim 6, wherein the water content of the slurry of the bed of sediment is 70-85%.

9. The vegetation restoration structure for the high and steep slope according to claim 6, wherein the growth substrate layer comprises peat soil, humus soil, slow release nutrient fertilizer, water retention agent, adhesive and water;

the plant seed layer generally comprises plant seeds, fibers, an adhesive, a water-retaining agent, a slow-release fertilizer and a microbial fertilizer.

10. A vegetation restoration structure for a high and steep slope according to claim 9, wherein the thickness of said growth substrate layer is 7-12 cm.

Technical Field

The invention belongs to the field of vegetation restoration and treatment, and particularly relates to a vegetation restoration process for a high and steep slope.

Background

At present, in order to meet the environmental protection requirement of sustainable development, vegetation damaged in the construction process of a wind power plant is required to be recovered frequently, and natural recovery and foreign soil spray seeding are adopted for recovering the vegetation in the high-mountain wind power plant.

Natural restoration is suitable for soil slopes, but vegetation restoration speed is low, and the vegetation restoration can be realized in three or four years, and the natural restoration is not suitable for rock slopes; the method mainly adopts a mesh anchoring mode, can be used for soil slopes and rock slopes, and can quickly recover the vegetation, but is not suitable for high slopes and rock slopes with the slope larger than 60 degrees, and the soil adheres unstably to a stone wall due to the steep slope, so that the soil dressing falls off.

Disclosure of Invention

Based on the background problem, the invention aims to provide a preparation and recovery process of a high and steep side slope, plant straws and a fixed inserting piece structure are added in a net piece, and the adhesive force is enhanced, so that the defect of unstable adhesion of soil and a stone wall in the prior art is overcome, and the preparation and recovery process can be used for the high and steep side slope; it is another object of the present invention to provide a structure formed by the above vegetation restoration process for a high and steep slope.

A vegetation recovery process for a high and steep slope is characterized in that a plant straw layer is laid on a ribbed mesh arranged on the surface of a slope body, and fixing inserting pieces are inserted into meshes of the ribbed mesh at intervals to increase the adhesive force of foreign soil.

Wherein, spray slurry on the plant straw layer in order to make the rock wall moist, spray growth substrate and plant seed in proper order, cover the non-woven fabrics at last and preserve soil moisture.

In order to achieve the above object, the present invention also provides a vegetation restoration structure for a steep side slope, comprising: the reinforced net sheets are arranged on the surface of the slope body and are fixed; the plant straw layer is formed by winding plant straws on the ribbed net sheet and fully spreading the ribbed net sheet; and the fixed inserting pieces are inserted into the meshes of the reinforced net sheet at intervals.

Preferably, the arrangement interval of the plant straws is 10-40cm, the arrangement interval of the fixing insertion pieces is 4-10cm, and the length of the fixing insertion pieces is 40-80 cm.

Wherein the plant straw is selected from one or more of wheat straw, rice straw, corn straw, rape straw, sugarcane straw and cotton straw; the fixing insertion sheet is selected from one or more of bamboo sheets, wood sheets and metal sheets.

Wherein, the vegetation recovery structure of high steep slope still includes: the bottom mud layer is formed by spraying mud on the side slope body and is used for wetting the rock wall; a growth substrate layer sprayed on the bottom mud layer; and the plant seed layer is sprayed on the growth substrate layer.

In one embodiment, a non-woven fabric layer is further laid on the plant seed layer to preserve moisture.

Wherein the water content of the mud of the bottom mud layer is 70-85%.

In one embodiment, the growth substrate layer comprises peat soil, humus soil, slow-release nutrient fertilizer, water-retaining agent, adhesive and water; the plant seed layer comprises plant seeds, fibers, an adhesive, a water-retaining agent, a slow-release fertilizer and a microbial bacterial fertilizer

Preferably, the thickness of the growth substrate layer is 7-12 cm.

Compared with the prior art, the invention has the following effects:

1. according to the invention, the plant straws are wound on the ribbed mesh sheet to form the plant straw layer, so that the adhesive force can be increased, and the thickness of the soil dressing can be ensured; the fixing insertion pieces are inserted into the meshes of the reinforced net piece, so that the adhesive force is further increased, the foreign soil is prevented from falling off due to the self gravity, the defect that the adhesion of the soil and the stone wall is unstable in the prior art is overcome, and the method can be used for 60-85-degree high and steep slopes.

2. The preparation method has short recovery time and wide application range.

Drawings

In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings used in the description of the embodiments will be briefly introduced below.

FIG. 1 is a flow chart of a preparation and recovery process of a high and steep slope in example 1 of the present invention;

fig. 2 is a schematic view of a vegetation restoration structure of a high-steep slope in embodiment 2 of the present invention;

fig. 3 is a partially enlarged view of a portion a in fig. 2.

Detailed Description

In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are some, but not all, embodiments of the present invention. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.

8页详细技术资料下载
上一篇:一种医用注射器针头装配设备
下一篇:一种用于中药材种植的营养土及其制备方法

网友询问留言

已有0条留言

还没有人留言评论。精彩留言会获得点赞!

精彩留言,会给你点赞!