Gear rack rock loading bucket traction mechanism with adjustable supporting point

文档序号:1691859 发布日期:2019-12-10 浏览:27次 中文

阅读说明:本技术 一种支点可调式齿轮齿条装岩铲斗牵引机构 (Gear rack rock loading bucket traction mechanism with adjustable supporting point ) 是由 郭前建 席志刚 袁伟 于洁 王志文 于 2019-09-09 设计创作,主要内容包括:本发明公开了一种支点可调式齿轮齿条装岩铲斗牵引机构,属于矿山巷道装载运输机械领域。该机构主要包括框架、铲斗系统、扬斗系统、可调式牵引系统、储料仓。该机构集装运、卸载功能为一体,所述扬斗系统在链条带动下使铲斗系统工作;所述可调式牵引系统通过齿条齿轮传动实现链轮支撑臂伸缩,其伸缩长度与铲斗动作耦合;该机构优化了各个系统的工作空间并集装运、卸载功能为一体,使其在占据空间小的前提下,动作互不干涉,因此可以在空间狭小的坑道内高效率工作,减少了对工人的技术依赖,使矸石采集工作更加安全可靠。(The invention discloses a fulcrum-adjustable gear rack rock-loading bucket traction mechanism, and belongs to the field of mine roadway loading and transporting machinery. The mechanism mainly comprises a frame, a bucket system, an adjustable traction system and a storage bin. The mechanism integrates loading, loading and unloading functions, and the bucket system works under the driving of the chain by the bucket system; the adjustable traction system realizes the extension and contraction of the chain wheel supporting arm through the transmission of a rack and a gear, and the extension and contraction length of the chain wheel supporting arm is coupled with the action of the bucket; the mechanism optimizes the working space of each system and integrates the functions of loading, transporting and unloading, so that the actions of the mechanism are not interfered with each other on the premise of occupying small space, high-efficiency work can be performed in a tunnel with narrow space, the technical dependence on workers is reduced, and the waste rock collection work is safer and more reliable.)

1. The invention discloses a fulcrum-adjustable gear rack rock-loading bucket traction mechanism, which is characterized in that: the mechanism comprises a bucket system, an adjustable traction system and a storage bin; the bucket system includes: a bucket [1], a bucket arm [8] and a rotating shaft [7 ]; the scoop system comprises: a fixed pin (9), a chain (2), an adjustable traction system, a bucket motor (5) and a chain drum (5); the adjustable traction system comprises: a chain wheel [3], a chain wheel supporting arm [15], a rack [13], a semi-gear [12] and a slideway [17 ]; the storage silo includes: a carriage [27], a door pin [23], a bin gate [24], a tipping bucket oil cylinder [26] and a tipping bucket pin [25 ].

2. The fulcrum-adjustable rack-and-pinion rock-loading bucket traction mechanism of claim 1, wherein: a bucket [1] of the bucket system is arranged on a bucket arm [8], the bucket arm [8] is arranged on a rotating shaft [7], and the rotating shaft [7] is arranged on a mechanism front end frame [11 ]; a fixed pin [9] of the bucket lifting system is fixed above the bucket [1] and is connected with the chain [2], the other end of the chain [2] is connected with a chain drum [5] after bypassing a chain wheel [3], the chain wheel [3] is arranged at the top of a chain wheel supporting arm [15], and the chain drum [5] is connected with a bucket lifting motor [5] through belt transmission and is fixed at the bottom of the frame through bolt connection; a chain wheel [3] of the adjustable traction system is arranged at the top end of a chain wheel supporting arm [15], the lower half section of the chain wheel supporting arm is a rack [13] and forms rack and gear transmission with a half gear [12] arranged on a bucket rotating shaft, so that the chain wheel supporting arm moves up and down in a slideway groove [22], and a slideway [21] is welded at the upper part of the frame; the carriage [27] of the storage bin is arranged at the rear part of the frame through a tipping bucket pin shaft [25], the bin door [24] is arranged at the rear part of the carriage through a vehicle door pin shaft [23], and the tipping bucket oil cylinder [26] is arranged at the bottom of the frame, so that the automatic unloading function is realized.

3. The fulcrum-adjustable rack-and-pinion rock-loading bucket traction mechanism of claim 1, wherein: the working process of the mechanism is as follows: the mechanism advances the bucket [1] to fill with the gangue, the bucket motor drives the drum chain to work, the chain [2] pulls the fixed pin [9], thereby driving the bucket [1] and the single-slewing arm [8] to start to overturn, and simultaneously the bucket slewing shaft [7] starts to rotate; the half gear (12) on the rotating shaft (7) rotates clockwise along with the action of the bucket; the rack (13) is driven by the half gear (12) to move backwards in the slideway groove (22); the chain wheel supporting arm (15) slowly returns into the groove of the slideway, when the bucket (1) reaches the maximum turnover angle, the gangue rolls down to the storage bin (4), the exposed length of the chain wheel supporting arm (15) is shortest, and the collision and mutual influence of the chain wheel supporting arm and the bucket arm are avoided; after the gangue is unloaded, the bucket [1] begins to fall by self weight, the rotary shaft [7] drives the half gear [12] to rotate anticlockwise, and the chain wheel supporting arm [15] begins to move towards the outside of the slideway groove and gradually returns to the original position; when unloading, the dump bucket oil cylinder [26] lifts the carriage [27], the carriage [27] overturns around the dump bucket pin shaft [25], at the moment, the bin door [24] rotates around the vehicle door pin shaft, the bin door is opened, gangue slides to a specified position, and the carriage [27] restores to the original position after unloading.

Technical Field

The invention belongs to the field of mine tunnel loading and transporting machinery, and particularly relates to a fulcrum-adjustable gear rack rock-loading bucket traction mechanism which is particularly suitable for tunnels with narrow space.

Background

At present, mine roadway loading and transporting mechanical equipment mainly comprises a scraper, a rock loader, a scraper bucket rock loader, an electric scraper winch and the like. The existing shipping mechanical equipment is large in size, lack of flexibility in use, poor in use stability and very inconvenient for narrow roadways. And in the middle of present most tunnel exploitation, the waste rock is loaded and is accomplished by two kinds of machinery respectively with the transportation uninstallation, and handing-over task is accomplished through manual control to two kinds of machinery in narrow and small tunnel, and miner's intensity of labour is big, and work efficiency is low to miner's personal safety can not be guaranteed, seriously influences mine exploitation progress and work efficiency. Therefore, the development of a maneuvering and flexible direction-adjustment-free efficient rock loading machine is urgently needed.

The invention realizes the direction-adjusting-free function of the rock loader by the integrated design of the loading and unloading system; meanwhile, the working spaces of the two systems are optimized, the coupling of the extension and contraction of the chain wheel supporting arm and the bucket action is realized, and the work is not influenced on the premise of occupying the minimum space, so that the underground mining task can be completed without being influenced by the narrow factors of the mining tunnel; meanwhile, work required by work is reduced, energy is saved, work efficiency is improved, and dependence on workers is reduced.

disclosure of Invention

The invention provides a fulcrum-adjustable gear rack rock-loading bucket traction mechanism according to the defects of larger space and insufficient flexibility of the conventional traction mechanism. The technical problem to be solved by the invention is as follows: aiming at the problems of narrow space in a roadway, limited moving range of a rock loader and the like, a rock loader bucket traction mechanism integrating loading, transportation and self-unloading is provided to solve the problem of difficult direction adjustment of the rock loader in the roadway at present, the problem of mutual influence between a single-swing-arm lower bucket system and a bucket system is solved by realizing the movable support arm of a fulcrum chain wheel, and the operation is sensitive and the swing radius is small, so that the rock loader bucket traction mechanism can quickly run or keep the optimal parking position in the narrow roadway, and the working efficiency is obviously improved.

The invention provides a fulcrum-adjustable gear rack rock-loading bucket traction mechanism, which is characterized in that: the mechanism comprises a bucket system, an adjustable traction system and a storage bin; the bucket system includes: the shovel, the shovel arm, the rotating shaft and the rotary bearing; the scoop system comprises: the device comprises a fixed pin, a chain, an adjustable traction system, a bucket raising motor and a chain winding drum; the adjustable traction system comprises: the chain wheel, the chain wheel supporting arm, the rack, the semi-gear and the slideway groove are arranged on the chain wheel; the storage silo includes: carriage, door round pin axle, feed bin door, tipping bucket hydro-cylinder, tipping bucket round pin axle. The bucket system of the mechanism is arranged at the foremost end of the frame and is responsible for loading gangue into the bucket; a bucket system of the mechanism is arranged at the top of the frame, and a bucket motor drives a chain winding drum, so that a bucket is driven by a chain to turn over, and gangue is loaded into a storage bin; an adjustable traction system of the mechanism is arranged in the frame, and a chain wheel pivot can move, so that the chain wheel supporting arm moves in the slide groove and is coupled with the action of the bucket; the storage bin is arranged at the bottom of the frame, and the function of automatically unloading the gangue in the carriage is realized through the skip bucket oil cylinder.

The working principle of the mechanism is as follows: the mechanism advances the bucket [1] to fill with the gangue, the bucket motor [5] drives the chain drum [5] to work, the chain [2] pulls the fixing pin [9], thereby driving the bucket [1] and the single slewing arm [8] to start to overturn, and simultaneously the bucket revolving shaft [7] starts to rotate; the half gear (12) on the rotating shaft (7) rotates clockwise along with the action of the bucket; the rack (13) is driven by the half gear (12) to move backwards in the slideway groove (22); the chain wheel supporting arm (15) slowly returns into the groove of the slideway, when the bucket (1) reaches the maximum turnover angle, the gangue rolls down to the storage bin (4), the exposed length of the chain wheel supporting arm (15) is shortest, and the collision and mutual influence of the chain wheel supporting arm and the bucket arm are avoided; after the gangue is unloaded, the bucket [1] begins to fall by self weight, the rotary shaft [7] drives the half gear [12] to rotate anticlockwise, and the chain wheel supporting arm [15] begins to move towards the outside of the slideway groove and gradually returns to the original position. When unloading, the dump bucket oil cylinder [26] lifts the carriage [27], the carriage [27] overturns around the dump bucket pin shaft [25], at the moment, the bin door [24] rotates around the vehicle door pin shaft, the bin door is opened, gangue slides to a specified position, and the carriage [27] restores to the original position after unloading.

The innovation points of the invention are as follows: (1) the supporting point adjustable gear rack rock loading bucket traction mechanism is provided, the mechanism integrates the loading, loading and unloading functions into a whole, and the direction adjustment-free function of a rock loading machine is realized; (2) the supporting arm fulcrum of the chain wheel can move, so that the working space of the system is optimized, and the work of each system is not interfered with each other on the premise of occupying the minimum space; (3) the traction device is rotationally coupled with the single bucket arm, so that the stress state in the gangue lifting process is changed, the work of the rock loader for overturning the gangue is saved to a certain extent, the load of a bucket and a chain is reduced, the resource is saved, and the service life of the rock loader is prolonged; (4) the design of the single bucket arm further reduces the self weight of the rock loader, so that the rock loader works more harmoniously, and the whole structure of the rock loader is compact and small in size, so that the rock loader is not influenced by narrow factors of mining tunnels.

Drawings

FIG. 1 is a general schematic diagram of the structure of the present invention.

Fig. 2 is a front view of the bucket.

Fig. 3 is a schematic diagram of the operation of the bucket (taken in cross-section for ease of viewing).

Fig. 4 is a schematic view of a rack and pinion gear.

Figure 5 is a schematic view of a storage silo.

In the figure: 1. a bucket; 2. a chain; 3. a sprocket; 4. a storage bin; 5. a bucket motor and a chain drum; 6. a tipping oil cylinder; 7. a rotating shaft; 8. a single swivel arm; 9. a fixing pin; 10. a bucket; 11. a frame; 12. a half gear; 13. a rack; 14. a sprocket; 15. A sprocket support arm; 16. a sprocket; 17. a slideway slot; 18. a half gear; 19. a sprocket support arm; 20. a rack; 21. a slideway; 22. a slideway slot; 23. a door pin; 24. a bin gate; 25. a tipping bucket pin shaft; 26. a tipping oil cylinder; 27. a carriage.

Detailed Description

Embodiments of the present invention are further described below with reference to the accompanying drawings.

FIG. 1 is a general schematic of the structure of the present invention; comprises a bucket (1), a chain (2), a chain wheel (3), a storage bin (4), a bucket motor, a chain drum (5) and a bucket-tipping oil cylinder (6).

FIG. 2 is a front view of the bucket; comprises a rotating shaft [7], a single-turn rotating arm [8], a fixed pin [9], a bucket [10], a frame [11], a semi-gear [12], a rack [13] and a chain wheel [14 ].

FIG. 3 is a bucket operational schematic; comprises a chain wheel supporting arm (15), a chain wheel (16), a slideway (17) and a half gear (18).

FIG. 4 is a schematic view of a rack and pinion drive; comprises a chain wheel supporting arm (19), a rack (20), a slideway (21) and a slideway groove (22). The slide is fixed on the frame of the loader, and the rack drives the chain wheel supporting arm to move back and forth in the slide groove, so that the coupling of the action of the traction device and the bucket is realized.

FIG. 5 is a schematic view of a storage silo; comprises a vehicle door pin shaft [23], a bin door [24], a tipping bucket pin shaft [25], a tipping bucket oil cylinder [26] and a carriage [27 ].

The working process is as follows:

In the advancing process of the mechanism, the bucket [1] is filled with gangue, the bucket motor [5] drives the chain drum [5] to work, the chain [2] pulls the fixing pin [9], so that the bucket [1] and the single-slewing arm [8] are driven to start to turn over, and meanwhile, the bucket revolving shaft [7] starts to rotate; the half gear (12) on the rotating shaft (7) rotates clockwise along with the action of the bucket; the rack (13) is driven by the half gear (12) to move backwards in the slideway groove (22); the chain wheel supporting arm (15) slowly returns into the groove of the slideway, when the bucket (1) reaches the maximum turnover angle, the gangue rolls down to the storage bin (4), the exposed length of the chain wheel supporting arm (15) is shortest, and the collision and mutual influence of the chain wheel supporting arm and the bucket arm are avoided; after the gangue is unloaded, the bucket [1] begins to fall by self weight, the rotary shaft [7] drives the half gear [12] to rotate anticlockwise, and the chain wheel supporting arm [15] begins to move towards the outside of the slideway groove and gradually returns to the original position. When unloading, the dump bucket oil cylinder [26] lifts the carriage [27], the carriage [27] overturns around the dump bucket pin shaft [25], at the moment, the bin door [24] rotates around the vehicle door pin shaft, the bin door is opened, gangue slides to a specified position, and the carriage [27] restores to the original position after unloading.

8页详细技术资料下载
上一篇:一种医用注射器针头装配设备
下一篇:一种全液压推土机

网友询问留言

已有0条留言

还没有人留言评论。精彩留言会获得点赞!

精彩留言,会给你点赞!