Three value optical computer method for scheduling task and system based on NEH algorithm

文档序号:1741538 发布日期:2019-11-26 浏览:18次 中文

阅读说明:本技术 基于neh算法的三值光学计算机任务调度方法及系统 (Three value optical computer method for scheduling task and system based on NEH algorithm ) 是由 王先超 庞昆 张�杰 王先传 刘争艳 于 2019-08-20 设计创作,主要内容包括:本发明公开了一种基于NEH算法的三值光学计算机任务调度方法及系统。所述方法首先获取三值光学计算机等待处理的多个任务的任务时间矩阵;根据所述任务时间矩阵确定任务Δ(i)的总加工响应时间;根据所述任务Δ(i)的总加工响应时间确定初始排列Δ′;根据所述初始排列Δ′确定最优任务调度序列;最后根据所述最优任务调度序列对所述三值光学计算机等待处理的多个任务进行有序处理。本发明方法以平均响应时间为性能指标,采用流水线技术,基于NEH算法进行任务调度优化,从而使三值光学计算机的任务处理效率得到提高,整体性能得以进一步优化。(The invention discloses a kind of three value optical computer method for scheduling task and system based on NEH algorithm.The method obtains the task time matrix of the multiple tasks to be processed such as three value optical computers first;Total processing response time of task Δ (i) is determined according to the task time matrix;According to total processing response time of the task Δ (i) determine initial arrangement Δ ';According to the initial arrangement Δ ' determine optimal task schedule sequence;Finally the multiple tasks to be processed such as the three values optical computer are orderly handled according to the optimal task schedule sequence.The method of the present invention is using average response time as performance indicator, using pipelining, carries out task schedule optimization based on NEH algorithm, so that the task treatment effeciency of three value optical computers be made to be improved, overall performance is advanced optimized.)

1. a kind of three value optical computer method for scheduling task based on NEH algorithm, which is characterized in that the described method includes:

Obtain the task time matrix of the multiple tasks to be processed such as the three values optical computer;In the task time matrix Including the corresponding machine M of task Δ (i)jProcess process time pJ, Δ (i)

Total processing response time of the task Δ (i) is determined according to the task time matrix;

According to total processing response time of the task Δ (i) determine initial arrangement Δ ';

According to the initial arrangement Δ ' determine optimal task schedule sequence;

The multiple tasks to be processed such as the three values optical computer are orderly located according to the optimal task schedule sequence Reason.

2. three values optical computer method for scheduling task according to claim 1, which is characterized in that described to appoint according to Business time matrix determines total processing response time of the task Δ (i), specifically includes:

According to the corresponding machine M of the task Δ (i)jProcess process time pJ, Δ (i), using formulaDescribed in determination Total processing response time T of task Δ (i)i;Wherein N is general assignment quantity.

3. three values optical computer method for scheduling task according to claim 2, which is characterized in that described to appoint according to Business Δ (i) total processing response time determine initial arrangement Δ ', specifically include:

According to the corresponding total processing response time T of the task Δ (i)iSequence from big to small carries out descending row to N number of task Column, generate the initial arrangement Δ '.

4. three values optical computer method for scheduling task according to claim 3, which is characterized in that described according to described first Beginning arrangement Δ ' determine optimal task schedule sequence, specifically includes:

Step (1): by the initial arrangement Δ ' preceding k-1 task composition part arrange Δp, by the initial arrangement Δ ' K-th of task is inserted into the component arrangement ΔpK possible neutral gears, generate k temporary arrangement;Take the k interim rows The smallest temporary arrangement of average response time is the component arrangement Δ that the k task is constituted in columnp

Step (2): enabling k=k+1, the process of repeating said steps (2), until all N number of tasks are all completed to sort, and makes ∑ F(Δp)=minΔ∈Ω∑ F (Δ), the component arrangement Δ obtained at this timepThe as described optimal task schedule sequence Δopt;Wherein ∑ F(Δp) it is component arrangement ΔpCorresponding total flowing water response time;∑ F (Δ) is feasible solution Δ corresponding total flowing water response time; Ω is the feasible zone of feasible solution Δ;minΔ∈Ω∑ F (Δ) is the minimum value of feasible solution Δ corresponding total flowing water response time.

5. three values optical computer method for scheduling task according to claim 4, which is characterized in that it is described according to most Excellent task schedule sequence orderly handles the multiple tasks to be processed such as the three values optical computer, specifically includes:

By the optimal task schedule sequence ΔoptIn i-th of task Δopt(i) data in are divided into n group;

The n group data are inputted in the continuous productive process model of the three values optical computer, sequentially the n group data are carried out Processing;It include T and W converter, T ' and w ' converter and T converter in the continuous productive process model.

6. a kind of three value optical computer task scheduling systems based on NEH algorithm, which is characterized in that the system comprises:

Task time matrix obtains module, when for obtaining the task of the multiple tasks to be processed such as the three values optical computer Between matrix;It include the corresponding machine M of task Δ (i) in the task time matrixjProcess process time pJ, Δ (i)

Total processing response time determining module, for determining total processing of the task Δ (i) according to the task time matrix Response time;

Initial arrangement determining module, for according to total processing response time of the task Δ (i) determine initial arrangement Δ ';

Optimal task schedule sequence determining module, for according to the initial arrangement Δ ' determine optimal task schedule sequence;

Task scheduling processing module, for be processed to the three values optical computer etc. according to the optimal task schedule sequence Multiple tasks orderly handled.

7. three values optical computer task scheduling system according to claim 6, which is characterized in that total processing response Time determining module specifically includes:

Total processing response time determination unit, for according to the corresponding machine M of the task Δ (i)jProcess process time pJ, Δ (i), using formulaDetermine total processing response time T of the task Δ (i)i;Wherein N is general assignment number Amount.

8. three values optical computer task scheduling system according to claim 7, which is characterized in that the initial arrangement is true Cover half block specifically includes:

Initial arrangement determination unit, for according to the corresponding total processing response time T of the task Δ (i)iSequence from big to small To N number of task carry out descending arrangement, generate the initial arrangement Δ '.

9. three values optical computer task scheduling system according to claim 8, which is characterized in that the OPTIMAL TASK tune Degree series determining module specifically includes:

Iterative processing unit, for by the initial arrangement Δ ' preceding k-1 task composition part arrange Δp, will be described initial Arrangement Δ ' k-th of task be inserted into the component arrangement ΔpK possible neutral gears, generate k temporary arrangement;It takes described The smallest temporary arrangement of average response time is the component arrangement Δ that the k task is constituted in k temporary arrangementp

Optimal task schedule sequence determination unit returns to the iterative processing unit, until all N number of for enabling k=k+1 Sequence is all completed in business, and makes ∑ F (Δp)=minΔ∈Ω∑ F (Δ), the component arrangement Δ obtained at this timepIt is optimal as described Business schedule sequences Δopt;Wherein ∑ F (Δp) it is component arrangement ΔpCorresponding total flowing water response time;∑ F (Δ) is feasible solution Δ Corresponding total flowing water response time;Ω is the feasible zone of feasible solution Δ;minΔ∈Ω∑ F (Δ) is the corresponding total flowing water of feasible solution Δ The minimum value of response time.

10. three values optical computer task scheduling system according to claim 9, which is characterized in that the task schedule Processing module specifically includes:

Task data grouped element is used for the optimal task schedule sequence ΔoptIn i-th of task Δopt(i) number in According to being divided into n group;

Continuous productive process model treatment unit, for the n group data to be inputted to the continuous productive process mould of the three values optical computer In type, sequentially the n group data are handled;It include T and W converter, T ' and w ' converter in the continuous productive process model And T converter.

Technical field

The present invention relates to the task scheduling technique fields of three value optical computers, are based on NEH algorithm more particularly to one kind Three value optical computer method for scheduling task and system.

Background technique

Since 20th century, electronic technology experienced the development from electron tube, transistor to super large-scale integration, electronics The computer also microcomputer from early stage bulky development of computer primary till now.With arriving for big data era Come, the problems such as energy consumption and bandwidth that electronic computer is generated due to manufacture craft restricts its and further develops, and optical computer It uses up and electronics is replaced to calculate to realize, can break through the bottleneck of electronic computer.The research of optical computer achieved in recent years A series of gratifying progress, development, completely restructural integreted phontonics signal processing system such as optical stabilization multivibrator Invention and research etc..Two when three value optical computers (ternary optical computer, TOC) You Youguang state Mutually perpendicular polarised light and unglazed state indicate three value informations, because its processor has step-by-step reconfigurability, step-by-step allocability And the advantages that concurrency, cause many researchers to pay close attention to.

However, there are still some problems at present for the task schedule of three value optical computers, up for optimization.It calculates with additive For, in three value optical computer service models, using First Come First Served (first come first served, FCFS) Strategy carry out task schedule, cause Mean Time of Systemic Response that cannot optimize, to cause to task data treatment effeciency Low problem.

Summary of the invention

The object of the present invention is to provide a kind of three value optical computer method for scheduling task and system based on NEH algorithm, Cause average response time that cannot optimize to solve the task scheduling strategy of existing three values optical computer, task data processing The problem of low efficiency.

To achieve the above object, the present invention provides following schemes:

A kind of three value optical computer method for scheduling task based on NEH algorithm, which comprises

Obtain the task time matrix of the multiple tasks to be processed such as the three values optical computer;The task time square It include the corresponding machine M of task Δ (i) in battle arrayjProcess process time pJ, Δ (i)

Total processing response time of the task Δ (i) is determined according to the task time matrix;

According to total processing response time of the task Δ (i) determine initial arrangement Δ ';

According to the initial arrangement Δ ' determine optimal task schedule sequence;

Had according to the optimal task schedule sequence to multiple tasks to be processed such as the three values optical computers Sequence processing.

Optionally, total processing response time that the task Δ (i) is determined according to the task time matrix, specifically Include:

According to the corresponding machine M of the task Δ (i)jProcess process time pJ, Δ (i), using formulaIt determines Total processing response time T of the task Δ (i)i;Wherein N is general assignment quantity.

Optionally, total processing response time according to the task Δ (i) determine initial arrangement Δ ', specifically include:

According to the corresponding total processing response time T of the task Δ (i)iN number of task drops in sequence from big to small Sequence arrangement, generate the initial arrangement Δ '.

Optionally, described according to the initial arrangement Δ ' determine optimal task schedule sequence, it specifically includes:

Step (1): by the initial arrangement Δ ' preceding k-1 task composition part arrange Δp, by the initial arrangement Δ ' k-th of task be inserted into the component arrangement ΔpK possible neutral gears, generate k temporary arrangement;Take the k The smallest temporary arrangement of average response time is the component arrangement Δ that the k task is constituted in temporary arrangementp

Step (2): enabling k=k+1, the process of repeating said steps (2), until all N number of tasks are all completed to sort, and makes Obtain ∑ F (Δp)=minΔ∈Ω∑ F (Δ), the component arrangement Δ obtained at this timepThe as described optimal task schedule sequence Δopt;Its Middle ∑ F (Δp) it is component arrangement ΔpCorresponding total flowing water response time;∑ F (Δ) is the corresponding total flowing water response of feasible solution Δ Time;Ω is the feasible zone of feasible solution Δ;minΔ∈Ω∑ F (Δ) is the minimum of feasible solution Δ corresponding total flowing water response time Value.

Optionally, described according to multiple to be processed to the three values optical computer etc. of the optimal task schedule sequence Task is orderly handled, and is specifically included:

By the optimal task schedule sequence ΔoptIn i-th of task Δopt(i) data in are divided into n group;

The n group data are inputted in the continuous productive process model of the three values optical computer, sequentially to the n group data It is handled;It include T and W converter, T ' and W ' converter and T converter in the continuous productive process model.

A kind of three value optical computer task scheduling systems based on NEH algorithm, the system comprises:

Task time matrix obtains module, for obtaining appointing for the multiple tasks to be processed such as the three values optical computer Business time matrix;It include the corresponding machine M of task Δ (i) in the task time matrixjProcess process time pJ, Δ (i)

Total processing response time determining module, for determining the total of the task Δ (i) according to the task time matrix The processing response time;

Initial arrangement determining module, for determining initial arrangement according to total processing response time of the task Δ (i) Δ′;

Optimal task schedule sequence determining module, for according to the initial arrangement Δ ' determine optimal task schedule sequence;

Task scheduling processing module, for being waited according to the optimal task schedule sequence the three values optical computer The multiple tasks of processing are orderly handled.

Optionally, total processing response time determining module specifically includes:

Total processing response time determination unit, for according to the corresponding machine M of the task Δ (i)jProcess process time pJ, Δ (i), using formulaDetermine total processing response time T of the task Δ (i)i;Wherein N is general assignment number Amount.

Optionally, the initial arrangement determining module specifically includes:

Initial arrangement determination unit, for according to the corresponding total processing response time T of the task Δ (i)iFrom big to small Sequence to N number of task carry out descending arrangement, generate the initial arrangement Δ '.

Optionally, the optimal task schedule sequence determining module specifically includes:

Iterative processing unit, for by the initial arrangement Δ ' preceding k-1 task composition part arrange Δp, will be described Initial arrangement Δ ' k-th of task be inserted into the component arrangement ΔpK possible neutral gears, generate k temporary arrangement;It takes The smallest temporary arrangement of average response time is the component arrangement that the k task is constituted in the k temporary arrangement Δp

Optimal task schedule sequence determination unit returns to the iterative processing unit, until all N for enabling k=k+1 A task is all completed to sort, and makes ∑ F (Δp)=minΔ∈Ω∑ F (Δ), the component arrangement Δ obtained at this timepAs it is described most Excellent task schedule sequence Δopt;Wherein ∑ F (Δp) it is component arrangement ΔpCorresponding total flowing water response time;∑ F (Δ) is feasible Solve Δ corresponding total flowing water response time;Ω is the feasible zone of feasible solution Δ;minΔ∈Ω∑ F (Δ) is that feasible solution Δ is corresponding total The minimum value of flowing water response time.

Optionally, the task scheduling processing module specifically includes:

Task data grouped element is used for the optimal task schedule sequence ΔoptIn i-th of task Δopt(i) in Data be divided into n group;

Continuous productive process model treatment unit, the flowing water for the n group data to be inputted to the three values optical computer are made In industry model, sequentially the n group data are handled;It include T and W converter, T ' and W ' change in the continuous productive process model Parallel operation and T converter.

The specific embodiment provided according to the present invention, the invention discloses following technical effects:

The present invention provides a kind of three value optical computer method for scheduling task and system based on NEH algorithm, the method The task time matrix of the multiple tasks to be processed such as three value optical computers is obtained first;It is true according to the task time matrix Determine total processing response time of task Δ (i);According to total processing response time of the task Δ (i) determine initial arrangement Δ '; According to the initial arrangement Δ ' determine optimal task schedule sequence;Finally according to the optimal task schedule sequence to described three The multiple tasks to be processed such as value optical computer are orderly handled.The method of the present invention refers to by performance of average response time Mark carries out task schedule optimization based on NEH algorithm, so that the task of three value optical computers be made to handle using pipelining Efficiency is improved, and overall performance is advanced optimized.

Detailed description of the invention

It in order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, below will be to institute in embodiment Attached drawing to be used is needed to be briefly described, it should be apparent that, the accompanying drawings in the following description is only some implementations of the invention Example, for those of ordinary skill in the art, without any creative labor, can also be according to these attached drawings Obtain other attached drawings.

Fig. 1 is the flow chart of the three value optical computer method for scheduling task provided by the invention based on NEH algorithm;

Fig. 2 is the MSD after three values optical computer processor provided in an embodiment of the present invention carries out reasonable distribution and reconstructs Adder part schematic diagram;

Fig. 3 is the continuous productive process space-time of the continuous productive process model of the three values optical computer provided in an embodiment of the present invention Figure;

Fig. 4 is the structure chart of the three value optical computer task scheduling systems provided by the invention based on NEH algorithm.

Specific embodiment

Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.

The object of the present invention is to provide a kind of three value optical computer method for scheduling task and system based on NEH algorithm, Cause average response time that cannot optimize to solve the task scheduling strategy of existing three values optical computer, task data processing The problem of low efficiency.

In order to make the foregoing objectives, features and advantages of the present invention clearer and more comprehensible, with reference to the accompanying drawing and specific real Applying mode, the present invention is described in further detail.

Pipeline schedule (flow-shop scheduling, FSS) problem is a kind of engineering problem for being worth research, master Wanting task is exactly the processing sequence that each task is determined in limited resource constraint, process time, with being optimal Productive target, i.e. average response time reaches minimum.Machine can only once handle a subtask, and subtask is once must It must continue until completing.Assuming that the processing time needed for operation i on machine j is tij.Processing only on machine 1 is complete Cheng Hou could handle operation by machine 2.Flow scheduling problem is the processing sequence of determining operation, so that average response timeReach minimum, wherein n is job task quantity, the response time refer to task waiting time and the processing time it With.Simultaneous distillation-extractor is famous one of scheduling problem, wherein the same sequential flow water problems of two machines can be used Johnson algorithm acquires optimal solution, but still is NP (non-deterministic polynomial) complete problem.

The solution space of np complete problem is related to multiple shot array, so the method for effectively solving np complete problem is not deposited at present In.For problems, modern science mainly uses heuritic approach.Heuristic algorithm mainly includes tabu search algorithm, loses Propagation algorithm, simulated annealing, artificial neural network etc..NEH (the Nawaz-Enscore- proposed by three people such as Nawaz Ham) algorithm is considered optimal.The core concept of the NEH algorithm is mainly the task in the task time matrix that will be given, Descending arrangement is carried out by the average response time of task, then takes the first two task in sequence, finds wherein the smallest average sound Corresponding sequence results between seasonable.For k-th task k=3 ..., n, in k possible positions, insert it into so that Thus the smallest position of the average response time of partial sequence obtains the minimum average B configuration response time corresponding of entire task-set Business sequence.However, NEH algorithm is mainly used at present in Job-Shop and pipeline schedule, the present invention is quasi- with MSD For (modified signed digit) adder calculator, three value optical computer task schedules are carried out using NEH algorithm Optimization.

Fig. 1 is the flow chart of the three value optical computer method for scheduling task provided by the invention based on NEH algorithm.Referring to Fig. 1, the three value optical computer method for scheduling task provided by the invention based on NEH algorithm specifically include:

Step 101: obtaining the task time matrix of the multiple tasks to be processed such as the three values optical computer.

The input of NEH algorithm of the present invention is task time matrix, and algorithm output is optimal task schedule sequence.Algorithm In task refer to not entering three value optical computer processors in state of saving bit by bit etc. task to be processed.And this hair Bright NEH algorithm is to use the task time matrix of N number of task as input, i.e., according to the tool for actually calculating each task Body handles the time, so that task time matrix (prior art) is obtained, the input as entire algorithm.

It include the corresponding machine M of task Δ (i) in the task time matrix of algorithm inputjProcess process time pJ, Δ (i).The process time of process can according to etc. the intrinsic property parameters of task amount combination machine to be processed be calculated.Its Middle task Δ (i) is also a feasible solution of scheduling.MjIt refers to the machine in NEH algorithm, is in three value optical computers Three parts (T and W converter, T ' and W ' converter and T converter) that processor is divided into are used as three machines, to ask Solve the optimal task schedule sequence of three machines.

Step 102: total processing response time of the task Δ (i) is determined according to the task time matrix.

Machine M is corresponded to N number of taskjProcess process time pJ, Δ (i)Progress read group total obtains the total of task Δ (i) and adds Work response time Ti, total processing response time TiCalculation formula it is as follows:

Wherein N is general assignment quantity, and task Δ (i) may be considered i-th of task in N number of task, machine MjIt can be with The jth platform machine being considered in M platform machine.M=3 in the present invention.

Step 103: according to total processing response time of the task Δ (i) determine initial arrangement Δ '.

According to the corresponding total processing response time T of the task Δ (i)iN number of task drops in sequence from big to small Sequence arrangement, generate the initial arrangement Δ '.The i.e. described initial arrangement Δ ' in include N number of task, the initial arrangement Δ ' in 1st task is to the corresponding total processing response time T of n-th taskiIt is sequentially reduced.

Step 104: according to the initial arrangement Δ ' determine optimal task schedule sequence.

The process for determining the optimal task schedule sequence is an iterative process, is specifically included:

Step (1): enabling k=1, at this time by the initial arrangement Δ ' preceding k-1 task composition part arrange Δp, by institute State initial arrangement Δ ' k-th of task be inserted into the component arrangement ΔpK possible neutral gears in, generate k interim rows Column;Taking the smallest temporary arrangement of average response time in the k temporary arrangement is that the part that the k task is constituted is arranged Column Δp;(wherein a task is ranked up when k means for 1, k is that 2 representatives are ranked up second task, with this Analogize).

Step (2): enabling k=k+1, the process of repeating said steps (2), until all N number of tasks are all completed to sort, and makes Obtain ∑ F (Δp)=minΔ∈Ω∑ F (Δ), the component arrangement Δ obtained at this timepThe as described optimal task schedule sequence Δopt

Wherein ∑ F (Δp) it is component arrangement ΔpCorresponding total flowing water response time.Δ=(Δ (1), Δ (2) ..., Δ (n)) ∈ Ω is a feasible solution of scheduling, and n is the quantity for the solution for including in feasible solution Δ, and Ω is the feasible zone of feasible solution Δ. ∑ F (Δ) is feasible solution Δ corresponding total flowing water response time;minΔ∈Ω∑ F (Δ) is the corresponding total flowing water response of feasible solution Δ The minimum value of time.

Export the optimal task schedule sequence Δopt, NEH algorithm of the present invention terminates.

Step 105: according to multiple times to be processed to the three values optical computer etc. of the optimal task schedule sequence Business is orderly handled.

Adder is otherwise fully engaged when traditional electronic computer calculates, therefore can not use continuous productive process.And it is of the invention 3 steps of MSD (modified signed digit) addition point that embodiment provides: step 1, while carrying out T and W transformation;Step 2, T ' and W ' transformation are carried out simultaneously;Step 3 carries out T transformation.3 step transformation is completed on 4 kinds of logical-arithmetic units, so three value light Pipelining can be used in the MSD addition for learning computer.For this purpose, three value optical computer processors are carried out reasonable distribution first And it is reconstructed into five independent logic units shown in Fig. 2 --- T and W converter, T ' and W ' converter and T transformation Device.

When the optimal task schedule sequence ΔoptIn some task Δopt(i) when reaching, according to processor digit and Task Δopt(i) digit of data is by task Δ inopt(i) data in are divided into many groups, such as are divided into n group.Assuming that completing 1 Secondary reconstitution time tre=100ns, optical processor digit are 80 000, and processing speed v is the speed v=for carrying out logical conversion 50GB/s, the calculation amount of task are 100GB.By every group of data d after grouped task2For 0.8kB, task is divided into g2=1.31 × 108Group.

The n group data are inputted in the continuous productive process model of the three values optical computer, sequentially to the n group data It is handled.It include T and W converter, T ' and W ' converter and T converter in the continuous productive process model.

Fig. 3 is the continuous productive process space-time of the continuous productive process model of the three values optical computer provided in an embodiment of the present invention Figure.It include two tasks, task 1 and task 2 in Fig. 3.As shown in figure 3, the operation of MSD adder continuous productive process model of the present invention Process is as follows:

T the and W converter described first is to first group of data D1 0T and W is carried out to convert to obtain D1 1;The T ' and W ' converter To D1 1It carries out T ' and W ' transformation obtains D1 2While, T the and W converter is to second group of data D2 0Carry out T transformation and W transformation Obtain D2 1;The T converter is to D1 2T is carried out to convert to obtain operation result R1While, the T ' and W ' converter are to D2 1It carries out T ' and W ' transformation obtain D2 2, T the and W converter is to third group data D3 0It carries out T transformation and W converts to obtain D3 1... with This analogizes, until the task Δopt(i) all data calculating finishes, and reprocesses next task Δopt(i+1) ... simple It is as shown in Figure 3 to change process.

The present invention is by taking MSD add operation as an example, using average response time as performance indicator, using pipelining, is based on NEH algorithm carries out the task schedule optimization of three value optical computers, so that the task of three value optical computer processors be made to handle Efficiency is improved, and overall performance is advanced optimized.

Based on the three value optical computer method for scheduling task provided by the invention based on NEH algorithm, the present invention also provides A kind of three value optical computer task scheduling systems based on NEH algorithm, as shown in figure 4, the system comprises:

Task time matrix obtains module 401, for obtaining the multiple tasks to be processed such as the three values optical computer Task time matrix;It include the corresponding machine M of task Δ (i) in the task time matrixjProcess process time pJ, Δ (i)

Total processing response time determining module 402, for determining the task Δ (i) according to the task time matrix Total processing response time;

Initial arrangement determining module 403, for determining initial arrangement according to total processing response time of the task Δ (i) Δ′;

Optimal task schedule sequence determining module 404, for according to the initial arrangement Δ ' determine optimal task schedule sequence Column;

Task scheduling processing module 405 is used for according to the optimal task schedule sequence to the three values optical computer It is orderly handled etc. multiple tasks to be processed.

Wherein, total processing response time determining module 402 specifically includes:

Total processing response time determination unit, for according to the corresponding machine M of the task Δ (i)jProcess process time pJ, Δ (i), using formulaDetermine total processing response time T of the task Δ (i)i;Wherein N is general assignment number Amount.

The initial arrangement determining module 403 specifically includes:

Initial arrangement determination unit, for according to the corresponding total processing response time T of the task Δ (i)iFrom big to small Sequence to N number of task carry out descending arrangement, generate the initial arrangement Δ '.

The optimal task schedule sequence determining module 404 specifically includes:

Iterative processing unit, for by the initial arrangement Δ ' preceding k-1 task composition part arrange Δp, will be described Initial arrangement Δ ' k-th of task be inserted into the component arrangement ΔpK possible neutral gears, generate k temporary arrangement;It takes The smallest temporary arrangement of average response time is the component arrangement that the k task is constituted in the k temporary arrangement Δp

Optimal task schedule sequence determination unit returns to the iterative processing unit, until all N for enabling k=k+1 A task is all completed to sort, and makes ∑ F (Δp)=minΔ∈Ω∑ F (Δ), the component arrangement Δ obtained at this timepAs it is described most Excellent task schedule sequence Δopt;Wherein ∑ F (Δp) it is component arrangement ΔpCorresponding total flowing water response time;∑ F (Δ) is feasible Solve Δ corresponding total flowing water response time;Ω is the feasible zone of feasible solution Δ;minΔ∈Ω∑ F (Δ) is that feasible solution Δ is corresponding total The minimum value of flowing water response time.

The task scheduling processing module 405 specifically includes:

Task data grouped element is used for the optimal task schedule sequence ΔoptIn i-th of task Δopt(i) in Data be divided into n group;

Continuous productive process model treatment unit, the flowing water for the n group data to be inputted to the three values optical computer are made In industry model, sequentially the n group data are handled;It include T and W converter, T ' and W ' change in the continuous productive process model Parallel operation and T converter.

The present invention proposes three value light by huge position property using three value optical computers and the characteristics such as multi-task parallel Learn the continuous productive process model of computer.Since task-set all includes multiple tasks under actual job, propose to be based on NEH algorithm Three value optical computer method for scheduling task and system.The method and system optimize traditional TOC service model, will Its processing strategie for being improved to continuous productive process model, and task processing sequence is carried out with NEH algorithm into one on this basis The optimization of step obtains optimal task schedule sequence, to enter continuous productive process model using optimal task schedule sequence, reaches most The purpose of smallization average response time, so that entire model performance is greatly improved, and for model treatment knot Fruit has certain reliability.The average response time for effectively shortening task processing improves appointing for three value optical computers Business treatment effeciency.

Each embodiment in this specification is described in a progressive manner, the highlights of each of the examples are with other The difference of embodiment, the same or similar parts in each embodiment may refer to each other.For system disclosed in embodiment For, since it is corresponded to the methods disclosed in the examples, so being described relatively simple, related place is said referring to method part It is bright.

Used herein a specific example illustrates the principle and implementation of the invention, and above embodiments are said It is bright to be merely used to help understand method and its core concept of the invention;At the same time, for those skilled in the art, foundation Thought of the invention, there will be changes in the specific implementation manner and application range.In conclusion the content of the present specification is not It is interpreted as limitation of the present invention.