Greenization system and implementation method based on photovoltaic curtain wall

文档序号:1758344 发布日期:2019-11-29 浏览:32次 中文

阅读说明:本技术 基于光伏幕墙的绿色化系统以及实现方法 (Greenization system and implementation method based on photovoltaic curtain wall ) 是由 杨世航 刘壮 张撷秋 张成宇 于 2019-09-12 设计创作,主要内容包括:本申请公开了一种基于光伏幕墙的绿色化系统以及实现方法。该系统包括光伏幕墙,用于在建筑中对建筑自身的基站和建筑周边的基站提供其转化的光伏能源,以及将用于容纳所述基站的各组件纳入建筑整体能耗,以使建筑内外的信息能耗实现最小化处理。本申请解决了缺少可降低对电网造冲击的绿色化系统的技术问题。通过本申请使用光伏清洁能源提供5G基站的用电需求,降低环境污染、减少电网压力。使用绿色话系统将5G基站纳入建筑的整体能耗优化方案中,有利于使用更低的成本实现5G基站的降能耗。(This application discloses a kind of greenization system and implementation method based on photovoltaic curtain wall.The system includes photovoltaic curtain wall, the photovoltaic energy of its conversion is provided for the base station under construction to the base station and building periphery of building itself, and each component for being used to accommodate the base station is included in the whole energy consumption of building, so that the information energy consumption of Discussion on architecture realizes minimum processing.Present application addresses lack the technical issues of can reducing the greenization system that impact is made to power grid.The power demand of the base station 5G is provided using photovoltaic clean energy resource by the application, environmental pollution is reduced, reduces power grid pressure.The base station 5G is included in the whole energy optimization scheme of building using green telephone system, is conducive to the drop energy consumption for realizing the base station 5G using lower cost.)

1. a kind of greenization system based on photovoltaic curtain wall characterized by comprising photovoltaic curtain wall, under construction to building It builds the base station of itself and the base station on building periphery provides the photovoltaic energy of its conversion, and

Each component for being used to accommodate the base station is included in the whole energy consumption of building, so that the information energy consumption of Discussion on architecture realizes minimum Change processing.

2. the greenization system according to claim 1 based on photovoltaic curtain wall, which is characterized in that by antenna in the base station Part is integrated in building curtain wall, and signal processing is placed in interior of building.

3. the greenization system according to claim 1 based on photovoltaic curtain wall, which is characterized in that will be used to accommodate the base Each component stood is included in the whole energy consumption of building, so that the information energy consumption realization minimum processing of Discussion on architecture includes:

By carrying out building materials assessment using the photovoltaic curtain wall as building materials.

4. the greenization system according to claim 1 based on photovoltaic curtain wall, which is characterized in that will be used to accommodate the base Each component stood is included in the whole energy consumption of building, so that the information energy consumption realization minimum processing of Discussion on architecture includes:

The physical equipment of the 5G signal processing unit of the base station is placed on unified computer room, passes through the temperature control to computer room entirety It adjusts or energy conservation is adjusted.

5. the greenization system according to claim 1 based on photovoltaic curtain wall, which is characterized in that will be used to accommodate the base Each component stood is included in the whole energy consumption of building, so that the information energy consumption realization minimum processing of Discussion on architecture includes:

The signal processing unit for the base station 5G for building peripheral extent is established to unified C-RAN centralization wireless access network computer room.

6. the greenization system according to claim 1 based on photovoltaic curtain wall, which is characterized in that the base of the building itself Station refers to the base station 5G being mounted on building roof and building curtain wall;The base station on the building periphery, which refers to, is mounted on building periphery The base station 5G;

It is whole that building is included in the space for being used to accommodate base station component BBU baseband processing unit or AAU active antenna processing unit Temperature control is carried out, so that the information energy consumption of Discussion on architecture realizes minimum processing.

7. the greenization system according to claim 1 based on photovoltaic curtain wall, which is characterized in that the photovoltaic curtain wall packet It includes: film or the hollow glass structure of crystal silicon component production.

8. the greenization system according to claim 1 based on photovoltaic curtain wall, which is characterized in that the base station includes at least Photovoltaic energy in the photovoltaic curtain wall is generated each single base station 5G using DC-AC inverter by the base station 5G Direct current is converted to the ac signal that the base station 5G uses;

Electricity consumption is distributed according to each base station 5G power consumption requirements, and dump energy is supplied to other use in building immediately Dump energy is returned to power grid distribution use by electricity.

9. a kind of greenization network system realization based on photovoltaic curtain wall characterized by comprising

The photovoltaic energy of its conversion is provided to the base station of the base station and building periphery of building itself under construction;And

Each component for being used to accommodate the base station is included in the whole energy consumption of building, so that the information energy consumption of Discussion on architecture realizes minimum Change processing.

10. the greenization network system realization according to claim 9 based on photovoltaic curtain wall, which is characterized in that will be used for Each component for accommodating the base station is included in the whole energy consumption of building, so that the information energy consumption of Discussion on architecture, which is realized, minimizes processing packet It includes:

At least include: by carrying out building materials assessment using the photovoltaic curtain wall as building materials, when wherein building materials are assessed light transmittance or The assessment factor of thermally conductive U value;

The physical equipment of the 5G signal processing unit of the base station is placed on unified computer room, passes through the temperature control to computer room entirety It adjusts or energy conservation is adjusted;Scheme is built using air source heat pump, the green of earth source heat pump when wherein temperature control adjusting or energy conservation are adjusted;

The signal processing unit for the base station 5G for building peripheral extent is established to unified C-RAN centralization wireless access network computer room, Wherein signal processing unit refers to BBU or AAU.

Technical field

This application involves curtain wall, the communications field 5G, in particular to a kind of greenization system based on photovoltaic curtain wall with And implementation method.

Background technique

The expenditure of the communication electricity charge occupies the 15%-30% of operator spending, in the mobile communication network, the overwhelming majority Electric cost expenditure derive from base station.

Inventors have found that since the 5G communication technology has higher frequency, so that 5G signal needs the covering of more base stations. Secondly, the calorific value of 5G base station component is bigger, so that the demand to power communications is also bigger.Further, the base station 5G is spread on a large scale Greater impact can be caused to power grid after if.

Aiming at the problem that greenization system for making impact to power grid can be reduced in the related technology by lacking, not yet propose have at present The solution of effect.

Summary of the invention

The main purpose of the application is to provide a kind of greenization system and implementation method based on photovoltaic curtain wall, with solution Certainly lack the problem of can reducing the greenization system that impact is made to power grid.

To achieve the goals above, according to the one aspect of the application, a kind of greenization based on photovoltaic curtain wall is provided System.

It include: photovoltaic curtain wall according to the greenization system based on photovoltaic curtain wall of the application, under construction to building The base station of itself and the base station on building periphery provide the photovoltaic energy of its conversion, and each component that will be used to accommodate the base station It is included in the whole energy consumption of building, so that the information energy consumption of Discussion on architecture realizes minimum processing.

Further, antenna part is integrated in building curtain wall in the base station, signal processing is placed in building Inside object.

Further, each component for being used to accommodate the base station is included in the whole energy consumption of building, so that the letter of Discussion on architecture Breath energy consumption realizes that minimum processing includes:

By carrying out building materials assessment using the photovoltaic curtain wall as building materials.

Further, each component for being used to accommodate the base station is included in the whole energy consumption of building, so that the letter of Discussion on architecture Breath energy consumption realizes that minimum processing includes:

The physical equipment of the 5G signal processing unit of the base station is placed on unified computer room, by computer room entirety Temperature control is adjusted or energy conservation is adjusted.

Further, each component for being used to accommodate the base station is included in the whole energy consumption of building, so that the letter of Discussion on architecture Breath energy consumption realizes that minimum processing includes:

The signal processing unit for the base station 5G for building peripheral extent is established to unified C-RAN centralization wireless access network machine Room.

Further, the base station of the building itself refers to the base station 5G being mounted on building roof and building curtain wall;Institute The base station for stating building periphery refers to the base station 5G for being mounted on building periphery;

Building is included in the space for being used to accommodate base station component BBU baseband processing unit or AAU active antenna processing unit It is whole to carry out temperature control, so that the information energy consumption of Discussion on architecture realizes minimum processing.

Further, the photovoltaic curtain wall includes: the hollow glass structure of film or crystal silicon component production.

Further, the base station includes at least the base station 5G, uses DC-AC inverter for each single base station 5G The direct current that photovoltaic energy in the photovoltaic curtain wall generates is converted into the ac signal that the base station 5G uses;

Electricity consumption is distributed according to each base station 5G power consumption requirements, and dump energy is supplied to its in building immediately Dump energy is returned to power grid distribution and uses by his electricity consumption.

To achieve the goals above, according to the another aspect of the application, a kind of greenization based on photovoltaic curtain wall is provided Network system realization.

Include: according to the greenization network system realization based on photovoltaic curtain wall of the application

The photovoltaic energy of its conversion is provided to the base station of the base station and building periphery of building itself under construction;And

Each component for being used to accommodate the base station is included in the whole energy consumption of building, so that the information energy consumption of Discussion on architecture is realized Minimum processing.

Further, each component for being used to accommodate the base station 5G is included in the whole energy consumption of building, so that Discussion on architecture Information energy consumption realizes that minimum processing includes:

It at least include: light transmittance when wherein building materials are assessed by carrying out building materials assessment using the photovoltaic curtain wall as building materials Or the assessment factor of thermally conductive U value;

The physical equipment of the 5G signal processing unit of the base station is placed on unified computer room, by computer room entirety Temperature control is adjusted or energy conservation is adjusted;It is built when wherein temperature control adjusting or energy conservation are adjusted using air source heat pump, the green of earth source heat pump Scheme;

The signal processing unit for the base station 5G for building peripheral extent is established to unified C-RAN centralization wireless access network machine Room, wherein signal processing unit refers to BBU or AAU.

Greenization system and implementation method based on photovoltaic curtain wall in the embodiment of the present application are used using photovoltaic curtain wall The mode for the photovoltaic energy that it is converted is provided in the base station under construction to the base station and building periphery of building itself, by that will use It is included in the whole energy consumption of building in each component for accommodating the base station 5G, so that the information energy consumption of Discussion on architecture is realized at minimum Reason has achieved the purpose that reduce environmental pollution, has reduced power grid pressure, realized the base station 5G using lower cost to realize The technical effect of energy consumption is dropped, and then solves and lacks the technical issues of can reducing the greenization system for making impact to power grid.

Detailed description of the invention

The attached drawing constituted part of this application is used to provide further understanding of the present application, so that the application's is other Feature, objects and advantages become more apparent upon.The illustrative examples attached drawing and its explanation of the application is for explaining the application, not Constitute the improper restriction to the application.In the accompanying drawings:

Fig. 1 is the greenization system structure diagram based on photovoltaic curtain wall according to the embodiment of the present application;

Fig. 2 is the greenization network system realization flow diagram based on photovoltaic curtain wall according to the embodiment of the present application;

Fig. 3 is the greenization system realization principle schematic diagram based on photovoltaic curtain wall according to the embodiment of the present application.

Specific embodiment

In order to make those skilled in the art more fully understand application scheme, below in conjunction in the embodiment of the present application Attached drawing, the technical scheme in the embodiment of the application is clearly and completely described, it is clear that described embodiment is only The embodiment of the application a part, instead of all the embodiments.Based on the embodiment in the application, ordinary skill people Member's every other embodiment obtained without making creative work, all should belong to the model of the application protection It encloses.

It should be noted that the description and claims of this application and term " first " in above-mentioned attached drawing, " Two " etc. be to be used to distinguish similar objects, without being used to describe a particular order or precedence order.It should be understood that using in this way Data be interchangeable under appropriate circumstances, so as to embodiments herein described herein.In addition, term " includes " and " tool Have " and their any deformation, it is intended that cover it is non-exclusive include, for example, containing a series of steps or units Process, method, system, product or equipment those of are not necessarily limited to be clearly listed step or unit, but may include without clear Other step or units listing to Chu or intrinsic for these process, methods, product or equipment.

In this application, term " on ", "lower", "left", "right", "front", "rear", "top", "bottom", "inner", "outside", " in ", "vertical", "horizontal", " transverse direction ", the orientation or positional relationship of the instructions such as " longitudinal direction " be orientation based on the figure or Positional relationship.These terms are not intended to limit indicated dress primarily to better describe the application and embodiment Set, element or component must have particular orientation, or constructed and operated with particular orientation.

Also, above-mentioned part term is other than it can be used to indicate that orientation or positional relationship, it is also possible to for indicating it His meaning, such as term " on " also are likely used for indicating certain relations of dependence or connection relationship in some cases.For ability For the those of ordinary skill of domain, the concrete meaning of these terms in this application can be understood as the case may be.

In addition, term " installation ", " setting ", " being equipped with ", " connection ", " connected ", " socket " shall be understood in a broad sense.For example, It may be a fixed connection, be detachably connected or monolithic construction;It can be mechanical connection, or electrical connection;It can be direct phase It even, or indirectly connected through an intermediary, or is two connections internal between device, element or component. For those of ordinary skills, the concrete meaning of above-mentioned term in this application can be understood as the case may be.

It should be noted that in the absence of conflict, the features in the embodiments and the embodiments of the present application can phase Mutually combination.The application is described in detail below with reference to the accompanying drawings and in conjunction with the embodiments.

As shown in Figure 1, the greenization system based on photovoltaic curtain wall of the embodiment of the present application, comprising: photovoltaic curtain wall 100 is used In the photovoltaic energy under construction to its conversion of base station 200 and the offer of base station 300 on building periphery for building itself, and will use It is included in the whole energy consumption of building in each component for accommodating the base station 5G, so that the information energy consumption of Discussion on architecture is realized at minimum Reason.Photovoltaic curtain wall 100 in the embodiment of the present application substitutes the hollow glass component that part curtain wall uses with photovoltaic module, so that curtain Wall has the function of photovoltaic power generation.Energy caused by the generation of information flow-rate in information energy consumption substantial communication in the embodiment of the present application Source consumption.And in view of the exponential increase with data traffic in embodiments herein, the total energy consumption of information is constantly mentioning It rises, a part that information energy consumption is included in green building energy consumption measurement index is become more and more important.Based on above-mentioned, the application reality It applies in example and each component for being used to accommodate the base station 5G is included in the whole energy consumption of building, so that the information energy consumption of Discussion on architecture is realized Minimum processing is conducive to the drop energy consumption that the base station 5G is realized using lower cost.

Specifically, the clean energy resource generated by photovoltaic curtain wall provides the 5G base for being mounted on building itself and building periphery That stands applies the energy.And by unified planning, precisely the power demand of the accounting base station 5G realizes photovoltaic in the photovoltaic curtain wall Precisely matching is realized in the measuring and calculating of battery component amount.

Further, the extra clean energy generated by the photovoltaic curtain wall, the construction in the base station 5G do not need trunk electricity Net increases additional quota.In this way, which environment had both been protected to also reduce the increased difficult and cost of transformation power grid.The light The electric power that volt curtain wall generates can store in such a way that power grid is interacted with alternating current or using battery.

Specifically, communication base station is made of baseband processing unit BBU and radio frequency remote unit RRU and antenna system, in 5G Generally merge RRU in technology and antenna is AAU active antenna element.Electric power i.e. in the base station 5G is in addition to being used in BBU and AAU etc. Except assembly power supply, greatly on the air conditioning electricity for realizing base station cooling.Passing through in embodiments herein The information energy consumption of building is included in the whole energy consumption of building, is realized to be optimized by the reduction to building entirety energy consumption Green building system more in broad sense.

AAU active antenna element or RRU Remote Radio Unit are separated with BBU baseband processing unit, use C-RAN collection In to the signal processing unit equipment temperature control and energy conservation and environmental protection in a urban area, be conducive to using electricity wisely, and make light The cost recovery for lying prostrate clean energy resource is quicker.

It can be seen from the above description that the application realizes following technical effect:

Greenization system and implementation method based on photovoltaic curtain wall in the embodiment of the present application are used using photovoltaic curtain wall The mode for the photovoltaic energy that it is converted is provided in the base station under construction to the base station and building periphery of building itself, by that will use It is included in the whole energy consumption of building in each component for accommodating the base station 5G, so that the information energy consumption of Discussion on architecture is realized at minimum Reason has achieved the purpose that reduce environmental pollution, has reduced power grid pressure, realized the base station 5G using lower cost to realize The technical effect of energy consumption is dropped, and then solves and lacks the technical issues of can reducing the greenization system for making impact to power grid.

According to the embodiment of the present application, as preferred in the present embodiment, antenna part is integrated in building in the base station Signal processing is placed in interior of building by curtain wall.

Specifically, the micro- of base station and antenna that itself the base station 5G includes building roof and building curtain wall facade is built Type base station, while also including the base station 5G near building.Antenna part can also be integrated in curtain wall by the base station 5G, at signal Reason part is placed in interior of building.

According to the embodiment of the present application, as preferred in the present embodiment, each component for being used to accommodate the base station is included in Whole energy consumption is built, so that the information energy consumption realization minimum processing of Discussion on architecture includes:

By carrying out building materials assessment using the photovoltaic curtain wall as building materials.

Specifically, unified management of the greenization system to information energy consumption based on photovoltaic curtain wall.5G antenna for base station and signal Processing fever uses in embodiments herein than more serious and establishes unified green building control system and building energy saving The base station 5G, is included in the overall energy conservation and environmental protection of building by control system, and building building make photovoltaic curtain wall when energy conservation and environmental protection is assessed The assessment of the building materials such as light transmittance, thermally conductive U value is carried out for building materials.Meet the related request of green building.

According to the embodiment of the present application, as preferred in the present embodiment, each component for being used to accommodate the base station is included in Whole energy consumption is built, so that the information energy consumption realization minimum processing of Discussion on architecture includes:

The physical equipment of the 5G signal processing unit of the base station is placed on unified computer room, by computer room entirety Temperature control is adjusted or energy conservation is adjusted.

Specifically, by the placement of the physical equipments such as 5G signal processing unit and unified computer room, by based on photovoltaic curtain wall Computer room is integrally included in building positive system and carries out meeting the unified planning that green builds group standard by greenization system.Pass through building energy saving The temperature control of computer room entirety, energy conservation is adjusted in system.It builds up ripe scheme using air source heat pump, earth source heat pump etc. are green and unites One energy saving temperature controlling advantageously reduces whole temperature control energy consumption.

According to the embodiment of the present application, as preferred in the present embodiment, each component for being used to accommodate the base station is included in Whole energy consumption is built, so that the information energy consumption realization minimum processing of Discussion on architecture includes:

The signal processing unit for the base station 5G for building peripheral extent is established to unified C-RAN centralization wireless access network machine Room.

Specifically, the signal processing unit of the larger range of base station 5G in building periphery, such as BBU Base-Band Processing list will be built Member etc. establishes unified C-RAN centralization wireless access network computer room, and carrying out unified energy consumption reduces planning, is conducive to further drop Low entirety temperature control energy consumption, and make photovoltaic curtain wall clean energy resource that there is higher economic benefit.

C-RAN in the embodiment of the present application refers to the framework based on communication information centralization processing, and having reduces cost, changes Kind performance, the advantage towards evolution deployment.

According to the embodiment of the present application, as preferred in the present embodiment, the base station of the building itself, which refers to be mounted on, to be built Build the base station 5G on roof and building curtain wall;The base station on the building periphery refers to the base station 5G for being mounted on building periphery;It will use It is included in the whole progress temperature control of building in the space for accommodating base station component BBU baseband processing unit or AAU active antenna processing unit, So that the information energy consumption of Discussion on architecture realizes minimum processing.

Preferably, the base station includes at least the base station 5G, will using DC-AC inverter for each single base station 5G The direct current that photovoltaic energy in the photovoltaic curtain wall generates is converted to the ac signal that the base station 5G uses;According to described Each base station 5G power consumption requirements distribute electricity consumption, and by dump energy immediately be supplied to building in other electricity consumptions or will be remaining Electric energy is returned to power grid distribution and uses.

Specifically, the micro- of base station and antenna that itself the base station 5G includes building roof and building curtain wall facade is built Type base station, while also including the base station 5G near building.Antenna part can also be integrated in curtain wall, signal processing part by the base station 5G Divide and is placed in interior of building.And since the single base station 5G can generate the energy consumption of multikilowatt, and be round-the-clock opening state State.The direct current that photovoltaic curtain wall clean energy resource generates is converted to by DC-AC inverter first in embodiments herein Then the ac signal that the base station 5G uses is distributed according to the base station 5G power consumption requirements by photovoltaic curtain wall energy adjustment system and is used Electricity, remaining capacity can be supplied to other electricity consumptions of building building immediately, or extra electric energy is returned to power grid distribution and is used.

According to the embodiment of the present application, as preferred in the present embodiment, the photovoltaic curtain wall includes: film or crystal silicon group The hollow glass structure of part production.

Specifically, the photovoltaic curtain wall is fabricated to hollow glass structure using film or crystal silicon component.

In some embodiments, part photovoltaic curtain wall reaches certain light transmittance using laser scribing, that is, film method, Meet the daylighting demand of building.

In some embodiments, photovoltaic curtain wall further comprises DC-AC inverter, battery and control system in addition to component System etc..

It should be noted that step shown in the flowchart of the accompanying drawings can be in such as a group of computer-executable instructions It is executed in computer system, although also, logical order is shown in flow charts, and it in some cases, can be with not The sequence being same as herein executes shown or described step.

According to the embodiment of the present application, additionally provide a kind of for implementing the greenization system based on photovoltaic curtain wall of above system System implementation method, as shown in Fig. 2, this method comprises:

Step S100 provides the photovoltaic energy of its conversion to the base station of the base station and building periphery of building itself under construction Source;And

Each component for being used to accommodate the base station is included in the whole energy consumption of building, so that the letter of Discussion on architecture by step S101 It ceases energy consumption and realizes minimum processing.

Specifically, the clean energy resource generated by photovoltaic curtain wall provides the 5G base for being mounted on building itself and building periphery That stands applies the energy.And by unified planning, precisely the power demand of the accounting base station 5G realizes photovoltaic in the photovoltaic curtain wall Precisely matching is realized in the measuring and calculating of battery component amount.

Further, the extra clean energy generated by the photovoltaic curtain wall, the construction in the base station 5G do not need trunk electricity Net increases additional quota.In this way, which environment had both been protected to also reduce the increased difficult and cost of transformation power grid.The light The electric power that volt curtain wall generates can store in such a way that power grid is interacted with alternating current or using battery.

Specifically, communication base station is made of baseband processing unit BBU and radio frequency remote unit RRU and antenna system, in 5G Generally merge RRU in technology and antenna is AAU.Electric power i.e. in the base station 5G in addition to be used in the assembly power supplies such as BBU and AAU it Outside, greatly on the air conditioning electricity for realizing base station cooling.Pass through letter that will build in embodiments herein Breath energy consumption is included in the whole energy consumption of building, to realize more broad sense by the reduction optimization to building entirety energy consumption On green building system.

According to the embodiment of the present application, as preferred in the present embodiment, each component for being used to accommodate the base station is included in Whole energy consumption is built, so that the information energy consumption realization minimum processing of Discussion on architecture includes:

It at least include: light transmittance when wherein building materials are assessed by carrying out building materials assessment using the photovoltaic curtain wall as building materials Or the assessment factor of thermally conductive U value;

The physical equipment of the 5G signal processing unit of the base station is placed on unified computer room, by computer room entirety Temperature control is adjusted or energy conservation is adjusted;It is built when wherein temperature control adjusting or energy conservation are adjusted using air source heat pump, the green of earth source heat pump Scheme;

The signal processing unit for the base station 5G for building peripheral extent is established to unified C-RAN centralization wireless access network machine Room, wherein signal processing unit refers to BBU or AAU.

Specifically, unified management of the greenization system to information energy consumption based on photovoltaic curtain wall.5G antenna for base station and signal Processing fever uses in embodiments herein than more serious and establishes unified green building controlling mechanism and building energy saving The base station 5G, is included in the overall energy conservation and environmental protection of building by controlling mechanism, and building building make photovoltaic curtain wall when energy conservation and environmental protection is assessed The assessment of the building materials such as light transmittance, thermally conductive U value is carried out for building materials.

Meet the related request of green building.

Specifically, by the placement of the physical equipments such as 5G signal processing unit and unified computer room, by based on photovoltaic curtain wall Computer room is integrally included in building positive system and carries out meeting the unified planning that green builds group standard by greenization system.By building building The temperature control of computer room entirety, energy conservation is adjusted in power-saving mechanism.Using air source heat pump, earth source heat pump etc. it is green build up ripe scheme into The unified energy saving temperature controlling of row, advantageously reduces whole temperature control energy consumption.

Specifically, the signal processing unit of the larger range of base station 5G in building periphery, such as BBU Base-Band Processing list will be built Member etc. establishes unified C-RAN centralization wireless access network computer room, and carrying out unified energy consumption reduces planning, is conducive to further drop Low entirety temperature control energy consumption, and make photovoltaic curtain wall clean energy resource that there is higher economic benefit.

Obviously, those skilled in the art should be understood that each module of above-mentioned the application or each step can be with general Computing device realize that they can be concentrated on a single computing device, or be distributed in multiple computing devices and formed Network on, optionally, they can be realized with the program code that computing device can perform, it is thus possible to which they are stored Be performed by computing device in the storage device, perhaps they are fabricated to each integrated circuit modules or by they In multiple modules or step be fabricated to single integrated circuit module to realize.In this way, the application be not limited to it is any specific Hardware and software combines.

The foregoing is merely preferred embodiment of the present application, are not intended to limit this application, for the skill of this field For art personnel, various changes and changes are possible in this application.Within the spirit and principles of this application, made any to repair Change, equivalent replacement, improvement etc., should be included within the scope of protection of this application.