A kind of double anchor slab bases fixed structure of transmission line of electricity joint plate stem

文档序号:1768037 发布日期:2019-12-03 浏览:15次 中文

阅读说明:本技术 一种输电线路联合板杆的双锚板基础固定结构 (A kind of double anchor slab bases fixed structure of transmission line of electricity joint plate stem ) 是由 雒亿平 李炎隆 于 2019-08-27 设计创作,主要内容包括:本发明公开了一种输电线路联合板杆的双锚板基础固定结构,包括板柱和板件,板件包括自上而下的第一子板和第二板组,第二板组包括两个独立设置的第二子板;还包括锚杆组件,锚杆组件包括第一锚杆和第二锚杆,板柱与第一子板通过第一锚杆固接,第一子板分别与两个第二子板通过第二锚杆固接。本发明提出的输电杆塔联合板杆双锚板基础结构,具有传力条件明确,抵抗动荷载能力强,安全可靠度高,施工简便,造价低等特点,该基础可解决输电杆塔联合板杆单锚板基础所提供的抗拔力不足的情形。(The invention discloses a kind of double anchor slab bases fixed structures of transmission line of electricity joint plate stem, including sheet-pile and plate, plate include top-down first daughter board and the second board group, and the second board group includes two the second daughter boards being independently arranged;It further include anchor rod component, anchor rod component includes the first anchor pole and the second anchor pole, and sheet-pile is affixed by the first anchor pole with the first daughter board, and the first daughter board is affixed by the second anchor pole with two the second daughter boards respectively.The double anchor slab foundation structures of transmission tower joint plate stem proposed by the present invention, have power transmission condition clear, it is strong to resist live load loading capability, safety reliability is high, the features such as easy construction, low cost, the basis can solve the hypodynamic situation of resistance to plucking provided by transmission tower joint plate stem list anchor slab basis.)

1. a kind of double anchor slab bases fixed structure of transmission line of electricity joint plate stem, which is characterized in that including sheet-pile (5) and board group, The board group includes top-down first daughter board (1) and the second plate, second plate include two be independently arranged Two daughter boards (2);

It further include anchor rod component, the anchor rod component includes the first anchor pole (3) and the second anchor pole (4), the sheet-pile (5) and first Daughter board (1) is affixed by the first anchor pole (3), and first daughter board (1) passes through the second anchor pole with two the second daughter boards (2) respectively (4) affixed.

2. a kind of double anchor slab bases fixed structure of transmission line of electricity joint plate stem as described in claim 1, which is characterized in that institute It states the first anchor pole (3) and is provided with multiple, the multiple first anchor pole (3) successively axially penetrates through sheet-pile (5) and the first daughter board (1), The both ends of multiple first anchor poles (3) are affixed by bolt with the first daughter board (1) and sheet-pile (5) respectively.

3. a kind of double anchor slab bases fixed structure of transmission line of electricity joint plate stem as claimed in claim 2, which is characterized in that institute The quantity for stating the first anchor pole (3) is 4.

4. a kind of double anchor slab bases fixed structure of transmission line of electricity joint plate stem as described in claim 1, which is characterized in that institute The quantity for stating the second anchor pole (4) is two.

5. a kind of double anchor slab bases fixed structure of transmission line of electricity joint plate stem as claimed in claim 4, which is characterized in that institute It states two the second anchor poles (4) and axially penetrates through described two second daughter boards (2) respectively, one end of described two second anchor poles (4) is equal Affixed by bolt with the second daughter board (2), the other end of described two second anchor poles (4) axially penetrates through the first daughter board (1) respectively And it is affixed by bolt with the first daughter board (1).

6. a kind of double anchor slab bases fixed structure of transmission line of electricity joint plate stem as described in claim 1, which is characterized in that institute The both ends for stating the first anchor pole (3) are equipped with steel plate (6), one of them described steel plate (6) is arranged between bolt and sheet-pile (5), Another steel plate (6) is arranged between bolt and the first daughter board (1), and one end of second anchor pole (4) is equipped with steel plate (6), institute The one end for stating steel plate (6) is arranged between bolt and the second plate (2).

7. a kind of double anchor slab bases fixed structure of transmission line of electricity joint plate stem as claimed in claim 6, which is characterized in that institute It states the steel plate (6) on the first anchor pole (3) and the second anchor pole (4) and is equipped between the bolt closed on gasket (7).

8. a kind of double anchor slab bases fixed structure of transmission line of electricity joint plate stem as described in claim 1, which is characterized in that institute It states and is cased with erosion resistant coating outside on the first anchor pole (3) and the second anchor pole (4), the erosion resistant coating includes anticorrosive casing pipe, the anti-corrosive cover Pipe is filled with anti-corrosion material between the first anchor pole (3) and the second anchor pole (4) respectively.

9. a kind of double anchor slab bases fixed structure of transmission line of electricity joint plate stem as described in claim 1, which is characterized in that institute It states sheet-pile (5) and is partly embedded in underground in construction, the height that sheet-pile (5) leaks out bottom surface is at least 200mm.

10. a kind of double anchor slab bases fixed structure of transmission line of electricity joint plate stem as described in any one of claims 1 to 9, It is characterized in that, column foot plate is connected with first anchor pole (3).

Technical field

The invention belongs to transmission tower apparatus fields, and in particular to a kind of double anchor slab bases of transmission line of electricity joint plate stem are solid Determine structure.

Background technique

Transmission line tower foundation mainly uses " heavy excavation " foundation class, " draw and dig base expanding and base expanding " foundation class, " explosion expanded piling " basis Class.The key dimension of " heavy excavation " foundation class need to be determined according to the resistance to plucking stability requirement of transmission line tower foundation, in order to full The needs of stability are pulled out on foot, it is necessary to increase key dimension, improve foundation cost, simultaneously because spoir is more, to environment It destroys also larger." draw and dig base expanding and base expanding " foundation class is suitable in the anhydrous cohesive soil for penetrating into foundation pit, while pile foundation specification provides, such as Basis uses pile foundation, and essential bearing stratum needs guiding through collapsible loess, therefore the basis is with not being suitable for big thickness collapsible loess Area." explosion expanded piling " foundation class difficulty of construction is larger, has biggish concealment, and complicated construction technique, construction quality are difficult to control It makes, construction quality problem is difficult to find in time, and there is also certain difficulties for detection after work.

In view of defect present in these foundation patterns and deficiency, obtained in Retaining Wall Engineering based on anchor cable pulling plate technology It must apply, Computing Principle and design considerations have been carried out some discussions, while drawing and digging pile foundation in transmission of electricity foundation engineering Construction technology tends to be mature, and design method and foundation are also relatively abundant, but the basis is with not being suitable for big thickness collapsible loess Area, and engineering cost is high.Since soil body withdrawal resistance is limited by buried depth than equal, to the higher area of resistance to plucking load requirement Domain, transmission line of electricity list anchor slab are just unable to satisfy resistance to plucking demand.

Summary of the invention

The object of the present invention is to provide a kind of transmission line of electricity joint plate stem double anchor slab bases fixed structure, structure simply, Convenient for later period maintenance.

The technical scheme adopted by the invention is that: a kind of double anchor slab bases fixed structure of transmission line of electricity joint plate stem, packet Rubbing board column and board group, board group include top-down first daughter board and the second plate, and the second plate includes two and is independently arranged Second daughter board;

It further include anchor rod component, anchor rod component includes the first anchor pole and the second anchor pole, and sheet-pile and the first daughter board pass through first Anchor pole is affixed, and the first daughter board is affixed by the second anchor pole with two the second daughter boards respectively.

The characteristics of used technical solution of the invention, also resides in,

First anchor pole is provided with multiple, and multiple first anchor poles successively axially penetrate through sheet-pile and the first daughter board, multiple first anchors The both ends of bar are affixed by bolt with the first daughter board and sheet-pile respectively.

The quantity of first anchor pole is 4.

The quantity of second anchor pole is two.

Two the second anchor poles axially penetrate through two the second daughter boards respectively, and one end of two the second anchor poles is logical with the second daughter board Cross that bolt is affixed, the other end of two the second anchor poles axially penetrates through the first daughter board and affixed by bolt with the first daughter board respectively.

The both ends of first anchor pole are equipped with steel plate, and one of steel plate is arranged between bolt and sheet-pile, another steel plate It is arranged between bolt and the first daughter board, one end of the second anchor pole is equipped with steel plate, and one end of steel plate is arranged in bolt and the second plate Between part.

Gasket is equipped between first anchor pole and steel plate on the second anchor pole and the bolt closed on.

Outer on first anchor pole and the second anchor pole to be cased with erosion resistant coating, erosion resistant coating includes anticorrosive casing pipe, anticorrosive casing pipe respectively with Anti-corrosion material is filled between first anchor pole and the second anchor pole.

Sheet-pile is partly embedded in underground in construction, and the height that sheet-pile leaks out bottom surface is at least 200mm.

Column foot plate is connected with first anchor pole.

Beneficial features of the invention are: in a kind of double anchor slab bases fixed structure of transmission line of electricity joint plate stem of the present invention, Sheet-pile is mainly used for connecting column foot plate and by the connecting portion effect of basseting, is convenient for later period maintenance and anti-corrosion;First daughter board master It is used to undertake and pushes load, transmitting portions uplift load, undertakes part uplift load;First anchor pole is mainly used for pulling out in transmitting Load and fixed upper plate short column and upper plate;Second anchor pole anchor pole is mainly used for transmitting most of uplift load;Second daughter board is main For resisting most of uplift load;Steel plate on first daughter board is mainly used for passing to the first daughter board to transmitting transmission tower Forced area is pulled out in load and increase.The double anchor slab foundation structures of transmission tower joint plate stem proposed by the present invention, have power transmission item Part is clear, resists the features such as live load loading capability is strong, and safety reliability is high, easy construction, low cost, which can solve power transmission rod Tower combines the hypodynamic situation of resistance to plucking provided by plate stem list anchor slab basis.

Detailed description of the invention

Fig. 1 is a kind of structural schematic diagram of double anchor slab bases fixed structure of transmission line of electricity joint plate stem of the present invention.

In figure, 1. first daughter boards, 2. second daughter boards, 3. first anchor poles, 4. second anchor poles, 5. sheet-piles, 6. steel plates, 7. pads Piece.

Specific embodiment

The following describes the present invention in detail with reference to the accompanying drawings and specific embodiments.

As shown in Figure 1, being a kind of structural representation of double anchor slab bases fixed structure of transmission line of electricity joint plate stem of the present invention Figure, including sheet-pile 5 and board group, board group include top-down first daughter board 1 and the second board group, and the second board group includes two independences The second daughter board 2 being arranged;

It further include anchor rod component, anchor rod component includes the first anchor pole 3 and the second anchor pole 4, and sheet-pile 5 passes through with the first daughter board 1 First anchor pole 3 is affixed, and the first daughter board 1 is affixed by the second anchor pole 4 with two the second daughter boards 2 respectively.

The quantity of first anchor pole 3 has multiple.Multiple first anchor poles 3 successively axially penetrate through sheet-pile 5 and the first daughter board 1, multiple The both ends of first anchor pole 3 are affixed by bolt with the first daughter board 1 and sheet-pile 5 respectively.

The quantity of first anchor pole 3 has 4.

The quantity of second anchor pole 4 is two.

Two the second anchor poles 4 axially penetrate through two the second daughter boards 2 respectively, two 4 one end of the second anchor pole with the second daughter board 2 Cross that bolt is affixed, the other end of two the second anchor poles 4 axially penetrates through the first daughter board 1 and solid by bolt with the first daughter board 1 respectively It connects.

The both ends of first anchor pole 3 are equipped with steel plate 6, and one of steel plate 6 is arranged between bolt and sheet-pile 5, another Steel plate 6 is arranged between bolt and the first daughter board 1, and one end of the second anchor pole 4 is equipped with steel plate 6, and one end of steel plate 6 is arranged in bolt Between the second plate 2.

Gasket 7 is equipped between first anchor pole 3 and steel plate 6 on the second anchor pole 4 and the bolt closed on.

Outer on first anchor pole 3 and the second anchor pole 4 to be cased with erosion resistant coating, erosion resistant coating includes anticorrosive casing pipe, anticorrosive casing pipe difference Anti-corrosion material is filled between the first anchor pole 3 and the second anchor pole 4.

Sheet-pile 5 is partly embedded in underground in construction, and the height that sheet-pile 5 leaks out bottom surface is at least 200mm.

The main function of all parts of the present invention are as follows:

1, sheet-pile 5 is that armored concrete pours, the main function of sheet-pile 5 be for transmitting and undertaking upper pressure, Sheet-pile 5 is partly embedded in underground in construction simultaneously, and anchoring mechanism is basseted, and is conducive to the maintenance of shaft tower anchoring mechanism and anchoring The anti-corrosion of body.

2, the first daughter board 1 is armoured concrete slab, and main function is the pressure for bearing the transmitting of top transmission tower, resists Part uplift load and uplift load is provided for two the second daughter boards 2.Two 2 shapes of the second daughter board are identical, are truncated cone-shaped Armoured concrete slab, the main function of two the second daughter boards 2 are resistant to most of uplift force of transmission tower transmitting.

3, the first anchor pole 3 and the second anchor pole 4 are round steel pipe, and erosion resistant coating is arranged in the outside of anchor pole, and the erosion resistant coating is by anti-corrosion Material and casing are constituted, and casing can also ensure the sliding between anchor pole and plate body, so that it is guaranteed that upper plate mainly undertakes transmission tower The lower pressure of transmitting, the first anchor pole 3 is used to transmit uplift force and resists the shearing force between short column and the first daughter board 1, to protect Hinder the stability on basis;The main function of second anchor pole 4 is to bear and transmit uplift load, while resisting electric power pylon to sheet-pile 5 horizontal forces applied prevent short column and upper plate from generating sliding.

4, steel plate 6 is mainly used for increasing forced area, and the steel plate 6 on the first daughter board 1 is mainly used for giving transmitting transmission tower It passes to and pulls out forced area on the load and increase of the first daughter board 1;Steel plate 6 on second daughter board 2 mainly gives two the second daughter boards 2 Uplift load is provided, the intensity of the second daughter board 2 is improved, while increasing the forced area of bolt and the second daughter board 2.

The double anchor slab foundation structures of transmission tower joint plate stem proposed by the present invention, have power transmission condition clear, resist live load Loading capability is strong, and safety reliability is high, easy construction, and low cost can be used for deep-etching area, frost heaving resistant and thaw collapsibility and can wait spies well Point.The basis can be used for single anchor slab resistance to plucking and hold compared to single anchor slab foundation structure, the double anchor slabs of transmission line of electricity joint plate stem of the present invention Carry the inadequate transmission line foundation of power.

6页详细技术资料下载
上一篇:一种医用注射器针头装配设备
下一篇:输电线路联合板杆双锚板基础结构的上板的设计方法

网友询问留言

已有0条留言

还没有人留言评论。精彩留言会获得点赞!

精彩留言,会给你点赞!