Transmission line of electricity combines the design method of the upper plate of three anchor slab foundation structure of plate stem

文档序号:1768041 发布日期:2019-12-03 浏览:20次 中文

阅读说明:本技术 输电线路联合板杆三锚板基础结构的上板的设计方法 (Transmission line of electricity combines the design method of the upper plate of three anchor slab foundation structure of plate stem ) 是由 李炎隆 雒亿平 于 2019-08-27 设计创作,主要内容包括:本发明一种输电线路联合板杆三锚板基础结构的上板的设计方法,三锚板基础固定结构包括上板短柱、板件组和锚杆组件,板件组包括自上而下的上板和下板件,下板件包括三个独立设置的下板,锚杆组件包括第一锚杆和第二锚杆,上板短柱与上板通过第一锚杆固接,上板与三个下板分别通过第二锚杆固接,上板的上表面和/或下表面设置有第一配筋,下板的上表面和/或下表面设置有第二配筋;上板的设计方法包括:步骤1:暂定得到上板的几何尺寸和埋深;步骤2:进行上板的稳定计算,确定几何尺寸和埋深;步骤3:上板进行配筋设计,完成上板的整体设计;本发明可简化施工条件,减少施工周期,可适用于施工条件较差的输电线路工程中。(A kind of design method of the upper plate of transmission line of electricity joint three anchor slab foundation structure of plate stem of the present invention, three anchor slab basis fixed structures include upper plate short column, plate group and anchor rod component, plate group includes top-down upper plate and lower plate, lower plate includes three lower plates being independently arranged, anchor rod component includes the first anchor pole and the second anchor pole, upper plate short column is affixed by the first anchor pole with upper plate, it is affixed that upper plate with three lower plates passes through the second anchor pole respectively, the upper surface and/or lower surface of upper plate are provided with the first arrangement of reinforcement, and the upper surface and/or lower surface of lower plate are provided with the second arrangement of reinforcement;The design method of upper plate includes: step 1: tentative to obtain the geometric dimension and buried depth of upper plate;Step 2: carrying out the stability Calculation of upper plate, determine geometric dimension and buried depth;Step 3: upper plate carries out Reinforcement Design, completes the whole design of upper plate;The present invention can simplify execution conditions, reduce construction period, be applicable in the poor work transmission line of execution conditions.)

1. the design method that transmission line of electricity combines the upper plate of three anchor slab foundation structure of plate stem, which is characterized in that

Three anchor slab basis fixed structure includes upper plate short column (3), plate group and anchor rod component,

Wherein, the plate group includes top-down upper plate (1) and lower plate, and the lower plate includes three and is independently arranged Lower plate (2), and

In the state of constructing completion, the upper plate (1) and the lower plate (2) are embedded in underground, the upper plate short column (3) At least part is exposed to environment;

Wherein, the anchor rod component includes the first anchor pole (4) and the second anchor pole (5), and the upper plate short column (3) and upper plate (1) are logical It is affixed to cross the first anchor pole (4), the upper plate (1) and three lower plates (2) are affixed by the second anchor pole (5) respectively, the upper plate (1) Upper surface and/or lower surface be provided with the first arrangement of reinforcement, the upper surface and/or lower surface of the lower plate (2) are provided with second and match Muscle;

The design method of the upper plate includes:

Step 1: tentative to obtain the geometric dimension and buried depth of upper plate;

Step 2: according to the tentative size and buried depth of the upper plate that step 1 obtains, carrying out the stability Calculation of upper plate, pass through calculating It is determined for compliance with the geometric dimension and buried depth of the requirement of specification;

Step 3: meeting the geometric dimension and buried depth of the requirement of specification according to step 2, arrangement of reinforcement is carried out to the upper plate and is set Meter, completes the whole design of the upper plate.

2. the design method of upper plate according to claim 1, which is characterized in that fix tentatively obtained upper plate described in step 1 Geometric dimension and buried depth include width, length, the thickness of upper plate, soil body bulk density γ and soil body cohesive strength c, the width of upper plate short column Degree, length and height, width, length and the height of upper carrying billet.

3. the design method of upper plate according to claim 1, which is characterized in that the step 2 is specifically, carry out on described The Checking Ground Bearing Capacity of plate carries out the antidumping checking computations of the upper plate, carries out the horizontal resistant slide checking computations of the upper plate, carries out The Punching Shear of the upper plate checks, and carries out the foundation deformation checking computations of the upper plate.

4. the design method of upper plate according to claim 3, which is characterized in that the Checking Ground Bearing Capacity packet of the upper plate Include characteristic value of foundation bearing capacity calculating, foundation pressure calculating and soil supporting layer strength checking:

The characteristic value of foundation bearing capacity is calculated specifically by the Checking Ground Bearing Capacity for carrying out upper plate, is carried out the anti-of upper plate and is inclined Checking computations are covered, the horizontal resistant slide checking computations of upper plate are carried out, carry out the Punching Shear checking computations of upper plate, carry out the foundation deformation checking computations of upper plate.

The Checking Ground Bearing Capacity of upper plate includes that characteristic value of foundation bearing capacity calculates, foundation pressure calculates and soil supporting layer intensity Checking computations:

Characteristic value of foundation bearing capacity calculates the characteristic load bearing capacity f that ground is calculated specifically by formula (1)a:

fa=Mbγb+Mdγmd+McC (1),

Wherein, faFor characteristic value of foundation bearing capacity (kPa), Mb、Md、McIt is characterized value design factor, b is the width of basic upper plate bottom surface Spending (m) c is cohesive strength (kPa) native in the upper board width buried depth in lower times of basic upper plate bottom, γmFor basic upper plate buried depth with The weighted average severe of interior soil, γ are soil supporting layer soil body severe;

The foundation pressure calculating of the upper plate calculates ground of the upper plate under bidirectional eccentric load action specifically by formula (2) Base pressure P:

Wherein, γGThe partial safety factor of-permanent load, QOn fFor the gravity of basic upper plate, A is upper plate and contact area of ground, and N is Upper load suffered by basis.

5. the design method of upper plate according to claim 4, which is characterized in that the soil supporting layer intensity of the upper plate is tested It calculates specifically:

In the case of it is eccentric load that the base top loading that upper plate is subject to, which carries, soil supporting layer strength checking is carried out according to formula (3):

p≤faif(3),

Wherein, p is plate average pressure of foundation base design value (kPa) f on the basis of axial load effect is loweraFor the ground after amendment Characteristic load bearing capacity (kPa), γifFor foundation bearing capacity regulation coefficient;

In the case of upper plate is by Under Eccentric Loading, soil supporting layer strength checking is carried out according to formula (4):

pmax≤1.2faif(4),

Wherein, pmaxPlate substrate maximum pressure design value (kPa) on the basis of under being acted on for axial load, faFor the ground after amendment Base characteristic load bearing capacity (kPa), γifFor foundation bearing capacity regulation coefficient.

6. the design method of upper plate according to claim 3, which is characterized in that the antidumping checking computations of the upper plate are specific Are as follows:

In the case of upper plate uplift force effect, do not need to be checked;

In the upper plate in the case of by power effect is pushed, the anti-of upper plate is carried out according to formula (5) and formula (6) and is inclined Cover checking computations:

Mh≥KFx(h+h1+h2) (6),

Wherein, KFxFor the two-way tilting moment of upper plate, MhFor limit tilting moment, l is and the power F that topplesHThe parallel basis in direction The length (m) of upper plate, K are the buckling safety factor that topples, and h is upper plate height, h1For short column height (m), h2For backing plate height (m).

7. the design method of upper plate according to claim 3, which is characterized in that the horizontal resistant slide of the upper plate checks tool Body are as follows:

Horizontal bearing capacity checking computations are carried out according to x direction of the formula (7) to the upper plate:

Horizontal bearing capacity checking computations are carried out according to y direction of the formula (8) to the upper plate:

Wherein, KpFor coefficient of passive earth pressure,B is the width (m) of basic upper plate bottom surface, and h is upper Plate height, c are cohesive strength (kPa) native in the upper board width buried depth in lower times of basic upper plate bottom, l be with power of toppling, Ep is water Flat power.

8. the design method of upper plate according to claim 3, which is characterized in that the Punching Shear of the upper plate, which checks, is specially The Punching Shear checking computations of the upper plate are carried out by formula (9), (10) and (11):

Fl≤0.7βhpftamh0(9),

Fl=pjAl(10),

Wherein, ftFor the axial tensile strength design value (kN/m of concrete2), amFor least favorable in the punching failure cone of upper plate Side computational length (m), atFor billet width (m), abIt is punching failure cone least favorable side in foundation's bottom area range Interior lower side length (m), h0For the effective height (m) of the punching failure cone of upper plate, pjFor the net counter-force (kN/ of foundation soil unit area m2), AlFor shaded area (m2), FlFor in shaded area AlOn the net counter-force design value (kN) of foundation soil.

9. the design method of upper plate according to claim 3, which is characterized in that the foundation deformation checking computations of the upper plate are specific Including calculating net foundation pressure, determining that settlement calculation depth, final settlement calculate and differential settlement checks;

Wherein, final settlement calculating is carried out according to formula (12):

Wherein, s is ground final deformation amount (mm), and s ' is calculated foundation deformation amount (mm), ΨsFor settlement calculation experience system Number, n are the soil layer number divided, EsiFor the lower i-th layer of native compression modulus (MPa) in basic upper plate bottom surface, zi, for basic upper plate bottom surface To the distance (m) of i-th layer of native bottom surface, zi-1For the distance (m) of (i-1)-th layer of native bottom surface,It is the calculating o'clock of upper plate bottom surface to i-th layer Average additional stress coefficient within the scope of native bottom surface,It is average attached within the scope of upper plate bottom surface calculating o'clock to (i-1)-th layer of native bottom surface Add stress coefficient.

10. the design method of upper plate according to claim 1, which is characterized in that the Reinforcement Design of step 3 include into The board bottom calculation of Bending Moment of the row upper plate, the board bottom arrangement of reinforcement for carrying out the upper plate calculate, and carry out the upper plate short column arrangement of reinforcement and calculate.

Technical field

The invention belongs to electric power line pole tower equipment technical fields, and in particular to a kind of transmission line of electricity joint three anchor slab of plate stem The design method of the upper plate of foundation structure.

Background technique

Transmission line tower foundation mainly uses " heavy excavation " foundation class, " draw and dig base expanding and base expanding " foundation class, " explosion expanded piling " basis Class.The key dimension of " heavy excavation " foundation class need to be determined according to the resistance to plucking stability requirement of transmission line tower foundation, in order to full The needs of stability are pulled out on foot, it is necessary to increase key dimension, improve foundation cost, simultaneously because spoir is more, to environment It destroys also larger." draw and dig base expanding and base expanding " foundation class is suitable in the anhydrous cohesive soil for penetrating into foundation pit, while pile foundation specification provides, such as Basis uses pile foundation, and essential bearing stratum needs guiding through collapsible loess, therefore the basis is with not being suitable for big thickness collapsible loess Area." explosion expanded piling " foundation class difficulty of construction is larger, has biggish concealment, and complicated construction technique, construction quality are difficult to control It makes, construction quality problem is difficult to find in time, and there is also certain difficulties for detection after work.Therefore, in conclusion current transmission of electricity Inconvenient ask is detected after overhead line structures foundation structure is primarily present complicated construction technique, and construction quality is not easy to control and work Topic.

Summary of the invention

The object of the present invention is to provide the design methods of the upper plate of transmission line of electricity joint three anchor slab foundation structure of plate stem, it is intended to Solve the existing complicated construction technique of current transmission line tower foundation structure, and after construction quality is not easy to control and work In detection inconvenience the problem of at least part.

The technical scheme adopted by the invention is that

A kind of design method of the upper plate of transmission line of electricity joint three anchor slab basis fixed structure of plate stem,

Three anchor slab basis fixed structures include upper plate short column, plate group and anchor rod component,

Wherein, plate group includes top-down upper plate and lower plate, and lower plate includes three lower plates being independently arranged, and And

In the state of constructing completion, upper plate and lower plate are embedded in underground, and at least part of upper plate short column is exposed to Environment;

Wherein, anchor rod component includes the first anchor pole and the second anchor pole, and upper plate short column is affixed by the first anchor pole with upper plate, on Plate passes through that the second anchor pole is affixed with three lower plates respectively, and the upper surface and/or lower surface of upper plate are provided with the first arrangement of reinforcement, lower plate Upper surface and/or lower surface are provided with the second arrangement of reinforcement;

The design method of upper plate includes:

Step 1: tentative to obtain the geometric dimension and buried depth of upper plate;

Step 2: according to the tentative size and buried depth of the upper plate that step 1 obtains, carrying out the stability Calculation of upper plate, pass through calculating It is determined for compliance with the geometric dimension and buried depth of the requirement of specification;

Step 3: according to the geometric dimension and buried depth of the requirement for meeting specification in step 2, Reinforcement Design is carried out to upper plate, it is complete At the whole design of upper plate.

The features of the present invention also characterized in that

Geometric dimension and buried depth that obtained upper plate is fixed tentatively in step 1 include width, length, the thickness of upper plate, and the soil body holds Weight γ and soil body cohesive strength c, width, length and the height of upper plate short column, width, length and the height of upper carrying billet.

Specifically, carrying out the Checking Ground Bearing Capacity of upper plate, the antidumping for carrying out upper plate checks step 2, carries out upper plate Horizontal resistant slide checking computations carry out the Punching Shear checking computations of upper plate, carry out the foundation deformation checking computations of upper plate.

The Checking Ground Bearing Capacity of upper plate includes that characteristic value of foundation bearing capacity calculates, foundation pressure calculates and soil supporting layer Strength checking:

Characteristic value of foundation bearing capacity calculates the characteristic load bearing capacity f that ground is calculated specifically by formula (1)a:

fa=Mbγb+Mdγmd+McC (1),

Wherein, faFor characteristic value of foundation bearing capacity (kPa), Mb、Md、McIt is characterized value design factor, upper board bottom based on b The width (m) in face, c are cohesive strength (kPa) native in the upper board width buried depth in lower times of basic upper plate bottom, γmFor basic upper plate Buried depth within native weighted average severe, γ is soil supporting layer soil body severe;

The foundation pressure calculating of upper plate calculates ground of the upper plate under bidirectional eccentric load action specifically by formula (2) Base pressure P:

Wherein, γGThe partial safety factor of-permanent load, QOn fFor the gravity of basic upper plate, A is upper plate and ground contact surface It is long-pending, suffered upper load based on N.

The soil supporting layer strength checking of upper plate specifically:

In the case of it is eccentric load that the base top loading that upper plate is subject to, which carries, soil supporting layer intensity is carried out according to formula (3) Checking computations:

p≤faif(3),

Wherein, p is plate average pressure of foundation base design value (kPa) f on the basis of axial load effect is loweraAfter amendment Characteristic value of foundation bearing capacity (kPa), γifFor foundation bearing capacity regulation coefficient;

In the case of upper plate is by Under Eccentric Loading, soil supporting layer strength checking is carried out according to formula (4):

pmax≤1.2faif(4),

Wherein, pmaxPlate substrate maximum pressure design value (kPa) on the basis of under being acted on for axial load, faTo correct it Characteristic value of foundation bearing capacity (kPa) afterwards, γifFor foundation bearing capacity regulation coefficient.

The antidumping of upper plate checks specifically:

In the case of the effect of upper plate uplift force, do not need to be checked;

In upper plate in the case of by power effect is pushed, the anti-of upper plate is carried out according to formula (5) and formula (6) and is inclined Cover checking computations:

Mh≥KFx(h+h1+h2) (6),

Wherein, KFxFor the two-way tilting moment of upper plate, MhFor limit tilting moment, l is and the power F that topplesHDirection is parallel The length (m) of basic upper plate, K are the buckling safety factor that topples, and h is upper plate height, h1For short column height (m), h2For backing plate height (m)。

The horizontal resistant slide of upper plate checks specifically:

Horizontal bearing capacity checking computations are carried out according to x direction of the formula (7) to upper plate:

Horizontal bearing capacity checking computations are carried out according to y direction of the formula (8) to upper plate:

Wherein, KpFor coefficient of passive earth pressure,B is the width (m) of basic upper plate bottom surface, h For upper plate height, c is cohesive strength (kPa) native in the upper board width buried depth in lower times of basic upper plate bottom, and l is and power of toppling, Ep For horizontal force.

The Punching Shear checking computations of upper plate are checked specifically by the Punching Shear that formula (9), (10) and (11) carry out upper plate:

Fl≤0.7βhpftamh0(9),

Fl=pjAl (10),

Wherein, ftFor the axial tensile strength design value (kN/m of concrete2), amFor in the punching failure cone of upper plate most Unfavorable side computational length (m), atFor billet width (m), abIt is punching failure cone least favorable side in foundation's bottom area Lower side length (m) in range, h0For the effective height (m) of the punching failure cone of upper plate, pjFor the net counter-force of foundation soil unit area (kN/m2), AlFor shaded area (m2), FlFor in shaded area AlOn the net counter-force design value (kN) of foundation soil.

The foundation deformation checking computations of upper plate, which specifically include, to be calculated net foundation pressure, determines settlement calculation depth, final settlement Amount calculates and differential settlement checking computations;

Wherein, final settlement calculating is carried out according to formula (12):

Wherein, s is ground final deformation amount (mm), and s ' is calculated foundation deformation amount (mm), ΨsFor settlement calculation warp Coefficient is tested, n is the soil layer number divided, EsiFor the lower i-th layer of native compression modulus (MPa) in basic upper plate bottom surface, zi, for basic upper plate Distance (m) of the bottom surface to i-th layer of native bottom surface, zi-1For the distance (m) of (i-1)-th layer of native bottom surface,It calculates o'clock for upper plate bottom surface to the Average additional stress coefficient within the scope of i layers of native bottom surface,It is average within the scope of upper plate bottom surface calculating o'clock to (i-1)-th layer of native bottom surface Additional stress coefficient.

The Reinforcement Design of step 3 includes the board bottom arrangement of reinforcement calculating of the board bottom calculation of Bending Moment of progress upper plate, progress upper plate, Upper plate short column arrangement of reinforcement is carried out to calculate.

The beneficial effects of the present invention are: the design side of the upper plate of transmission line of electricity joint three anchor slab foundation structure of plate stem of the present invention Method, upper plate and short column fabricated construction, can remove basis upper plate maintenance work, eliminate wet construction, eliminate through the invention Live reinforcing bar binds operation, reduces construction period.

Detailed description of the invention

Fig. 1 is joint plate stem three in the design method of the upper plate of transmission line of electricity joint three anchor slab foundation structure of plate stem of the present invention The schematic diagram of anchor slab foundation structure;

Fig. 2 is the structure of upper plate in the design method of the upper plate of transmission line of electricity joint three anchor slab foundation structure of plate stem of the present invention Schematic diagram;

Fig. 3 is joint plate stem three in the design method of the upper plate of transmission line of electricity joint three anchor slab foundation structure of plate stem of the present invention The stereoscopic schematic diagram of anchor slab foundation structure;

Fig. 4 is the signal of upper plate in the design method of the upper plate of transmission line of electricity joint three anchor slab foundation structure of plate stem of the present invention Figure;

Fig. 5 is joint plate Suo Ji in the design method of the upper plate of transmission line of electricity joint three anchor slab foundation structure of plate stem of the present invention Plinth base top plane of constraint schematic diagram;

Fig. 6 is that the anti-of upper plate inclines in the design method of the upper plate of transmission line of electricity joint three anchor slab foundation structure of plate stem of the present invention Cover calculating schematic diagram;

Fig. 7 is the punching of upper plate in the design method of the upper plate of transmission line of electricity joint three anchor slab foundation structure of plate stem of the present invention Schematic diagram;

Fig. 8 is upper plate settlement gauge in the design method of the upper plate of transmission line of electricity joint three anchor slab foundation structure of plate stem of the present invention The hierarchical diagram of calculation.

In figure, 1. upper plates, 2. lower plates, 3. upper plate short columns, 4. first anchor poles, 5. second anchor poles, 6. protective caps, 7. bottom steel Plate, 8. foot pedals, 9. anti-corrosion pipe sleeves, 10. anti-corrosion materials.

Specific embodiment

The following describes the present invention in detail with reference to the accompanying drawings and specific embodiments.

A kind of design method of the upper plate of transmission line of electricity joint three anchor slab foundation structure of plate stem of the present invention,

As depicted in figs. 1 and 2, three anchor slab basis fixed structures include upper plate short column 3, plate group and anchor rod component,

Wherein, plate group includes top-down upper plate 1 and lower plate, and lower plate includes three lower plates being independently arranged 2, And

In the state of constructing completion, upper plate 1 and lower plate 2 are embedded in underground, at least part exposure of upper plate short column 3 In environment;

Wherein, anchor rod component includes the first anchor pole 4 and the second anchor pole 5, and upper plate short column 3 and upper plate 1 are solid by the first anchor pole 4 It connects, upper plate 1 is affixed by the second anchor pole 5 respectively with three lower plates 2, and the upper surface and/or lower surface of upper plate 1 are provided with first and match Muscle, the upper surface and/or lower surface of lower plate 2 are provided with the second arrangement of reinforcement;

The design method of upper plate, comprising:

Step 1: tentative to obtain the geometric dimension and buried depth of upper plate;

Step 2: according to the tentative size and buried depth of the upper plate that step 1 obtains, carrying out the stability Calculation of upper plate, pass through calculating It is determined for compliance with the geometric dimension and buried depth of the requirement of specification;

Step 3: according to the geometric dimension and buried depth of the requirement for meeting specification in step 2, Reinforcement Design is carried out to upper plate, it is complete At the whole design of upper plate.

Further, the design method of the upper plate of the double anchor slab foundation structures of transmission line of electricity joint plate stem of the present invention:

Geometric dimension and buried depth that obtained upper plate is fixed tentatively in step 1 include width, length, the thickness of upper plate, and the soil body holds Weight γ and soil body cohesive strength c, width, length and the height of upper plate short column, width, length and the height of upper carrying billet.

Specifically, carrying out the Checking Ground Bearing Capacity of upper plate, the antidumping for carrying out upper plate checks step 2, carries out upper plate Horizontal resistant slide checking computations carry out the Punching Shear checking computations of upper plate, carry out the foundation deformation checking computations of upper plate.

The Checking Ground Bearing Capacity of upper plate includes that characteristic value of foundation bearing capacity calculates, foundation pressure calculates and soil supporting layer Strength checking:

Characteristic value of foundation bearing capacity calculates the characteristic load bearing capacity f that ground is calculated specifically by formula (1)a:

fa=Mbγb+Mdγmd+McC (1),

Wherein, faFor characteristic value of foundation bearing capacity (kPa), Mb、Md、McIt is characterized value design factor, upper board bottom based on b Width (m) c in face is cohesive strength (kPa) native in the upper board width buried depth in lower times of basic upper plate bottom, γmFor basic upper plate Native weighted average severe within buried depth, γ are soil supporting layer soil body severe;

The foundation pressure calculating of upper plate calculates ground of the upper plate under bidirectional eccentric load action specifically by formula (2) Base pressure P:

Wherein, γGThe partial safety factor of-permanent load, QOn fFor the gravity of basic upper plate, A is upper plate and ground contact surface It is long-pending, suffered upper load based on N.

The soil supporting layer strength checking of upper plate specifically:

In the case of it is eccentric load that the base top loading that upper plate is subject to, which carries, soil supporting layer intensity is carried out according to formula (3) Checking computations:

p≤faif(3),

Wherein, p is plate average pressure of foundation base design value (kPa) f on the basis of axial load effect is loweraAfter amendment Characteristic value of foundation bearing capacity (kPa), γifFor foundation bearing capacity regulation coefficient;

In the case of upper plate is by Under Eccentric Loading, soil supporting layer strength checking is carried out according to formula (4):

pmax≤1.2faif(4),

Wherein, pmaxPlate substrate maximum pressure design value (kPa) on the basis of under being acted on for axial load, faTo correct it Characteristic value of foundation bearing capacity (kPa) afterwards, γifFor foundation bearing capacity regulation coefficient.

The antidumping of upper plate checks specifically:

In the case of the effect of upper plate uplift force, do not need to be checked;

In upper plate in the case of by power effect is pushed, the anti-of upper plate is carried out according to formula (5) and formula (6) and is inclined Cover checking computations:

Mh≥KFx(h+h1+h2) (6),

Wherein, KFxFor the two-way tilting moment of upper plate, MhFor limit tilting moment, l is and the power F that topplesHDirection is parallel The length (m) of basic upper plate, K are the buckling safety factor that topples, and h is upper plate height, and h1 is short column height (m), and h2 is that backing plate is high It spends (m).

The horizontal resistant slide of upper plate checks specifically:

Horizontal bearing capacity checking computations are carried out according to x direction of the formula (7) to upper plate:

Horizontal bearing capacity checking computations are carried out according to y direction of the formula (8) to upper plate:

Wherein, KpFor coefficient of passive earth pressure,B is the width (m) of basic upper plate bottom surface, h For upper plate height, c is cohesive strength (kPa) native in the upper board width buried depth in lower times of basic upper plate bottom, and l is and power of toppling, Ep For horizontal force.

The Punching Shear checking computations of upper plate are checked specifically by the Punching Shear that formula (9), (10) and (11) carry out upper plate:

Fl≤0.7βhpftamh0(9),

Fl=pjAl (10),

Wherein, ftFor the axial tensile strength design value (kN/m of concrete2), amFor in the punching failure cone of upper plate most Unfavorable side computational length (m), atFor billet width (m), abIt is punching failure cone least favorable side in foundation's bottom area Lower side length (m) in range, h0For the effective height (m) of the punching failure cone of upper plate, pjFor the net counter-force of foundation soil unit area (kN/m2), AlFor shaded area (m2), FlFor in shaded area AlOn the net counter-force design value (kN) of foundation soil.

The foundation deformation checking computations of upper plate, which specifically include, to be calculated net foundation pressure, determines settlement calculation depth, final settlement Amount calculates and differential settlement checking computations;

Wherein, final settlement calculating is carried out according to formula (12):

Wherein, s is ground final deformation amount (mm), and s ' is calculated foundation deformation amount (mm), ΨsFor settlement calculation warp Coefficient is tested, n is the soil layer number divided, EsiFor the lower i-th layer of native compression modulus (MPa) in basic upper plate bottom surface, zi、zi-1Based on Distance (m) of the upper plate bottom surface to i-th layer of native bottom surface, zi-1For the distance (m) of (i-1)-th layer of native bottom surface,Point is calculated for upper plate bottom surface Average additional stress coefficient within the scope of to i-th layer of native bottom surface,For within the scope of upper plate bottom surface calculating o'clock to (i-1)-th layer of native bottom surface Average additional stress coefficient.

The Reinforcement Design of step 3 includes the board bottom arrangement of reinforcement calculating of the board bottom calculation of Bending Moment of progress upper plate, progress upper plate, Upper plate short column arrangement of reinforcement is carried out to calculate.