A kind of floor system of integrated pipeline and the construction method of the floor system

文档序号:1768286 发布日期:2019-12-03 浏览:20次 中文

阅读说明:本技术 一种集成管线的地板系统及该地板系统的施工方法 (A kind of floor system of integrated pipeline and the construction method of the floor system ) 是由 杨泓斌 李缙 陈祥祥 张亮亮 王云燕 于 2018-05-25 设计创作,主要内容包括:本发明适用于建筑施工技术领域,提供了一种集成管线的地板系统及该地板系统的施工方法。该施工方法包括如下步骤:a、在工厂预制预留有拼接结构和线槽的若干垫板;b、制备若干面板以及购买管线;c、在工厂将若干面板预先一一对应黏贴于若干垫板表面上,使每块面板与每块垫板形成一个整体构件;d、将若干的整体构件运输至施工现场;e、清洁作业面,将整体构件铺贴于作业面上,使管线容纳于线槽内,并将整体构件上的拼接结构进行相互拼接;f、在整体构件的拼接处进行密封处理。该地板系统施工工艺取消了传统存在湿作业的地板铺贴方法,减少建筑垃圾,有利于环保,并且大大减少了现场施工时间与施工工序,降低了施工难度以及节约了施工成本。(The present invention is suitable for technical field of building construction, provides a kind of floor system of integrated pipeline and the construction method of the floor system.The construction method includes the following steps: a, being prefabricated in the factory is reserved with several backing plates of splicing construction and wire casing;B, several panels and purchase pipeline are prepared;C, several panels are corresponded in factory in advance and is sticked on several pad surfaces, every piece of panel is made to form an integrated member with every piece of backing plate;D, several integrated members is transported to construction site;E, cleaning operation face is contained in pipeline in wire casing by integrated member paving in work surface, and the splicing construction on integrated member is mutually spliced;F, processing is sealed in the stitching portion of integrated member.The floor system construction technology eliminates tradition, and there are the floor laying methods of wet construction, reduce building waste, are good for the environment, and greatly reduce on-site construction time and working procedure, reduce difficulty of construction and saved construction cost.)

1. a kind of floor system of integrated pipeline, which is characterized in that including several backing plates, several panels and pipeline, the backing plate Upper surface and the lower surface of the panel match, several panels, which correspond, sticks in several backing plates On, the lower end of the backing plate is provided with several spaced wire casings, and the wire casing runs through along the length or width direction of backing plate The backing plate, for the line layout in the wire casing, the edge of several backing plates is equipped with splicing construction, the splicing Structure includes the first splicing construction and the second splicing construction, all has first splicing construction and second on every piece of backing plate Splicing construction is mutually stitched and fastened by first splicing construction with the second splicing construction between several backing plates.

2. floor system as described in claim 1, which is characterized in that first splicing construction is the first L-type tongue and groove, described Second splicing construction is the second L-type tongue and groove mutually identical with the first L-type tongue and groove.

3. floor system as described in claim 1, which is characterized in that first splicing construction is groove structure, described the Two splicing constructions are the cord tissue to match with the groove structure.

4. floor system as described in claim 1, which is characterized in that the pipeline is floor heating pipe, water pipe or electric wire.

5. floor system as described in claim 1, which is characterized in that the backing plate is extruded sheet.

6. a kind of construction method of floor system as described in claim 1, which comprises the steps of:

A, the edge that is prefabricated in the factory is reserved with splicing construction and lower end is reserved with several backing plates of wire casing;

B, purchase or several panels to match in factory's preparation with backing plate upper surface size, purchase floor heating pipe, water pipe or Electric wire is as the pipeline being laid with;

C, several panels are corresponded in factory in advance and is sticked on several pad surfaces, made described in every piece Panel forms an integrated member with every piece of backing plate, and the lower edge of each integrated member is made to all have the splicing knot Structure makes the lower end of each integrated member all have the wire casing;

D, by several integrated member and pipeline transportation to construction site;

E, floor heating pipe, water pipe or electric wire are laid in work surface by cleaning operation face according to use demand pipeline installation;Then By the integrated member paving in be contained in floor heating pipe, water pipe or wire pair should in the wire casing of integrated member, most The splicing construction on the integrated member is mutually spliced afterwards, with overwrite job face;

F, processing is sealed in the stitching portion of the integrated member.

7. construction method as claimed in claim 6, which is characterized in that described step c, d, e and f can be replaced following step It is rapid:

C ', by several backing plates, several panels and pipeline transportation to construction site;

Floor heating pipe, water pipe or electric wire are laid in work surface, then by d ', cleaning operation face according to use demand pipeline installation The backing plate is layed in work surface, be contained in floor heating pipe, water pipe or wire pair should in the wire casing of backing plate lower end, finally will Splicing construction on backing plate is mutually spliced, and so that several backing plates is mutually stitched together, with overwrite job face;

E ', several panels correspondence is pasted to the backing plate;

F ', processing is sealed in the stitching portion of several panels.

8. construction method as claimed in claim 6, which is characterized in that in the step a, it is previously prepared go out with the backing plate The mold that matches of shape, the mold injection is then injected using plastic material and goes out the backing plate.

9. construction method as claimed in claim 8, which is characterized in that the plastic material used is polystyrene foam modeling Material, using the backing plate being molded by as extruded sheet.

Technical field

The invention belongs to technical field of building construction more particularly to the floor systems and the floor system of a kind of integrated pipeline Construction method.

Background technique

Building industry modernization is pushed most importantly to promote the transformation of development mode, it is necessary to get rid of tradition and build The mode made, seeking a kind of building industry modern times turns to evolution of objective path.

Currently, floor is affixed with, traditional thick painting is wet to paste method and plaster application two ways;Wherein, traditional thick painting is wet pastes method It needs there are wet construction, to be also easy to produce a large amount of building wastes, and construction period is slow using cement mortar screeding;And wet construction needs It is required that ceramic tile impregnates in advance, working procedure is cumbersome, and speed of application is slow, waste water resource, and pollutes environment.Although and plaster application The adhesive used is less, and ceramic tile can save water resource, but still remain wet construction, be also easy to produce building waste without immersion, Pollute environment.

In addition, the constructions such as domestic electric wire, water pipe mostly use pre-buried mode by line layout in ground, then spread on the ground Paste floor;It is carried out more however, pipeline service life generally in 10-20 or so, needs to dig within house service life ground It changes, the main structure for causing destroying for times to be built reduces the house's vives.As it can be seen that conventional line built-in process is in maintenance Need to destroy main structure, and maintenance difficulty is larger, at high cost, maintenance efficiency is lower;Meanwhile a large amount of building rubbish are generated when maintenance Rubbish and noise pollution.

Summary of the invention

The technical problem to be solved by the embodiment of the invention is that providing floor system and the floor of a kind of integrated pipeline The construction method of system, it is intended to which solving floor paving construction in the prior art, there are building waste is also easy to produce caused by wet construction And pollute environment and cumbersome problem of constructing.

The embodiments of the present invention are implemented as follows, provides a kind of floor system of integrated pipeline, if the floor system includes Dry backing plate, several panels and pipeline, the upper surface of the backing plate and the lower surface of the panel match, several panels It corresponds and sticks on several backing plates, the lower end of the backing plate is provided with several spaced wire casings, the line Slot runs through the backing plate along the length or width direction of backing plate, and the line layout is in the wire casing, several backing plates Edge be equipped with splicing construction, the splicing construction includes the first splicing construction and the second splicing construction, every piece of backing plate On all have first splicing construction and the second splicing construction, pass through first splicing construction between several backing plates It is mutually stitched and fastened with the second splicing construction.

Further, first splicing construction is the first L-type tongue and groove, and second splicing construction is and the first L The second mutually identical L-type tongue and groove of type tongue and groove.

Further, first splicing construction is groove structure, and second splicing construction is and the groove structure The cord tissue to match.

Further, the pipeline is floor heating pipe, water pipe or electric wire.

Further, the backing plate is extruded sheet.

The embodiment of the present invention also provides a kind of construction method of the floor system of above-mentioned integrated pipeline comprising following step It is rapid:

A, the edge that is prefabricated in the factory is reserved with splicing construction and lower end is reserved with several backing plates of wire casing;

B, purchase or several panels to match in factory's preparation with backing plate upper surface size, buy floor heating pipe, water Pipe or electric wire are as the pipeline being laid with;

C, several panels are corresponded in factory in advance and is sticked on several pad surfaces, make every piece The panel forms an integrated member with every piece of backing plate, and the lower edge of each integrated member is made to all have the spelling Binding structure makes the lower end of each integrated member all have the wire casing;

D, by several integrated member and pipeline transportation to construction site;

E, floor heating pipe, water pipe or electric wire are laid in work surface by cleaning operation face according to use demand pipeline installation; Then by the integrated member paving in the wire casing in work surface, making floor heating pipe, water pipe or wire pair that should be contained in integrated member It is interior, finally the splicing construction on the integrated member is mutually spliced, with overwrite job face;

F, processing is sealed in the stitching portion of the integrated member.

Further, described step c, d, e and f can be replaced following steps:

C ', by several backing plates, several panels and pipeline transportation to construction site;

Floor heating pipe, water pipe or electric wire are laid in work surface by d ', cleaning operation face according to use demand pipeline installation, Then the backing plate is layed in work surface, accommodates floor heating pipe, water pipe or wire pair should in the wire casing of backing plate lower end, finally Splicing construction on backing plate is mutually spliced, so that several backing plates is mutually stitched together, with overwrite job face;

E ', several panels correspondence is pasted to the backing plate;

F ', processing is sealed in the stitching portion of several panels.

Further, in the step a, then the previously prepared mold matched out with the shape of the backing plate is adopted The mold injection, which is injected, with plastic material goes out the backing plate.

Further, the plastic material used is crowded with the backing plate being molded by for polystyrene foam plastics Mould plate.

Compared with prior art, beneficial effect is the embodiment of the present invention: floor system of the invention, by sticking panel It is affixed on backing plate, is mutually stitched and fastened by the first splicing construction with the second splicing construction between backing plate and backing plate, and will Line layout realizes the separation of pipeline and main structure, overcomes traditional preheating embedding line and repairing in the wire casing of backing plate lower end When the drawbacks of need to digging ground, so as to be easily installed and dismantle in the case where not destroying main structure, facilitate maintenance, have Conducive to environmental protection.

Floor system construction method of the invention be first factory prepare several backing plates and with backing plate upper surface size The panel to match is reserved with the splicing construction for several backing plates to be stitched together on backing plate and remains for laying in advance Several panels is corresponded the upper surface for sticking in backing plate in factory by the wire casing of pipeline, and backing plate and panel is made to form one It is transported again after a integrated member to construction site, then accommodates pipeline on acting surface several integrated member pavings In in wire casing, finally the splicing construction on each integrated member is mutually spliced, completes floor to be covered in work surface Paving.The floor system construction technology is dry construction technique, eliminates tradition there are the floor laying method of wet construction, with Building waste is reduced, is good for the environment, and the construction technology greatly reduces on-site construction time and working procedure, reduces Difficulty of construction and construction cost is saved.

Detailed description of the invention

Fig. 1 is a kind of construction method flow chart of floor system provided in an embodiment of the present invention;

Fig. 2 is the backing structure schematic diagram provided in an embodiment of the present invention for being reserved with splicing construction;

Fig. 3 is the backing structure schematic diagram provided in this embodiment for being reserved with wire casing and splicing construction;

Fig. 4 is the structural schematic diagram that correspondence pastes formation integrated member after panel on backing plate shown in Fig. 3.

Fig. 5 is the structural schematic diagram before the integrated member that the embodiment of the present invention one provides mutually splices;

Fig. 6 is the mutually spliced structural schematic diagram of integrated member shown in fig. 5;

Fig. 7 is the structural schematic diagram that integrated member provided by Embodiment 2 of the present invention mutually splices;

Fig. 8 is another construction method flow chart of floor system provided in an embodiment of the present invention.

Fig. 9 is the floor system overall structure diagram of integrated pipeline provided in an embodiment of the present invention;

Figure 10 is the decomposition texture schematic diagram of Fig. 9.

Specific embodiment

In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to the accompanying drawings and embodiments, right The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and It is not used in the restriction present invention.

As shown in Figures 1 to 7, be a kind of integrated pipeline provided in an embodiment of the present invention floor system construction method, The dry construction method includes the following steps:

A, the edge that is prefabricated in the factory is reserved with splicing construction 10 and lower end is reserved with several backing plates 1 of wire casing 20, the splicing Structure 10 is for making several backing plates 2 mutually be stitched together.

B, purchase or several panels 2 to match in factory's preparation with 1 upper surface size of backing plate, make the side of every piece of panel 2 Edge can be bonded the top surface edge of every piece of backing plate 1 of alignment, and according to use demand, the pipeline of purchase is floor heating pipe, water pipe or electricity Line.The floor heating pipe, water pipe or electric wire are laid in the wire casing 20 of backing plate 1 for subsequent construction, and the shape of wire casing 20 is according to laying Pipeline type and line cross-section size and shape depending on.

C, several panels 2 are corresponded in factory in advance and is sticked on several 1 surfaces of backing plate, make every piece of panel 2 and every Block backing plate 1 forms an integrated member 3, in this way, the lower edge of each integrated member 3 all has splicing construction 10, each entirety The lower end of component 3 all has wire casing 20, facilitate it is subsequent carry out quick paving at the construction field (site), save on-site construction time and construction Cost.

D, by several integrated members 3 and pipeline transportation to construction site.

E, cleaning operation face guarantees that work surface meets Ground Nuclear Magnetic Resonance requirement, according to use demand pipeline installation, by floor heating Pipe, water pipe or electric wire are laid in work surface;Then by several integrated members 3 successively paving in work surface, making floor heating pipe, water Pipe or wire pair should be contained in the wire casing 20 of 3 lower end of integrated member, and the splicing construction 10 on integrated member 3 is finally carried out phase Mutually splicing, makes several integrated members 3 be stitched together, with overwrite job face.

F, it is sealed processing in the stitching portion of integrated member 3 using modes such as sealing strip or gluings, guarantees floor paving Leakproofness and stability.

It please refers to shown in Fig. 8, above-mentioned steps c, d, e and f can be can be replaced following steps depending on condition of construction:

C ', by several backing plates 1, several panels 2 and pipeline transportation to construction site.

D ', cleaning operation face, and guarantee that work surface meets Ground Nuclear Magnetic Resonance requirement, according to use demand pipeline installation, by ground Heating coil, water pipe or electric wire are laid in work surface, and several backing plates 1 is successively layed in work surface, make floor heating pipe, water pipe or Wire pair should be contained in the wire casing 20 of 1 lower end of backing plate, and the splicing construction 10 on backing plate 1 is mutually spliced, and be made several Backing plate 1 is mutually stitched together, with overwrite job face.

E ', several panels 2 are corresponded respectively and are pasted by cohesive materials such as glues for tile to several backing plates 1.

F ', processing is sealed in the stitching portion of panel 2 using modes such as sealing strip or gluings.

In above-described embodiment, in step a, the previously prepared mold matched out with the shape of backing plate 1, then using modeling Material material injection mold injection goes out backing plate 1.In the present embodiment, the plastic material used is polystyrene foam plastics, with note The backing plate 1 moulded out is extruded sheet, and using the extruded sheet paving in work surface, which convenient for construction, and has There are excellent insulation, resistance to compression, moisture-proof and antiseptic property, guarantees that floor paving is with good performance.

In step a, it is located at the edge of backing plate 1 in the splicing construction reserved on backing plate 1, splicing construction 10 includes the first spelling Binding structure 101 and the second splicing construction 102 all have the first splicing construction 101 and the second splicing construction 102 on every piece of backing plate 1, And the first splicing construction 101 on one of backing plate 1 can mutually be spelled with the second splicing construction 102 on another piece of backing plate 1 It closes.

It please refers to shown in Fig. 5 and Fig. 6, in the present embodiment one, the first splicing construction 101 on backing plate 1 is the first L-type enterprise Mouthful, the second splicing construction 102 is the second L-type tongue and groove mutually identical with the first L-type tongue and groove, will be passed through between several backing plates 1 First L-type tongue and groove is mutually stitched together with the second L-type tongue and groove.It please refers to shown in Fig. 7, in the present embodiment two, on backing plate 1 First splicing construction 101 can also be groove structure, and the second splicing construction 102 is the cord tissue to match with groove structure, is made It is mutually inserted together between several backing plates 1 by groove structure and cord tissue;It should be noted that above-mentioned first spells Binding structure 101 and the second splicing construction 102 are not limited to two kinds of above-mentioned splicing constructions, any can also mutually spell to be other The structure type connect.

In conclusion floor system construction of the invention is dry construction technique, eliminating tradition, there are the ground of wet construction Board construction method is good for the environment with reducing building waste, and greatly reduces working procedure, reduces difficulty of construction, section About construction cost and construction time.By being laid in electric wire, water pipe or floor heating pipe in the wire casing 20 of backing plate 1, pipe is realized The drawbacks of line is separated with main structure, need to dig ground when overcoming traditional pre-buried line maintenance, so as to not break In the case where bad main structure, the disassembly of backing plate 1 easily can be repaired and be replaced to pipeline, greatly reduce later period dimension Repair and the building waste generated when being transformed and noise pollution, reduce the destruction to natural environment, provide building safety reliability, Durability.

It as shown in Figures 9 and 10, is the floor system of integrated pipeline provided in an embodiment of the present invention.The floor system includes Several backing plates 1, several panels 2 and pipeline 4, the upper surface of backing plate 1 and the lower surface of panel 2 match, and several panels 2 are one by one Correspondence sticks on several backing plates 1, and the lower end of backing plate 1 is provided with several spaced wire casings 20, length of the wire casing 20 along backing plate 1 Degree or width direction run through backing plate 1, and pipeline 4 is laid in wire casing 20, which is floor heating pipe, water pipe or electric wire.Several backing plates 1 edge is equipped with splicing construction 10, the splicing construction 10 include the first splicing construction 101 and the second splicing construction 102, every piece The first splicing construction 101 and the second splicing construction 102 are all had on backing plate 1, pass through the first splicing construction between several backing plates 1 101 mutually stitch and fasten with the second splicing construction 102.

In the present embodiment, which is extruded sheet, and the first splicing construction 101 on backing plate 1 is the first L-type tongue and groove, the Two splicing constructions 102 are the second L-type tongue and groove mutually identical with the first L-type tongue and groove, will pass through the first L between several backing plates 1 Type tongue and groove is mutually stitched together with the second L-type tongue and groove.In other embodiments, the first splicing construction 101 and the second splicing Structure 102 can mutually splice the structure of shape for any other, and such as the first splicing construction 101 is groove structure, the second splicing Structure 102 is the cord tissue to match with groove structure.The floor system is easily installed and dismantles, and facilitates maintenance, is conducive to Environmental protection.

The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Made any modifications, equivalent replacements, and improvements etc., should all be included in the protection scope of the present invention within mind and principle.

14页详细技术资料下载
上一篇:一种医用注射器针头装配设备
下一篇:一种集成管线的干式地板系统及其施工方法

网友询问留言

已有0条留言

还没有人留言评论。精彩留言会获得点赞!

精彩留言,会给你点赞!