A kind of floor edge construction operation platform

文档序号:1768321 发布日期:2019-12-03 浏览:17次 中文

阅读说明:本技术 一种楼层临边施工操作平台 (A kind of floor edge construction operation platform ) 是由 漆勤 谢箭霄 王长胜 聂志强 于 2019-07-19 设计创作,主要内容包括:本发明公开了一种楼层临边施工操作平台,包括底承载层,设置在底承载层上方且通过底爬梯与底承载层相连接的中过度层,以及设置在中过度层前端上方且通过顶爬梯与中过渡层相连接的施工操作层。本发明提供一种楼层临边施工操作平台,能够很好的为施工人员提供一个平台以对建筑的外侧进行施工,其使用放便极大的降低了产品使用的成本,同时移动方便,提高了产品的使用灵活性,同时还能很好的保护施工人员的安全,提高了产品使用的安全性。(The invention discloses a kind of floor edge construction operation platforms, including bottom bearing bed, excessive layer in being arranged in above the bearing bed of bottom and being connected by bottom ladder with bottom bearing bed, and in being arranged in excessively above layer front end and the constructing operation layer that is connected by top ladder with middle transition zone.The present invention provides a kind of floor edge construction operation platform; it can be good at providing a platform for construction personnel with to constructing on the outside of building; it, which uses to put, just greatly reduces the cost that product uses; conveniently moving simultaneously; improve the using flexible of product; the safety that also can be well protected construction personnel simultaneously, improves the safety that product uses.)

1. a kind of floor edge construction operation platform, it is characterised in that: including bottom bearing bed, be arranged above the bearing bed of bottom and logical Cross bottom ladder (8) be connected with bottom bearing bed in excessive layer, and be arranged in above excessive layer front end and by push up ladder (9) the constructing operation layer being connected with middle transition zone.

2. a kind of floor edge construction operation platform according to claim 1, it is characterised in that: the bottom bearing bed is main By underlying platform (1), the four rolling (4) in underlying platform (1) downside quadrangle is set, underlying platform (1) is vertically arranged in Two short support columns at the surface rear end two corners of upside, two root longs being vertically arranged at the two corners of underlying platform (1) upper side front end Support column, and the counterweight fixed platform composition of setting surface rear end on the upside of underlying platform (1).

3. a kind of floor edge construction operation platform according to claim 2, it is characterised in that: excessive layer is main in described By middle layer platform (2), and be vertically arranged the middle layer support bar group of platform (2) upper side forward end in middle level at;In affiliated The downside surface rear end two corners of layer platform (2) are erected at the top of short support column, the middle layer platform (2) drawn money on credit strut run through and in Layer platform (2) strut of being drawn money on credit is bolted at the position with the strut of drawing money on credit.

4. a kind of floor edge construction operation platform according to claim 3, it is characterised in that: the middle layer platform (2) Width it is identical as underlying platform (1), the length of the middle layer platform (2) is slightly longer than underlying platform (1), and the middle layer platform (2) Length less than 5/4 underlying platform (1) length.

5. a kind of floor edge construction operation platform according to claim 4, it is characterised in that: the counterweight fixed platform By the counterweight cabinet (5) with door being fixed on underlying platform (1), the hydraulic cylinder internal in counterweight cabinet (5) is set, is vertically arranged in Counterweight cabinet (5) upper side central location and the upper hydraulic stem (6) through middle layer platform (2) is thought downward through counterweight cabinet (5), and Fixing head (7) composition on hydraulic stem (6) top is set;The hydraulic stem (6) and hydraulic cylinder pass through piping connection.

6. a kind of floor edge construction operation platform according to claim 5, it is characterised in that: the upside of the fixing head Face is provided with several metal nails or rubber pad.

7. a kind of floor edge construction operation platform according to claim 6, it is characterised in that: the constructing operation layer by Operating platform (3), and it is circumferentially positioned at guardrail (10) composition of operating platform (3) upper side front end, left end and right end.

8. a kind of floor edge construction operation platform according to claim 7, it is characterised in that: the operating platform (3) Left and right sides front end be respectively arranged with one piece of main bearing diagonal beam (11), the bottom end of two pieces of main bearing diagonal beams (11) is separately fixed at Center position at left and right sides of underlying platform (1);The left and right sides front end of the middle layer platform (2) is respectively arranged with one piece downwards Inclined sub- bearing diagonal beam (12), the bottom end of two pieces of bearing diagonal beams (12) is separately fixed on two root long support columns.

9. a kind of floor edge construction operation platform according to claim 8, it is characterised in that: the underlying platform (1) The left and right ends of leading flank are respectively forwardly provided with a horizontal additional reinforcement horizontal block (14), in additional reinforcement horizontal block (14) Front end is additionally provided with an additional reinforcement skewback (13), one end and additional reinforcement horizontal block (14) phase of the additional reinforcement skewback (13) Connection, the other end are connected with strut of drawing money on credit.

10. a kind of floor edge construction operation platform according to claim 9, it is characterised in that: the bottom ladder (8) Quantity is two, is separately positioned on the left and right sides of underlying platform (1), and fixed platform (2) in middle level in upper end of bottom ladder (8) Upper and lower end is fixed on underlying platform (1);The upper end of affiliated top ladder (9) is fixed on operating platform (3) upper and lower end and is fixed on On middle layer platform (2).

Technical field

The invention belongs to engineering construction field, in particular to a kind of floor edge construction operation platforms.

Background technique

It in building engineering construction, constructs to the part to floor edge, then needs to build height on the outside of floor Layer scaffold makes construction personnel reach construction location to complete to construct by way of hanging.

But the shortcomings that above-mentioned method, is as follows:

Building time-consuming and laborious and needing to expend a large amount of material for high-rise scaffold, greatly improves the cost of construction, The duration for also greatly extending construction simultaneously is unfavorable for improving project progress.

The mode hung mainly has that platform is hung and construction personnel hangs, the higher cost that platform is hung and equipment is installed With use complexity, not only needing to expend longer installation period extends integrated engineering progress, it is also necessary to expend the higher time with Energy is to transport and install equipment, to improve the cost of construction;Construction personnel hangs, because construction personnel is suspended in midair, The difficulty that construction personnel's construction can greatly be improved, to reduce the efficiency of construction, while there is also great construction risks, no Meet the requirement of today's society.

Summary of the invention

It is an object of the invention to overcome the above problem, a kind of floor edge construction operation platform is provided, can be good at A platform is provided for construction personnel just to greatly reduce what product used using putting to constructing on the outside of building Cost, while conveniently moving improve the using flexible of product, while also can be well protected the safety of construction personnel, mention The safety that high product uses.

The purpose of the invention is achieved by the following technical solution:

A kind of floor edge construction operation platform, including bottom bearing bed are arranged above the bearing bed of bottom and pass through bottom ladder Excessive layer in being connected with bottom bearing bed, and be arranged in above excessive layer front end and by top ladder and middle transition zone phase The constructing operation layer of connection.

Further, four rollings of underlying platform downside quadrangle are arranged in mainly by underlying platform in the bottom bearing bed Wheel is vertically arranged in two short support columns on the upside of underlying platform at surface rear end two corners, is vertically arranged in underlying platform upper side Two root long support columns at the two corners of front end, and the counterweight fixed platform composition of surface rear end on the upside of underlying platform is set.

Further, excessively layer is mainly by middle layer platform in described, and before being vertically arranged platform upper side in middle level Hold end middle layer support bar group at;The downside surface rear end two corners of affiliated middle layer platform are erected at the top of short support column, in this Layer platform strut of being drawn money on credit runs through and platform strut of being drawn money on credit in middle layer is bolted at the position with the strut of drawing money on credit.

Preferably, the width of the middle layer platform is identical as underlying platform, the length of the middle layer platform is slightly longer than bottom Platform, and the length of the middle layer platform is less than the length of 5/4 underlying platform.

Preferably, the counterweight fixed platform is arranged by the counterweight cabinet with door being fixed on underlying platform in counterweight Hydraulic cylinder inside cabinet is vertically arranged in counterweight cabinet upper side central location and thinks downward through counterweight cabinet upper through middle layer platform Hydraulic stem, and be arranged in hydraulic stem top fixing head composition;The hydraulic stem and hydraulic cylinder pass through piping connection.

Preferably, the upper side of the fixing head is provided with several metal nails or rubber pad.

Further, the constructing operation layer is by operating platform, and be circumferentially positioned at operating platform upper side front end, The guardrail of left end and right end composition.

Preferably, the left and right sides front end of the operating platform is respectively arranged with one piece of main bearing diagonal beam, two pieces of masters are oblique The bottom end of supporting beam is separately fixed at center position at left and right sides of underlying platform;The left and right sides front end of the middle layer platform point It is not provided with one piece of sub- bearing diagonal beam tilted down, the bottom end of two pieces of bearing diagonal beams is separately fixed on two root long support columns.

Preferably, the left and right ends of the underlying platform leading flank are respectively forwardly provided with a horizontal additional reinforcement Horizontal block is additionally provided with an additional reinforcement skewback, one end of the additional reinforcement skewback and auxiliary in the front end of additional reinforcement horizontal block Horizontal block is connected, the other end is connected with strut of drawing money on credit for reinforcing.

Preferably, the quantity of the bottom ladder is two, it is separately positioned on the left and right sides of underlying platform, and bottom ladder The fixed platform upper and lower end in middle level in upper end be fixed on underlying platform;The upper end of affiliated top ladder is fixed on the operational platform, On the fixed platform in middle level in lower end.

Compared with prior art, the present invention have the following advantages that and the utility model has the advantages that

Structure of the invention is simple, can be good at providing a platform for construction personnel with to applying on the outside of building Work just greatly reduces the cost that product uses using putting, while conveniently moving, improves the using flexible of product, The safety that also can be well protected construction personnel simultaneously, improves the safety that product uses.

Detailed description of the invention

Fig. 1 is the structural diagram of the present invention.

Description of symbols: 1, underlying platform;2, middle layer platform;3, operating platform;4, idler wheel;5, counterweight cabinet;6, hydraulic Bar;7, fixing head;8, bottom ladder;9, ladder is pushed up;10, guardrail;11, main bearing diagonal beam;12, sub- bearing diagonal beam;13, additional reinforcement Skewback;14, additional reinforcement horizontal block.

Specific embodiment

Below with reference to embodiment, the present invention is described in further detail, and embodiments of the present invention are not limited thereto.