River hydroenergy power station based on two anchor double flow deflectors

文档序号:1843059 发布日期:2021-11-16 浏览:22次 中文

阅读说明:本技术 一种基于双锚双导流板的江河水能发电站 (River hydroenergy power station based on two anchor double flow deflectors ) 是由 不公告发明人 于 2021-05-27 设计创作,主要内容包括:一种基于双锚双导流板的江河水能发电站,本发明是绿色能源装置,利用大江大河的天然水流移动形成的不竭动能(亦称“江河水能”)作为原始动力资源进行发电,采用双锚及锚链(固定装置及锚链)装置对驳船进行定位,江河流水由于位差形成势能并冲击螺旋桨(螺旋轴),带动发电机旋转并转换为电能,经过电控系统调谐,汇聚多组或矩阵式安装的发电机共同的电能,形成600V三相电,并升压至60KV后,通过高压电缆汇入发电总场,最后并入国家电网并输送至用户。(The invention relates to a river water energy power station based on double anchors and double flow guide plates, which is a green energy device and is characterized in that inexhaustible kinetic energy (also called river water energy) formed by the movement of natural water flow of a large river is used as an original power resource to generate electricity, double anchors and anchor chain (fixing devices and anchor chain) devices are adopted to position a barge, potential energy is formed by river water due to potential difference and impacts a propeller (a screw shaft), a generator is driven to rotate and is converted into electric energy, the electric energy common to multiple groups of generators or installed in a matrix form is gathered through an electric control system to form 600V three-phase electricity, the 600V three-phase electricity is boosted to 60KV, and the 600V three-phase electricity is collected into a power generation general field through a high-voltage cable and finally merged into a national power grid and is transmitted to users.)

1. A river water energy power station (hereinafter referred to as a water energy power station) based on double anchors and double guide plates. The hydropower station is characterized in that potential energy formed by natural flow of rivers in China and residual potential energy formed by water flow height difference after hydropower station generates electricity are utilized to carry out potential energy strengthening through guide plates on two sides of a power station barge, so that a generator is driven to convert the potential energy of the rivers into electric energy for generating electricity; the river hydroenergy power station based on the double anchors and the double flow guide plates can be briefly described as a propeller (spiral shaft) which is arranged at the bottom of a ship body in a matrix mode, rotates powerfully under the action of natural water flow and the pressurization of the flow guide plates, and rapidly drives a generator to rotate through a planetary gear to generate electricity, and each generator set is connected to a national power grid under the tuning of an electric control system; the hydropower station has relative stability of position, cheapness in construction and controllability on rivers, and as long as the site selection meets the conditions of geographical geology, hydrological meteorology, flow velocity and the like, the hydropower station (installed on a barge) consisting of a plurality of sets of power generation equipment can generate strong current no matter day, night, spring, summer, autumn and winter, and the powerful current is intersected with the power of other hydropower stations through an electric control system and then is merged into a national power grid.

2. A hydro-energy power plant according to claim 1, characterized in that: the power generation equipment is arranged at the bottom of the barge, a propeller and a screw shaft (which can be used in a superposition way) drive a generator to rotate under the action of potential energy formed by river running water to generate 600V alternating current, the alternating current is regulated to 60KV (or main road voltage of a national power grid) through a booster arranged on the barge, and the alternating current is merged into the national power grid through an electric control system and transmits the electric energy to users.

3. A hydro-energy power plant as defined in claim 1: the anchoring system comprises 1, an anchoring fixing system; 2. a diversion pressurization system; 3. barge hull (carrying generator and power distribution system, etc.); 4. a high voltage transmission cable; 5. a power distribution system; 6. a step-up transformer; 7. a generator; 8. a generator drive shaft; 9. a propeller (a screw shaft), and other accessory facilities.

4. The propeller (screw shaft) driven by river flowing water according to claim 1, wherein under the potential energy formed by the potential difference of flowing water in the hydroelectric power station and the pressure increase of the water potential by the guide plate, the flowing water flows downwards and forwards to generate a very large potential energy, and drives the generator to generate electric energy (multiple groups or matrix arrangement of power generation equipment operate simultaneously, so that the electric energy is increased by multiple times, the benefit and efficiency effects of the power station can be greatly improved), and the electric energy is boosted to 60KV transmission voltage through the power distribution system and the transformer, and is transmitted to the main power grid through the high-voltage cable, and finally is output to users.

5. The power generation system of claim 1, wherein: no matter in the daytime, at night, in spring, summer, autumn and winter, the barge bearing the power generation device can swing properly under the anchoring of the two irons to bear water flow impact at the optimal angle, and under the action of the guide plate, the flow velocity of the water flow is enhanced and the water potential is enhanced, so that each power generation unit is in a full-load power output state.

6. A barge according to claim 1 in which the anchor is anchored to the bottom of a river, in three modes: 1. the barge is fixed on a hydroenergy power station at a certain position of a river through an iron anchor; 2. the aperture of a single cylinder is more than 3 meters, and the single cylinder is driven into the single-point mooring at the deep place of the river mud land through a piling boat, so that a hydroenergy power station of the barge is fixed; 3. the drilling ship which provides accommodation logistics service for abandoned offshore oil fields is eliminated, partial functions such as lifting function, ballast and the like can be reserved, and hydroenergy generating sets and other facilities are added, so that the hydroenergy generating station can be reused. The three ship mooring and positioning modes can be used in groups in one mode or can be comprehensively used in multiple modes.

7. In order to increase the stability of the ship body, a double-hull system and a double-anchor anchoring system can be adopted, and the barge can also be anchored through a river bank.

8. The double flow guide plates according to claim 1 are actually a whole steel plate with radian respectively connected to the left and the right of the ship body, and form an included angle of thirty degrees with the right front of the ship body after installation, so that water energy and water potential can be gathered in a larger area, and the power generation capacity of the single body can be improved.

9. A barge according to claim 1 wherein: the ship body is provided with a plurality of cabins which are distributed according to functions, most cabins are ballast cabins, the generator cabins are arranged in the last but one row at the rear part of the cabin and protrude out of the bottom of the cabin respectively, and the generators are connected with large-sized impellers through connecting shafts which are installed in parallel (the technical requirements for building the impellers can be greatly lower than that of the impellers adopted by sailing ships). The tail part of the ship body is provided with a plurality of same-type impellers. The third last row at the rear part of the cabin is a screw shaft generator system, and the generator is flexibly connected with the screw shaft (the length of the screw shaft and the diameter of an impeller) through a universal shaft and can be matched according to an impeller generator, so that the electric control system can be subjected to proper fine adjustment to realize electric networking.

10. The barge deck according to claim 1, wherein: 1. the manned power station: the main deck is provided with a distribution room (an electric control system), a voltage transformation and boosting room, a monitoring operation room, an equipment maintenance room, a hydrological meteorological room, a storeroom, a living area, a wind power emergency power generation and energy storage system, a small tower crane (an electric crane), a lightning arrester, a wind vane, a satellite antenna, a safety railing, a left and right tugboat berthing ladder of a barge, an anchoring system, a high-strength cabin forced ventilation system, a data transmission system and an emergency escape system (a lifeboat raft). 2. Unmanned power station: the main deck is provided with a distribution room (an electric control system), a voltage transformation and boosting room, a maintenance rest room, a wind power emergency power generation and energy storage system, a small tower crane (an electric crane), a lightning arrester, a wind vane, a satellite antenna, a safety railing, a small mooring platform for left and right tugboats of a barge, an anchoring system, a high-strength cabin forced ventilation system, an emergency escape system (a life raft) and a data transmission system.

Technical Field

The dual-anchor dual-deflector-based river hydroenergy power station can be used as an important supplement of a national green energy hydroelectric power generation branch, so that the initiated innovation concept, construction concept and green prospect provide a realistic, possible and wide imagination space for energy regeneration. The mode is different from potential energy power generation modes of offshore wind power generation, seawater tidal energy, seawater wave energy and damming water storage, and is also different from power generation modes of nuclear power, thermal power, photoelectricity and the like, so that the defects of poor seawater tidal gap, high manufacturing cost, high installation difficulty and no wind or electricity of offshore wind power generation equipment are effectively overcome, the defect of small power generation amount of the offshore wave energy is also overcome, the defects of large scale, high manufacturing cost, low efficiency and the like of damming water storage power generation are also overcome, the potential radiation hazard of nuclear power is avoided, and carbon emission and light pollution are also avoided. The river height and fall form water potential kinetic energy to drive the generator to convert into electric energy, a plurality of sets of equipment do work simultaneously, powerful electric energy can be provided for a national power grid, and if the achievement is applied to rivers suitable for the big rivers in China on a large scale, the achievement is a green power source for promoting the national development.

Background

Enterprises such as electric power and energy firmly establish the concept of energy transformation and green development, technical innovation is increased, energy electric power is promoted from high carbon to low carbon, the pace of replacing petrochemical energy with clean energy is accelerated, and green production and consumption modes are gradually formed. The invention provides a double-anchor double-flow guiding barge and a power station for generating power by utilizing river water flow energy, and aims to exert the good desire of the whole people to participate in green energy construction and combine long-term marine engineering project management, basic level research and profound special thinking.

At present, green energy acquisition mode is comparatively numerous and diverse, and the technical maturity differs: the large wind power generation device is high in manufacturing and operating cost, high in technical requirement, high in installation and maintenance difficulty, long in effect period, capable of forming a huge and dead barrier for seasonally migrating birds and space eagles with strong desire, high in electricity price and not favored by users. The other green energy solar power generation device has large occupied area, and the energy loss of converting light energy into electric energy is large, so that certain light pollution is formed on the periphery. In the aspect of ocean wave energy power generation, certain attempts are made at home and abroad, mainly including three types of mechanical type, pneumatic type and hydraulic type, but the market application prospect is dim, large-scale construction cannot be achieved, and only the creative and experimental stages are remained.

The technology of the invention can also be used for large-scale construction of lower rivers of the power station which is already built and started in the great rivers. If the produced hydroelectric power station is in a full-load operation state, the downward water flow can form impact potential energy, and the potential energy formed by natural fall of the river reach can increase the water flow velocity by 9M/S meters and can drive a propeller with the diameter of 4 meters to drive a generator to generate 500 kilowatts, if a hydroenergy power station is simultaneously provided with 20 sets of water flow generators, the average power of 10000 kilowatts per hour can be generated, and the calculation is carried out by 0.46 yuan per watt, so that 110,400 yuan of RMB can be saved every day for the hydroenergy power station. By this calculation, a hydropower station can create 4029.6 ten thousand yuan of profit all the year round, and the construction cost can be recovered after the hydropower station is put into production for 4 years.

The invention is a continuous utilization of green renewable energy, the power source can not be exhausted, although the generated energy of a single hydroenergy power station has a certain seasonal change between the abundance and exhaustion of river running water, if the site selection is proper (geological conditions, the terrain of the river, the flow velocity of the running water and the water level drop), and the water flow supercharging effect of the double guide plates and a plurality of dragging type hydroenergy power stations which are arranged at a certain distance (the hull is positioned according to the flow velocity, and the distance between the two hydroenergy power stations is proper in 1 sea), the generated energy can be multiplied, the electric power of the plurality of hydroenergy power stations is tuned to a uniform parameter and then is merged into the national power grid. If the technology is applied in a large scale, immeasurable economic and social benefits can be generated, and the fresh water resource value of the great rivers in China is contributed.

Disclosure of Invention

A river hydroenergy power station based on double anchors and double deflectors aims to solve the problem of sustainable utilization of existing green energy, is scientifically planned, innovatively synthesized and massively used through various mature technologies required in the market, utilizes inexhaustible and inexhaustible powerful hydroenergy of a big river of China to be efficiently converted into electric energy, and converges the electric energy into a national power grid through reasonable tuning of voltage, current and electric power so as to provide power guarantee for national green energy construction.

The working principle of the river hydroenergy power station with double anchors and double flow deflectors of the utility model is as follows (briefly described): river water flow is pressurized through a guide plate, increased water energy drives a propeller (screw shaft) to rotate, a plurality of groups of propellers (screw shafts) arranged in a matrix form are arranged at the lower part of a barge, the propellers (screw shafts) respectively drive a generator to generate strong electric power, the electric power is boosted through a silicon controlled tuning and electric control system, and the electric power is converged into a main circuit of the water energy generator, and finally the water energy generator is uniformly distributed to users by a national power grid.

The technical scheme that this practical two diversion plate's rivers hydroenergy power station was taken is: the first system is an anchoring device which comprises an iron anchor, an iron chain, an anchor mark, an iron anchor guide rope, a snap ring, an anchor machine, a guide wheel and an anchor chain pressure sensor; the hydraulic power generation system comprises a propeller, a spiral shaft, a main shaft, a connector, a flexible connector, a generator, a speed change gear box, a boosting tuning control system, an electric control system, a high-voltage transmission line and a slip ring set; and the third is a ship body connection control system, which comprises a ship body, a power distribution room (electric control system), a voltage transformation and boosting room, a monitoring operation room, an equipment maintenance room, a storage room, a living area, a ballast cabin and left and right ship body towing wheel berthing ladders. And fourthly, an assistant system which comprises a hydrological weather detection system, a wind power emergency power generation energy storage system, a small tower crane, a lightning arrester, a wind vane, a satellite antenna, a safety rail, a cabin forced ventilation system, a data transmission system, an emergency escape system (lifeboat raft), a beacon light, a fog light and an airspace warning light.

Drawings

FIG. 1: a river water energy power station (top view) based on double anchor and double flow guide plates:

the figure is a top view of a river water energy power station with double flow guide plates, and the main systems are distributed as follows: the front of the ship body is provided with a double-guide device and an anchoring device; an anchor machine, an auxiliary system and a barge control system are arranged on a barge deck; the inside of the ship body is provided with a generator set, a silicon control system and the like; the lower part of the ship body is provided with a propeller (a spiral shaft).

FIG. 2: a river water energy power station (side view) based on double anchors and double flow deflectors.

Concise legends: the figure is a measured view of a hydropower station, an upper part of a waterline control room, an anchor machine, a main deck, a small electric crane and the like; the inside of the ship body is provided with a generator set, a ballast tank and an operation and maintenance room; the lower part of the waterline is provided with a guide plate, a propeller (a spiral shaft) and the like.

Detailed Description

The method comprises the steps of building a river hydroenergy power station provided with the double anchors and the double flow guide plates, firstly carrying out hydrological and geological condition investigation on a big river of China, having the knowledge of relevant national regulations and rules, carrying out feasibility analysis on the built hydropower station and issuing a report, carrying out desktop deduction on the analysis report, building a model according to a certain proportion after acquiring data to obtain actual data, and modifying and correcting each component part to pursue an optimal design.

In the lower section of a national large hydroelectric power station and a river channel which does not influence navigation, a river section which has high flow speed, large fall, less quicksand, stable geological conditions, proper water depth and no obstacles is selected as a preferred implantation point of the hydropower station.

The river water power station with the double anchors and the double flow guide plates is pulled to the implantation point by a large work ship.

Transferring the anchor to an anchor throwing ship, throwing the two iron anchors to the front river bottom in a fifteen-degree direction, wherein the iron anchors and the anchoring hole of the ship body form a fifteen-degree angle; starting the anchor machine and tightening the iron chain; the working ship is connected with the tail of the barge, and applies force to five times of load when the hydroelectric power station normally works, if the anchor is out, the larger iron anchor is replaced to obtain larger ground holding force and meet the requirement of five times of safe load.

And respectively debugging the hydroenergy generator sets, carrying out internal grid connection through the electric control system after test operation, and merging the electric control system into an external network (national power grid) after the conditions are met.