Construction method for heating pipeline at water distributing and collecting device part

文档序号:1873454 发布日期:2021-11-23 浏览:16次 中文

阅读说明:本技术 一种分集水器部位采暖管道施工方法 (Construction method for heating pipeline at water distributing and collecting device part ) 是由 张俊杰 黄运昌 王晓东 李享 于 2021-09-05 设计创作,主要内容包括:本发明公开了一种分集水器部位采暖管道施工方法,所述分集水器部位采暖管道施工方法包括如下步骤:地暖管安装,按照施工规范对地暖管进行安装,将地暖管铺设于地面基层;固定夹板的设计制作,采用钻孔装置在固定夹板上开设多个安装孔,所述安装孔用于贯穿所述地暖管,多个所述安装孔等间距设置;地暖管穿过固定夹板,将地暖管一一对应的穿过固定夹板上的安装孔,所述安装孔将多根所述地暖管独立分离;固定夹板的固定安装,将固定夹板固定安装于墙面,从而将固定夹板的位置固定;地面施工,在地面基层上进行浇筑,将铺设在地面基层上的地暖管覆盖。原材料可使用施工现场木模板边角料,可以提高边角料的二次利用,该材料还可以重复利用。(The invention discloses a construction method of heating pipelines at water distributing and collecting device positions, which comprises the following steps: installing the ground heating pipes, namely installing the ground heating pipes according to the construction specification, and paving the ground heating pipes on a ground base layer; the design and manufacture of the fixed splint are realized by adopting a drilling device to form a plurality of mounting holes on the fixed splint, wherein the mounting holes are used for penetrating through the floor heating pipes and are arranged at equal intervals; the ground heating pipes penetrate through the fixing clamping plate, the ground heating pipes correspondingly penetrate through the mounting holes in the fixing clamping plate one by one, and the mounting holes separate the plurality of ground heating pipes independently; the fixed splint is fixedly arranged, and the fixed splint is fixedly arranged on the wall surface, so that the position of the fixed splint is fixed; and (3) ground construction, namely pouring on a ground base layer, and covering the ground heating pipes paved on the ground base layer. The raw material can use the leftover material of the wood template in the construction site, the secondary utilization of the leftover material can be improved, and the material can be recycled.)

1. A construction method for heating pipelines at water distributing and collecting device positions is characterized by comprising the following steps:

installing the ground heating pipes, namely installing the ground heating pipes according to the construction specification, and paving the ground heating pipes on a ground base layer;

the design and manufacture of the fixed splint are realized by adopting a drilling device to form a plurality of mounting holes on the fixed splint, wherein the mounting holes are used for penetrating through the floor heating pipes and are arranged at equal intervals;

the ground heating pipes penetrate through the fixing clamping plate, the ground heating pipes correspondingly penetrate through the mounting holes in the fixing clamping plate one by one, and the mounting holes separate the plurality of ground heating pipes independently;

the fixed splint is fixedly arranged, and the fixed splint is fixedly arranged on the wall surface, so that the position of the fixed splint is fixed;

performing ground construction, namely pouring on a ground base layer, and covering the ground heating pipes paved on the ground base layer;

and a water distributor and a water collector are arranged, and a pipe orifice in the ground heating pipe after penetrating through the fixed clamping plate is connected with the water distributor and the water collector.

2. The method for constructing the heating pipeline at the water dividing and collecting device part as claimed in claim 1, wherein the fixing clamp plate is designed and manufactured in the step, the width of the fixing clamp plate is between 100 and 115mm, and the length of the fixing clamp plate is between 320 and 350 mm.

3. The method for constructing the heating pipeline at the water dividing and collecting device part according to claim 1, wherein in the step of designing and manufacturing the fixing splint, the drilling device adopts a bench drill.

4. The method for constructing the heating pipeline at the water dividing and collecting device part according to claim 1, wherein in the step of designing and manufacturing the fixing splint, the size of the mounting holes is 16-20mm, and the hole center distance between two adjacent mounting holes is 35-40 mm.

5. The method for constructing the heating pipeline at the water dividing and collecting device part according to claim 1, wherein in the step of fixedly installing the fixing splint, the lower part of the upper layer fixing splint is lined with a wood template strip, the wood template strip is fixed on the wall surface by two steel nails, and the upper layer fixing splint is nailed on the wood strip by the steel nails.

6. The method for constructing a heating pipeline at the position of a water collector and collector as claimed in claim 1, wherein the bracket for fixing the splint and the wood formwork strip are removed after the step of ground construction and before the step of installation and connection of the water collector and collector.

Technical Field

The invention belongs to the technical field of installation and construction of ground heating pipes, and particularly relates to a construction method of a heating pipeline at a water distributing and collecting device part.

Background

Water distributor-water distributor-device for connecting main heating water supply pipe and water return pipe in floor heating system. The water separator is divided into a water separator and a water collector. The water distributor is a water distribution device which is used for connecting water supply pipes of heating pipes in a water system. The water collector is a water collecting device which is arranged in a water system and is used for connecting water return pipes of heating pipes.

With the development of the construction industry, the new technology of the new process is endlessly developed, and how to effectively simplify the process flow and shorten the construction period becomes the key point of attention of each construction enterprise. The special item of ground heating water collecting and distributing device in the heating and ventilating project is in the important stage of installation and construction, how to ensure that the heating pipeline is straight and the space is even, the later stage of being convenient for is connected with the water collecting and distributing device pipeline, and the device has important significance for later stage installation and delivery owners.

Disclosure of Invention

Based on the technical problems in the background art, the invention provides a construction method of a heating pipeline at a water distributing and collecting device part.

The invention provides a construction method of heating pipelines at water distributing and collecting device positions, which comprises the following steps:

installing the ground heating pipes, namely installing the ground heating pipes according to the construction specification, and paving the ground heating pipes on a ground base layer;

the design and manufacture of the fixed splint are realized by adopting a drilling device to form a plurality of mounting holes on the fixed splint, wherein the mounting holes are used for penetrating through the floor heating pipes and are arranged at equal intervals;

the ground heating pipes penetrate through the fixing clamping plate, the ground heating pipes correspondingly penetrate through the mounting holes in the fixing clamping plate one by one, and the mounting holes separate the plurality of ground heating pipes independently;

the fixed splint is fixedly arranged, and the fixed splint is fixedly arranged on the wall surface, so that the position of the fixed splint is fixed;

performing ground construction, namely pouring on a ground base layer, and covering the ground heating pipes paved on the ground base layer;

and a water distributor and a water collector are arranged, and a pipe orifice in the ground heating pipe after penetrating through the fixed clamping plate is connected with the water distributor and the water collector.

Preferably, in the step of designing and manufacturing the fixing splint, the width of the fixing splint is between 100 and 115mm, and the length of the fixing splint is between 320 and 350 mm.

Preferably, in the step of designing and manufacturing the fixed splint, the drilling device adopts a bench drill.

Preferably, in the design and manufacture of the step fixing splint, the size of the mounting holes is 16-20mm, and the hole center distance between two adjacent mounting holes is 35-40 mm.

Preferably, in the step of fixing the fixing splint, the wood pattern lath is lined below the upper layer fixing splint, the wood pattern lath is fixed on the wall surface by two steel nails, and the upper layer fixing splint is nailed on the wood lath by the steel nails.

Preferably, the bracket for fixing the clamping plate and the wood formwork strip are removed after the step of ground construction and before the step of installing and taking over the water collecting and distributing device.

Compared with the prior art, the invention has the beneficial effects that:

1. the raw materials can use leftover materials of the wood template in the construction site, the secondary utilization of the leftover materials can be improved, and the materials can be recycled;

2. the construction is simple and convenient, and the site constructors can construct the concrete;

3. the space between the heating pipes and the wall is not limited, the later heating pipes are smooth and straight, and the connecting pipes are convenient; if the wall surface is not plastered, the distance between the wall surface and the wall can be uniformly increased.

Detailed Description

The technical solution of the present invention will be clearly and completely described below.

A construction method of heating pipelines at water distributing and collecting device positions comprises the following steps:

installing the ground heating pipes, namely installing the ground heating pipes according to the construction specification, and paving the ground heating pipes on a ground base layer;

the design and manufacture of the fixed splint are realized by adopting a drilling device to form a plurality of mounting holes on the fixed splint, wherein the mounting holes are used for penetrating through the floor heating pipes and are arranged at equal intervals;

the ground heating pipes penetrate through the fixing clamping plate, the ground heating pipes correspondingly penetrate through the mounting holes in the fixing clamping plate one by one, and the mounting holes separate the plurality of ground heating pipes independently;

the fixed splint is fixedly arranged, and the fixed splint is fixedly arranged on the wall surface, so that the position of the fixed splint is fixed;

performing ground construction, namely pouring on a ground base layer, and covering the ground heating pipes paved on the ground base layer;

and a water distributor and a water collector are arranged, and a pipe orifice in the ground heating pipe after penetrating through the fixed clamping plate is connected with the water distributor and the water collector.

Among the above-mentioned technical scheme, through equidistant mounting hole that sets up on solid fixed splint, with the mounting hole that passes of ground heating pipe one by one during the installation to make equidistant separation of a plurality of ground heating coil, further be convenient for more follow-up and divide water collector's being connected.

The preferable technical proposal is that the design and the manufacture of the fixing splint in the step are carried out, the width of the adopted fixing splint is between 100 and 115mm, and the length is between 320 and 350 mm; particularly, the splint with the size can meet the installation requirements of heating pipelines at most of water collecting and distributing devices.

According to the preferable technical scheme, in the step of designing and manufacturing the fixed splint, the drilling device adopts a bench drill; when the fixed splint is manufactured in a specific design, holes are drilled in the fixed splint through the bench drill.

According to the preferable technical scheme, in the step of designing and manufacturing the fixing splint, the size of the mounting holes is 16-20mm, and the hole center distance between every two adjacent mounting holes is 35-40 mm.

According to the preferable technical scheme, in the step of fixing and installing the fixing clamp plates, wood template strips are lined below the upper layer of fixing clamp plates, the wood template strips are fixed on the wall surface by two steel nails, and the upper layer of fixing clamp plates are nailed on the wood strips by the steel nails; among the specific this technical scheme, the upper strata is fixed on the wall through the wood pattern lath, and wherein the distance between solid fixed splint and the wall can be decided by the length of wood pattern lath, and can adjust according to the in service behavior.

According to the preferable technical scheme, after the step of ground construction and before the step of water distributor installation and pipe connection, the bracket for fixing the clamping plate and the wood formwork strip are detached.

By adopting the technical scheme, compared with the existing construction method of the heating pipeline at the water distributing and collecting device part, the construction method of the heating pipeline at the water distributing and collecting device part has the advantages that the raw materials can use the leftover materials of the wood template at the construction site, the secondary utilization of the leftover materials can be improved, and the materials can be reused; meanwhile, the construction method is simple and convenient to construct, and field constructors can construct the concrete; the space between the heating pipe and the wall is not limited, the later heating pipe is smooth and straight, and the pipe connection is convenient; if the wall surface is not plastered, the distance between the wall surface and the wall can be uniformly increased.

The technical solution is further described by the following specific examples, and it is obvious that the described examples are only a part of examples of the present invention, but not all examples.

Example one

A construction method of heating pipelines at water distributing and collecting device positions comprises the following steps:

installing the ground heating pipes, namely installing the ground heating pipes according to the construction specification, and paving the ground heating pipes on a ground base layer;

designing and manufacturing a fixed splint, namely manufacturing the fixed splint with the width of 100mm and the length of 320mm, and then arranging a plurality of mounting holes on the fixed splint by adopting a drilling device, wherein the drilling device is a bench drill, the mounting holes are used for penetrating through the floor heating pipes, the mounting holes are arranged at equal intervals, the size of each mounting hole is 16mm, and the hole center interval of every two adjacent mounting holes is 35 mm;

the ground heating pipes penetrate through the fixing clamping plate, the ground heating pipes correspondingly penetrate through the mounting holes in the fixing clamping plate one by one, and the mounting holes separate the plurality of ground heating pipes independently;

the fixing clamp plate is fixedly arranged on a wall surface, so that the position of the fixing clamp plate is fixed, a wood template strip is lined below the upper layer of fixing clamp plate, the wood template strip is fixed on the wall surface by two steel nails, and the upper layer of fixing clamp plate is nailed on the wood strip by the steel nails;

constructing the ground, namely pouring on a ground base layer, covering a ground heating pipe paved on the ground base layer, and then removing a bracket for fixing a splint and a wood template strip;

and a water distributor and a water collector are arranged, and a pipe orifice in the ground heating pipe after penetrating through the fixed clamping plate is connected with the water distributor and the water collector.

Example two

A construction method of heating pipelines at water distributing and collecting device positions comprises the following steps:

installing the ground heating pipes, namely installing the ground heating pipes according to the construction specification, and paving the ground heating pipes on a ground base layer;

designing and manufacturing a fixed splint, namely manufacturing the fixed splint with the width of 115mm and the length of 350mm, and then arranging a plurality of mounting holes on the fixed splint by adopting a drilling device, wherein the drilling device is a bench drill, the mounting holes are used for penetrating through the floor heating pipes, the mounting holes are arranged at equal intervals, the size of each mounting hole is 20mm, and the hole center interval of every two adjacent mounting holes is 40 mm;

the ground heating pipes penetrate through the fixing clamping plate, the ground heating pipes correspondingly penetrate through the mounting holes in the fixing clamping plate one by one, and the mounting holes separate the plurality of ground heating pipes independently;

the fixing clamp plate is fixedly arranged on a wall surface, so that the position of the fixing clamp plate is fixed, a wood template strip is lined below the upper layer of fixing clamp plate, the wood template strip is fixed on the wall surface by two steel nails, and the upper layer of fixing clamp plate is nailed on the wood strip by the steel nails;

constructing the ground, namely pouring on a ground base layer, covering a ground heating pipe paved on the ground base layer, and then removing a bracket for fixing a splint and a wood template strip;

and a water distributor and a water collector are arranged, and a pipe orifice in the ground heating pipe after penetrating through the fixed clamping plate is connected with the water distributor and the water collector.

EXAMPLE III

A construction method of heating pipelines at water distributing and collecting device positions comprises the following steps:

installing the ground heating pipes, namely installing the ground heating pipes according to the construction specification, and paving the ground heating pipes on a ground base layer;

designing and manufacturing a fixed splint, namely manufacturing the fixed splint with the width of 110mm and the length of 340mm, and then arranging a plurality of mounting holes on the fixed splint by adopting a drilling device, wherein the drilling device is a bench drill, the mounting holes are used for penetrating through the floor heating pipes, the mounting holes are arranged at equal intervals, the size of each mounting hole is 18mm, and the hole center interval of every two adjacent mounting holes is 36 mm;

the ground heating pipes penetrate through the fixing clamping plate, the ground heating pipes correspondingly penetrate through the mounting holes in the fixing clamping plate one by one, and the mounting holes separate the plurality of ground heating pipes independently;

the fixing clamp plate is fixedly arranged on a wall surface, so that the position of the fixing clamp plate is fixed, a wood template strip is lined below the upper layer of fixing clamp plate, the wood template strip is fixed on the wall surface by two steel nails, and the upper layer of fixing clamp plate is nailed on the wood strip by the steel nails;

constructing the ground, namely pouring on a ground base layer, covering a ground heating pipe paved on the ground base layer, and then removing a bracket for fixing a splint and a wood template strip;

and a water distributor and a water collector are arranged, and a pipe orifice in the ground heating pipe after penetrating through the fixed clamping plate is connected with the water distributor and the water collector.

The foregoing is only a preferred embodiment of the present invention, and it should be noted that, for those skilled in the art, various modifications and decorations can be made without departing from the principle of the present invention, and these modifications and decorations should also be regarded as the protection scope of the present invention.

6页详细技术资料下载
上一篇:一种医用注射器针头装配设备
下一篇:一种供热及储能系统

网友询问留言

已有0条留言

还没有人留言评论。精彩留言会获得点赞!

精彩留言,会给你点赞!