Heating ventilation device in heat supply building

文档序号:1962357 发布日期:2021-12-14 浏览:9次 中文

阅读说明:本技术 一种供热建筑内的暖气通风装置 (Heating ventilation device in heat supply building ) 是由 董丽芬 于 2021-08-06 设计创作,主要内容包括:本发明公开了供热技术领域的一种供热建筑内的暖气通风装置,包括除菌箱,除菌箱上端安装有盖板,除菌箱内部安装有两个除菌网,除菌箱前端上部安装有进气管,进气管前端安装有气泵,除菌箱后端中部安装有连接管,连接管中部安装有第一安装板和第二安装板,第二安装板右侧安装有两个第一锁紧螺栓,第一锁紧螺栓均与第一安装板转动连接,连接管前端安装有加热室,加热室内底端安装有加热片;本发明中,通过过滤网对暖气进行过滤作业,暖气内部含有的杂质在收集槽内部进行储存,定期握住握板,将收集槽内的杂质进行清除,暖气穿过过滤网会导致连接柱上下运动,使过滤网进行上下震动,避免灰尘对过滤网产生堵塞,避免暖气污染,减少对人体损害。(The invention discloses a heating ventilation device in a heat supply building, which belongs to the technical field of heat supply and comprises a sterilization box, wherein a cover plate is arranged at the upper end of the sterilization box, two sterilization nets are arranged in the sterilization box, an air inlet pipe is arranged at the upper part of the front end of the sterilization box, an air pump is arranged at the front end of the air inlet pipe, a connecting pipe is arranged in the middle of the rear end of the sterilization box, a first mounting plate and a second mounting plate are arranged in the middle of the connecting pipe, two first locking bolts are arranged on the right side of the second mounting plate, the first locking bolts are rotatably connected with the first mounting plate, a heating chamber is arranged at the front end of the connecting pipe, and a heating sheet is arranged at the bottom end in the heating chamber; according to the invention, the heating installation is filtered through the filter screen, impurities contained in the heating installation are stored in the collecting tank, the holding plate is held regularly to remove the impurities in the collecting tank, the heating installation passes through the filter screen to cause the connecting column to move up and down, so that the filter screen vibrates up and down, the filter screen is prevented from being blocked by dust, the heating installation pollution is avoided, and the damage to a human body is reduced.)

1. A heating ventilation device in a heating building, comprising a sterilization box (11), characterized in that: the upper end of the sterilizing box (11) is provided with a cover plate (1), two sterilizing nets (17) are arranged in the sterilizing box (11), an air inlet pipe (3) is arranged at the upper part of the front end of the sterilizing box (11), an air pump (4) is arranged at the front end of the air inlet pipe (3), a connecting pipe (30) is arranged in the middle of the rear end of the sterilizing box (11), a first mounting plate (18) and a second mounting plate (19) are arranged in the middle of the connecting pipe (30), two first locking bolts (20) are arranged on the right side of the second mounting plate (19), the first locking bolts (20) are rotatably connected with the first mounting plate (18), a heating chamber (15) is arranged at the front end of the connecting pipe (30), a heating sheet (16) is arranged at the inner bottom end of the heating chamber (15), an exhaust pipe (14) is installed in the middle of the upper end of the heating chamber (15), and an air outlet net (13) is installed at the upper end of the exhaust pipe (14).

2. A heating and ventilation unit for a heating building as claimed in claim 1, wherein: intake pipe (3) mid-mounting has rose box (2), mid-mounting has filter screen (23) in rose box (2), bottom plate (29) are all installed to filter screen (23) upper end four corners department, spliced pole (21) are all installed to bottom plate (29) upper end, fixed plate (22) are all installed at spliced pole (21) middle part, fixed plate (22) inboard all with rose box (2) fixed connection.

3. A heating and ventilation unit for a heating building as claimed in claim 2, wherein: collecting vat (6) is installed to bottom in rose box (2), collecting vat (6) and rose box (2) sliding connection, board (7) are held to collecting vat (6) front end installation, hold and install on board (7) antiskid circle (8), bottom plate (5) are installed to rose box (2) lower extreme, bottom plate (5) right side and degerming case (11) fixed connection.

4. A heating and ventilation unit for a heating building as claimed in claim 1, wherein: degerming case (11) lower extreme four corners department all installs slip post (25), surge chamber (10) are all installed to slip post (25) lower extreme, a plurality of springs (26) are installed to bottom in surge chamber (10), baffle (24) are installed to spring (26) upper end, baffle (24) upper end all with slip post (25) fixed connection.

5. A heating and ventilation unit for a heating building as claimed in claim 1, wherein: second locking bolt (27) are all installed to apron (1) upper end four corners department, second locking bolt (27) all rotate with apron (1) and are connected.

6. A heating and ventilation unit for a heating building as claimed in claim 1, wherein: sealing sheet (28) are installed to apron (1) and degerming case (11) junction, sealing sheet (28) upper end and apron (1) fixed connection.

7. A heating and ventilation unit for a heating building as claimed in claim 1, wherein: the middle of the connecting pipe (30) is provided with a first electromagnetic valve (12), and the middle of the exhaust pipe (14) is provided with a second electromagnetic valve (31).

8. A heating and ventilation unit for a heating building as claimed in claim 1, wherein: degerming case (11) left side installation control panel (9), control panel (9) all with air pump (4) and heating plate (16) electric connection.

Technical Field

The invention relates to the technical field of heat supply, in particular to a heating ventilation device in a heat supply building.

Background

The warm air refers to a facility for keeping out cold in winter in northern China and in national regions with low annual average temperature. The product and the method for meeting the heating requirement of people are widely used, and the product is a product which heats a heat medium by a heat source and then heats air to form heat exchange and then increases the ambient temperature. The common heating installation in north is the water heating scheme, and the earliest design requirement in practice mainly comes from freezing of the tap water pipe in winter in the area where the temperature can reach below 0 ℃, and the coping strategy is generated by the phenomenon. In short, heating is a service or side effect for supplying water to urban residents.

In the prior art, the inside of a heating device in a building contains impurities, and the impurities can pollute air and damage human bodies; heating installation ventilation unit in the building is not provided with the dehumidification function, leads to the inside moisture that contains of exhaust heating installation, and moisture adsorbs the dust in the air, causes the pollution, brings the inconvenience.

Disclosure of Invention

The present invention is directed to a heating and ventilating device in a heating building to solve the above problems.

In order to achieve the purpose, the invention provides the following technical scheme: the utility model provides a heating installation ventilation unit in heat supply building, including the degerming case, the apron is installed to degerming case upper end, degerming case internally mounted has two degerming nets, degerming case front end upper portion installs the intake pipe, the air pump is installed to the intake pipe front end, degerming case rear end mid-mounting has the connecting pipe, the connecting pipe mid-mounting has first mounting panel and second mounting panel, two first locking bolts are installed on second mounting panel right side, first locking bolt all rotates with first mounting panel to be connected, the heating chamber is installed to the connecting pipe front end, the heating plate is installed to the bottom in the heating chamber, heating chamber upper end mid-mounting has the blast pipe, the net of giving vent to anger is installed to the blast pipe upper end.

As a further scheme of the invention: intake pipe mid-mounting has the rose box, mid-mounting has the filter screen in the rose box, bottom plate is all installed to filter screen upper end four corners department, the spliced pole is all installed to the bottom plate upper end, the fixed upper plate is all installed at the spliced pole middle part, the fixed upper plate inboard all with rose box fixed connection, the filter screen carries out the filtering operation to the heating installation, the inside impurity that contains of heating installation is stored inside the collecting vat, the heating installation passes the filter screen and can lead to the spliced pole up-and-down motion, it shakes from top to bottom to make the filter screen, avoid the dust to produce the jam to the filter screen, avoid heating installation to pollute, reduce the harm to the human body.

As a further scheme of the invention: the collecting vat is installed to rose box bottom, collecting vat and rose box sliding connection, and the holding plate is installed to the collecting vat front end, installs the antiskid circle on the holding plate, and the bottom plate is installed to the rose box lower extreme, and the holding plate is regularly held with degerming case fixed connection on the bottom plate right side, clears away the impurity in the collecting vat, and it is convenient to bring.

As a further scheme of the invention: the degerming case lower extreme four corners department all installs the slip post, and the surge chamber is all installed to slip post lower extreme, and a plurality of springs are installed to the bottom in the surge chamber, and the baffle is installed to the spring upper end, the baffle upper end all with slip post fixed connection, slip post downstream makes the baffle downstream, and the spring extrudees to the vibrations that the device produced have been slowly reduced, have played absorbing effect.

As a further scheme of the invention: second locking bolt is all installed to apron upper end four corners department, and second locking bolt all rotates with the apron to be connected, unscrews second locking bolt, changes the degerming net, and it is convenient to bring.

As a further scheme of the invention: the gasket is installed with degerming case junction to the apron, gasket upper end and apron fixed connection, and the gasket seals degerming incasement portion, has improved the leakproofness of degerming case.

As a further scheme of the invention: the connecting pipe mid-mounting has first solenoid valve, and the blast pipe mid-mounting has the second solenoid valve, and the velocity of flow of heating installation is all controlled to first solenoid valve and second solenoid valve, conveniently controls the operation.

As a further scheme of the invention: degerming case left side installation control panel, control panel all with air pump and heating plate electric connection, control panel all controls air pump and heating plate, brings conveniently.

Compared with the prior art, the invention has the beneficial effects that:

1. according to the invention, the heating installation is filtered through the filter screen, impurities contained in the heating installation are stored in the collecting tank, the holding plate is held regularly to remove the impurities in the collecting tank, the heating installation passes through the filter screen to cause the connecting column to move up and down, so that the filter screen vibrates up and down, the filter screen is prevented from being blocked by dust, the heating installation pollution is avoided, and the damage to a human body is reduced.

2. In the invention, the heating air enters the heating chamber 15 through the connecting pipe, and the heating sheet 16 carries out heating and dehumidifying operation on the heating air, thereby preventing pollution and bringing convenience.

Drawings

FIG. 1 is a schematic external view of the present invention;

FIG. 2 is a schematic view of the structure of the filtration tank of the present invention;

FIG. 3 is an enlarged view of A of the present invention;

FIG. 4 is an enlarged view of B of the present invention;

FIG. 5 is an enlarged view of the present invention C;

FIG. 6 is a schematic view of the sterilization case of the present invention;

FIG. 7 is a schematic view of a heating chamber according to the present invention;

FIG. 8 is a schematic view showing the structure of a buffer chamber according to the present invention.

In the figure: 1. a cover plate; 2. a filter box; 3. an air inlet pipe; 4. an air pump; 5. a base plate; 6. collecting tank; 7. holding the plate; 8. an anti-slip ring; 9. a control panel; 10. a buffer chamber; 11. a sterilization box; 12. a first solenoid valve; 13. an air outlet net; 14. an exhaust pipe; 15. a heating chamber; 16. a heating plate; 17. a sterilization net; 18. a first mounting plate; 19. a second mounting plate; 20. a first locking bolt; 21. connecting columns; 22. an upper fixing plate; 23. a filter screen; 24. a baffle plate; 25. a sliding post; 26. a spring; 27. a second locking bolt; 28. sealing the sheet; 29. a lower fixing plate; 30. a connecting pipe; 31. a second solenoid valve.

Detailed Description

The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.

Referring to fig. 1 to 8, in an embodiment of the present invention, a heating ventilation device in a heat supply building includes a sterilization box 11, a cover plate 1 is installed at an upper end of the sterilization box 11, two sterilization nets 17 are installed inside the sterilization box 11, an air inlet pipe 3 is installed at an upper portion of a front end of the sterilization box 11, an air pump 4 is installed at a front end of the air inlet pipe 3, a connecting pipe 30 is installed at a middle portion of a rear end of the sterilization box 11, a first mounting plate 18 and a second mounting plate 19 are installed at a middle portion of the connecting pipe 30, two first locking bolts 20 are installed at a right side of the second mounting plate 19, the first locking bolts 20 are rotatably connected with the first mounting plate 18, a heating chamber 15 is installed at a front end of the connecting pipe 30, a heating plate 16 is installed at an inner bottom end of the heating chamber 15, an exhaust pipe 14 is installed at a middle portion of an upper end of the heating chamber 15, and an air outlet net 13 is installed at an upper end of the exhaust pipe 14.

3 mid-mounting in intake pipe has rose box 2, mid-mounting has filter screen 23 in the rose box 2, bottom plate 29 is all installed to filter screen 23 upper end four corners department, spliced pole 21 is all installed to bottom plate 29 upper end, fixed plate 22 is all installed at spliced pole 21 middle part, 22 inboard all with rose box 2 fixed connection of fixed plate, filter screen 23 filters the operation to the heating installation, the inside impurity that contains of heating installation is stored in 6 insidely of collecting vat, the heating installation passes filter screen 23 and can lead to spliced pole 21 up-and-down motion, make filter screen 23 shake from top to bottom, avoid the dust to produce the jam to filter screen 23, avoid the heating installation to pollute, the reduction is to the human harm.

Collecting vat 6 is installed to 2 bottom ends in the rose box, and collecting vat 6 and 2 sliding connection of rose box, holding plate 7 is installed to 6 front ends in collecting vat, installs antiskid circle 8 on holding plate 7, and bottom plate 5 is installed to 2 lower extremes in rose box, and 5 right sides of bottom plate and degerming case 11 fixed connection regularly hold holding plate 7, clear away the impurity in collecting vat 6, it is convenient to bring.

The sliding columns 25 are installed at four corners of the lower end of the degerming box 11, the buffer chamber 10 is installed at the lower end of each sliding column 25, a plurality of springs 26 are installed at the bottom end of each buffer chamber 10, the baffle plate 24 is installed at the upper end of each spring 26, the upper end of each baffle plate 24 is fixedly connected with the corresponding sliding column 25, the sliding columns 25 move downwards, the baffle plates 24 move downwards, the springs 26 extrude, vibration generated by the device is reduced, and the effect of shock absorption is achieved.

Second locking bolt 27 is all installed in apron 1 upper end four corners department, and second locking bolt 27 all rotates with apron 1 to be connected, unscrews second locking bolt 27, changes degerming net 17, and it is convenient to bring.

The sealing piece 28 is installed with degerming case 11 junction to apron 1, sealing piece 28 upper end and apron 1 fixed connection, and sealing piece 28 is sealed 11 insides of degerming case, has improved degerming case 11's leakproofness.

The first electromagnetic valve 12 is installed in the middle of the connecting pipe 30, the second electromagnetic valve 31 is installed in the middle of the exhaust pipe 14, and the first electromagnetic valve 12 and the second electromagnetic valve 31 both control the flow rate of the warm air, so that the operation is convenient to control.

Degerming case 11 left side installation control panel 9, control panel 9 all with air pump 4 and heating plate 16 electric connection, control panel 9 all controls air pump 4 and heating plate 16, and it is convenient to bring.

The working principle of the invention is as follows: starting the air pump 4, the heating air in the building enters the filter box 2 from the air inlet pipe 3, the filter screen 23 filters the heating air, impurities contained in the heating air are stored in the collecting tank 6, the holding plate 7 is periodically held, the impurities in the collecting tank 6 are removed, the heating air passes through the filter screen 23 to cause the connecting column 21 to move up and down, the filter screen 23 vibrates up and down, the dust is prevented from blocking the filter screen 23, the heating air enters the sterilizing box 11 after the heating air is filtered, the sterilizing net 17 performs sterilizing operation on the heating air, the bacteria contained in the heating air is prevented from harming the human body, the heating air enters the connecting pipe 30 after the sterilizing operation is completed, the heating air enters the heating chamber 15, the heating fins 16 performs heating and dehumidifying operation on the heating air, after the heating operation and dehumidifying operation are completed, the heating air is discharged to the outside of the device from the air outlet net 13, and the device can vibrate during the operation, vibrations lead to sliding column 25 downstream, makes baffle 24 downstream, and spring 26 extrudees to slowly reduce the vibrations that the device produced, played the absorbing effect, the velocity of flow of heating installation is all controlled to first solenoid valve 12 and second solenoid valve 31, and convenient control operation is regularly unscrewed second locking bolt 27, changes degerming net 17, and it is convenient to bring.

The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and the technical solutions and the inventive concepts thereof according to the present invention should be equivalent or changed within the scope of the present invention.

9页详细技术资料下载
上一篇:一种医用注射器针头装配设备
下一篇:一种带尾气处理装置的分离式火箱控温结构

网友询问留言

已有0条留言

还没有人留言评论。精彩留言会获得点赞!

精彩留言,会给你点赞!