Safety monitoring system and method for intelligent power distribution cabinet

文档序号:88906 发布日期:2021-10-08 浏览:17次 中文

阅读说明:本技术 一种智能配电柜的安全监控系统及方法 (Safety monitoring system and method for intelligent power distribution cabinet ) 是由 张神锋 张忠 于 2021-09-06 设计创作,主要内容包括:本发明公开了一种智能配电柜的安全监控系统及方法,本发明涉及配电柜控制技术领域,该系统包括仿真模型建立模块、预测定位模块、故障概率分析模块和数据存储模块;所述仿真模型建立模块,获取配电柜内各零件的三维坐标数据,并根据配电柜内三维坐标数据建立仿真模型,能够在虚拟配电柜上进行仿真实验;所述预测定位控制模块,获取配电柜内发生预警信号的位置,将预警信号的位置映射在虚拟配电柜模型中,并预测在未来时间段内零件的预警次数,对预警次数高于预设次数的零件进行维修;所述故障概率分析模块,获取零件和相邻零件的状态,分析出零件发生故障的总概率,根据零件发生的总概率对发生预警的零件选择维修或者更换。(The invention discloses a safety monitoring system and a method of an intelligent power distribution cabinet, relating to the technical field of power distribution cabinet control, wherein the system comprises a simulation model establishing module, a prediction positioning module, a fault probability analysis module and a data storage module; the simulation model establishing module is used for acquiring three-dimensional coordinate data of each part in the power distribution cabinet, establishing a simulation model according to the three-dimensional coordinate data in the power distribution cabinet and performing a simulation experiment on the virtual power distribution cabinet; the prediction positioning control module is used for acquiring the position of an early warning signal in the power distribution cabinet, mapping the position of the early warning signal in a virtual power distribution cabinet model, predicting the early warning times of parts in a future time period, and maintaining the parts with the early warning times higher than the preset times; the failure probability analysis module acquires states of the parts and the adjacent parts, analyzes the total failure probability of the parts, and selects maintenance or replacement of the parts with early warning according to the total failure probability of the parts.)

1. The utility model provides a safety monitoring system of intelligent power distribution cabinet which characterized in that: the system comprises a simulation model establishing module, a prediction positioning module, a fault probability analysis module and a data storage module;

the simulation model establishing module is used for acquiring three-dimensional coordinate data of each part in the power distribution cabinet and establishing a simulation model according to the three-dimensional coordinate data in the power distribution cabinet;

the prediction positioning control module is used for acquiring the position of an early warning signal in the power distribution cabinet, mapping the position of the early warning signal in a virtual power distribution cabinet model, predicting the early warning times of parts in a future time period, and maintaining the parts with the early warning times higher than the preset times;

the fault probability analysis module acquires the states of the parts and the adjacent parts, analyzes the total probability of the parts having faults, and selects maintenance or replacement of the parts with early warning according to the total probability of the parts;

the data storage module acquires data of each part in the power distribution cabinet through the sensor and stores the acquired data;

the data storage module is connected with the simulation model establishing module, the prediction positioning control module and the fault probability analysis module.

2. The safety monitoring system of the intelligent power distribution cabinet according to claim 1, characterized in that: the simulation model building module comprises a three-dimensional coordinate obtaining unit, a part change position unit and a data dynamic display unit;

the three-dimensional coordinate acquisition unit acquires three-dimensional coordinate information of the position of the part and stores the three-dimensional coordinate information into the data storage module;

the part change position unit is used for analyzing the state of the part according to the position change information of the part in different time periods;

and the data dynamic display unit displays the dynamic change of the parts on the virtual power distribution cabinet if the dynamic change of the parts is detected.

3. The safety monitoring system of the intelligent power distribution cabinet according to claim 1, characterized in that: the prediction positioning control module comprises an early warning information positioning marking unit, a current parameter analysis unit, an early warning frequency prediction unit, a fault marking unit and a control feedback unit;

the early warning information positioning and marking unit is used for acquiring the position of the part where the early warning signal occurs, and marking and displaying the position of the part in the virtual power distribution cabinet;

the current parameter analysis unit detects a part current signal flowing through the early warning position through an ammeter arranged in the power distribution cabinet, and predicts the early warning frequency of parts in the power distribution cabinet if the current flowing through the parts is detected to be larger than the safe current;

the early warning frequency prediction unit predicts the early warning frequency of the part in the virtual power distribution cabinet in the future time period through a prediction model and analyzes the failure probability of the part;

the fault marking unit is used for acquiring the early warning times of the part in the future time period, and if the early warning times are detected to be greater than the preset standard early warning times, fault marking is carried out on the part;

the control feedback unit feeds back the fault information of the parts to the power distribution cabinet, the signals are mapped on the virtual power distribution cabinet through the power distribution cabinet, and the state of the simulation parts of the virtual power distribution cabinet is analyzed.

4. The safety monitoring system of the intelligent power distribution cabinet according to claim 1, characterized in that: the fault probability analysis module comprises an adjacent part state detection unit, a fault probability superposition unit and a prediction time adjustment unit;

the adjacent state detection unit acquires adjacent parts within the standard distance range of the parts, analyzes the current value flowing through the adjacent parts and analyzes whether the current value is greater than the safety current or not; if the current value flowing through the adjacent part is detected to be larger than the safe current, jumping to a fault probability updating unit;

the fault probability superposition unit analyzes the fault probability of adjacent parts and superposes the fault probability of the parts to obtain the total fault probability;

the prediction time adjusting unit is used for acquiring the fault time of the part and the maintenance time of the part in the simulation state of the virtual power distribution cabinet to obtain the fault probability of the part; and if the signal that the part has the fault is not detected in the virtual power distribution cabinet, prolonging the prediction time until the signal that the part has the fault is detected.

5. The safety monitoring system of the intelligent power distribution cabinet according to claim 1, characterized in that: the data storage module is used for storing three-dimensional coordinate data of the power distribution cabinet, current data displayed by the ammeter, failure probability data of the power distribution cabinet and early warning frequency prediction data.

6. A safety monitoring method of an intelligent power distribution cabinet is characterized in that: the method comprises the following steps:

a01: acquiring early warning data of the power distribution cabinet, and recording and storing the early warning data;

a02: acquiring three-dimensional coordinates of each part in the power distribution cabinet, establishing a three-dimensional coordinate model, and establishing a simulation model to obtain a virtual power distribution cabinet;

a03: acquiring three-dimensional coordinates of each part of the power distribution cabinet in static and dynamic states and performing two-way mapping with the virtual power distribution cabinet model; therefore, the states of all parts of the power distribution cabinet are known;

a04: positioning the early warning position of a part in the power distribution cabinet, and detecting and judging whether the current passing through the part is greater than the safe current; if the current flowing through the part is detected to be larger than the safe current, marking and maintaining the part;

a05: acquiring current data flowing through the marked part, and predicting the early warning times of the part in a future time period according to the current data; if the early warning times of the predicted future time period are detected to be larger than the preset standard times, whether the part breaks down or not is analyzed; if the part is detected to be out of order, recording the failure probability and jumping to the step A06; if the part is not detected to have a fault, prolonging the prediction time period and updating the fault rate;

a06: detecting whether the current of the adjacent part is larger than the safe current, if so, superposing the current in the step A05 and updating the fault probability, and jumping to the step A07; if the current of the associated part is detected to be smaller than the safe current, the fault probability is stored, and the step A07 is skipped;

a07: and analyzing whether the fault probability is greater than a preset standard fault probability, and if the fault probability is detected to be greater than the preset standard probability, replacing parts in the power distribution cabinet.

7. The safety monitoring method of the intelligent power distribution cabinet according to claim 6, characterized in that: in the step a05, T = { T is acquired1,t2...tnThe current data set flowing through the part at the time point is I = { I = }1,i2,...,inDetecting ik>When the current is larger than the standard current, the number of times of early warning needs to be detected; detection at a point in time T = { T = }1,t2...tnW = { W } is the average set of early warning times generated in the method1,w2,w3...wn};

According to the formula:

setting the linear equation as W = kt + b; k is the slope and b is the intercept;

by substituting the time T, the future time period T is analyzedi-TjNumber of times of early warningi-WjWhen the number of times of early warning is detected Wi-Wj>In WB, the probability of part failure needs to be checked;

where n refers to a data item, tnMeans n day, tiMeans day i, inMeans the current flowing through the part on the nth day, ikIs the current flowing through the part on the k day, i is the safety current, wnMeans the number of prewarning times of the nth day, wiThe number of early warning times on the i-th day is referred to as o, and the number of WB is referred to as preset standard early warning times.

8. The safety monitoring method of the intelligent power distribution cabinet according to claim 6, characterized in that: in the step A05-A06, position data and signals of early warning of parts in the power distribution cabinet are obtained, the early warning times of the parts are detected to be larger than the preset standard early warning times, and the probability of the parts breaking down is P1(ii) a Acquiring the state of the part at the position adjacent to the part, and if the state is detectedWhen the early warning signal is received, the adjacent parts are influenced, and the fault probability of the adjacent parts is determined to be P2Wherein the adjacent satisfied condition isWhereinRefers to the three-dimensional coordinates of the adjacent parts,refers to the three-dimensional coordinates of the part,it is referred to as a preset standard distance,refers to the current flowing through adjacent parts;

when the early warning signal V2=1, adjacent part positions A and B are set, and if the distance difference between the adjacent part position A and the part position is smaller than the distance difference between the adjacent part position B and the part position, P of the adjacent part position A is set2P with value close to 1 and adjacent part position B2The value is between (0, 1), and the fault probability of the adjacent part position B is smaller than that of the adjacent position A;

the time for detecting the part to have the fault at this time is tbObtaining the time t for maintaining the part at this timeoIf the time period of the current fault is not detected in the simulation model, prolonging the simulation prediction time period until a signal of the fault of the part is obtained through simulation, and recording the time period of the fault;

wherein, P1The probability of a part failing, the probability of an adjacent part failing and the early warning signal of the adjacent part are indicated;

if the probability P of fault occurrence is detectedGeneral assemblyWhen the probability is larger than the preset standard probability, the parts are not maintained any more, and the parts in the power distribution cabinet are selected to be replaced.

9. The safety monitoring method of the intelligent power distribution cabinet according to claim 6, characterized in that: in the steps A02-A03, a time point T = { T = is acquired1,t2,...,tnThe three-dimensional coordinate set of a plurality of vertexes of the inner part is Z = { Z1,z2,z3...zm};

According to the formula:

at a time period t1-tvIn the previous step, the value obtained at t is obtained1The coordinates of the part at a point in time are { z11,z21,z31...zm1Get at tvThe coordinates of the part at a point in time are { z1v,z2v,z3v,z4vThe coordinate distance between the vertexes of the parts is

At a time period tv-tgGet at tvThe coordinates of the part at a point in time are { z1v,z2v,z3v,z4vGet at tgThe coordinates of the part at a point in time are { z1g,z2g,z3g...zmgThe coordinate distance between the vertexes of the parts is

If H is detected1-H2If =0, the state of the part is static;

if it is detectedAnd in the process, the state of the part is dynamic, and the dynamic coordinates of the part need to be added when the simulation model is built.

Technical Field

The invention relates to the technical field of power distribution cabinet control, in particular to a safety monitoring system and a method of an intelligent power distribution cabinet.

Background

The power distribution cabinet is a final-stage device in all power distribution systems, but is the core of the power distribution systems, can effectively provide protection, monitoring and control for loads, and comprises a relay, a fuse, an indicator light, a button switch, a universal change-over switch and the like;

although the power distribution cabinet is the final-stage equipment in the power distribution system, the power distribution cabinet is the most fragile system product which needs frequent maintenance, and when a maintenance worker receives a fault of a part in the power distribution cabinet, the maintenance worker often cannot determine whether to replace or maintain the part, and cannot judge the time for maintaining the part after the part is maintained, so that the repeated maintenance of the same part is complicated, and the maintenance worker cannot visually know the working state of each part of the power distribution cabinet;

in the prior art, a digital twin model is arranged to carry out mapping simulation on the power distribution cabinet, so that the abnormal state of the power distribution cabinet can be known. Although the abnormal state of the distribution cabinet can be known and solved by the digital twin model, the time and effect of solving the abnormality of the distribution cabinet by this method cannot be expected, and thus, improvement thereof is required.

Disclosure of Invention

The invention aims to provide a safety monitoring system and a safety monitoring method for an intelligent power distribution cabinet, which aim to solve the problems in the background technology.

In order to solve the technical problems, the invention provides the following technical scheme: a safety monitoring system and method of an intelligent power distribution cabinet comprises a simulation model establishing module, a prediction positioning module, a fault probability analysis module and a data storage module;

the simulation model establishing module is used for acquiring three-dimensional coordinate data of each part in the power distribution cabinet and establishing a simulation model according to the three-dimensional coordinate data in the power distribution cabinet, so that a virtual power distribution cabinet is obtained, and a simulation experiment can be performed on the virtual power distribution cabinet;

the prediction positioning control module is used for acquiring the position of an early warning signal in the power distribution cabinet, mapping the position of the early warning signal in a virtual power distribution cabinet model, predicting the early warning times of parts in a future time period, and maintaining the parts with the early warning times higher than the preset times so as to analyze whether the parts break down or not;

the fault probability analysis module acquires the states of the parts and the adjacent parts, analyzes the total probability of the parts having faults, and selects maintenance or replacement of the parts with early warning according to the total probability of the parts;

the data storage module acquires data of each part in the power distribution cabinet through the sensor and stores the acquired data so as to be convenient for calling from the data storage module in time;

the data storage module is connected with the simulation model establishing module, the prediction positioning control module and the fault probability analysis module.

Further, the simulation model building module comprises a three-dimensional coordinate obtaining unit, a part change position unit and a data dynamic display unit;

the three-dimensional coordinate acquisition unit acquires three-dimensional coordinate information of the position of the part and stores the three-dimensional coordinate information into the data storage module;

the part change position unit is used for analyzing the state of the part according to the position change information of the part in different time periods;

and if the data dynamic display unit detects that the part is in dynamic change, the dynamic change of the part is displayed on the virtual power distribution cabinet, so that the change of the state of the part can be observed in time.

Furthermore, the prediction positioning control module comprises an early warning information positioning marking unit, a current parameter analysis unit, an early warning frequency prediction unit, a fault marking unit and a control feedback unit;

the early warning information positioning and marking unit is used for acquiring the position of the part where the early warning signal occurs, and marking and displaying the position of the part in the virtual power distribution cabinet;

the current parameter analysis unit detects a part current signal flowing through the early warning position through an ammeter arranged in the power distribution cabinet, and predicts the early warning frequency of parts in the power distribution cabinet if the current flowing through the parts is detected to be larger than the safe current;

the early warning frequency prediction unit predicts the early warning frequency of the part in the virtual power distribution cabinet in the future time period through a prediction model and analyzes the failure probability of the part;

the fault marking unit is used for acquiring the early warning times of the part in the future time period, and if the early warning times are detected to be greater than the preset standard early warning times, fault marking is carried out on the part;

the control feedback unit feeds back the fault information of the parts to the power distribution cabinet, the signals are mapped on the virtual power distribution cabinet through the power distribution cabinet, and the state of the simulation parts of the virtual power distribution cabinet is analyzed.

Further, the fault probability analysis module comprises an adjacent part state detection unit, a fault probability superposition unit and a prediction time adjustment unit;

the adjacent state detection unit acquires adjacent parts within the standard distance range of the parts, analyzes the current value flowing through the adjacent parts and analyzes whether the current value is greater than the safety current or not; if the current value flowing through the adjacent part is detected to be larger than the safe current, jumping to a fault probability updating unit;

the fault probability superposition unit analyzes the fault probability of adjacent parts and superposes the fault probability of the parts to obtain the total fault probability;

the prediction time adjusting unit is used for acquiring the fault time of the part and the maintenance time of the part in the simulation state of the virtual power distribution cabinet to obtain the fault probability of the part; and if the signal that the part has the fault is not detected in the virtual power distribution cabinet, prolonging the prediction time until the signal that the part has the fault is detected.

The data storage module is used for storing three-dimensional coordinate data of the power distribution cabinet, current data displayed by the ammeter, failure probability data of the power distribution cabinet and early warning frequency prediction data.

Further, a safety monitoring method for an intelligent power distribution cabinet comprises the following steps:

a01: acquiring early warning data of the power distribution cabinet, and recording and storing the early warning data;

a02: acquiring three-dimensional coordinates of each part in the power distribution cabinet, establishing a three-dimensional coordinate model, and establishing a simulation model to obtain a virtual power distribution cabinet; each part comprises a breaker, a box body, a cable, a voltmeter, an ammeter, a fuse, a current collecting table and the like

A03: acquiring three-dimensional coordinates of each part of the power distribution cabinet in static and dynamic states and performing two-way mapping with the virtual power distribution cabinet model; therefore, the states of all parts of the power distribution cabinet are known;

a04: positioning the early warning position of a part in the power distribution cabinet, and detecting and judging whether the current passing through the part is greater than the safe current; if the current flowing through the part is detected to be larger than the safe current, marking and maintaining the part;

a05: acquiring current data flowing through the marked part, and predicting the early warning times of the part in a future time period according to the current data; if the early warning times of the predicted future time period are detected to be larger than the preset standard times, whether the part breaks down or not is analyzed; if the part is detected to be out of order, recording the failure probability and jumping to the step A06; if the part is not detected to have a fault, prolonging the prediction time period and updating the fault rate;

a06: detecting whether the current of the adjacent part is larger than the safe current, if so, superposing the current in the step A05 and updating the fault probability, and jumping to the step A07; if the current of the associated part is detected to be smaller than the safe current, the fault probability is stored, and the step A07 is skipped;

a07: and analyzing whether the fault probability is greater than a preset standard fault probability, and if the fault probability is detected to be greater than the preset standard probability, replacing parts in the power distribution cabinet.

In the step a05, T = { T is acquired1,t2...tnThe current data set flowing through the part at the time point is I = { I = }1,i2,...,inDetecting ik>When the current is larger than the standard current, the number of times of early warning needs to be detected; detection at a point in time T = { T = }1,t2...tnW = { W } is the average set of early warning times generated in the method1,w2,w3...wn};

According to the formula:

setting a linear equation as W = kt + b, wherein k is a slope and b is an intercept;

respectively deriving k and b and calculating, wherein the specific formula is as follows:

analyzing the time period T by substituting the time Ti-TjNumber of times of early warningi-WjWhen the number of times of early warning is detected Wi-Wj>In WB, the probability of part failure needs to be checked;

where n refers to a data item, tnMeans n day, tiMeans day i, inMeans the current flowing through the part on the nth day, ikIs the current flowing through the part on the k day, i is the safety current, wnMeans the number of prewarning times of the nth day, wiThe number of early warning times on the i-th day is referred to as o, and the number of WB is referred to as preset standard early warning times.

In the step A05-A06, position data and signals of early warning of parts in the power distribution cabinet are obtained, the early warning times of the parts are detected to be larger than the preset standard early warning times, and the probability of the parts breaking down is P1(ii) a Acquiring the state of the part at the position adjacent to the part, and if the state is detectedWhen the early warning signal is received, the adjacent parts are influenced, and the fault probability of the adjacent parts is determined to be P2Wherein the adjacent satisfied condition isWhereinRefers to the three-dimensional coordinates of the adjacent parts,refers to the three-dimensional coordinates of the part,it is referred to as a preset standard distance,refers to the current flowing through adjacent parts;

when the early warning signal V2=1, adjacent part positions A and B are set, and if the distance difference between the adjacent part position A and the part position is smaller than the distance difference between the adjacent part position B and the part position, P of the adjacent part position A is set2P with value close to 1 and adjacent part position B2The value is between (0, 1), and the fault probability of the adjacent part position B is smaller than that of the adjacent position A;

the time for detecting the part to have the fault at this time is tbObtaining the time t for maintaining the part at this timeoIf the time period of the current fault is not detected in the simulation model, prolonging the simulation prediction time period until a signal of the fault of the part is obtained through simulation, and recording the time period of the fault;

wherein, P1The probability of a part failing, the probability of an adjacent part failing and the early warning signal of the adjacent part are indicated;

if the probability P of fault occurrence is detectedGeneral assemblyWhen the probability is larger than the preset standard probability, the parts are not maintained any more, and the parts in the power distribution cabinet are selected to be replaced.

In the step A02-A03, a time period T = { T = is acquired1,t2,...,tnThe three-dimensional coordinate set of a plurality of vertexes of the inner part is Z = { Z1,z2,z3...zm};

According to the formula:

at a time period t1-tvIn the previous step, the value obtained at t is obtained1The coordinates of the part at a point in time are { z11,z21,z31...zm1Get at tvThe coordinates of the part at a point in time are { z1v,z2v,z3v...zmvThe coordinate distance between the vertexes of the parts is

At a time period tv-tgGet at tvThe coordinates of the part at a point in time are { z11,z21,z31...zm1Get at tgThe coordinates of the part at a point in time are { z1g,z2g,z3g...zmgThe coordinate distance between the vertexes of the parts is

If H is detected1-H2If =0, the state of the part is static;

if it is detectedAnd in the process, the state of the part is dynamic, and the dynamic coordinates of the part need to be added when the simulation model is built.

Compared with the prior art, the invention has the following beneficial effects:

the simulation model building module is arranged, and the virtual power distribution cabinet is built by acquiring three-dimensional coordinate data in the power distribution cabinet, so that the simulation model is built; the method carries out simulation on the early warning part, can analyze whether the current maintenance on the early warning part can solve the fundamental problem or not in time, ensures the long-term use of the part, does not need repeated maintenance any more, and ensures the normal operation of the whole power distribution cabinet; the method predicts the early warning times, and can analyze whether the predicted early warning times can cause the failure of the power distribution cabinet, so that the failure probability of the parts is predicted; through analyzing the fault probability of adjacent parts, whether the adjacent parts are damaged or not can be judged by using a predetermined overhauling method, and whether the preset method plays a role in protecting the whole power distribution cabinet or not is judged.

Drawings

The accompanying drawings, which are included to provide a further understanding of the invention and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention and together with the description serve to explain the principles of the invention and not to limit the invention. In the drawings:

FIG. 1 is a schematic diagram illustrating steps of a safety monitoring system and method for an intelligent power distribution cabinet according to the present invention;

fig. 2 is a schematic diagram of module components of the security monitoring system and method for an intelligent power distribution cabinet according to the present invention.

Detailed Description

The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.

Referring to fig. 1-2, the present invention provides the following technical solutions: a safety monitoring system and method of an intelligent power distribution cabinet comprises a simulation model establishing module, a prediction positioning module, a fault probability analysis module and a data storage module;

the simulation model establishing module is used for acquiring three-dimensional coordinate data of each part in the power distribution cabinet and establishing a simulation model according to the three-dimensional coordinate data in the power distribution cabinet, so that a virtual power distribution cabinet is obtained, and a simulation experiment can be performed on the virtual power distribution cabinet;

the prediction positioning control module is used for acquiring the position of an early warning signal in the power distribution cabinet, mapping the position of the early warning signal in a virtual power distribution cabinet model, predicting the early warning times of parts in a future time period, and maintaining the parts with the early warning times higher than the preset times so as to analyze whether the parts break down or not;

the fault probability analysis module acquires the states of the parts and the adjacent parts, analyzes the total probability of the parts having faults, and selects maintenance or replacement of the parts with early warning according to the total probability of the parts;

the data storage module acquires data of each part in the power distribution cabinet through the sensor and stores the acquired data so as to be convenient for calling from the data storage module in time;

the data storage module is connected with the simulation model establishing module, the prediction positioning control module and the fault probability analysis module.

Further, the simulation model building module comprises a three-dimensional coordinate obtaining unit, a part change position unit and a data dynamic display unit;

the three-dimensional coordinate acquisition unit acquires three-dimensional coordinate information of the position of the part and stores the three-dimensional coordinate information into the data storage module;

the part change position unit is used for analyzing the state of the part according to the position change information of the part in different time periods;

and if the data dynamic display unit detects that the part is in dynamic change, the dynamic change of the part is displayed on the virtual power distribution cabinet, so that the change of the state of the part can be observed in time.

Furthermore, the prediction positioning control module comprises an early warning information positioning marking unit, a current parameter analysis unit, an early warning frequency prediction unit, a fault marking unit and a control feedback unit;

the early warning information positioning and marking unit is used for acquiring the position of the part where the early warning signal occurs, and marking and displaying the position of the part in the virtual power distribution cabinet;

the current parameter analysis unit detects a part current signal flowing through the early warning position through an ammeter arranged in the power distribution cabinet, and predicts the early warning frequency of parts in the power distribution cabinet if the current flowing through the parts is detected to be larger than the safe current;

the early warning frequency prediction unit predicts the early warning frequency of the part in the virtual power distribution cabinet in the future time period through a prediction model and analyzes the failure probability of the part;

the fault marking unit is used for acquiring the early warning times of the part in the future time period, and if the early warning times are detected to be greater than the preset standard early warning times, fault marking is carried out on the part;

the control feedback unit feeds back the fault information of the parts to the power distribution cabinet, the signals are mapped on the virtual power distribution cabinet through the power distribution cabinet, and the state of the simulation parts of the virtual power distribution cabinet is analyzed.

Further, the fault probability analysis module comprises an adjacent part state detection unit, a fault probability superposition unit and a prediction time adjustment unit;

the adjacent state detection unit acquires adjacent parts within the standard distance range of the parts, analyzes the current value flowing through the adjacent parts and analyzes whether the current value is greater than the safety current or not; if the current value flowing through the adjacent part is detected to be larger than the safe current, jumping to a fault probability updating unit;

the fault probability superposition unit analyzes the fault probability of adjacent parts and superposes the fault probability of the parts to obtain the total fault probability;

the prediction time adjusting unit is used for acquiring the fault time of the part and the maintenance time of the part in the simulation state of the virtual power distribution cabinet to obtain the fault probability of the part; and if the signal that the part has the fault is not detected in the virtual power distribution cabinet, prolonging the prediction time until the signal that the part has the fault is detected.

The data storage module is used for storing three-dimensional coordinate data of the power distribution cabinet, current data displayed by the ammeter, failure probability data of the power distribution cabinet and early warning frequency prediction data.

Further, a safety monitoring method for an intelligent power distribution cabinet comprises the following steps:

a01: acquiring early warning data of the power distribution cabinet, and recording and storing the early warning data;

a02: acquiring three-dimensional coordinates of each part in the power distribution cabinet, establishing a three-dimensional coordinate model, and establishing a simulation model to obtain a virtual power distribution cabinet; each part comprises a breaker, a box body, a cable, a voltmeter, an ammeter, a fuse, a current collecting table and the like

A03: acquiring three-dimensional coordinates of each part of the power distribution cabinet in static and dynamic states and performing two-way mapping with the virtual power distribution cabinet model; therefore, the states of all parts of the power distribution cabinet are known;

a04: positioning the early warning position of a part in the power distribution cabinet, and detecting and judging whether the current passing through the part is greater than the safe current; if the current flowing through the part is detected to be larger than the safe current, marking and maintaining the part;

a05: acquiring current data flowing through the marked part, and predicting the early warning times of the part in a future time period according to the current data; if the early warning times of the predicted future time period are detected to be larger than the preset standard times, whether the part breaks down or not is analyzed; if the part is detected to be out of order, recording the failure probability and jumping to the step A06; if the part is not detected to have a fault, prolonging the prediction time period and updating the fault rate;

a06: detecting whether the current of the adjacent part is larger than the safe current, if so, superposing the current in the step A05 and updating the fault probability, and jumping to the step A07; if the current of the associated part is detected to be smaller than the safe current, the fault probability is stored, and the step A07 is skipped;

a07: and analyzing whether the fault probability is greater than a preset standard fault probability, and if the fault probability is detected to be greater than the preset standard probability, replacing parts in the power distribution cabinet.

In the step a05, T = { T is acquired1,t2...tnThe current data set flowing through the part at the time point is I = { I = }1,i2,...,inDetecting ik>When the current is larger than the standard current, the number of times of early warning needs to be detected; detection at a point in time T = { T = }1,t2...tnW = { W } is the average set of early warning times generated in the method1,w2,w3...wn};

According to the formula:

setting a linear equation as W = kt + b, wherein k is a slope and b is an intercept;

respectively deriving k and b and calculating, wherein the specific formula is as follows:

analyzing the time period T by substituting the time Ti-TjNumber of times of early warningi-WjWhen the number of times of early warning is detected Wi-Wj>In WB, the probability of part failure needs to be checked;

where n refers to a data item, tnMeans n day, tiMeans day i, inMeans the current flowing through the part on the nth day, ikIs the current flowing through the part on the k day, i is the safety current, wnMeans the number of prewarning times of the nth day, wiThe number of early warning times on the i-th day is referred to as o, and the number of WB is referred to as preset standard early warning times.

By setting the equation of a straight line W = kt + b; the relation between the early warning times and the time can be analyzed and obtained, the probability of the early warning times can be predicted and obtained through the formula, and a linear equation is set, so that the early warning times and the time are in a linear relation, and the method is simple and high in prediction accuracy;

derivation, which can solve to obtain the most approximate and in line with the actual situation

The function of (2) can not lead to producing the error when predicting the early warning number of times, lead to the switch board to produce the abnormal signal but not detect and obtain, has guaranteed prediction model's precision and accuracy.

In the step A05-A06, position data and signals of early warning of parts in the power distribution cabinet are obtained, the early warning times of the parts are detected to be larger than the preset standard early warning times, and the probability of the parts breaking down is P1(ii) a Acquiring the state of the part at the position adjacent to the part, and if the state is detectedWhen the early warning signal is received, the adjacent parts are influenced, and the fault probability of the adjacent parts is determined to be P2Wherein the adjacent satisfied condition isWhereinRefers to the three-dimensional coordinates of the adjacent parts,refers to the three-dimensional coordinates of the part,it is referred to as a preset standard distance,refers to the current flowing through adjacent parts;

when the early warning signal V2=1, adjacent part positions A and B are set, and if the distance difference between the adjacent part position A and the part position is smaller than the distance difference between the adjacent part position B and the part position, P of the adjacent part position A is set2P with value close to 1 and adjacent part position B2The value is between (0, 1), and the fault probability of the adjacent part position B is smaller than that of the adjacent position A;

the time for detecting the part to have the fault at this time is tbObtaining the time t for maintaining the part at this timeoIf the time period of the current fault is not detected in the simulation model, prolonging the simulation prediction time period until a signal of the fault of the part is obtained through simulation, and recording the time period of the fault;

wherein, P1Is referred to as the probability of a part failing,is meant the probability of failure of an adjacent part,is the early warning signal of the adjacent part;

if the probability P of fault occurrence is detectedGeneral assemblyWhen the probability is larger than the preset standard probability, parts are not maintained any more, and parts in the power distribution cabinet are selected to be replaced;

by setting upIn order to verify whether the maintenance of the parts by the current solution is correct or not, the fault probability of the adjacent parts is detected, so that the influence of the current parts on the peripheral parts is avoided, wherein the method is provided withWhether the adjacent parts receive the early warning signal or not is analyzed, when the early warning signal is detected, the adjacent parts are affected, and the method for calculating the fault probability of the adjacent parts is the same as that of the parts; therefore, only the fault probability of the part is verified;

in the failure model for verifying the part, t is setb,toJudging the number of days of failure in the simulation model test; 365 days are set on the denominator, and the fault probability of the part in one year (365 days or 366 days) is judged; if the detected failure probability is larger than the preset standard probability, the current maintenance mode of the part is inaccurate through analysis, and the part is replaced, so that the complexity of repeatedly overhauling the part by a maintenance worker is reduced.

In the step A02-A03, a time period T = { T = is acquired1,t2,...,tnThe three-dimensional coordinate set of a plurality of vertexes of the inner part is Z = { Z1,z2,z3...zm};

According to the formula:

at a time period t1-tvIn the previous step, the value obtained at t is obtained1Coordinates of a part at a point in timeIs { z11,z21,z31...zm1Get at tvThe coordinates of the part at a point in time are { z1v,z2v,z3v...zmvThe coordinate distance between the vertexes of the parts is

At a time period tv-tgGet at tvThe coordinates of the part at a point in time are { z1v,z2v,z3v...zmvGet at tgThe coordinates of the part at a point in time are { z1g,z2g,z3g...zmgThe coordinate distance between the vertexes of the parts is

If H is detected1-H2If =0, the state of the part is static;

if it is detectedIn the process, the state of the part is dynamic, and the dynamic coordinates of the part need to be added when the simulation model is built;

through the coordinate of contrast part in different time quantums, can judge the state of part in the switch board, specifically static or dynamic, can be in the state of more clear understanding part in simulation model.

Example (b): acquisition at a time point T = { T = }1,t2,t3The three-dimensional coordinate set of a plurality of vertexes of the inner part is Z = { Z1,z2,z3,z4,z5,z6,};

At a time period t1-t2In the previous step, the value obtained at t is obtained1The coordinates of the part at a point in time are { z11,z21,z31,z41,z51,z61} = { (50,40,70), (50,0,70), (100,80,70), (120,80,70), (70,0,90), (70,60,90) }, and acquisition was given at tvThe coordinates of the part at a point in time are { z1v,z2v,z3v,z4v,z5v,

z6v} = { (50,40,70), (50,0,70), (100,80,70), (120,80,70), (70,0,90), (70,60,70) }, coordinate distance between vertices of the part

Therefore, the part obtained by analysis is static;

at a time period t2-t3In the previous step, the value obtained at t is obtained1The coordinates of the part at a point in time are { z11,z21,z31,z41,z51,z61} = { (50,40,70), (50,0,70), (100,80,70), (120,80,70), (70,0,90), (70,60,90) }, and acquisition was given at tvThe coordinates of the part at a point in time are { z1v,z2v,z3v,z4v,z5v,

z6v} = { (50,60,70), (50,0,70), (120,80,70), (120,80,70), (70,10,90), (70,80,70) }, coordinate distance between vertices of the part

Thus, the analysis results in the part being dynamic.

It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.

Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that changes may be made in the embodiments and/or equivalents thereof without departing from the spirit and scope of the invention. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

15页详细技术资料下载
上一篇:一种医用注射器针头装配设备
下一篇:一种抽出式纵向隔离双断口真空断路器手车装置

网友询问留言

已有0条留言

还没有人留言评论。精彩留言会获得点赞!

精彩留言,会给你点赞!