阅读说明:本技术 一体化抗压井盖的修复施工方法 (Repairing construction method of integrated pressure-resistant well lid ) 是由 周伟平 于 2020-08-07 设计创作,主要内容包括:本发明涉及一种一体化抗压井盖的修复施工方法,其特征是,包括如下步骤:(1)用圆形球面切割机进行切割;(2)对圆形内路面进行破碎,移除原有井盖;对井盖外围进行破碎,形成修复井盖的井圈安装孔;(3)将修复料浇灌在井圈安装孔中填实,浇灌后抹平修复料至与路面平齐;(4)一体化抗压井盖吊装过程中,井盖下方修复料填充井盖与侧壁之间的缝隙,沿一体化抗压井盖边沿溢出,抹去溢出的修复料。本发明安装施工快捷,井盖吊装后井盖周边无需进行灌缝操作,修复操作更为简便,并能有效防止井圈下方修复料与井圈安装孔之间发生分离造成的井盖周边损坏现象,充分发挥一体化抗压井盖的作用,实现真正的井盖、修复料和路面之间的一体化结构。(The invention relates to a restoration construction method of an integrated pressure-resistant well lid, which is characterized by comprising the following steps: (1) cutting by a circular spherical surface cutting machine; (2) crushing the round inner pavement, and removing the original well cover; crushing the periphery of the well lid to form a well ring mounting hole for repairing the well lid; (3) pouring the repairing material into the well ring mounting hole to be filled firmly, and leveling the repairing material to be level with the road surface after pouring; (4) in the integration resistance to compression well lid hoist and mount process, the gap between well lid and the lateral wall is filled to well lid below prosthetic materials, spills over along integration resistance to compression well lid border, wipes off the prosthetic materials that spills over. The manhole cover is quick to install and construct, the periphery of the manhole cover does not need to be subjected to crack pouring operation after the manhole cover is hoisted, the repairing operation is simpler and more convenient, the phenomenon that the periphery of the manhole cover is damaged due to the fact that repairing materials below a manhole ring are separated from a manhole ring installing hole can be effectively prevented, the effect of an integrated compression-resistant manhole cover is fully exerted, and a real integrated structure among the manhole cover, the repairing materials and a road surface is realized.)

1. A restoration construction method of an integrated pressure-resistant well lid is characterized by comprising the following steps:

(1) placing the circle center positioning frame on the well lid to be repaired, enabling the center of the circle center positioning frame to coincide with the center of the well lid, and fixing the circle center positioning frame and the peripheral pavement of the well lid together to realize positioning;

(2) fixing the cutting center of the circular spherical surface cutting machine on the circle center of the circle center positioning frame, and adjusting the cutting radius of the circular spherical surface cutting machine according to the required cutting radius to cut;

(3) after the circular cutting is finished, removing the cutting machine and the positioning frame, clearing accumulated water on the road surface, and sucking sewage; crushing the round inner pavement, and removing the original well cover;

(4) after cleaning, a cross brace rod is installed at the position of a well mouth, a well mouth cover plate and cover cloth are placed on the cross brace rod, and a well ring crushing surface on the periphery of the well cover is crushed to form a well ring installation hole for repairing the well cover;

(5) paving a pavement protection pad at a well mouth, wherein an opening on the pavement protection pad exposes the area of the well curb mounting hole;

(6) disassembling a wellhead cover plate, cover cloth and a cross brace rod, putting a reinforcement cage into a walling crib mounting hole, and inserting a filling mold with a large caliber and a small caliber into a wellhead;

(7) preparing a repairing material, pouring the repairing material into the well ring mounting hole to be filled firmly, and leveling the repairing material to be level with the road surface after pouring; taking out the filling mould;

(8) pasting a circle of adhesive tape on the edge of the integrated pressure-resistant well cover, and hoisting the integrated pressure-resistant well cover to the mounting hole after pouring the repairing material for 5-8 minutes; during installation, details are adjusted according to field conditions, and the surface of the integrated pressure-resistant well cover is knocked to enable the integrated pressure-resistant well cover to be consistent with the pavement evenness;

(9) in the hoisting process of the integrated pressure-resistant well lid, repairing materials below the well lid fill gaps between the well lid and the side walls, overflow along the edge of the integrated pressure-resistant well lid, and the overflowing repairing materials are wiped off;

(10) and screwing down the bolts between the integrated pressure-resistant well cover and the repairing material to complete the installation of the well cover.

2. The restoration construction method of the integrated pressure-resistant well lid as claimed in claim 1, wherein: the diameter of a circle cut by the asphalt on the periphery of the well lid to be repaired is not more than 0.01 meter relative to the diameter of the well lid and the well ring.

3. The restoration construction method of the integrated pressure-resistant well lid as claimed in claim 1, wherein: the depth of the well ring mounting hole of the integrated pressure-resistant well lid is not less than the height of the well lid.

4. The restoration construction method of the integrated pressure-resistant well lid as claimed in claim 1, wherein: the side surface of the well lid mounting hole obtained by cutting with the circular spherical surface cutting machine is an inclined surface or an arc surface.

Technical Field

The invention relates to a well lid repairing method, in particular to a repairing construction method of an integrated pressure-resistant well lid.

Background

At present, the problem of collapse of the road surface around the manhole cover is 5% of the problem of damage and noise caused by the quality problem of the manhole cover, but 95% of the problem is that the road surface around the manhole cover collapses or the foundation of the manhole cover collapses. The main reasons for the collapse of the road surface around the well lid and the collapse of the well lid foundation are the design defects of the traditional well lid. The traditional method for repairing the damaged pavement around the well cover mainly comprises the steps of digging out and grooving the asphalt pavement in the area range near the well cover for forming, filling the periphery of the well cover with cold-mixed asphalt mixture or hot-mixed asphalt mixture, and then performing construction compaction. Traditional well lid installation construction, need use concrete placement to come unable adjustment base during the maintenance, need seven days before and after the construction just can be under construction and lay pitch, the time limit for a project is longer, influences the normal current of road, and the maintenance that the construction is complicated and the maintenance back road surface needs certain time during the change leads to the fact certain traffic pressure to urban road, especially to the great road of vehicle flow, changes well lid maintenance road surface and becomes more difficult. On the other hand, the upper surface on the peripheral road surface of well lid is restoreed the back and can not guarantee the parallel and level with the road surface, influences the travelling comfort that vehicle and pedestrian passed through.

To current well lid at vehicle roll compaction in-process atress concentrate on the well seat, the atress is uneven, easily causes the problem that the road surface sinks around the well lid, has redesigned the structure of well lid among the prior art, has made the adjustment to the well lid structure from the angle of the atress area and the atress principle of well lid, forms integration resistance to compression well lid (like the well lid of the disclosure of CN201510746411, CN 201510746411). This kind of integration resistance to compression well lid passes through outer walling crib and forms integrated structure with the road surface around the well lid, has improved the compressive strength of well lid. The installation process of present integration resistance to compression well lid when being used for restoreing does: a pit is arranged at the damaged part around the well lid, and a hoisting gap is expanded outside the edge of the pit, so that a gap is reserved between the edge of the pit and the well lid ring body, and the well lid ring is favorably hoisted into the pit; and hoisting the well lid body to the well lid ring body. In the construction method in the prior art, after the ring body is hoisted, a gap exists between the ring body and the pit, a small amount of concrete can be poured in the gap, and the construction efficiency is improved.

However, in the process of repairing and installing the existing integrated pressure-resistant well lid, after the ring body is hoisted into the pit, the gap between the ring body and the pit needs to be additionally subjected to crack pouring operation, the construction steps are not simple enough, and the crack pouring work needs to be performed carefully to ensure that the heights of the well lid, the crack pouring and the road surface are kept consistent after the crack pouring. If the crack is not filled enough, a certain cavity and a loose part exist between the repair material base layer below the well lid and the side wall of the well lid mounting hole, in the vehicle rolling process, the difference exists between the strain generated by the bearing stress of the cavity and the loose part and the strain generated by the bearing stress of the repair material filled part, so that the repair material base layer is separated from the well ring mounting hole, and the periphery of the well lid is damaged. Therefore, although the integrated pressure-resistant well lid can structurally solve the phenomena of peripheral collapse and damage, the seam filling process enables the seam filling and the well lid foundation to be not of an integrated structure, and the unreasonable installation mode can also cause the reduction of the effect of the integrated pressure-resistant well lid.

Disclosure of Invention

The invention aims to overcome the defects in the prior art, and provides a repair construction method of an integrated compression-resistant well lid, which is quick to install and construct, free from crack pouring operation on the periphery of the well lid after the well lid is hoisted, simpler and more convenient in repair operation, capable of effectively preventing the damage phenomenon of the periphery of the well lid caused by the separation of a repair material below a well ring and a well ring installation hole, fully playing the role of the integrated compression-resistant well lid, and realizing the real integrated structure among the well lid, the repair material and a road surface.

According to the technical scheme provided by the invention, the restoration construction method of the integrated pressure-resistant well lid is characterized by comprising the following steps of:

(1) determining a well lid to be repaired, placing a circle center positioning frame on the well lid, enabling the center of the circle center positioning frame to coincide with the center of the well lid, and fixing the circle center positioning frame and the peripheral pavement of the well lid together to realize positioning;

(2) fixing the cutting center of the circular spherical surface cutting machine on the circle center of the circle center positioning frame, and adjusting the cutting radius of the circular spherical surface cutting machine according to the required cutting radius to cut;

(3) after the circular cutting is finished, removing the cutting machine and the positioning frame, clearing accumulated water on the road surface, and sucking sewage; crushing the round inner pavement, and removing the original well cover;

(4) after cleaning, a cross brace rod is installed at the position of a well mouth, a well mouth cover plate and cover cloth are placed on the cross brace rod, and a well ring crushing surface on the periphery of the well cover is crushed to form a well ring installation hole for repairing the well cover;

(5) paving a pavement protection pad at a well mouth, wherein an opening on the pavement protection pad exposes the area of the well curb mounting hole;

(6) disassembling a wellhead cover plate, cover cloth and a cross brace rod, putting a reinforcement cage into a walling crib mounting hole, and inserting a filling mold with a large caliber and a small caliber into a wellhead;

(7) preparing a repairing material, pouring the repairing material into the well ring mounting hole to be filled firmly, and leveling the repairing material to be level with the road surface after pouring; taking out the filling mould;

(8) pasting a circle of adhesive tape on the edge of the integrated pressure-resistant well cover, and hoisting the integrated pressure-resistant well cover to the mounting hole after pouring the repairing material for 5-8 minutes; during installation, details are adjusted according to field conditions, and the surface of the integrated pressure-resistant well cover is knocked to enable the integrated pressure-resistant well cover to be consistent with the pavement evenness;

(9) in the hoisting process of the integrated pressure-resistant well lid, repairing materials below the well lid fill gaps between the well lid and the side walls, overflow along the edge of the integrated pressure-resistant well lid, and the overflowing repairing materials are wiped off;

(10) and screwing down the bolts between the integrated pressure-resistant well cover and the repairing material to complete the installation of the well cover.

Further, the diameter of a circle cut by the asphalt at the periphery of the well lid to be repaired is not more than 0.01 meter relative to the diameter of the well lid and the well ring.

Further, the depth of the walling crib mounting hole of the integrated pressure-resistant manhole cover is not less than the height of the manhole cover.

Further, the side surface of the well lid mounting hole obtained by cutting with the circular spherical surface cutting machine is an inclined surface or an arc surface.

The invention has the following advantages:

(1) the manhole cover is quick to install and construct, the periphery of the manhole cover does not need to be subjected to crack pouring operation after the manhole cover is hoisted, the repairing operation is simpler and more convenient, the phenomenon that the periphery of the manhole cover is damaged due to the fact that repairing materials below a manhole ring are separated from a manhole ring installing hole can be effectively prevented, the function of an integrated compression-resistant manhole cover is fully exerted, and a real integrated structure among the manhole cover, the repairing materials and a road surface is realized;

(2) the invention can realize rapid construction under the condition of not influencing road operation.

Drawings

Fig. 1 is a sectional view of a first well cover mounting hole obtained by cutting.

Fig. 2 is a sectional view of a second well cover mounting hole obtained by cutting.

Fig. 3 is a schematic view of a pour mold.

Detailed Description

The invention is further described below with reference to the accompanying drawings.

9页详细技术资料下载
上一篇:一种医用注射器针头装配设备
下一篇:一种地下空间连接通道预留接口施工方法

网友询问留言

已有0条留言

还没有人留言评论。精彩留言会获得点赞!

精彩留言,会给你点赞!