Scaffold pedal mounting method and scaffold
阅读说明:本技术 一种脚手架踏板的安装方法及脚手架 (Scaffold pedal mounting method and scaffold ) 是由 杨国辉 于 2020-05-14 设计创作,主要内容包括:本发明公开了一种脚手架踏板的安装方法及脚手架,脚手架由横杆、纵杆、立杆交叉搭建而成,横杆、纵杆交叉搭建的水平架构面上铺设踏板,踏板由若干条形铺板平铺拼接而成,该纵杆为平行墙面,该横杆垂直纵杆;该若干条形铺板固定跨接在平行的两纵杆之间并沿着纵杆的延伸方向拼接铺设,该若干条形铺板的长度方向平行横杆且垂直纵杆。它具有如下优点:缩短踏板与墙面之间的间隔距离,确保施工安全,同一条形铺板的规格,提高安装效率。(The invention discloses a scaffold pedal mounting method and a scaffold, wherein the scaffold is formed by cross building of a cross rod, a longitudinal rod and a vertical rod, the pedal is paved on a horizontal framework surface formed by cross building of the cross rod and the longitudinal rod, the pedal is formed by tiling and splicing a plurality of strip-shaped planks, the longitudinal rod is a parallel wall surface, and the cross rod is vertical to the longitudinal rod; the plurality of strip-shaped planks are fixedly bridged between the two parallel longitudinal rods and are spliced and laid along the extending direction of the longitudinal rods, and the length directions of the plurality of strip-shaped planks are parallel to the transverse rods and perpendicular to the longitudinal rods. It has the following advantages: the spacing distance between the pedal and the wall surface is shortened, the construction safety is ensured, and the installation efficiency is improved due to the specification of the same strip-shaped floor.)
1. A method for installing a scaffold pedal comprises the steps that the scaffold is formed by cross building of a cross rod, a longitudinal rod and a vertical rod, the pedal is paved on a horizontal framework surface formed by cross building of the cross rod and the longitudinal rod, the pedal is formed by tiling and splicing a plurality of strip-shaped planks, the longitudinal rod is a parallel wall surface, and the cross rod is perpendicular to the longitudinal rod; the method is characterized in that: the plurality of strip-shaped planks are fixedly bridged between the two parallel longitudinal rods and are spliced and laid along the extending direction of the longitudinal rods, and the length directions of the plurality of strip-shaped planks are parallel to the transverse rods and perpendicular to the longitudinal rods.
2. A method of installing a scaffold board according to claim 1, wherein: the both ends of each bar-shaped floor are seted up respectively and are stepped down the hole in order to spill the vertical pole of bar-shaped floor below, have with the buckle that should step down the hole one-to-one and pair the use, the buckle through stepping down the hole lock joint on the vertical pole, the size of the at least part of buckle body is greater than the hole aperture of stepping down simultaneously and makes the bar-shaped floor can not upwards deviate from the buckle to fix the bar-shaped floor on the vertical pole.
3. A method of installing a scaffold board according to claim 2, wherein: the buckle is provided with a U-shaped part and an I-shaped part which are connected, the U-shaped part is buckled on the longitudinal rod, and the size of the I-shaped part is larger than the aperture of the abdicating hole and is pressed on the strip-shaped floor board.
4. A method of installing a scaffold board according to claim 2, wherein: the abdicating hole is a waist-shaped hole.
5. A method of installing a scaffold board according to claim 1, wherein: the cross section of the strip-shaped plank is in a concave-convex shape, and the abdicating hole is arranged in the concave part of the strip-shaped plank.
6. A method of installing a scaffold board according to claim 5, wherein: a plurality of anti-skid convex bodies are arranged on the convex part of the strip-shaped bed plate at intervals along the length direction of the convex part.
7. A method of installing a scaffold board according to any one of claims 1 to 6, wherein: the length and width specifications of the plurality of strip-shaped planks are the same.
8. A scaffold, characterized in that: the scaffold is provided with scaffold pedals formed by the installation method according to any one of claims 1 to 6.
9. A scaffold, characterized in that: the scaffold is provided with scaffold steps formed by the installation method according to claim 7.
Technical Field
The invention relates to a platform for aerial work, in particular to a method for installing a scaffold pedal and a scaffold.
Background
Referring to fig. 1 and 2, the scaffold is formed by cross-building a
Secondly, the scaffold is constructed such that the lateral spacing defined by two adjacent
Disclosure of Invention
The invention provides a scaffold pedal mounting method and a scaffold, which overcome the defects of the prior art in the background art.
One of the technical schemes adopted by the invention for solving the technical problems is as follows:
a method for installing a scaffold pedal comprises the steps that the scaffold is formed by cross building of a cross rod, a longitudinal rod and a vertical rod, the pedal is paved on a horizontal framework surface formed by cross building of the cross rod and the longitudinal rod, the pedal is formed by tiling and splicing a plurality of strip-shaped planks, the longitudinal rod is a parallel wall surface, and the cross rod is perpendicular to the longitudinal rod; the plurality of strip-shaped planks are fixedly bridged between the two parallel longitudinal rods and are spliced and laid along the extending direction of the longitudinal rods, and the length directions of the plurality of strip-shaped planks are parallel to the transverse rods and perpendicular to the longitudinal rods.
In one embodiment: the both ends of each bar-shaped floor are seted up respectively and are stepped down the hole in order to spill the vertical pole of bar-shaped floor below, have with the buckle that should step down the hole one-to-one and pair the use, the buckle through stepping down the hole lock joint on the vertical pole, the size of the at least part of buckle body is greater than the hole aperture of stepping down simultaneously and makes the bar-shaped floor can not upwards deviate from the buckle to fix the bar-shaped floor on the vertical pole.
In one embodiment: the buckle is provided with a U-shaped part and an I-shaped part which are connected, the U-shaped part is buckled on the longitudinal rod, and the size of the I-shaped part is larger than the aperture of the abdicating hole and is pressed on the strip-shaped floor board.
In one embodiment: the abdicating hole is a waist-shaped hole.
In one embodiment: the cross section of the strip-shaped plank is in a concave-convex shape, and the abdicating hole is arranged in the concave part of the strip-shaped plank.
In one embodiment: a plurality of anti-skid convex bodies are arranged on the convex part of the strip-shaped bed plate at intervals along the length direction of the convex part.
In one embodiment: the length and width specifications of the plurality of strip-shaped planks are the same.
The second technical scheme adopted by the invention for solving the technical problems is as follows:
a scaffold provided with scaffold steps formed by the installation method according to one of the schemes.
Compared with the background technology, the technical scheme has the following advantages:
1. this case is ingenious with the mounting means of scaffold footboard change into from striding to establish the horizontal pole setting and stride and establish the vertical pole setting, the footboard after the change laying means can guarantee that the footboard does not receive the restriction of circular chuck, make the footboard can lay and extend to the vertical pole and surpass the vertical pole even, shorten the interval distance between footboard and the wall, thereby guarantee the distance between footboard and the wall within the safe distance of regulation, make the installation of scaffold and footboard stronger to the adaptability of site operation environment, also make setting up of footboard and scaffold safer, guarantee constructor's personal safety.
2. The installation mode of footboard, the strip bed board that only needs the specification to unify (length specification is unified at least) can accomplish laying of the scaffold footboard of all different vertical length, has reduced the loaded down with trivial details degree of processing of footboard, has improved the installation effectiveness of footboard and scaffold.
3. The both ends of each bar-shaped floor are seted up respectively and are stepped down the hole in order to spill the vertical pole of bar-shaped floor below, have with the buckle that should step down the hole one-to-one pair and use, the buckle is through stepping down the hole lock joint on the vertical pole, the size of the at least part of buckle body is greater than the hole aperture of stepping down simultaneously and makes the bar-shaped floor can not upwards deviate from the buckle to fix the bar-shaped floor on the vertical pole, the fixed mode of stepping down the fixed bar-shaped floor in hole through the buckle cooperation is simple, swift, improves the installation effectiveness of footboard.
Drawings
The invention is further illustrated by the following figures and examples.
Fig. 1 is a schematic view of a conventional scaffolding as described in the background art.
Fig. 2 is a partially enlarged view of fig. 1.
Fig. 3 is a schematic view of the scaffold according to the present embodiment.
Fig. 4 is a partially enlarged view of fig. 3.
Fig. 5 is a schematic structural diagram of a strip-shaped plank.
Fig. 6 is a schematic structural view of the buckle.
Detailed Description
Referring to fig. 3 to 6, a scaffold pedal mounting method includes that a scaffold is formed by cross building of a
The two ends of each strip-
In this embodiment, the buckle 50 has a
Preferably, the cross section of the strip-
The installation mode of the pedal can finish the laying of all
A scaffold is provided with
This case is ingenious with
The above description is only a preferred embodiment of the present invention, and therefore should not be taken as limiting the scope of the invention, which is defined by the appended claims and their equivalents.
- 上一篇:一种医用注射器针头装配设备
- 下一篇:一种钢管脚手架的交叉连接机构