Comprehensive construction method for shaping component

文档序号:1198156 发布日期:2020-09-01 浏览:35次 中文

阅读说明:本技术 一种定型构件的综合性施工工法 (Comprehensive construction method for shaping component ) 是由 石会荣 张雪娥 李逢博 张峰 金业鑫 于 2019-02-25 设计创作,主要内容包括:一种定型构件的综合性施工工法,包括以下步骤:步骤1:施工准备;步骤2:预埋工字钢压环钢筋;步骤3:搭设架体;步骤4:搭设工字钢;步骤5:拉线、安装钢板网连接件;步骤6:搭设钢板网;步骤7:钢板网维护。本工法所采用的钢板网相对于传统使用的密目网而言、施工速度快,缩短了施工工期,质量及安全系数高,有利于低碳环保、节能减排。本施工工法采用定型构件,技术先进、安全可靠,经济效益高,操作简单方便,施工标准化程度较高。安装施工质量、感官较好、整体性好。制作的构件成品施工后均可以多次周转、重复使用,符合施工标准化、规范化管理要求。本工法适用于悬挑脚手架、施工电梯架等防护架体施工。(A comprehensive construction method of a shaping component comprises the following steps: step 1: construction preparation; step 2: pre-burying I-shaped steel compression ring reinforcing steel bars; and step 3: erecting a frame body; and 4, step 4: erecting I-shaped steel; and 5: pulling wires and installing steel plate net connecting pieces; step 6: erecting a steel plate net; and 7: and (5) maintaining the steel plate net. Compared with the traditional dense mesh net, the steel plate net adopted by the construction method has the advantages of high construction speed, shortened construction period, high quality and safety factor, low carbon, environmental protection, energy conservation and emission reduction. The construction method adopts the shaping component, and has the advantages of advanced technology, safety, reliability, high economic benefit, simple and convenient operation and higher construction standardization degree. The installation construction quality, the sense organ are better, the integrity is good. The finished product of the manufactured component can be turned over and reused for many times after construction, and meets the requirements of construction standardization and standardized management. The construction method is suitable for construction of protective frame bodies such as overhanging scaffolds, construction elevator frames and the like.)

1. A comprehensive construction method for a shaping component is characterized by comprising the following steps:

step 1: construction preparation;

(1) before formal construction, the adopted steel plate mesh connecting piece, the screw cap, the steel plate mesh, the embedded ring, the I-steel, the steel pipe, the fastener and the steel wire rope are processed in advance; specially processing a connecting sheet at a corner; before the steel plate net is erected, a wire rope is used for pulling through a wire as a reference to ensure that a steel plate net connecting piece is on the same horizontal plane;

(2) i-beams are arranged on each building, an optimal scheme is selected, drawing is deepened, and the positions of the I-beams and the reusable bolt compression rings are positioned;

(3) collecting relevant construction technical standards, carrying out technical crossing on constructors, manufacturing a steel plate mesh cantilever frame sample plate, trying to arrange the space between I-shaped steel, and determining the blanking size;

step 2: pre-burying I-shaped steel compression ring reinforcing steel bars;

(1) after the floor top plate template is erected and qualified in acceptance and check, paying off and positioning each reusable bolt compression ring;

(2) the reusable compression ring is prefabricated in advance through a detailed node diagram and is transported to the site during construction; in order to prevent water leakage of the toilet, a plastic sleeve is not adopted, and the reusable pressure ring is spot-welded on the steel bar of the toilet structural slab;

(3) the other parts of the embedded rings are sleeved at the bottoms of the embedded rings by plastic sleeves, the plastic sleeves are fixed on the templates by nails, the U-shaped steel bars in the plastic sleeves can be taken out after the templates are disassembled later, and the panel surface is blocked;

(4) after the compression ring is embedded, roof steel bars are bound, the part of the embedded ring is structurally reinforced, 2 HRB335 steel bars with the length of 1.5m and the diameter of 18mm are embedded, and roof concrete is poured after acceptance;

and step 3: erecting a frame body;

(1) erecting a vertical rod, a ground sweeping rod, a large cross rod and a small cross rod, erecting a vertical rod in the middle of a tree and a protective railing, and erecting a frame body by analogy;

(2) leveling the bottom of the vertical rod of the overhanging scaffold by using a leveling instrument, ensuring that the elevation of the bottom surface of the vertical rod is the same as the elevation of the upper surface of the I-shaped steel, and enabling the bottom of the pre-overhanging scaffold body to be located on the floor type double-row scaffold; laying I-shaped steel after the concrete wall of the layer is poured;

and 4, step 4: erecting I-shaped steel;

reserving I-shaped steel holes on the shear wall, enabling the I-shaped steel holes to be in the same straight line with the compression ring, adopting 6 m-long PVC pipes to replace I-shaped steel to verify whether the reserved holes are proper or not, laying the I-shaped steel after concrete pouring is finished and certain strength is achieved, erecting a coupling beam, and connecting the coupling beam with the bottom I-shaped steel by adopting a U-shaped sleeve ring matched bolt;

and 5: pulling wires and installing steel plate net connecting pieces;

(1) a through line parallel to the large cross rod is pulled out from the upright rod by a cord and is used as a base line for controlling the distance of the connecting piece extending out of the frame body and ensuring that the connecting pieces are all on the same horizontal line; calculating the actual quantity of the first layer of steel plate nets through the stay wires, comparing the actual quantity with the model, and controlling the quantity of the steel plate nets manufactured at the later stage;

(5) the connecting piece is modeled by using a BIM technology, and is processed and manufactured in a sizing size;

step 6: erecting a steel plate net;

(1) the steel plate net and the connecting piece are alternately constructed, the connecting piece is controlled by taking a cord as a base line, the flatness of the vertical surface of the steel plate net is controlled by the extending length of the connecting piece, and fine adjustment can be carried out in the construction process to ensure the integrity and the attractiveness of the steel plate net;

(2) the steel plate nets are connected with the connecting pieces through connecting pieces welded on two sides of the steel plate nets and bolts, the welding positions of the connecting pieces of the steel plate nets on the bottommost layer are 45cm away from the bottom and 15cm away from the top, and the connecting pieces 45cm away from the bottom are not required to be welded on the steel plate nets on the upper portion;

the upper part of each layer of steel plate net is welded with steel plate connecting sheets 12cm-15cm away from the two sides respectively, and the upper steel plate net can be clamped;

(3) splicing the steel plate nets to corners, reserving the special-shaped steel plate nets, measuring the actual reserved size, comparing the actual reserved size with a model, and when the width is less than 75cm, using the steel plate nets without square pipes as keels; before the production of the special-shaped steel plate net is finished, a reserved hole is shielded by a dense mesh net;

(4) when the steel plate net is installed, the installation position of the unloading platform is reserved, and the reserved position of the unloading platform is suitable for the whole area of the steel plate net, so that the phenomenon that the whole bearing wind load is uneven due to the fact that the opening is too large is avoided;

(5) in order to ensure the comprehensive coverage of the steel plate net and the erection of a frame body, the upper and lower overhanging I-beams are subjected to dislocation adjustment treatment at each overhanging joint of the steel plate net overhanging scaffold, otherwise, the vertical rod at one overhanging part of the lower part can influence the laying of the upper overhanging I-beam; after the upper and lower overhanging rods are subjected to dislocation treatment, the upper and lower overhanging steel plate nets are in seamless lap joint, and the effect of the outer vertical surface of the steel plate net is more attractive;

and 7: maintaining a steel plate net;

(1) after each layer of steel plate net is installed, the corners of the steel plate net and the joints of the steel plate net and the connecting pieces are checked, so that the phenomenon of falling off caused by instable installation is prevented;

(2) when the steel plate net is damaged, the steel plate net is required to be replaced immediately, so that the threat of sharp edges and corners at the damaged part of the steel plate net to constructors is prevented;

(3) and the steel plate nets are regularly checked, so that the safety of the scaffold and the use of the steel plate nets is ensured.

2. The comprehensive construction method of the shaping member according to claim 1, wherein the shaping member comprises a bevel fixing plate (1) and a sill fixing plate (2); first oblique angle groove (4) have been seted up to one side of oblique angle fixed plate (1), top screens groove (6) have been seted up to the adjacent side of first oblique angle groove (4), sill fixed plate (2) set up in the bottom of oblique angle fixed plate (1), the top of sill fixed plate (2) is equipped with second oblique angle groove (5), end screens groove (7) have been seted up to the offside of second oblique angle groove (5) bottom, the top of oblique angle fixed plate (1) is equipped with bevel board (9), the inside of sill fixed plate (2) is equipped with sill (8).

3. The comprehensive construction method of the shaping member according to claim 2, wherein a bearing oblique block (12) is embedded in the middle position of the oblique angle fixing plate (1) and the bottom beam fixing plate (2), an oblique bolt (10) is arranged at the top of the first oblique angle groove (4), and the oblique bolt (10) is embedded in the oblique angle plate (9) and is driven into the bottom beam (8) through the bearing oblique block (12) and the bottom beam fixing plate (2).

4. The comprehensive construction method of the shaping member according to claim 2, wherein the top and bottom catching grooves (6, 7) are opposite in position, and fixing bolts (11) are provided inside the top and bottom catching grooves (6, 7).

5. The comprehensive construction method of the shaping member according to claim 2, wherein the bottom beam fixing plate (2) is provided at a side thereof with symmetrical installation grooves (3).

6. The comprehensive construction method of the shaping member as claimed in claim 1, wherein the steel plate net is a semi-steel safety net, the galvanized square pipe for the frame diagonal bracing has a size of 20 x 1.0mm, the galvanized steel plate net has a thickness of 0.3mm, and the outer vertical surface is painted.

7. The comprehensive construction method of the setting member as claimed in claim 1, wherein the construction preparation quality is controlled; each component is manufactured accurately according to the size, and splicing and dislocation are avoided in the connection process; when the connecting sheets are welded, the accurate positioning of the welding sheets is required to be noticed, so that the connecting difficulty caused by the dislocation of the welding sheets at the two sides is prevented; when the steel plate net is erected on each layer, the stay wire ropes are required to ensure that the whole plane has good levelness and verticality.

8. The comprehensive construction method of the shaping member as set forth in claim 1, wherein the construction process quality is controlled; in the process of installing the steel plate net, orderly splicing is carried out in sequence according to the model, and proper adjustment is carried out, so that the special-shaped size is reduced, and the cost is reduced; after each steel plate net is installed, adjusting the flatness in the horizontal direction through a cord; the steel plate net at each joint should be strictly controlled for edge joint, and the distance between the large cross rods attached to the connecting pieces is controlled, so that the connection stability of the steel plate net and the connecting pieces is ensured; the seam splicing of the special-shaped steel plate net at the corner is strictly controlled not to exceed 2-3 mm, and the seam splicing dislocation of the steel plate net is not caused.

9. A comprehensive construction method of a shaping member according to claim 1, wherein a process quality control is maintained; in the using process of the steel plate net, if the steel plate net is damaged, the steel plate net should be replaced in time, and the connecting nodes of the steel plate net are periodically checked to prevent the steel plate net from settling and falling off.

10. A comprehensive construction method of a setting member according to claim 1, wherein safety measures; the power line of the handheld cutting machine adopts a weather-proof rubber sheath copper core flexible cable; the secondary wire of the electric welding machine is a waterproof rubber sheath copper core flexible cable, the length of the primary wire is not more than 5m, and the primary wire is protected by penetrating a pipe; all power lines must not have any breakage and joint, must not be any to connect and lengthen or tear open and change; the anti-skidding supporting legs are arranged below the support, the steel plate nets prevented from being dismantled are stacked on the outer frame and slide down to cause safe construction, four-point lifting rings are erected on the support, lifting efficiency of the steel plate nets is improved, dangerous actions when workers hook the steel plate nets are avoided during high-altitude operation, and extrusion damage to the steel plate nets caused by tower crane steel wire ropes in a lifting process is prevented.

Technical Field

The invention relates to the technical field of buildings, in particular to a comprehensive construction method for a shaping component.

Background

With the rapid development of the building industry, high-rise buildings and super high-rise buildings are more and more, and the application of the steel plate meshes in the cantilever scaffold engineering is more and more extensive. The construction method mainly analyzes the important difficulty of the steel plate net in the construction process of the cantilever scaffold, summarizes the problems of the steel plate net in the application of the cantilever scaffold, provides corresponding solutions, and can be used for reference of the steel plate net cantilever scaffold in the field of building engineering. The popularization and application of the steel plate mesh overhanging scaffold can reduce the danger in the aspect of construction safety and reduce the cost in the construction process.

Disclosure of Invention

In order to solve the problems of the prior art, the invention provides a comprehensive construction method for a shaping member.

The technical scheme adopted by the invention for solving the technical problems is as follows: a comprehensive construction method of a shaping component comprises the following steps:

step 1: construction preparation; (1) before formal construction, the adopted steel plate mesh connecting piece, the screw cap, the steel plate mesh, the embedded ring, the I-steel, the steel pipe, the fastener and the steel wire rope are processed in advance; connecting pieces at corners are specially processed to ensure the integrity after the steel plate nets are connected; before the steel plate net is erected, a wire rope is used for pulling through a wire as a reference to ensure that a steel plate net connecting piece is on the same horizontal plane; (2) i-beams are distributed on each building, an optimal scheme is selected, deepening drawing is carried out, and the positions of each I-beam and the reusable bolt compression ring are positioned; (3) collecting relevant construction technical standards, carrying out technical crossing on constructors, manufacturing a steel plate mesh cantilever frame sample plate, trying to arrange the space between the I-shaped steel and determining the blanking size.

Step 2: pre-burying I-shaped steel compression ring reinforcing steel bars; (1) after the floor top plate template is erected, paying off and positioning each reusable bolt compression ring after the floor top plate template is qualified in acceptance; (2) the reusable compression ring is prefabricated in advance through a detailed node diagram, is transported to the site during construction, can bear the dead load of a frame body and the live load during construction in the using process, and can be taken out from the bottom of the structural slab after construction is finished for turnover use; in order to prevent water leakage of the toilet, a plastic sleeve is not adopted, and the reusable pressure ring is spot-welded on the steel bar of the toilet structural slab; (3) the other parts of the embedded rings are sleeved at the bottoms of the embedded rings by plastic sleeves, the plastic sleeves are fixed on the templates by nails, the U-shaped steel bars in the plastic sleeves can be taken out after the templates are disassembled later, and the panel surface is blocked; (4) and after the compression ring is embedded, top plate steel bar binding is carried out, because the engineering top plate is 100mm in thickness, the structure of the embedded ring part needs to be reinforced, 2 steel bars with the length of 1.5m and the diameter of 18mmHRB335 are embedded, and the top plate concrete is poured after acceptance inspection is qualified.

And step 3: erecting a frame body; (1) erecting a vertical rod, a ground sweeping rod, a large cross rod and a small cross rod, erecting a vertical rod in the middle of a tree and a protective railing, and erecting a frame body by analogy; (2) leveling the bottom of the vertical rod of the overhanging scaffold by using a leveling instrument, ensuring that the elevation of the bottom surface of the vertical rod is the same as the elevation of the upper surface of the I-shaped steel, and enabling the bottom of the pre-overhanging scaffold body to be located on the floor type double-row scaffold; and laying I-shaped steel after the concrete wall of the layer is poured.

And 4, step 4: erecting I-shaped steel; an I-shaped steel hole is reserved on the shear wall, the I-shaped steel hole and the compression ring are in the same straight line, a 6 m-long PVC pipe can be used for replacing an I-shaped steel to verify whether the hole is properly reserved at each position, after concrete pouring is finished and certain strength is achieved, the I-shaped steel is laid, a coupling beam is erected, and the coupling beam and the bottom I-shaped steel are connected through a U-shaped sleeve ring matched bolt.

And 5: pulling wires and installing steel plate net connecting pieces; (1) a through line parallel to the large cross rod is pulled out from the upright rod by a cord and is used as a base line for controlling the distance of the connecting piece extending out of the frame body and ensuring that the connecting pieces are all on the same horizontal line; calculating the actual quantity of the first layer of steel plate nets through the stay wires, comparing the actual quantity with the model, and controlling the quantity of the steel plate nets manufactured at the later stage; (5) the connecting piece is modeled by using BIM technology, and is processed and manufactured in a sizing size.

Step 6: erecting a steel plate net; (1) the steel plate net and the connecting piece are alternately constructed, the connecting piece is controlled by taking a cord as a base line, the flatness of the vertical surface of the steel plate net is controlled by the extending length of the connecting piece, and fine adjustment can be carried out in the construction process to ensure the integrity and the attractiveness of the steel plate net; (2) the steel plate nets are connected with the connecting pieces through connecting pieces welded on two sides of the steel plate nets and bolts, the welding positions of the connecting pieces of the steel plate nets on the bottommost layer are 45cm away from the bottom and 15cm away from the top, and the connecting pieces 45cm away from the bottom are not required to be welded on the steel plate nets on the upper portion; the upper part of each layer of steel plate net is welded with steel plate connecting sheets 12cm-15cm away from the two sides respectively, and the upper steel plate net can be clamped; the steel plate nets are ensured to be on the same horizontal plane up and down, and the phenomenon that the inner sides and the outer sides of the steel plate nets slide laterally to cause falling off is prevented; (3) splicing the steel plate nets to corners, reserving the special-shaped steel plate nets, measuring the actual reserved size, comparing the actual reserved size with a model, and when the width is less than 75cm, using the steel plate nets without square pipes as keels; before the production of the special-shaped steel plate net is finished, a reserved hole is shielded by a dense mesh net; (4) when the steel plate net is installed, the installation position of the unloading platform is reserved, and the reserved position of the unloading platform is suitable for the whole area of the steel plate net, so that the phenomenon that the whole bearing wind load is uneven due to the fact that the opening is too large is avoided; (5) the steel plate net overhanging scaffold is characterized in that the joint of each overhanging part is used for ensuring the comprehensive coverage of the steel plate net and the erection of a frame body, so that the upper and lower overhanging I-beams are subjected to dislocation adjustment, otherwise, the vertical rod at one overhanging part of the lower part can influence the laying of the upper overhanging I-beam; after the upper and lower overhanging rods are subjected to dislocation treatment, the upper and lower overhanging steel plate nets are in seamless lap joint, and the effect of the outer vertical surface of the steel plate net is more attractive.

And 7: maintaining a steel plate net; (1) after each layer of steel plate net is installed, the corners of the steel plate net and the joints of the steel plate net and the connecting pieces are checked, so that the phenomenon of falling off caused by instable installation is prevented; (2) when the steel plate net is damaged, the steel plate net is required to be replaced immediately, so that the threat of sharp edges and corners at the damaged part of the steel plate net to constructors is prevented; (3) and the steel plate nets are regularly checked, so that the safety of the scaffold and the use of the steel plate nets is ensured.

Compared with the prior art, the invention has the advantages that:

(1) compared with the traditional dense mesh net, the steel plate net adopted by the construction method has the advantages of high construction speed, shortened construction period, high quality and safety factor, low carbon, environmental protection, energy conservation and emission reduction.

(2) The construction method adopts the shaping component, and has the advantages of advanced technology, safety, reliability, high economic benefit, simple and convenient operation and higher construction standardization degree. The installation construction quality, the sense organ are better, the integrity is good. The finished product of the manufactured component can be turned over and reused for many times after construction, and meets the requirements of construction standardization and standardized management.

(3) Safety in the steel plate hoisting, mounting and dismounting processes is guaranteed through the self-made steel plate mesh hoisting support and the safety hanging rope.

(4) The construction method is suitable for construction of protective frame bodies such as overhanging scaffolds, construction elevator frames and the like.

The invention provides a shaping component for a building through improvement, which can carry out the shaping of a bevel angle special-shaped top beam frame, does not need to adopt lap joint materials for welding and fixing, has the advantages of convenient and quick construction, and is embodied as follows: the middle positions of the oblique angle fixing plate and the bottom beam fixing plate are embedded with bearing oblique blocks, oblique bolts are arranged at the tops of the first oblique angle grooves and embedded into oblique angle plates, and the oblique bolts penetrate through the bearing oblique blocks and the bottom beam fixing plate and are driven into the bottom beam. Oblique scute is connected through the oblique angle fixed plate that sets up, the floorbar fixed plate is used for connecting the floorbar, it carries out the obliquely bearing to bear the weight of the intermediate position of sloping angle fixed plate and floorbar fixed plate in the sloping block, hit into the oblique bolt from first oblique angle trench after sloping scute and floorbar target in place, do not squeeze into the back of the gim peg to the floorbar inside from top screens groove and bottom screens groove again, it is fixed to accomplish the design between oblique scute and the floorbar on the heterotypic back timber frame of oblique angle, need not to adopt the overlap joint material to carry out welded fastening, it is convenient that the construction gets up.

Additional aspects and advantages of the invention will be set forth in part in the description which follows and, in part, will be obvious from the description, or may be learned by practice of the invention.

Drawings

In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the drawings without creative efforts.

FIG. 1 is a schematic flow chart of a comprehensive construction method of a setting member according to the present invention.

FIG. 2 is a schematic structural view of a sizing member of the present invention;

fig. 3 is a schematic view of the installation of the styling member of the present invention.

Sequence numbers shown in the figures: the oblique angle fixing plate comprises an oblique angle fixing plate 1, a bottom beam fixing plate 2, a mounting groove 3, a first oblique angle groove 4, a second oblique angle groove 5, a top clamping groove 6, a bottom clamping groove 7, a bottom beam 8, an oblique angle plate 9, an oblique bolt 10, a fixing bolt 11 and a bearing oblique block 12.

Detailed Description

Exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings, in order that the present disclosure may be more fully understood and fully conveyed to those skilled in the art. While the exemplary embodiments of the present disclosure are shown in the drawings, it should be understood that the invention is not limited to the embodiments set forth herein.

In the description of the present invention, it is to be understood that the terms "longitudinal", "lateral", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", and the like, indicate orientations or positional relationships based on those shown in the drawings, are merely for convenience of description of the present invention, and do not indicate or imply that the referenced devices or elements must have a particular orientation, be constructed and operated in a particular orientation, and thus, are not to be construed as limiting the present invention.

Furthermore, the terms "first," "second," "third," and the like are used for descriptive purposes only and are not to be construed as indicating or implying relative importance. Meanwhile, in the description of the present invention, unless otherwise explicitly specified or limited, the terms "connected" and "connected" should be interpreted broadly, for example, as being fixedly connected, detachably connected, or integrally connected; the connection can be mechanical connection or electrical connection; may be directly connected or indirectly connected through an intermediate. The specific meanings of the above terms in the present invention can be understood in specific cases to those skilled in the art.

A comprehensive construction method of a shaping component comprises the following steps:

step 1: construction preparation; (1) before formal construction, the adopted steel plate mesh connecting piece, the screw cap, the steel plate mesh, the embedded ring, the I-steel, the steel pipe, the fastener and the steel wire rope are processed in advance; connecting pieces at corners are specially processed to ensure the integrity after the steel plate nets are connected; before the steel plate net is erected, a wire rope is used for pulling through a wire as a reference to ensure that a steel plate net connecting piece is on the same horizontal plane; (2) i-beams are distributed on each building, an optimal scheme is selected, deepening drawing is carried out, and the positions of each I-beam and the reusable bolt compression ring are positioned; (3) collecting relevant construction technical standards, carrying out technical crossing on constructors, manufacturing a steel plate mesh cantilever frame sample plate, trying to arrange the space between the I-shaped steel and determining the blanking size.

Step 2: pre-burying I-shaped steel compression ring reinforcing steel bars; (1) after the floor top plate template is erected, paying off and positioning each reusable bolt compression ring after the floor top plate template is qualified in acceptance; (2) the reusable compression ring is prefabricated in advance through a detailed node diagram, is transported to the site during construction, can bear the dead load of a frame body and the live load during construction in the using process, and can be taken out from the bottom of the structural slab after construction is finished for turnover use; in order to prevent water leakage of the toilet, a plastic sleeve is not adopted, and the reusable pressure ring is spot-welded on the steel bar of the toilet structural slab; (3) the other parts of the embedded rings are sleeved at the bottoms of the embedded rings by plastic sleeves, the plastic sleeves are fixed on the templates by nails, the U-shaped steel bars in the plastic sleeves can be taken out after the templates are disassembled later, and the panel surface is blocked; (4) and after the compression ring is embedded, top plate steel bar binding is carried out, because the engineering top plate is 100mm in thickness, the structure of the embedded ring part needs to be reinforced, 2 steel bars with the length of 1.5m and the diameter of 18mmHRB335 are embedded, and the top plate concrete is poured after acceptance inspection is qualified.

And step 3: erecting a frame body; (1) erecting a vertical rod, a ground sweeping rod, a large cross rod and a small cross rod, erecting a vertical rod in the middle of a tree and a protective railing, and erecting a frame body by analogy; (2) leveling the bottom of the vertical rod of the overhanging scaffold by using a leveling instrument, ensuring that the elevation of the bottom surface of the vertical rod is the same as the elevation of the upper surface of the I-shaped steel, and enabling the bottom of the pre-overhanging scaffold body to be located on the floor type double-row scaffold; and laying I-shaped steel after the concrete wall of the layer is poured.

And 4, step 4: erecting I-shaped steel; an I-shaped steel hole is reserved on the shear wall, the I-shaped steel hole and the compression ring are in the same straight line, a 6 m-long PVC pipe can be used for replacing an I-shaped steel to verify whether the hole is properly reserved at each position, after concrete pouring is finished and certain strength is achieved, the I-shaped steel is laid, a coupling beam is erected, and the coupling beam and the bottom I-shaped steel are connected through a U-shaped sleeve ring matched bolt.

And 5: pulling wires and installing steel plate net connecting pieces; (1) a through line parallel to the large cross rod is pulled out from the upright rod by a cord and is used as a base line for controlling the distance of the connecting piece extending out of the frame body and ensuring that the connecting pieces are all on the same horizontal line; calculating the actual quantity of the first layer of steel plate nets through the stay wires, comparing the actual quantity with the model, and controlling the quantity of the steel plate nets manufactured at the later stage; (5) the connecting piece is modeled by using BIM technology, and is processed and manufactured in a sizing size.

Step 6: erecting a steel plate net; (1) the steel plate net and the connecting piece are alternately constructed, the connecting piece is controlled by taking a cord as a base line, the flatness of the vertical surface of the steel plate net is controlled by the extending length of the connecting piece, and fine adjustment can be carried out in the construction process to ensure the integrity and the attractiveness of the steel plate net; (2) the steel plate nets are connected with the connecting pieces through connecting pieces welded on two sides of the steel plate nets and bolts, the welding positions of the connecting pieces of the steel plate nets on the bottommost layer are 45cm away from the bottom and 15cm away from the top, and the connecting pieces 45cm away from the bottom are not required to be welded on the steel plate nets on the upper portion; the upper part of each layer of steel plate net is welded with steel plate connecting sheets 12cm-15cm away from the two sides respectively, and the upper steel plate net can be clamped; the steel plate nets are ensured to be on the same horizontal plane up and down, and the phenomenon that the inner sides and the outer sides of the steel plate nets slide laterally to cause falling off is prevented; (3) splicing the steel plate nets to corners, reserving the special-shaped steel plate nets, measuring the actual reserved size, comparing the actual reserved size with a model, and when the width is less than 75cm, using the steel plate nets without square pipes as keels; before the production of the special-shaped steel plate net is finished, a reserved hole is shielded by a dense mesh net; (4) when the steel plate net is installed, the installation position of the unloading platform is reserved, and the reserved position of the unloading platform is suitable for the whole area of the steel plate net, so that the phenomenon that the whole bearing wind load is uneven due to the fact that the opening is too large is avoided; (5) the steel plate net overhanging scaffold is characterized in that the joint of each overhanging part is used for ensuring the comprehensive coverage of the steel plate net and the erection of a frame body, so that the upper and lower overhanging I-beams are subjected to dislocation adjustment, otherwise, the vertical rod at one overhanging part of the lower part can influence the laying of the upper overhanging I-beam; after the upper and lower overhanging rods are subjected to dislocation treatment, the upper and lower overhanging steel plate nets are in seamless lap joint, and the effect of the outer vertical surface of the steel plate net is more attractive.

And 7: maintaining a steel plate net; (1) after each layer of steel plate net is installed, the corners of the steel plate net and the joints of the steel plate net and the connecting pieces are checked, so that the phenomenon of falling off caused by instable installation is prevented; (2) when the steel plate net is damaged, the steel plate net is required to be replaced immediately, so that the threat of sharp edges and corners at the damaged part of the steel plate net to constructors is prevented; (3) and the steel plate nets are regularly checked, so that the safety of the scaffold and the use of the steel plate nets is ensured.

Preferably, the steel plate net is a semi-steel safety net, the galvanized square pipe for the frame diagonal bracing is 20 multiplied by 1.0mm in specification, the galvanized steel plate net is 0.3mm in thickness, and the outer vertical surface is painted.

Optimizing, and controlling the quality of construction preparation; each component is manufactured accurately according to the size, and splicing and dislocation are avoided in the connection process; when the connecting sheets are welded, the accurate positioning of the welding sheets is required to be noticed, so that the connecting difficulty caused by the dislocation of the welding sheets at the two sides is prevented; when the steel plate net is erected on each layer, the stay wire ropes are required to ensure that the whole plane has good levelness and verticality.

Optimizing, and controlling the quality of the construction process; in the process of installing the steel plate net, orderly splicing is carried out in sequence according to the model, and proper adjustment is carried out, so that the special-shaped size is reduced, and the cost is reduced; after each steel plate net is installed, adjusting the flatness in the horizontal direction through a cord; the steel plate net at each joint should be strictly controlled for edge joint, and the distance between the large cross rods attached to the connecting pieces is controlled, so that the connection stability of the steel plate net and the connecting pieces is ensured; the seam splicing of the special-shaped steel plate net at the corner is strictly controlled not to exceed 2-3 mm, and the seam splicing dislocation of the steel plate net is not caused.

Optimizing, maintaining process quality control; in the using process of the steel plate net, if the steel plate net is damaged, the steel plate net should be replaced in time, and the connecting nodes of the steel plate net are periodically checked to prevent the steel plate net from settling and falling off.

Optimized, safety measures; the power line of the handheld cutting machine adopts a weather-proof rubber sheath copper core flexible cable; the secondary wire of the electric welding machine is a waterproof rubber sheath copper core flexible cable, the length of the primary wire is not more than 5m, and the primary wire is protected by penetrating a pipe; all power lines must not have any breakage and joint, must not be any to connect and lengthen or tear open and change; the anti-skidding supporting legs are arranged below the support, the steel plate nets prevented from being dismantled are stacked on the outer frame and slide down to cause safe construction, four-point lifting rings are erected on the support, lifting efficiency of the steel plate nets is improved, dangerous actions when workers hook the steel plate nets are avoided during high-altitude operation, and extrusion damage to the steel plate nets caused by tower crane steel wire ropes in a lifting process is prevented.

The present invention provides a setting member by improvement, as shown in fig. 1 to 2, which can be implemented as follows; including oblique angle fixed plate 1 and floorbar fixed plate 2, first bevel groove 4 has been seted up to one side of oblique angle fixed plate 1, top screens groove 6 has been seted up to the adjacent side in first bevel groove 4, floorbar fixed plate 2 sets up in the bottom of oblique angle fixed plate 1, the top of floorbar fixed plate 2 is equipped with second bevel groove 5, the offside of 5 bottoms in second bevel groove is seted up and is had end screens groove 7, the top of oblique angle fixed plate 1 is equipped with bevel board 9, the inside of floorbar fixed plate 2 is equipped with floorbar 8.

In the invention, a bearing oblique block 12 is embedded in the middle position of the oblique angle fixing plate 1 and the bottom beam fixing plate 2, an oblique bolt 10 is arranged at the top of the first oblique angle groove 4, the oblique bolt 10 is embedded in the oblique angle plate 9 and penetrates through the bearing oblique block 12 and the bottom beam fixing plate 2 to be driven into the bottom beam 8. The oblique angle plate 9 is connected through the arranged oblique angle fixing plate 1, the bottom beam fixing plate 2 is used for connecting the bottom beam 8, the bearing oblique block 12 is embedded into the middle position of the oblique angle fixing plate 1 and the bottom beam fixing plate 2 to carry out oblique bearing, after the oblique angle plate 9 and the bottom beam 8 are in place, the oblique bolt 10 is driven into the first oblique angle groove 4, and then the fixing bolt 11 is driven into the bottom beam 8 from the top clamping groove 6 and the bottom clamping groove 7 respectively to finish the shaping and fixing between the oblique angle plate 9 and the bottom beam 8 on the oblique angle special-shaped top beam frame, and the construction is convenient without adopting lap joint materials for welding and fixing; the top clamping groove 6 is opposite to the bottom clamping groove 7 in position, and fixing bolts 11 are arranged inside the top clamping groove 6 and the bottom clamping groove 7. The bottom beam fixing plate 2 and the bottom beam 8 are connected through a fixing bolt 11; the side of the bottom beam fixing plate 2 is provided with symmetrical mounting grooves 3. Mounting the structure to a building structure by means of the provided mounting groove 3; the bevel angle fixing plate 1 and the bottom beam fixing plate 2 are made of galvanized steel products and are used for ensuring the structural strength of the member.

The working principle of the shaping component is as follows: this kind of design component comprises oblique angle fixed plate 1 and floorbar fixed plate 2, during the use earlier stretch into floorbar fixed plate 2 with floorbar 8 in, laminate oblique angle board 9 and oblique angle fixed plate 1 again, and place floorbar fixed plate 2 top, connect oblique angle board 9 through the oblique angle fixed plate 1 that sets up, floorbar fixed plate 2 is used for connecting floorbar 8, bear the weight of oblique piece 12 and embed to carry out the inclined bearing to the intermediate position of oblique angle fixed plate 1 and floorbar fixed plate 2, hit into oblique bolt 10 from first oblique angle groove 4 position after oblique angle board 9 and floorbar 8 target in place, hit into behind the fixing bolt 11 to the floorbar 8 inside from top screens groove 6 and bottom screens groove 7 respectively again, accomplish on the heterotypic top beam frame that oblique angle is fixed between oblique angle board 9 and the floorbar 8.

A technological principle of a comprehensive construction method of a shaping component is as follows:

(1) the national current industry standard 'construction fastener type scaffold safety technical Specification' JGJ130 specifies: the length of the end of each rod piece extending out of the edge of the fastener cover plate is not less than 100mm, so when the rod piece is connected with the longitudinal horizontal rod of the frame body to form a steel plate net connecting piece, one end of the connecting piece is required to extend out of the edge of the fastener cover plate by 100mm to prevent the connecting piece from falling out of the fastener.

(2) The vertical surfaces of the steel plate nets are spliced transversely and vertically, and gaps among the spliced seams cannot exceed 2-3 mm. The corner is processed, and a special steel plate net connecting sheet is welded at the corresponding position of the steel plate net, so that the corner is connected. The steel plate net is clamped up and down through the steel plate net connecting sheet, and the left side and the right side are connected with the steel plate net connecting sheet through the connecting piece, so that the integrity of the vertical surface of the steel plate net is ensured.

(3) Adopt novel prefabricated reuse formula bolt clamping ring and cooperation plastic sheath to use, it is pre-buried on the roof, demolish the roof template after the construction finishes, adopt the sledgehammer hammering, take out pre-buried ring to adopt pea gravel concreten shutoff structural slab entrance to a cave.

(4) The traditional construction process of the cantilever scaffold is changed, the cantilever scaffold frame body is pre-cantilevered at the rooting part of the cantilever scaffold, and then the I-steel is laid, so that the cantilever scaffold frame body is located on the I-steel layer.

(5) In order to ensure that the frame body is erected between the two picks, the I-shaped steel between the two picks is subjected to dislocation adjustment treatment.

An application example, the science and technology of the university of western's traffic creates a secondary-segment student dormitory building B area of the scientific and creative base of the harbor.

The 12-section student dormitory building in the B area of the two-section area of the science and technology creation base of the western-security traffic university constructed by the company of the national institute of technology, is of a shear wall structure, has 1 floor below the ground and 11 floors above the ground, has a total building area of 133054.33 square meters, and is operated 3 months and 5 days in 2017. 12 a students' dormitory building four layers and all adopt the steel screen to encorbelment scaffold construction more than four layers, the application area: 56000 square meter, application cycle: 6 months in 2017-4 months in 2018. No quality safety accident occurs in the construction process.

The science and technology of the university of western's traffic creates a secondary-segment dormitory building C area of the scientific and creative base of the harbor. The 12-section student dormitory building in the C area of the two-section area of the science and technology creation base of the western-security traffic university constructed by the company of the national institute of technology, is of a shear wall structure, has 1 floor below the ground and 11 floors above the ground, has a total building area of 132709.2 square meters, and is operated 3 months and 5 days in 2017. 12 a students' dormitory building four layers and all adopt the steel screen to encorbelment scaffold construction more than four layers, the application area: 54000 square meters, application cycle: 6 months in 2017-4 months in 2018. No quality safety accident occurs in the construction process.