Reinforcing tool for aluminum alloy K plate matched CCW heat insulation system and construction method

文档序号:1226489 发布日期:2020-09-08 浏览:6次 中文

阅读说明:本技术 一种铝合金k板配合ccw保温体系的加固工具及施工方法 (Reinforcing tool for aluminum alloy K plate matched CCW heat insulation system and construction method ) 是由 朱宾 岳亚超 于 2020-05-21 设计创作,主要内容包括:本发明公开了一种铝合金K板配合CCW保温体系的加固工具及施工方法,属于建筑施工的技术领域。包括混凝土结构和模板结构,所述混凝土结构由外至内依次设有墙体保护层、钢筋网片、保温板和结构墙体,所述保温板固定连接在钢筋网片上;所述模板结构包括铝模、对拉螺栓、铝合金K板和预埋组件,所述铝模通过对拉螺栓固定连接在结构墙体的内侧和墙体保护层的外侧,所述铝合金K板通过预埋组件与钢筋网片固定连接,所述铝合金K板位于在墙体保护层外侧铝模的顶部。对铝模K板加固及拆卸更加简易方便,结构的质量控制效果明显,施工经济效益好。(The invention discloses a reinforcing tool for an aluminum alloy K plate and CCW heat insulation system and a construction method, and belongs to the technical field of building construction. The concrete structure is sequentially provided with a wall protection layer, a steel bar net piece, a heat insulation plate and a structural wall from outside to inside, and the heat insulation plate is fixedly connected to the steel bar net piece; the template structure comprises an aluminum mold, a split bolt, an aluminum alloy K plate and a pre-embedded assembly, wherein the aluminum mold is fixedly connected to the inner side of a structure wall body and the outer side of a wall body protective layer through the split bolt, the aluminum alloy K plate is fixedly connected with a reinforcing mesh through the pre-embedded assembly, and the aluminum alloy K plate is located at the top of the aluminum mold outside the wall body protective layer. The reinforcing and dismounting of the aluminum mould K plate are simpler and more convenient, the quality control effect of the structure is obvious, and the construction economic benefit is good.)

1. A strengthening tool for an aluminum alloy K plate matched with a CCW heat insulation system is characterized by comprising a concrete structure and a template structure,

the concrete structure is sequentially provided with a wall body protective layer (1), a steel bar net piece (2), an insulation board (3) and a structural wall body (4) from outside to inside, and the insulation board (3) is fixedly connected to the steel bar net piece (2);

the template structure includes aluminium mould (11), split bolt (12), aluminum alloy K board (5) and pre-buried subassembly, aluminium mould (11) are through split bolt (12) fixed connection in the inboard of structure wall body (4) and the outside of wall body protective layer (1), aluminum alloy K board (5) are through pre-buried subassembly and reinforcing bar net piece (2) fixed connection, aluminum alloy K board (5) are located the top at wall body protective layer (1) outside aluminum mould (11).

2. The reinforcing tool of aluminum alloy K plate cooperation CCW heat preservation system of claim 1, characterized in that, pre-buried subassembly includes buried sleeve (6) and connecting bolt (7), be equipped with the bellying on the outer wall of buried sleeve (6), the one end of buried sleeve (6) runs through reinforcing bar net piece (2) and laminates with heated board (3), connecting bolt (7) run through aluminum alloy K plate (5) and buried sleeve (6) accordant connection.

3. The reinforcing tool for the aluminum alloy K plate matched CCW heat insulation system according to claim 2, further comprising a connecting plate (8), wherein the connecting plate (8) is arranged on the outer side of the aluminum alloy K plate (5), a through hole for the connecting bolt (7) to pass through is formed in the connecting plate (8), a first horizontal plate (81) is fixedly connected to the top of the connecting plate (8), and a connecting hole is formed in the first horizontal plate (81).

4. The tool for reinforcing the aluminum alloy K plate matched CCW heat insulation system according to claim 1, wherein a second horizontal plate (9) is fixedly connected to the bottom of the aluminum alloy K plate (5), the second horizontal plate (9) is fixedly connected to the top of an aluminum die (11) through bolts, and a reinforcing rod (10) is fixedly connected between the second horizontal plate (9) and the aluminum alloy K plate (5).

5. A construction method of a reinforcing tool for an aluminum alloy K plate matched with a CCW heat insulation system is characterized by comprising the following steps:

s1, firstly, fixing the outer side of the heat insulation board (3) and the reinforcing mesh (2), hoisting the heat insulation board to a designed position through hoisting equipment, and fixing the inner side of the heat insulation board (3) and the reinforcing steel bars on the inner side of the structural wall (4);

s2, installing cushion blocks on the outer side of the heat preservation plate (3), installing aluminum molds (11) on the outer side of the area to be poured, and fixing the aluminum molds (11) on the two sides at the designed positions through split bolts (12);

s3, at the designed position of the top of the aluminum mold (11), the embedded sleeve (6) penetrates through the steel bar net piece (2) and is attached to the heat preservation plate (3), then the horizontal plate II (9) is fixed at the top of the aluminum mold (11) on the outer side through bolts, and the connecting bolts (7) sequentially penetrate through holes in the connecting plate (8), and the aluminum alloy K plate (5) and the embedded sleeve (6) are connected in a matched mode;

s4, pouring concrete on two sides of the heat preservation plate (3), and forming a wall protection layer (1) and a structural wall (4) after the concrete reaches a certain strength;

s5, when the upper-layer wall is constructed, the horizontal plate I (81) at the top of the connecting plate (8) is connected with the aluminum die (11) at the bottom of the upper layer through bolts, and the inner side of the aluminum alloy clamping plate and the inner side of the aluminum die (11) on the upper layer are ensured to be located on the same plane.

Technical Field

The invention belongs to the technical field of building construction, and particularly relates to a reinforcing tool and a construction method for an aluminum alloy K plate and CCW heat insulation system.

Background

Traditional aluminium mould K board is consolidated and is adopted pulling-on piece or split bolt, and it is complicated to appear consolidating the installation and dismantle, consolidates the in-process and destroys CCW heat preservation system, and the later stage is consolidated the processing control degree of difficulty and is big, and under the condition that outer wall heat preservation technique is updated day by day, the construction of aluminium mould cooperation CCW heat preservation system has become the trend, for making construction operation process simpler and easy, accelerates the construction progress to reduce the cost input, improve the new way.

Disclosure of Invention

The invention aims to overcome the defects in the prior art, and provides a reinforcing tool and a construction method for an aluminum alloy K plate matched with a CCW heat insulation system.

In order to achieve the purpose, the invention adopts the following scheme:

a strengthening tool for an aluminum alloy K plate matched with a CCW heat insulation system comprises a concrete structure and a template structure,

the concrete structure is sequentially provided with a wall body protective layer, a steel bar mesh, an insulation board and a structural wall body from outside to inside, and the insulation board is fixedly connected to the steel bar mesh;

the template structure comprises an aluminum mold, a split bolt, an aluminum alloy K plate and a pre-embedded assembly, wherein the aluminum mold is fixedly connected to the inner side of a structure wall body and the outer side of a wall body protective layer through the split bolt, the aluminum alloy K plate is fixedly connected with a reinforcing mesh through the pre-embedded assembly, and the aluminum alloy K plate is located at the top of the aluminum mold outside the wall body protective layer.

Further, pre-buried subassembly includes buried sleeve and connecting bolt in advance, be equipped with the bellying on buried sleeve's the outer wall in advance, buried sleeve's one end runs through the reinforcing bar net piece and laminates with the heated board, connecting bolt runs through aluminum alloy K board and buried sleeve accordant connection.

Further, still include the connecting plate, the connecting plate sets up in the outside of aluminum alloy K board, set up the through-hole that is convenient for connecting bolt to pass on the connecting plate, the top fixedly connected with horizontal plate one of connecting plate, be equipped with the connecting hole on the horizontal plate one.

Further, the bottom of the aluminum alloy K plate is fixedly connected with a second horizontal plate, the second horizontal plate is fixedly connected to the top of the aluminum die through bolts, and a reinforcing rod is fixedly connected between the second horizontal plate and the aluminum alloy K plate.

A construction method of a reinforcing tool for an aluminum alloy K plate matched with a CCW heat insulation system comprises the following steps:

s1, firstly, fixing the outer side of the heat-insulation plate and the reinforcing steel bar net piece, hoisting the heat-insulation plate to a designed position through hoisting equipment, and fixing the inner side of the heat-insulation plate and the reinforcing steel bar on the inner side of the structural wall;

s2, mounting cushion blocks on the outer side of the heat preservation plate, mounting aluminum molds on the outer side of the area to be poured, and fixing the aluminum molds on the two sides at the designed positions through split bolts;

s3, at the designed position of the top of the aluminum mold, the embedded sleeve penetrates through the steel mesh and is attached to the heat preservation plate, then a horizontal plate II is fixed at the top of the outer aluminum mold through a bolt, and a connecting bolt sequentially penetrates through a through hole in the connecting plate and the aluminum alloy K plate to be connected with the embedded sleeve in a matching mode;

s4, pouring concrete on two sides of the heat preservation plate, and forming a wall protection layer and a structural wall after the concrete reaches a certain strength;

s5, when the upper-layer wall is constructed, the horizontal plate I at the top of the connecting plate is connected with the aluminum die at the bottom of the upper layer through the bolt, and the inner side of the aluminum alloy clamping plate and the inner side of the aluminum die at the upper layer are located on the same plane.

Compared with the prior art, the invention can obtain the following technical effects:

when the aluminum alloy K plate is used, the aluminum alloy K plate is fixedly arranged above an aluminum mold through the embedded assembly, the bottom of the aluminum alloy K plate is fixedly provided with the second horizontal plate to ensure the structural strength during the construction of the current layer, meanwhile, the reinforcing rod can realize vertical auxiliary support on the aluminum alloy K plate to meet the structural strength, the embedded assembly comprises an embedded sleeve, a connecting bolt and a connecting plate, the embedded sleeve is provided with a bulge, the embedded sleeve penetrates through a reinforcing mesh sheet through the bulge to be embedded in a wall protection layer, the embedded sleeve is fixedly connected with the reinforcing mesh sheet through the bulge, the end surface of the embedded sleeve is inserted into the surface of the heat insulation layer to control the insertion depth to ensure the structural strength during the construction of the upper layer wall, and the connecting bolt sequentially penetrates through a through hole of the connecting plate and the aluminum alloy K plate to realize threaded connection with the embedded sleeve to realize higher structural, and meanwhile, when the upper-layer wall body is constructed, the second horizontal plate and the upper-layer aluminum die are fixed to realize the stable state of the aluminum alloy K plate.

Drawings

FIG. 1 is a schematic view of the overall structure of the present invention;

fig. 2 is a connection relation diagram of the connection bolt and the embedded sleeve according to the present invention.

In the figure: 1. a wall protection layer; 2. reinforcing mesh sheets; 3. a thermal insulation board; 4. a structural wall; 5. an aluminum alloy K plate; 6. pre-burying a sleeve; 7. a connecting bolt; 8. a connecting plate; 81. a first horizontal plate; 9. a second horizontal plate; 10. a reinforcing bar; 11. aluminum molding; 12. and (4) oppositely pulling the bolts.

Detailed Description

In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention is further described in detail with reference to the following embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.

6页详细技术资料下载
上一篇:一种医用注射器针头装配设备
下一篇:一种锚固修补混凝土和砂浆动态裂缝的方法和结构

网友询问留言

已有0条留言

还没有人留言评论。精彩留言会获得点赞!

精彩留言,会给你点赞!