High-wear-resistance ultrahigh manganese steel casting production equipment for machinery
阅读说明:本技术 一种机械用高耐磨超高锰钢铸件生产设备 (High-wear-resistance ultrahigh manganese steel casting production equipment for machinery ) 是由 韩炎鑫 于 2019-10-31 设计创作,主要内容包括:本发明公开了一种机械用高耐磨超高锰钢铸件生产设备,涉及钢铸件生产技术领域。该机械用高耐磨超高锰钢铸件生产设备,包括支撑板,所述支撑板的上方设置有罐体,支撑板的顶部固定安装有第一箱体和第二箱体,第一箱体和第二箱体为相邻设置,第一箱体的一侧外壁和罐体的一侧外壁相贴合,第二箱体的一侧外壁和罐体的另一侧外壁相贴合,罐体的底部固定安装有第一支撑腿,罐体的上方设置有传动机构,罐体的顶部固定安装有进料管,进料管和罐体内部相通,罐体的一侧外壁固定安装有第一进风管,第一进风管和罐体内部相通,第一进风管上固定安装有第一阀门。本发明便于操作,便于提高工作效率,操作简单且造价低。(The invention discloses high-wear-resistance ultrahigh manganese steel casting production equipment for machinery, and relates to the technical field of steel casting production. The production equipment for the high-wear-resistance ultrahigh manganese steel casting for machinery comprises a supporting plate, wherein a tank body is arranged above the supporting plate, a first box body and a second box body are fixedly mounted at the top of the supporting plate, the first box body and the second box body are adjacently arranged, one side outer wall of the first box body is attached to one side outer wall of the tank body, one side outer wall of the second box body is attached to the other side outer wall of the tank body, a first supporting leg is fixedly mounted at the bottom of the tank body, a transmission mechanism is arranged above the tank body, a feeding pipe is fixedly mounted at the top of the tank body and communicated with the inside of the tank body, a first air inlet pipe is fixedly mounted on one side outer wall of the tank body and communicated with the inside of the tank body, and a first valve. The invention is convenient to operate, improves the working efficiency, and has simple operation and low cost.)
1. The production equipment of the high-wear-resistance ultrahigh manganese steel casting for machinery comprises a support plate (29), and is characterized in that: the tank is characterized in that a tank body (1) is arranged above the supporting plate (29), a first tank body (12) and a second tank body (18) are fixedly arranged at the top of the supporting plate (29), the first tank body (12) and the second tank body (18) are adjacently arranged, one side outer wall of the first tank body (12) is attached to one side outer wall of the tank body (1), one side outer wall of the second tank body (18) is attached to the other side outer wall of the tank body (1), a first supporting leg (17) is fixedly arranged at the bottom of the tank body (1), a transmission mechanism (2) is arranged above the tank body (1), an inlet pipe (7) is fixedly arranged at the top of the tank body (1), the inlet pipe (7) is communicated with the inside of the tank body (1), a first air inlet pipe (8) is fixedly arranged on one side outer wall of the tank body (1), the first air inlet pipe (8) is communicated with the inside of the tank body (1), a first valve (, heat-conducting plates (10) are fixedly mounted on the inner walls of two sides of the tank body (1), the number of the heat-conducting plates (10) is six, a heating mechanism (11) is arranged above the first tank body (12), a second sealing door (31) is hinged to the outer surface of the front side of the first tank body (12), a connecting plate (15) is arranged in the first tank body (12), supporting rods (14) are fixedly mounted at the bottom of the connecting plate (15), the number of the supporting rods (14) is two, a cleaning mechanism (16) is arranged above the connecting plate (15), a second sealing door (31) is hinged to the outer surface of the front side of the second tank body (18), an air drying mechanism (19) is arranged in the second tank body (18), a discharge pipe (20) is fixedly mounted at the bottom of the tank body (1), the discharge pipe (20) is communicated with the interior of the tank body (1), a second valve (, the top fixed mounting of backup pad (29) has places case (26), and the top of placing case (26) has seted up second opening (28), and second goes out tuber pipe (1903) and places case (26) inside and communicate with each other, and the bottom fixed mounting of backup pad (29) has second supporting leg (30).
2. The production equipment of the high-wear-resistance ultra-high manganese steel casting for machinery as claimed in claim 1, wherein: the transmission mechanism (2) comprises a first gear (201), a second gear (202), a third gear (203), a motor (204) and a transmission chain (205), motor (204) are installed admittedly at the top of jar body (1), the output shaft of motor (204) passes through shaft coupling and second gear fixed connection, the bottom fixed mounting of first gear (201) has first dwang (3), fixed mounting has first stirring rake (4) on first dwang (3), the bottom fixed mounting of third gear (203) has second dwang (5), fixed mounting has second stirring rake (6) on second dwang (5), first gear (201), the cover is equipped with drive chain (205) on second gear (202) and third gear (203), first gear (201), second gear (202) and third gear (203) pass through drive chain (205) transmission and connect.
3. The production equipment of the high-wear-resistance ultra-high manganese steel casting for machinery as claimed in claim 2, wherein: the quantity of first stirring rake (4) is three groups, and the quantity of second stirring rake (6) is three groups, and first stirring rake (4) and second stirring rake (6) are crisscross setting.
4. The production equipment of the high-wear-resistance ultra-high manganese steel casting for machinery as claimed in claim 1, wherein: the heating mechanism (11) comprises a first fan (1101), a connecting pipe (1102), an air outlet pipe (1103), a heating assembly (1104), a heating wire (1105) and a hoop (1106), wherein the top of the first box (12) is fixedly provided with the first fan (1101), the heating assembly (1104) is arranged above the first box (12), the heating assembly (1104) is internally and fixedly provided with the heating wire (1105), the top of the first box (12) is fixedly provided with the hoop (1106), the hoop (1106) is fixedly connected with the heating assembly (1104), the air inlet end of the first fan (1101) is fixedly provided with the connecting pipe (1102), the connecting pipe (1102) is communicated with the inside of the first fan (1101), one end of the connecting pipe (1102) far away from the first fan (1101) is fixedly connected with the heating assembly (1104), the air outlet pipe (1103) is fixedly arranged at the air outlet end of the first fan (1101), and the air outlet pipe (1103) is communicated with the inside of the first fan (1101, one end of the air outlet pipe (1103) far away from the first fan (1101) is fixedly connected with the tank body (1), and the air outlet pipe (1103) is communicated with the interior of the tank body (1).
5. The production equipment of the high-wear-resistance ultra-high manganese steel casting for machinery as claimed in claim 1, wherein: the cleaning mechanism (16) comprises a water tank (1601), a water injection pipe (1602), a water inlet pipe (1603), a water pump (1604), a water outlet pipe (1605) and an atomizing spray head (1606), wherein the water tank (1601) is fixedly installed at the top of a connecting plate (15), the water pump (1604) is fixedly installed at the top of the connecting plate (15), the water tank (1601) and the water pump (1604) are adjacently arranged, the water injection pipe (1602) is fixedly installed at the top of the water tank (1601), the water injection pipe (1602) is communicated with the inside of the water tank (1601), the water inlet end of the water pump (1604) is fixedly installed with the water inlet pipe (1603), the water inlet pipe (1603) is communicated with the inside of the water pump (1604), one end of the water inlet pipe (1603) far away from the water pump (1604) is fixedly connected with the water tank (1601), the water inlet pipe (1603) is communicated with the inside of the water tank (, the water outlet pipe (1605) is a hose, the water outlet pipe (1605) penetrates through the first box body (12) and is fixedly provided with the atomizing nozzle (1606), and the atomizing nozzle (1606) is communicated with the water outlet pipe (1605) in the interior.
6. The production equipment of the high-wear-resistance ultra-high manganese steel casting for machinery as claimed in claim 1, wherein: air-dry mechanism (19) including second fan (1901), second air-supply line (1902), second play tuber pipe (1903), the bottom fixed mounting of second box (18) has second fan (1901), the air-supply line fixed mounting of second fan (1901) has second air-supply line (1902), second air-supply line (1902) and second fan (1901) are inside to communicate with each other, second air-supply line (1902) are kept away from the one end of second fan (1901) and are run through second box (18), the air-out fixed mounting of second fan (1901) has second play tuber pipe (1903), second play tuber pipe (1903) and second fan (1901) are inside to communicate with each other, the one end that second fan (1901) was kept away from in second play tuber pipe (1903) runs through second box (18).
7. The production equipment of the high-wear-resistance ultra-high manganese steel casting for machinery as claimed in claim 1, wherein: adjacent lateral wall fixed mounting of first box (12) and second box (18) has fixed plate (22), has seted up first opening (25) on fixed plate (22), and fixed mounting has swash plate (23) on fixed plate (22), and swash plate (23) are quantity two sets of, and fixed mounting has filter screen (24) on fixed plate (22), filter screen (24) and two sets of swash plate (23) fixed connection, and the diameter of filter screen (24) is greater than the aperture of first opening (25).
8. The production equipment of the high-wear-resistance ultra-high manganese steel casting for machinery as claimed in claim 1, wherein: handles (27) are fixedly arranged on the outer walls of the two sides of the placing box (26).
Technical Field
The invention relates to the technical field of steel casting production, in particular to high-wear-resistance ultrahigh manganese steel casting production equipment for machinery.
Background
The casting is a metal molding object obtained by various casting methods, namely, the smelted liquid metal is poured into a casting mold prepared in advance by pouring, injecting, sucking or other casting methods, and after cooling, the casting is subjected to subsequent processing means such as grinding and the like, so that the object with certain shape, size and performance is obtained.
The production process of the steel casting needs to carry out hot melting on the raw materials of the steel casting, and the traditional mode has the disadvantages of slow hot melting efficiency and slow work efficiency to a certain extent; when the materials are melted into liquid, the materials contain certain impurities, which can affect the production quality of the steel casting to a certain extent; the traditional method has the advantages that the unfused solid filtered in the filtering process needs manual treatment, the burden of workers is increased, the time is wasted, and the manual cleaning speed is slow; after the existing high manganese steel casting is hot-melted, most of the existing high manganese steel castings are cooled and shaped in a normal-temperature natural cooling mode, so that the time consumption is long, the production and processing efficiency is low, and the popularization and the use are not facilitated.
Disclosure of Invention
The invention aims to provide high-wear-resistance ultrahigh manganese steel casting production equipment for machinery, which aims to solve the problems in the background technology.
In order to achieve the purpose, the invention provides the following technical scheme: a production device of a high-wear-resistance ultrahigh manganese steel casting for machinery comprises a supporting plate, wherein a tank body is arranged above the supporting plate, a first tank body and a second tank body are fixedly installed at the top of the supporting plate, the first tank body and the second tank body are adjacently arranged, the outer wall of one side of the first tank body is attached to the outer wall of one side of the tank body, the outer wall of one side of the second tank body is attached to the outer wall of the other side of the tank body, a first supporting leg is fixedly installed at the bottom of the tank body, a transmission mechanism is arranged above the tank body, a feeding pipe is fixedly installed at the top of the tank body and communicated with the inside of the tank body, a first air inlet pipe is fixedly installed on the outer wall of one side of the tank body and communicated with the inside of the tank body, a first valve is fixedly installed on the first air inlet pipe, heat conducting plates are fixedly installed on, articulated second sealing door of installing of front side external surface of first box, be provided with the connecting plate in the first box, the bottom fixed mounting of connecting plate has the bracing piece, the quantity of bracing piece is two sets of, the top of connecting plate is provided with wiper mechanism, the articulated second sealing door of installing of front side external surface of second box, be provided with air-dry mechanism in the second box, the bottom fixed mounting of the jar body has the discharging pipe, discharging pipe and jar internal portion communicate with each other, fixed mounting has the second valve on the discharging pipe, the top fixed mounting of backup pad has places the case, place the top of case and seted up the second opening, the second goes out the tuber pipe and places the incasement portion and communicate with each other, the bottom fixed mounting of backup.
Preferably, drive mechanism includes first gear, second gear, third gear, motor, drive chain, the motor is equipped with to the top of the jar body admittedly, the output shaft of motor passes through shaft coupling and second gear fixed connection, the bottom fixed mounting of first gear has first dwang, fixed mounting has first stirring rake on the first dwang, the bottom fixed mounting of third gear has the second dwang, fixed mounting has the second stirring rake on the second dwang, first gear, the cover is equipped with drive chain on second gear and the third gear, first gear, second gear and third gear pass through drive chain transmission and connect, the stirring of being convenient for.
Preferably, the quantity of first stirring rake is three groups, and the quantity of second stirring rake is three groups, and first stirring rake and second stirring rake are crisscross setting, are convenient for increase stirring efficiency.
Preferably, the heating mechanism includes first fan, the connecting pipe, go out the tuber pipe, heating element, the heater strip, the staple bolt, the top fixed mounting of first box has first fan, the top of first box is provided with heating element, fixed mounting has the heater strip in the heating element, the top fixed mounting of first box has the staple bolt, staple bolt and heating element fixed connection, the air inlet fixed mounting of first fan has the connecting pipe, the connecting pipe communicates with each other with first fan is inside, the one end and the heating element fixed connection of first fan are kept away from to the connecting pipe, the air-out fixed mounting of first fan has a tuber pipe, it communicates with each other with first fan is inside to go out the tuber pipe, the one end and the jar body fixed connection of first fan are kept away from to the tuber pipe, go out tuber pipe and jar internal portion and communicate.
Preferably, wiper mechanism includes the water tank, the water injection pipe, the inlet tube, a water pump, the outlet pipe, atomizer, the top fixed mounting of connecting plate has the water tank, the top fixed mounting of connecting plate has the water pump, water tank and water pump are adjacent setting, the top fixed mounting of water tank has the water injection pipe, water injection pipe and water tank inside communicate with each other, the end fixed mounting that intakes of water pump has the inlet tube, inlet tube and water pump are inside to communicate with each other, the one end and the water tank fixed connection of water pump are kept away from to the inlet tube, inlet tube and water tank inside communicate with each other, the play water end fixed mounting of water pump has the outlet pipe, outlet pipe and water pump inside communicate with each other, the outlet pipe is the hose, the outlet.
Preferably, the air-drying mechanism comprises a second fan, a second air inlet pipe and a second air outlet pipe, the bottom of the second box body is fixedly provided with the second fan, the air inlet end of the second fan is fixedly provided with the second air inlet pipe, the second air inlet pipe is communicated with the inside of the second fan, one end, far away from the second fan, of the second air inlet pipe penetrates through the second box body, the air outlet end of the second fan is fixedly provided with the second air outlet pipe, the second air outlet pipe is communicated with the inside of the second fan, one end, far away from the second fan, of the second air outlet pipe penetrates through the second box body, and the material forming speed is increased conveniently.
Preferably, the adjacent lateral wall fixed mounting of first box and second box has the fixed plate, has seted up first opening on the fixed plate, and fixed mounting has the swash plate on the fixed plate, and the swash plate is quantity two sets ofly, and fixed mounting has the filter screen on the fixed plate, filter screen and two sets of swash plate fixed connection, and the diameter of filter screen is greater than first open-ended aperture, is convenient for filter.
Preferably, the handles are fixedly arranged on the outer walls of the two sides of the placing box, so that the placing box can be held by hands conveniently.
Compared with the prior art, the invention has the beneficial effects that:
(1) this machinery is with high wear-resisting superelevation manganese steel foundry goods production facility, through the motor, the second gear, the third gear, drive chain's cooperation is used, through motor output drive power, not only can improve stirring efficiency effectively, can also practice thrift the electric energy simultaneously effectively, reduce the manufacturing cost of this equipment, energy-concerving and environment-protective, be favorable to improving work efficiency, convenient to popularize and use, through first dwang, the second stirring rake, the cooperation of second stirring rake is used, can stir the material, make the material stirring more even, the melting of the material of being convenient for, the speed of material fusion has been improved to a certain extent, be favorable to saving time, convenient to use.
(2) This machinery is with high wear-resisting superelevation manganese steel foundry goods production facility uses through the cooperation of first fan, connecting pipe, play tuber pipe, heating element, heater strip staple bolt, and through setting up heating mechanism, heating mechanism can further melt the material, can improve the speed of material hot melt, is convenient for improve work efficiency, and easy operation and cost are low.
(3) This machinery is with high wear-resisting superelevation manganese steel foundry goods production facility uses through the cooperation of water tank, water pump, inlet tube, outlet pipe, can wash the filter screen, prevents that the filter screen from blockking up and influencing work, is favorable to using manpower sparingly, is convenient for reduce staff's work burden, indirectly has saved the time cost, is convenient for improve the cleaning efficiency
(4) The filter screen fixing plate is matched with the filter screen and the fixing plate, so that the inside unfused solid of the high manganese steel material hot melting solution can be effectively filtered, the quality of the high manganese steel material hot melting material is increased to a certain extent, the filter screen can be fixed through the matching of the inclined plate, and the use efficiency of the filter screen is convenient to improve.
(5) The efficiency of cooling design can be effectively improved through the cooperation use of second fan, air-supply line, second air-out pipe, the time cost has been practiced thrift to a certain extent, is convenient for improve the efficiency of steel casting production, has further improved work efficiency, and is better than traditional mode, convenient to popularize and use.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is an enlarged view of portion A of the present invention;
FIG. 3 is an enlarged view of the portion B of the present invention;
FIG. 4 is an enlarged view of the portion C of the present invention;
FIG. 5 is an enlarged view of section D of the present invention;
FIG. 6 is an enlarged view of section E of the present invention;
fig. 7 is a front view of the present invention.
In the figure: 1 tank body, 2 transmission mechanisms, 201 first gear, 202 second gear, 203 third gear, 204 motor, 205 transmission chain, 3 first rotating rod, 4 first stirring paddle, 5 second rotating rod, 6 second stirring paddle, 7 feeding pipe, 8 first air inlet pipe, 9 first valve, 10 heat conducting plate, 11 heating mechanism, 1101 first fan, 1102 connecting pipe, 1103 air outlet pipe, 1104 heating component, 1105 heating wire, 1106 hoop, 12 first box body, 13 first sealing door, 14 supporting rod, 15 connecting plate, 16 cleaning mechanism, 1601 water tank, 1602 water injection pipe, 1603 water inlet pipe, 1604 water pump, 1605 water outlet pipe, 1606 atomization nozzle, 17 first supporting leg, 18 second box body, 19 air drying mechanism, 1901 second fan, 1902 second air inlet pipe, 1903 second air outlet pipe, 20, 21 second valve, 22 fixing plate, 23, 24, 25 first opening, 26 placing box, 27 handle, 28 second opening, 29 support plate, 30 second support leg, 31 second sealing door.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-7, the present invention provides a technical solution: a production device of a high-wear-resistance ultrahigh manganese steel casting for machinery comprises a supporting
through the arrangement of the
By arranging the heating mechanism 11, the heating mechanism 11 can further melt the materials, the speed of material hot melting can be improved, the work efficiency is convenient to improve, the operation is simple, the manufacturing cost is low, the
By arranging the cleaning mechanism 16, the
During the use, pour into the material into the jar body 1 through the inlet pipe 7, cooperation through heat-conducting
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
- 上一篇:一种医用注射器针头装配设备