阅读说明:本技术 燃气管道暗埋系统和方法 (Gas pipeline buried system and method ) 是由 崔强 田丰华 郭少辉 于源 吕德怀 李培国 杨孟全 于 2019-11-07 设计创作,主要内容包括:本发明公开了燃气管道暗埋系统和方法,包括燃气立管,燃气立管连接燃气计量表,燃气计量表顶部设有橱柜顶板,燃气计量表分出连接燃气输送管和热水器燃气输送管,燃气计量表左部相对位置设有多个暗埋槽,暗埋槽顶部高于橱柜顶板,暗埋槽底部低于橱柜顶板,燃气输送管进入暗埋槽内部且通过暗埋槽向上穿过橱柜顶板,燃气输送管顶部连接燃气灶前暗埋阀门,燃气灶前暗埋阀门分出灶具连接管且后续的灶具连接管通过暗埋槽向下再次经过橱柜顶板,后续灶具连接管在橱柜顶板下部相对位置与燃气灶连通,所有暗埋槽内部都设有有色填充物,有色填充物表面设有瓷砖,瓷砖表面与墙体表面平齐。本发明的有益效果为:不仅更加美观而且施工更加方便。(The invention discloses a gas pipeline concealed burying system and a method, which comprises a gas vertical pipe, wherein the gas vertical pipe is connected with a gas meter, the top of the gas meter is provided with a cabinet top plate, the gas meter is connected with a gas delivery pipe and a water heater gas delivery pipe in a separated mode, a plurality of concealed grooves are formed in the left relative position of the gas meter, the tops of the concealed grooves are higher than the cabinet top plate, the bottoms of the concealed grooves are lower than the cabinet top plate, the gas delivery pipe enters the concealed grooves and upwards penetrates through the cabinet top plate through the concealed grooves, the top of the gas delivery pipe is connected with a gas stove front concealed valve, the gas stove front concealed valve is separated into stove connecting pipes, the subsequent stove connecting pipes downwards penetrate through the cabinet top plate through the concealed grooves again, the subsequent stove connecting pipes are communicated with the gas stove at the relative positions of the lower parts of the cabinet top plate, colored fillers are arranged in. The invention has the beneficial effects that: not only more beautiful but also more convenient for construction.)

1. Gas pipeline buries system secretly, its characterized in that: including gas riser (11), gas strapping table (2) is connected in gas riser (11), gas strapping table (2) top is equipped with cupboard roof (1), gas strapping table (2) branch connects gas delivery pipe and water heater gas delivery pipe, gas strapping table (2) left part relative position is equipped with a plurality of blind buried groove (7), gas strapping table (2) rear portion is equipped with wall body (5), cupboard roof (1) trailing flank and wall body (5) leading flank contact, blind buried groove (7) have sunk certain degree of depth to wall body (5) inside, blind buried groove (7) top is higher than cupboard roof (1), blind buried groove (7) bottom is less than cupboard roof (1), the gas delivery pipe gets into inside blind buried groove (7) and upwards passes cupboard roof (1) through blind buried groove (7), gas delivery pipe top connection gas stove front buried valve (6) branch connects pipe and subsequent connecting pipe passes through kitchen range blind groove (7) Downwards again through cupboard roof (1), follow-up cooking utensils connecting pipe communicates with gas-cooker (9) in cupboard roof (1) lower part relative position, the valve is secretly buried before the water heater is connected through secretly burying groove (7) to the water heater gas conveyer pipe, the valve is secretly buried before the water heater passes through water heater connecting pipe and connects gas heater (10), all secretly bury groove (7) inside and all be equipped with coloured filler, coloured filler surface is equipped with ceramic tile (8), coloured filler will bury groove (7) inside and be full of, there is not the pipeline in cupboard roof (1) upper portion and expose outside.

2. The gas pipeline burial system of claim 1, wherein: the parts of the gas delivery pipe, the stove connecting pipe and the water heater gas delivery pipe which are positioned at the lower part of the cabinet top plate (1) are exposed at the front side of the wall body (5), and soft sleeves for preventing gas from leaking at the lower part of the cabinet top plate (1) are arranged on the surfaces of the gas delivery pipe, the stove connecting pipe and the water heater gas delivery pipe.

3. The gas pipeline burial system of claim 1, wherein: the gas delivery pipe, the stove connecting pipe and the water heater gas delivery pipe are positioned at the inner part of the hidden groove (7), and iron square pipes used for protecting the gas pipeline and preventing the gas pipeline from being adhered to colored fillers are arranged on the surfaces of the gas delivery pipe, the stove connecting pipe and the water heater gas delivery pipe.

4. The gas pipeline burial system of claim 1, wherein: a plurality of buried grooves (7) are arranged at the left relative position of the gas meter (2).

5. The gas pipeline burial system of claim 1, wherein: the gas delivery pipe and the stove connecting pipe are parallel to each other between the hidden valve (6) in front of the gas stove and the cabinet top plate (1).

6. Construction method according to any of the preceding claims 1-5, characterised by the following steps:

s1, arranging a hidden groove (7) on a wall (5) at a relative position by using tools such as an electric hammer and a percussion drill, then installing a gas water heater (10), a hidden valve in front of the water heater, a hidden valve in front of the gas stove (6) and a gas stove (9) at the relative position, arranging a gas delivery pipe, a stove connecting pipe, a water heater gas delivery pipe and a water heater connecting pipe according to the positions of the gas stove (9) and the gas water heater (10), arranging soft sleeves which are positioned at the front part of the wall (5) and prevent gas leakage in the process of arranging various pipelines, and installing iron square pipes which play a role of protecting the gas pipelines on the surfaces of a gas stove pipeline (9) pipeline (3) and a water heater pipeline (4) when the gas delivery pipe, the stove connecting pipe, the water heater gas delivery pipe and the water heater connecting pipe are arranged in the hidden groove (7), with gas riser (11), gas strapping table (2), the gas delivery pipe, the cooking utensils connecting pipe, water heater gas delivery pipe and water heater connecting pipe, bury valve (6) secretly before the gas-cooker, gas-cooker (9), gas heater (10) communicate each other, at this moment, bury colored filler in that groove (7) are inside to be poured into secretly, then at colored filler surface mounting ceramic tile (8), the iron side pipe that will bury groove (7) secretly after the colored filler solidifies is sealed fixed, cupboard roof (1) upper portion does not expose at outer gas pipeline.

Technical Field

The invention belongs to the technical field of gas pipelines, and particularly relates to a gas pipeline buried system and a gas pipeline buried method.

Background

At present, most indoor gas piping system all obviously installs on the wall surface, and pipeline and valve all expose outward, and the gas riser is most selected to drill from wall upper portion and then introduce from outdoor, therefore whole gas pipeline most all is in the upper portion in whole room, or upper portion and lower part respectively have partly, through practice, and the installation can have many problems like this.

First, most gas pipeline all exposes outside, has the potential safety hazard easily, uses for a long time and can be polluted by the greasy dirt, is corroded by the air, occupies space simultaneously, and is not pleasing to the eye, influences indoor whole fitment effect. Secondly, the pipeline is located at a high position, the gas stove is located at a low position, finally, the pipeline at the high position is connected to the gas stove downwards, in the process of connecting the gas stove, compared with the process of directly arranging the gas pipeline below the wall body, the gas pipeline with certain length is wasted, if the gas pipeline is buried in a hidden manner, the construction difficulty and the construction period are increased, in addition, when the gas stove and the gas water heater are connected downwards from the upper part, the gas interfaces of the gas stove and the gas water heater are generally located at the lower part, the gas pipeline can be connected with the gas interfaces of the gas stove and the gas water heater only by additionally arranging an elbow according to the actual condition, the construction cost is increased, the potential safety hazard is also caused, thirdly, the gas pipeline arranged at the upper part of the wall body is often interfered with the bearing beam, the drilling and slotting construction of the bearing beam are influenced, and the lower part of, fourth, the sleeve pipe that plays the guard action will be installed sometimes to the gas pipeline surface, wall body upper portion is too near apart from the roof, do not have how much space, the sleeve pipe is difficult to install, fifth, the water route, a circuit, air outlet and other various pipelines are all installed on wall body upper portion by the choice mostly, the gas pipeline interferes with other pipelines easily, sixth, when the gas pipeline connects gas-cooker and gas heater downwards from upper portion, can also occupy the space in wall body middle part, take place easily and interfere when other furniture is installed to the user, seventh, the pipeline is located the eminence, constructor need lift the installation for a long time, some positions still need use the scaffold frame, can cause inconvenience for whole installation like this, make the installation effectiveness descend, high altitude construction is dangerous.

To this end, a gas piping system installed at the lower portion of a wall body has been proposed.

Disclosure of Invention

The invention provides a gas pipeline buried system and a method, which are more attractive and more convenient to construct.

In order to solve the technical problems, the invention adopts the following technical scheme:

a gas pipeline concealed system comprises a gas vertical pipe, the gas vertical pipe is connected with a gas meter, a cabinet top plate is arranged at the top of the gas meter, the gas meter is connected with a gas delivery pipe and a water heater gas delivery pipe in a separated mode, a plurality of concealed grooves are formed in the left relative positions of the gas meter, a wall body is arranged at the rear portion of the gas meter, the rear side face of the cabinet top plate is in contact with the front side face of the wall body, a certain depth is formed in the concealed grooves in a sunken mode towards the interior of the wall body, the tops of the concealed grooves are higher than the cabinet top plate, the bottoms of the concealed grooves are lower than the cabinet top plate, the gas delivery pipe enters the concealed grooves and upwards penetrates through the cabinet top plate through the concealed grooves, the tops of the gas delivery pipes are connected with a gas stove front concealed valve, the gas stove connecting pipe is separated from the, the water heater gas conveyer pipe is connected with the hidden valve before the water heater through the hidden groove, and the hidden valve before the water heater is connected with the gas water heater through the water heater connecting pipe, and all hidden groove insides all are equipped with coloured filler, and coloured filler surface is equipped with the ceramic tile, and coloured filler will be hidden and buried the inslot portion and be full of, and cabinet roof upper portion does not have the pipeline and exposes outside.

Furthermore, the parts of the gas delivery pipe, the stove connecting pipe and the water heater gas delivery pipe which are positioned at the lower part of the top plate of the cabinet are exposed at the front side of the wall body, and soft sleeves for preventing the gas from leaking at the lower part of the top plate of the cabinet are arranged on the surfaces of the gas delivery pipe, the stove connecting pipe and the water heater gas delivery pipe.

Further, the gas delivery pipe, the stove connecting pipe and the water heater gas delivery pipe are positioned at the part inside the hidden buried groove, and iron square pipes used for protecting the gas pipeline and preventing the gas pipeline from being adhered to colored fillers are arranged on the surfaces of the gas delivery pipe, the stove connecting pipe and the water heater gas delivery pipe.

Furthermore, a plurality of buried grooves are formed in the left part of the gas meter at the corresponding positions.

Further, the gas delivery pipe and the stove connecting pipe are parallel to each other between the hidden valve in front of the gas stove and the top plate of the cabinet.

Further, the construction method of the gas pipeline buried system is characterized by comprising the following steps:

s1, using electric hammer and impact drill to set hidden groove on wall, then installing gas water heater, hidden valve in front of gas range, arranging gas delivery pipe, stove connecting pipe, water heater gas delivery pipe and water heater connecting pipe according to gas range and gas water heater, in the course of arranging various pipes, the gas delivery pipe, stove connecting pipe, water heater gas delivery pipe and water heater connecting pipe under cabinet top plate are all installed on the front of wall and soft sleeve pipe for preventing gas leakage is installed on surface, when the gas delivery pipe, stove connecting pipe, water heater gas delivery pipe and water heater connecting pipe are installed in hidden groove, iron square pipe for protecting gas delivery pipe is installed on surface of gas range pipe and water heater pipe, gas vertical pipe, gas meter, etc, The gas delivery pipe, the stove connecting pipe, the water heater gas delivery pipe, the water heater connecting pipe, the gas stove front concealed valve, the gas stove and the gas water heater are communicated with each other, at the moment, colored fillers are poured into the concealed groove, then ceramic tiles are installed on the surfaces of the colored fillers, the iron square pipe inside the concealed groove is sealed and fixed after the colored fillers are solidified, and the upper part of the top plate of the cabinet is not provided with a gas pipeline exposed outside.

Compared with the prior art, the invention has the beneficial effects that:

in the invention, a cabinet top plate is arranged at the top of a gas meter, a plurality of buried grooves are arranged at opposite positions at the left part of the gas meter, a wall body is arranged at the rear part of the gas meter, the rear side surface of the cabinet top plate is contacted with the front side surface of the wall body, the buried grooves sink to a certain depth towards the inside of the wall body, the buried grooves are communicated with the upper part and the lower part of the cabinet top plate, colored fillers are arranged in all the buried grooves, the surfaces of the colored fillers are provided with ceramic tiles, the inside of the buried grooves are filled with the colored fillers, no pipeline is exposed out at the upper part of the cabinet top plate, the whole gas system is more beautiful by burying a gas pipeline at the upper part of the cabinet top plate in the wall body, the pipeline at the lower part of the cabinet top plate is completely in the cabinet and can not be observed from the outside, the cabinet, the pipeline is connected from the lower part upwards when gas-cooker and gas heater are connected, need not install the elbow, it is more convenient to install, pipeline length and construction strength have also been practiced thrift simultaneously, the pipeline is installed in the wall body lower part, the water route has been avoided, the circuit, air outlet and other various pipelines, it is more convenient to install, safety, the spandrel girder in house has also been avoided simultaneously, the bearing structure in house has been protected, simultaneously, when the pipeline of the same diameter of installation, use the square sleeve pipe of iron, can save space than using circular sleeve pipe, and then reduce grooved area, and construction cost is reduced.

Drawings

FIG. 1 is a schematic structural diagram of the present invention.

In the figure: 1. the gas meter comprises a cabinet top plate, 2 parts of a gas meter, 5 parts of a wall, 6 parts of a hidden valve in front of a gas stove, 7 parts of a hidden groove, 8 parts of ceramic tiles, 9 parts of the gas stove, 10 parts of a gas water heater and 11 parts of a gas vertical pipe.

Detailed Description

6页详细技术资料下载
上一篇:一种医用注射器针头装配设备
下一篇:基于烟温通信控制阀门的电站锅炉余热利用系统

网友询问留言

已有0条留言

还没有人留言评论。精彩留言会获得点赞!

精彩留言,会给你点赞!