Municipal administration cement lid carrier

文档序号:1701780 发布日期:2019-12-13 浏览:16次 中文

阅读说明:本技术 一种市政水泥盖搬运车 (Municipal administration cement lid carrier ) 是由 梁荣 于 2019-09-11 设计创作,主要内容包括:本发明涉及一种搬运车,尤其涉及一种市政水泥盖搬运车。要解决的技术问题是如何研发一种搬运时使工人更轻松,保证工作效率,并且搬运时能够将水泥盖进行固定,避免水泥盖跌落破损,影响使用的市政水泥盖搬运车。该市政水泥盖搬运车包括有车架、车轮、滑块等,车架上设有车轮,车轮用于方便车架进行移动。本发明通过自动夹持装置带动挂杆将水泥盖挂住,使水泥盖固定在本搬运车上,且不需要人工操作将水泥盖挂住,挂杆将水泥盖挂住后,通过弹性件与限位块配合带动挂杆将水泥盖卡住,避免水泥盖在运输过程中跌落,造成安全事故,并且将水泥盖挂住后,通过车架与车轮配合将水泥盖运走,在保证了工作效率的情况下又能够让工人更加轻松。(The invention relates to a carrier, in particular to a municipal cement cover carrier. The technical problem who solves makes the workman lighter during how research and development a transport, guarantees work efficiency to can fix the cement lid during the transport, avoid the cement lid to fall the damage, influence the municipal cement lid carrier of using. This municipal administration cement lid carrier is equipped with the wheel including frame, wheel, slider etc. on the frame, and the wheel is used for making things convenient for the frame to remove. According to the invention, the automatic clamping device drives the hanging rod to hang the cement cover, so that the cement cover is fixed on the carrier, manual operation is not needed to hang the cement cover, after the cement cover is hung by the hanging rod, the hanging rod is driven by the cooperation of the elastic part and the limiting block to clamp the cement cover, the cement cover is prevented from falling off in the transportation process, safety accidents are avoided, and after the cement cover is hung, the cement cover is transported away by the cooperation of the frame and the wheels, and workers can feel easier under the condition of ensuring the working efficiency.)

1. The utility model provides a municipal administration cement lid carrier, is equipped with the wheel including frame and wheel on the frame, and the wheel is used for making things convenient for the frame to remove its characterized in that: the automobile frame is characterized by further comprising sliding blocks, supporting rods, shaft sleeves, guide rods, guide sleeves and hanging rods, sliding grooves are formed in the two side faces of the automobile frame, the sliding blocks are arranged in the sliding grooves in a sliding mode, the supporting rods are connected to the sliding blocks on the two sides, the shaft sleeves are arranged between the tail ends of the two supporting rods, the guide rods are connected between the two shaft sleeves, the guide sleeves are arranged on the guide rods in a sliding mode, and the hanging rods used for hanging cement covers are arranged on the.

2. The municipal cement cap carrier according to claim 1, further comprising a stopper and a resilient member, wherein the stopper is disposed on each side of the guide bar corresponding to the guide sleeve, the resilient member is connected between the stopper and the guide sleeve, and the resilient member is disposed on the guide bar.

3. The municipal cement cover carrier according to claim 2, further comprising an automatic clamping device, wherein the automatic clamping device comprises a sliding sleeve, a sliding rod, a rack, a connecting plate, a gear, a one-way clutch, a reel, a pull rope and a tension spring, the sliding sleeve is arranged on each of two sides of the guide rod, the sliding rod is arranged in the sliding sleeve in a sliding manner, the rack is arranged on the inner side of the sliding rod, the connecting plate is arranged on each of two sides of the guide rod, the reel is arranged on each of the connecting plates, the one-way clutch is arranged on one side of the reel, the gear is arranged on the outer side of the one-way clutch and meshed with the gear and the rack, the pull rope is wound on the reel, the tail end of the pull rope is connected.

4. The municipal cement cover truck according to claim 3, further comprising a buffer spring and a buffer block, wherein the buffer spring is disposed on each of the left and right walls of the chute, the buffer block is connected to the tail end of each buffer spring, and the buffer block is in sliding fit with the chute.

5. The municipal cement cap carrier according to claim 4, further comprising a fixing rod, wherein the fixing rod is provided on the slider, and the tail end of the fixing rod is connected to the support rod.

Technical Field

The invention relates to a carrier, in particular to a municipal cement cover carrier.

Background

Along with the continuous development of society, the improvement of people's quality of life, the ditch at modern urban road both sides all can be covered with the cement lid, avoids other people to fall into in the ditch, and the cement lid mixes material such as sand stone after watering with cement according to certain proportion together, and the material after mixing is poured into the mould and is hardened into the cement lid, need carry to the place that needs to use after the cement lid is processed.

At present, when transporting the cement cover, generally all manual transport cement cover of manual work, and when manual transport cement cover, because of the cement lid overweight, need have a rest many times among the workman handling, influence work efficiency, if fall carelessly easily injure the people moreover, cause the incident to lead to the cement cover fracture easily after falling, influence the use.

It is necessary to make the workman lighter in the handling to prior art's shortcoming, design one kind and need not frequently stop the rest, guarantee work efficiency to can fix the cement lid during the transport, avoid the cement lid to fall and cause the incident, or lead to the damaged municipal cement lid carrier that influences the use of cement lid.

Disclosure of Invention

In order to overcome the cement lid overweight, need have a rest many times when the workman carries, influence work efficiency, easily injure the people by a crashing object when falling moreover, cause the incident to lead to the cement lid fracture easily after falling, influence the shortcoming of using, the technical problem who solves: the utility model provides a make the workman lighter during transport, guarantee work efficiency to can fix the cement lid during transport, avoid the cement lid to fall the damage, influence the municipal cement lid carrier of use.

The technical scheme is as follows: the utility model provides a municipal administration cement lid carrier, including frame and wheel, be equipped with the wheel on the frame, the wheel is used for making things convenient for the frame to remove, still including slider, bracing piece, axle sleeve, guide arm, guide pin bushing and peg, the spout has all been opened to frame both sides face, the spout inward sliding type is equipped with the slider, all be connected with the bracing piece on the slider of both sides, be equipped with the axle sleeve between two bracing piece tail ends, be connected with the guide arm between the diaxon cover, the equal slidingtype in both sides is equipped with the guide pin bushing on the guide arm, be equipped with the.

Furthermore, the guide rod device further comprises a limiting block and an elastic piece, the limiting block is arranged on two sides of the guide rod corresponding to the guide sleeve, the elastic piece is connected between the limiting block and the guide sleeve, and the elastic piece is sleeved on the guide rod.

Further, still including automatic clamping device, automatic clamping device is including the sliding sleeve, the slide bar, the rack, the connecting plate, the gear, one way clutch, the reel, stay cord and straining spring, the guide arm both sides all are equipped with the sliding sleeve, the sliding sleeve internal sliding formula is equipped with the slide bar, the slide bar inboard is equipped with the rack, the guide arm both sides all are equipped with the connecting plate, all be equipped with the reel on the connecting plate, one side of reel is equipped with one way clutch, the one way clutch outside is equipped with the gear, wheel and rack toothing, around there being the stay cord on the reel, the stay cord tail end is connected with the guide pin bushing, all be connected with straining spring between the top in guide arm top both.

Further, still including buffer spring and buffer block, two walls all are equipped with buffer spring about in the spout, and the buffer spring tail end all is connected with the buffer block, buffer block and spout sliding fit.

Furthermore, the device also comprises a fixed rod, the sliding block is provided with the fixed rod, and the tail end of the fixed rod is connected with the supporting rod.

The beneficial effects are that: according to the invention, the automatic clamping device drives the hanging rod to hang the cement cover, so that the cement cover is fixed on the carrier, manual operation is not needed to hang the cement cover, after the cement cover is hung by the hanging rod, the hanging rod is driven by the cooperation of the metal spring and the limiting block to clamp the cement cover, the cement cover is prevented from falling off in the transportation process, safety accidents are avoided, and after the cement cover is hung, the cement cover is transported away by the cooperation of the frame and the wheels, and workers can feel easier under the condition of ensuring the working efficiency.

Drawings

Fig. 1 is a schematic front view of the present invention.

FIG. 2 is a left side view of the present invention without lifting the cement cover.

Fig. 3 is a left side view schematically showing the cement cover of the present invention being lifted.

Fig. 4 is an enlarged view of the left side view of the automatic clamping device of the present invention.

Part names and serial numbers in the figure: 1 vehicle frame, 2 wheels, 3 chutes, 4 sliders, 5 support rods, 6 shaft sleeves, 8 guide rods, 9 limit blocks, 10 metal springs, 11 guide sleeves, 12 hanging rods, 13 automatic clamping devices, 131 sliding sleeves, 132 sliding rods, 133 racks, 134 connecting plates, 135 gears, 136 one-way clutches, 137 reels, 138 pull ropes, 139 tensioning springs, 14 buffer springs, 15 buffer blocks, 16 fixing rods and 100 cement covers.

Detailed Description

The present invention will be described in detail below with reference to the accompanying drawings.

First embodiment

Please refer to fig. 1 and 2, a municipal administration cement cover carrier, including frame 1 and wheel 2, frame 1 is equipped with wheel 2, wheel 2 rotary type is connected with frame 1, wheel 2 is used for making things convenient for frame 1 to move, the vehicle further includes slider 4, bracing piece 5, axle sleeve 6, guide arm 8, guide bush 11 and peg 12, frame 1 both sides face is all opened spout 3, the slidingtype is equipped with slider 4 in the spout 3, both sides are connected with bracing piece 5 on the slider 4, bracing piece 5 is connected with slider 4 through bolted connection, be equipped with axle sleeve 6 between two bracing piece 5 tails, be connected with guide arm 8 between the two axle sleeves 6, both sides are slidingtype is equipped with guide bush 11 on the guide arm 8, be equipped with peg 12 that is used for hanging cement cover 100 on the guide bush 11, peg 12 is connected with guide bush 11 through welded connection's mode.

When the cement cover 100 needs to be pulled, a user lifts the right side of the frame 1 and swings upwards by taking the wheel 2 as an axis, so that the left side of the frame 1 swings downwards, the left side of the frame 1 moves downwards to drive the support rod 5 to move downwards through the slider 4, the support rod 5 moves downwards to drive the hanging rod 12 to move downwards towards the right through the shaft sleeve 6, when the hanging rod 12 moves downwards to be in contact with the cement cover 100, the user pulls the hanging rod 12 to hang on a hanging ring of the cement cover 100, then presses the right side of the frame 1 downwards to swing downwards by taking the wheel 2 as the axis, so that the left side of the frame 1 swings upwards, the left side of the frame 1 swings upwards to pull the cement cover 100 through the hanging rod 12, the hanging rod 12 drives the cement cover 100 to move into the frame 1 through the slider 4 under the action of gravity, and then the cement cover 100 can be pulled to move through the frame. When the cement cover 100 needs to be put down, a user lifts the right side of the frame 1 again and swings with the wheels 2 as an axis, so that the left side of the frame 1 swings downwards, the hanging rod 12 drives the cement cover 100 to move out of the frame 1 through the sliding block 4 under the action of gravity, and when the cement cover 100 is in contact with the ground, the hanging rod 12 is pulled to be separated from the cement cover 100.

Referring to fig. 2, the guide device comprises a limiting block 9 and a metal spring 10, the limiting block 9 is disposed on two sides of the guide rod 8 corresponding to the guide sleeve 11, the limiting block 9 is fixedly connected to the guide rod 8, the metal spring 10 is connected between the limiting block 9 and the guide sleeve 11, and the metal spring 10 is sleeved on the guide rod 8.

When the hanging rod 12 is hung on the cement cover 100, the hanging rod 12 clamps the cement cover 100 under the action of the metal spring 10, so that the hanging ring of the cement cover 100 can be prevented from falling off from the hanging rod 12 in the transportation process, and the transportation stability is ensured. The guide sleeve 11 is limited by the limiting block 9, and the guide sleeve 11 is prevented from moving excessively.

Second embodiment

Referring to fig. 4, the automatic clamping device 13 further comprises an automatic clamping device 13, the automatic clamping device 13 comprises a sliding sleeve 131, a sliding rod 132, a rack 133, a connecting plate 134, a gear 135, a one-way clutch 136, a reel 137, a pull rope 138 and a tension spring 139, the sliding sleeve 131 is arranged on both sides of the guide rod 8, the sliding rod 132 is arranged in the sliding sleeve 131 in a sliding manner, the rack 133 is arranged on the inner side of the sliding rod 132, the connecting plates 134 are arranged on both front and rear sides of the guide rod 8, the connecting plates 134 are connected with the guide rod 8 through bolts, the reel 137 is arranged on the connecting plates 134, the reel 137 is rotatably connected to the connecting plates 134, the one side of the reel 137 is provided with the one-way clutch 136, the gear 135 is arranged on the outer side of the one-way clutch 136, the gear 135 is connected with the reel 137 through bolts, the gear 135, tension springs 139 are connected between both sides of the top of the guide bar 8 and the inner tops of the sliding bars 132.

When a user lifts the right side of the frame 1 and swings on the axis of the wheel 2, the guide rod 8 moves downwards to drive the sliding rod 132 to move downwards, when the sliding rod 132 moves downwards to be in contact with the ground, the sliding rod 132 does not move any more, at the moment, the guide rod 8 moves downwards to drive the gear 135 to move downwards, the tensioning spring 139 is stretched, the gear 135 moves downwards to rotate through the rack 133, the gear 135 rotates to roll up the pull rope 138 through the reel 137, the pull rope 138 pulls the guide sleeve 11 to move outwards to enable the hanging rods 12 on the two sides to be away from each other, the metal spring 10 is compressed, when the gear 135 moves to be disengaged with the rack 133, the hanging rods 12 on the two sides are close to each other under the resetting effect of the metal spring 10 to hang the cement cover 100, then the cement cover 100 is lifted, the sliding rod 132 is not in contact with the ground, the sliding rod 132 is driven to reset under the resetting effect of the tensioning spring 139, the gear 135 is engaged, the reel 137 will not rotate under the action of the one-way clutch 136, and the pull rope 138 will not be released or retracted, so that the carriage 1 can be pushed to move the truck. The hanging rod 12 does not need to be manually used for hanging the cement cover 100, and the carrying efficiency is improved. When the cement cover 100 needs to be placed on the ground, the right side of the frame 1 is lifted again and swings around the wheel 2, and the pull rope 138 pulls the guide sleeve 11 to move outwards to enable the hanging rods 12 on the two sides to be away from each other through the operation, so that the hanging rods 12 can be moved out of the hanging ring of the cement cover 100, and the cement cover 100 is placed on the ground.

Referring to fig. 1, the sliding chute further comprises a buffer spring 14 and a buffer block 15, the buffer spring 14 is arranged on each of the left wall and the right wall of the sliding chute 3, the tail end of each buffer spring 14 is connected with the buffer block 15, the buffer block 15 has a buffering effect on the sliding block 4, and the buffer block 15 is in sliding fit with the sliding chute 3.

When the sliding block 4 moves leftwards or rightwards in the sliding groove 3, the buffer blocks 15 and the buffer springs 14 on the left side and the right side can play a role of buffering, and the sliding block 4 is prevented from directly impacting the frame 1.

Referring to fig. 1, the portable electronic device further includes a fixing rod 16, the slider 4 is provided with the fixing rod 16, the tail end of the fixing rod 16 is connected with the supporting rod 5, and the fixing rod 16 is connected with the slider 4 and the supporting rod 5 through a bolt connection mode.

The fixing rod 16 can better fix the support rod 5 and avoid the bending deformation of the support rod 5.

While the present invention has been described with reference to exemplary embodiments, it is to be understood that the invention is not limited to the disclosed exemplary embodiments. The scope of the following claims is to be accorded the broadest interpretation so as to encompass all such modifications and equivalent structures and functions.

9页详细技术资料下载
上一篇:一种医用注射器针头装配设备
下一篇:一种受限空间超大构件运输装置及方法

网友询问留言

已有0条留言

还没有人留言评论。精彩留言会获得点赞!

精彩留言,会给你点赞!