The management system of conveyer belt

文档序号:1745757 发布日期:2019-11-26 浏览:18次 中文

阅读说明:本技术 传送带的管理系统 (The management system of conveyer belt ) 是由 侯刚 于 2017-12-18 设计创作,主要内容包括:本申请提供一种能尽可能早地掌握传送带的更适当的更换时期而降低传送带的运行成本的传送带的管理系统。通过输入部5将设置于使用现场的传送带的上覆盖橡胶的磨耗量的数据输入至服务器2,运算部3基于所输入的数据以及存储于存储部4的带规格数据库4a及按每个带规格预先输入有关于磨耗量的允许范围的允许范围数据库4b来计算出传送带的残存寿命Ja。基于关于此前使用的传送带的使用条件及带规格与实际的寿命Jr的相关关系、该传送带的使用条件以及该传送带的规格,运算部3在使用前计算出该传送带的预定寿命Jf,在该计算时使用更新后的相关关系数据库4d。(The application provides a kind of more appropriate replacement period that can grasp conveyer belt as early as possible and the management system of the conveyer belt of the operating cost that reduces conveyer belt.The data of the abrasion loss of the upper covering rubber for the conveyer belt for being set to use site are input to server 2 by input unit 5, and operational part 3 is based on the data inputted and is stored in specification the allowed band database 4b about the allowed band of abrasion loss being pre-entered and calculate the remaining service life Ja of conveyer belt with Specifications Database 4a and by each for storage unit 4.Based on the use condition about previously used conveyer belt and correlativity, the use condition of the conveyer belt and the specification of the conveyer belt with specification Yu actual service life Jr, operational part 3 calculates the predetermined age Jf of the conveyer belt before use, and updated correlativity database 4d is used in the calculating.)

1. a kind of management system of conveyer belt, has: input unit above covers including at least for the conveyer belt for being set to use site The abrasion loss of the rubber of lid rubber is as cuit;And server, it is inputted for the data of the cuit, the conveyer belt Management system be characterized in that, use following constitute:

The server has operational part and storage unit, is stored in the storage unit: band Specifications Database has pre-entered The specification of the conveyer belt;With allowed band database, pre-entered by the specification of each conveyer belt described about being input to The allowed band of the cuit of server,

Data based on the cuit for being input to the server are input to the transmission with Specifications Database The specification of band and the allowed band for being input to the allowed band database are calculated described by the operational part The remaining service life of conveyer belt, also,

Use condition in the belt conveyer device based on the use site, be input to it is described with Specifications Database The actual service life of the specification of the conveyer belt and the specification and conveyer belt of the use condition of conveyer belt and conveyer belt it is preparatory The correlativity of grasp is calculated before the conveyer belt is secured to the belt conveyer device by the operational part The predetermined age of the conveyer belt,

When calculating the predetermined age of the conveyer belt used after the conveyer belt, using when will use the conveyer belt Use condition, the specification of the conveyer belt, each data input in actual service life of the conveyer belt and updated described Correlativity.

2. the management system of conveyer belt according to claim 1, wherein use following constitute:

Based on the actual service life of the conveyer belt compared with the predetermined age of the conveyer belt, Lai Jiaozheng is in the conveyer belt The predetermined age of the conveyer belt used later.

3. the management system of conveyer belt according to claim 1 or 2, wherein use following constitute:

Input has the replacement conveyer belt of the conveyer belt in the use site of the conveyer belt or the stock ground on its periphery The inventory database of quantity in stock is stored in the storage unit, and the server is communicatively coupled with subscriber terminal's equipment,

Based on the quantity in stock that is input to the inventory database and the calculated remaining service life, from the server to Subscriber terminal's equipment sends the contact in the order period of the replacement conveyer belt or urges the contact ordered.

4. the management system of conveyer belt according to any one of claim 1 to 3, wherein

In the input unit, including will act on the impact force of the conveyer belt, tension, indicate core state index, Indicate both ends interconnecting piece state index, indicate attaching have the conveyer belt belt conveyer device state index, Indicate input unit of at least one of this six cuits of the index of the use environment of the conveyer belt as cuit.

Technical field

The present invention relates to a kind of management systems of conveyer belt, more specifically, are related to a kind of to grasp biography as early as possible Send the more appropriate replacement period of band and the management system of the conveyer belt of the operating cost that reduces conveyer belt.

Background technique

Headed by the mineral resources such as iron ore, lime stone, various conveying objects are conveyed by conveyer belt.It is covered on conveyer belt Lid rubber is worn away over time because being put into conveying object.When the abrasion of upper covering rubber become excessive, pass Send band become unable to using.

If conveyer belt becomes unable to using conveyor path stops and generates big influence to the conveying of conveying object.When When the replacement period of conveyer belt is unknown, the conveyer belt of the replacement of inventory's necessity or more is needed, it is also desirable to its stock control is carried out, Therefore, operating cost is significantly increased.Moreover, there is also libraries in the case where the type of the conveying object conveyed by conveyer belt changes The conveyer belt for the replacement deposited become unable to using risk.If in advance clearly go out conveyer belt become unable to using period (more Change period), then it can will be suppressed to minimum limit during the stopping of conveyor path, also not need the extra library for being transmitted band It deposits.

In the past, the management system (referring to patent document 1) for determining the replacement period of conveyer belt is proposed.It is suggested at this In management system, the abrasion loss of conveyer belt is grasped to calculate its remaining service life.Therefore, unless using conveyer belt to a certain degree Rubber is worn away, the remaining service life otherwise cannot be grasped.In addition, the stage few in the abrasion loss of rubber, the remaining service life it is pre- Precision is surveyed to be lower.

If the more appropriate replacement period of conveyer belt can be grasped as early as possible, the conveyer belt to be replaced is not needed Extra inventory, or during can be shortened the inventory of conveyer belt of replacement.Therefore, for grasping conveyer belt as early as possible More appropriate replacement period and there are rooms for improvement for reducing the operating cost of conveyer belt.

Summary of the invention

Problems to be solved by the invention

It is dropped the object of the present invention is to provide a kind of more appropriate replacement period that can grasp conveyer belt as early as possible The management system of the conveyer belt of the operating cost of low conveyer belt.

Technical solution

In order to achieve the above objectives, the management system of conveyer belt of the invention has: input unit will be set to use site Conveyer belt include at least it is upper covering rubber rubber abrasion loss as cuit;And server, for the input item The input of purpose data, the management system of the conveyer belt are characterized in that use following constitute: the server has operation Portion and storage unit are stored in the storage unit: band Specifications Database pre-enters the specification of the conveyer belt;With permit Xu Fanweishuojuku is pre-entered by the specification of each conveyer belt about the cuit for being input to the server Allowed band, data based on the cuit for being input to the server are input to the institute with Specifications Database It states the specification of conveyer belt and is input to the allowed band of the allowed band database, calculated by the operational part The remaining service life of the conveyer belt out, also, use condition in the belt conveyer device based on the use site, Be input to the specification of the conveyer belt with Specifications Database and the use condition of conveyer belt and the specification of conveyer belt with The correlativity grasped in advance in the actual service life of conveyer belt, the conveyer belt be secured to the belt conveyer device it The preceding predetermined age that the conveyer belt is calculated by the operational part, in the transmission that calculating uses after the conveyer belt When the predetermined age of band, use condition, the specification of the conveyer belt, the conveyer belt when will use the conveyer belt are used The actual service life each data input and the updated correlativity.

Beneficial effect

According to the present invention, conveyer belt is calculated using the abrasion loss of at least upper covering rubber of conveyer belt in use The remaining service life.Moreover, use condition based on previously used conveyer belt and its closing with specification is related to the actual service life System, the use condition of the conveyer belt and with specification, calculate the predetermined age of the conveyer belt before use.Then, it is calculating When predetermined age, using will it is tight before use conveyer belt use condition, with specification, the input of each data in actual service life simultaneously Updated correlativity.Therefore, it can reflect the severity of nearest use condition and more precisely calculate predetermined Service life.

Since the predetermined age and remaining the two service life in service life can be grasped, the service life of a side is not depended solely on, It is easily mastered the more appropriate replacement period of conveyer belt.Moreover, because predetermined age can be grasped before using conveyer belt, because This, it is easy to ensure that for preparing the temporal of conveyer belt of replacement, the surplus in fund.It is accompanied by this, reduces conveyer belt Extra inventory or shorten inventory during become easy, for reduce conveyer belt operating cost for be advantageous.

Detailed description of the invention

Fig. 1 is the explanatory diagram of the whole summary of the management system of illustrated conveyer belt of the invention.

Fig. 2 is the illustrated explanatory diagram with Specifications Database.

Fig. 3 is the explanatory diagram of illustrated allowed band database.

Fig. 4 is the explanatory diagram of illustrated use condition database.

Fig. 5 is the explanatory diagram of illustrated inventory database.

Fig. 6 be with side view simplifiedly illustrated attaching have conveyer belt belt conveyer device explanatory diagram.

Fig. 7 is the A-A sectional view of Fig. 6.

Fig. 8 is with the explanatory diagram of the construction in the both ends connection portion (endless) for overlooking the conveyer belt of illustrated Fig. 6.

Specific embodiment

Hereinafter, being illustrated based on management system of the embodiment shown in figure to conveyer belt of the invention.

The management system 1 (hereinafter referred to as management system 1) of illustrated conveyer belt of the invention is in fig. 6 and 7 in Fig. 1 It falls into a trap during the use of the conveyer belt 12 of the illustrated belt conveyer device 9 for being secured to use site and calculates its remaining longevity Order Ja.In addition, the management system 1 calculates its predetermined age Jf before using conveyer belt 12.

In the belt conveyer device 9, conveyer belt 12 be set up between driving pulley 10a and driven pulley 10b and with Defined tension tensioning setting.Between driving pulley 10a and driven pulley 10b, conveyer belt 12 is by with interval appropriate configuration It is supported in backing roll 10c with long dimension direction.

Conveyer belt 12 is constituted by core layer 14 and across the upper covering rubber 13a and lower covering rubber 13b of core layer 14, The core layer 14 is made of the core 15 formed using steel cord or canvas.Core layer 14 is subject to for being tensioned setting transmission Component with 12 tension.In addition to this also additional width direction end rubber 13c, enhancement layer etc. are appropriate, necessary for conveyer belt 12 Component and constitute.

In the transmission equipment side of conveyer belt 12, lower covering rubber 13b is supported by backing roll 10c, in reversion side, upper covering rubber 13a is supported by backing roll 10c.In the transmission equipment side of conveyer belt 12, three backing roll 10c are arranged in parallel in bandwidth direction, are led to These backing rolls 10c is crossed, conveyer belt 12 is supported to concavity with the defined angle of the v-groove.

Driving pulley 10a is rotated by drive motor to be driven.Tensing (take up) mechanism 11 keeps driven pulley 10b mobile, and Make the interval variation of driving pulley 10a and driven pulley 10b to make desired tension force effect in conveyer belt 12 (core layer 14).

The long dimension direction end of each core layer 14 of more conveyer belts 12 of length appropriate is engaged with each other and shape As ring-type.In the case where conveyer belt 12 of all length, by the core layer at the long dimension direction both ends of a conveyer belt 12 14 are engaged with each other and are formed as cyclic annular.Therefore, as Fig. 8 is exemplified, in conveyer belt 12, by core in long dimension direction The part (both ends interconnecting piece 16B) of 14 engagement of layer and non-both ends interconnecting piece 16A are adjacent to presence in long dimension direction.In the biography It send in band 12, core layer 14 is formed by multiple steel cords 15 arranged side by side on bandwidth direction.In the interconnecting piece 16B of both ends, from The steel cord 15 that opposed each non-both ends interconnecting piece 16A extends on long dimension direction mutually on bandwidth direction every One ground enters between the steel cord 15 of other side side.

In the case where core layer 14 is formed by canvas, in the interconnecting piece 16B of both ends, become from band long dimension direction The canvas engagement that opposed each non-both ends interconnecting piece 16A extends is construction well known to ladder-like wait.In non-both ends interconnecting piece 16A In, core layer 14 is jointlessly continuous, but in the interconnecting piece 16B of both ends, and core layer 14 becomes seam like this.Therefore, two It holds in interconnecting piece 16B and non-both ends interconnecting piece 16A, it is poor to generate on elongation, the tension of effect, bendability (flexural rigidity) It is different.

The upper covering rubber 13a of the conveyer belt 12 be put by another conveyer belt convey come conveying object C, be put into Conveying object C by conveyer belt 12 be delivered to conveying destination.Sometimes also conveying object can be put into conveyer belt 12 by hopper etc. C。

Upper covering rubber 13a is impacted because of the conveying object C being put into.In addition, just being thrown in upper covering rubber 13a Conveying object C after entering and loading to cover rubber 13a in the pressing of defined surface pressing, and relative to conveyer belt 12 to The opposite direction of its direction of travel is mobile.At this point, effect has frictional force on upper covering rubber 13a.Upper covering rubber 13a is main It is worn away because conveying the This move of object C.Width direction end rubber 13c sometimes also can be relative to belt conveyer device 9 guide rail etc. is slided and is worn away.Lower covering rubber 13b sometimes also can be relative to cannot rotate or become unable to swimmingly The backing roll 10c of rotation is slided and is worn away.Lower covering rubber 13b sometimes also can be insufficient because acting on the tension of conveyer belt 12 It is worn away Deng skidding is generated between belt wheel 10a, 10b.Lower covering rubber 13b sometimes also can be because relative in order to remove down The scraper plate for falling on the lower conveying object C covered on rubber 13b and being arranged is slided and is worn away.

The management system 1 has input unit 5 (5a~5g) and by input unit 5 come the server 2 of input data.Server 2 have operational part 3 (microprocessor) and storage unit 4 (memory).

Input unit 5 is communicatively coupled with server 2.In this embodiment, management system 1 has seven kinds of input unit 5a ~5g, these input units 5 are connect with transmission unit 6.The data inputted by input unit 5 are sent to server 2 from transmission unit 6.And And server 2 is communicatively coupled with subscriber terminal's equipment 7 and producer's terminal device 8.Subscriber terminal's equipment 7 with And producer's terminal device 8 is such as using personal computer.Server 2, input unit 5, subscriber terminal's equipment 7 and manufacture Person's terminal device 8 can for example be connected respectively by internet.

Server 2 is for example set to the company of the retailer of sale conveyer belt 12.Input unit 5 is for example configured at conveyer belt 12 Use site.Subscriber terminal's equipment 7 is for example set to the company using quotient of conveyer belt 12.8, producer's terminal device Such as it is set to the company (factory) of the manufacturer of manufacture conveyer belt 12.In the retailer of conveyer belt 12 situation identical with manufacturer Under (in the case where the manufacture retailer of conveyer belt 12), such as manufacture retailer company configured with server 2 and system The person's of making terminal device 8.

It enters data into about by each input unit 5 to the frequency of server 2, also can be set at one week, one month The interior indefinite period for number appropriate etc., but be set as far as possible it is each regularly fix during preferably.The input frequency is for example It is set as 1 times/day, 1 times/week, 1 time/month etc..

Abrasion loss input unit 5a is using the abrasion loss P1 of the rubber for including at least upper covering rubber 13a of conveyer belt 12 as defeated Enter project.Abrasion loss input unit 5a can also be only using the abrasion loss of upper covering rubber 13a as cuit, but for example can also be with It will be either in lower covering rubber 13b and width direction end rubber 13c or the abrasion loss of both sides is added in cuit. The various types of abrasion loss sensing for the abrasion loss that rubber 13a is covered on sensing can be used for example in abrasion loss input unit 5a Device.Alternatively, can also be (personal by the input terminal equipment for being used to that the data of abrasion loss P1 to be input to server 2 for operator Computer etc.) it is used as abrasion loss input unit 5a.

Impact force input unit 5b will act on the impact force P2 of conveyer belt 12 as cuit, and tension input unit 5c will make For tension P3 for conveyer belt 12 as cuit, core state input unit 5d will indicate that the index P4 of the state of core 15 makees For cuit, both ends interconnecting piece state input unit 5e will indicate the index P5 of the state of both ends interconnecting piece 16B as input item Mesh, unit state input unit 5f will indicate the index P6 of the state of belt conveyer device 9 as cuit, and use environment is defeated Enter portion 5g will indicate conveyer belt 12 use environment index P7 as cuit.

Generally, due to the abrasion loss P1 of upper covering rubber 13a most influences the remaining service life Ja of conveyer belt 12, therefore, In the present invention, input unit 5 is at least using abrasion loss P1 as cuit.That is, in during the use of conveyer belt 12, Above-mentioned six cuits (P2~P7) are input to server 2 to be arbitrary.Accordingly it is also possible to be constituted using following, that is, tool It is standby: other than abrasion loss P1, also to input the cuit selected from six cuits (P2~P7), two inputs Project, three cuits, four cuits, the input unit 5 of five cuits or six cuits.

The impact that sensing acts on conveyer belt 12 (above covering rubber 13a) can be used for example in impact force input unit 5b Various types of shock sensors of power P2.Alternatively, can also will be used to be input to the data of impact force P2 for operator The input terminal equipment (personal computer etc.) of server 2 is used as impact force input unit 5b.

Can be used for example in tension input unit 5c sensing act on conveyer belt 12 (core layer 14) tension P3 it is each The tension sensor of seed type.Alternatively, the input of server 2 will can also be used to be input to the data of tension P3 for operator Terminal device (personal computer etc.) is used as tension input unit 5c.

Indicate that the index P4 of the state of core 15 can for example enumerate 15 mutual bandwidth direction gap of core arranged side by side. X-ray irradiation can be used for example in core state input unit 5d and sense the X-ray apparatus etc. in the width direction gap.Or Person will can also be used to be input to the data of index P4 for operator the input terminal equipment (personal computer of server 2 Deng) it is used as core state input unit 5d.

Indicate that the index P5 of the state of both ends interconnecting piece 16B can for example enumerate the bonding length of both ends interconnecting piece 16B.In The long dimension direction both ends position that sensing is embedded in both ends interconnecting piece 16B can be used for example in the interconnecting piece state input unit 5e of both ends The linear transducer etc. at label (colorful rubber, marking etc.) the mutual interval set.Alternatively, can also will be used to incite somebody to action for operator The input terminal equipment (personal computer etc.) that the data of index P5 are input to server 2 is used as both ends interconnecting piece state input unit 5e。

Indicate that the index P6 of the state of belt conveyer device 9 can for example be enumerated: the conveying speed of conveying object C, every list The conveying weight of position time;The outer diameter etc. of belt wheel 10a, 10b, backing roll 10c.Can for example it make in unit state input unit 5f With the velocity sensor of the conveying speed of sensing conveying object C, the weight sensor of conveying weight of sensing per unit time etc..Or Person will can also be used to be input to the data of index P6 for operator the input terminal equipment (personal computer of server 2 Deng) it is used as unit state input unit 5f.

Indicate that the index P7 of the use environment of conveyer belt 12 can for example be enumerated: use environment temperature, humidity;Determine conveying The numerical value of the specification (material (hardness, oil content), shape, temperature etc.) of object C.Can for example it make in use environment input unit 5g With temperature sensor, humidity sensor, hardness transducer, digital camera of shape of identification conveying object C etc..Alternatively, can also be with It will be used to be used as the input terminal equipment (personal computer etc.) that the data of index P7 are input to server 2 for operator to use Environment input unit 5g.

Be stored in storage unit 4: band Specifications Database 4a pre-enters the specification of conveyer belt 12;Allowed band number According to library 4b, the allowed band about each cuit (P1~P7) is pre-entered by the specification of each conveyer belt 12;It uses Condition database 4c;And correlativity database 4d.

In this embodiment, further, inventory database 4e is stored in storage unit 4.In inventory database 4e, input There is the replacement conveyer belt 12a of the use site of conveyer belt 12 or the conveyer belt 12 in the stock ground (stock yard) on its periphery Quantity in stock (inventory's length).It should be noted that also currently used conveyer belt 12 and replacement are set with conveyer belt 12a sometimes For same size, but it is also set as different size sometimes.For example, also making currently used conveyer belt 12 and replacement conveyer belt sometimes The material of the upper covering rubber 13a of 12a is different.

It shows as exemplified in fig. 2, it is defeated by the specification (specification A, B, C ...) of each conveyer belt in Specifications Database 4a Enter to have material, the size etc. of member of formation.For example, input has: above covering the rubber kind of rubber 13a and lower covering rubber 13b Class (rubber physical property) and thickness, the material (physical property) of core 15 and outer diameter, constitute core layer 14 core 15 quantity, arranged side by side The mutual width direction gap of core 15, bonding length of both ends interconnecting piece 16B etc..

If Fig. 3 is exemplified, in allowed band database 4b by each conveyer belt 12 specification (specification A, B, C, the allowed band about each cuit (P1~P7) ...) is inputted.Due to seven cuits in this embodiment (P1~P7) is input to server 2, and therefore, input has the allowed band of seven cuits, if but being input to server 2 Cuit is only the abrasion loss P1 of upper covering rubber 13a, then only the allowed band of abrasion loss P1 is input to allowed band number According to library 4b, if the cuit for being input to server 2 is three, only the allowed band of three cuits is entered To allowed band database 4b.

If the abrasion loss P1 of upper covering rubber 13a becomes excessive over time, it is easy to produce failure.Cause This, such as abrasion loss P1 is set with, the allowed band of defined upper limit value has been determined.

If impact force P2 becomes excessive, it is easy to produce failure.Regulation has been determined thus, for example being set with to impact force P2 Upper limit value allowed band.

If tension P3 becomes excessive, it is easy to produce failure, if becoming too small, is easy to produce tortuous and generates failure. The allowed band of defined upper limit value and lower limit value has been determined thus, for example being set with to tension P3.

No matter become over time as the mutual width direction gap of core 15 of the typical example of index P4 It is excessive still to become too small, all it is easy to produce failure.Thus, for example as defined in being set with and having determined to width direction gap P4 The allowed band of upper limit value and lower limit value.

If the bonding length of the both ends interconnecting piece 16B of the typical example as index P5 increases over time, It is easy to produce the removing of engagement.The allowed band of defined upper limit value has been determined thus, for example being set with to bonding length P5.

If the conveying speed P6 of the typical example as index P61Become excessive, then the abrasion loss P1 of upper covering rubber 13a increases Greatly, if becoming too small, the Weight Loaded of the conveying object C of per unit area increases and the load becomes large to conveyer belt 12.Therefore, Such as to conveying speed P61It is set with the allowed band of upper limit value and lower limit value as defined in having determined.If as index P6's The conveying weight P6 per unit time of another typical example2Become excessive, then the load becomes large to conveyer belt 12.Thus, for example To the conveying weight P6 per unit time2It is set with the allowed band of upper limit value as defined in having determined.

No matter as index P7 typical example use environment temperature P71, humidity P72It is excessive or too small, all it is easy to produce The failure of conveyer belt 12.Thus, for example to temperature P71, humidity P72It is set with upper limit value and lower limit value as defined in having determined Allowed band.If the hardness P7 of the conveying object C of another typical example as index P73It is excessive, then it is easy in upper covering rubber 13a Generate damage.Thus, for example to hardness P73It is set with the allowed band of upper limit value as defined in having determined.If as index P7 Another typical example conveying object C shape P74There is acute angle portion in outer surface, then be easy to generate in upper covering rubber 13a Damage.Thus, for example to the shape P7 of conveying object C4It is set with and has been determined that the surface in the conveying object C being put into has acute angle The allowed band of the defined upper limit value of the ratio of the quantity of partial conveying object C.

If Fig. 4 is exemplified, input has the belt conveyer device 9 of the use site in use condition database 4c In use condition.The use condition is for example are as follows: conveying speed, the conveying weight per unit time of conveying object C;Belt wheel 10a, The outer diameter etc. of 10b, backing roll 10c.In addition, use environment temperature, the humidity of conveyer belt 12;(material is (hard for the specification of conveying object C Degree, oil content), shape, temperature etc.) also become use condition.

That is, the use condition and above-mentioned cuit P6, P7 repeat.Accordingly it is also possible to use device state input unit 5f And the data of use condition are input to server 2 by use environment input unit 5g.Kind of the use condition whenever conveying object C It is re-updated when the use conditions variation such as class variation.

In correlativity database 4d, input has the use condition and biography indicated about previously used many conveyer belts Send the data of the correlativity of the specification of band and the actual service life Jr of conveyer belt.That is, using item by what parsing was accumulated before this Part (above-mentioned cuit P6, P7), each data with specification, the actual service life Jr of conveyer belt 12 can be grasped in advance and be used Condition and correlativity with specification Yu actual service life Jr.

For example, with conveying speed P61It becomes faster and actual service life Jr shortens, with conveying weight P6 per unit time2 Become larger and the service life Jr on border such quantitative correlativity that shortens is input to correlativity database 4d.In addition, with making With environment temperature P71, humidity P72Get higher and actual service life Jr shorten, with conveying object C hardness P73Become larger and the actual longevity Life Jr shortens, for the shape P7 of conveying object C4For with outer surface have acute angle portion conveying object C ratio become larger and Actual service life Jr such quantitative correlativity that shortens is input to correlativity database 4d.

If Fig. 5 is exemplified, by specification (specification A, B, C, the ...) input of each conveyer belt in inventory database 4e Measure (inventory's length) in stock.Inventory database 4e is updated when replacement is with the storage of conveyer belt 12a and outbound.Cause This, becomes the state that input has nearest quantity in stock.

Operational part 3 becomes data based on the cuit (P1~P7) input by each input unit 5, is input to advising The specification of the conveyer belt 12 of lattice database 4a and each cuit (P1~P7) for being input to allowed band database 4b Allowed band calculates the composition of the remaining service life Ja of conveyer belt 12.

If describing in detail, then compare over time each cuit for being input to server 2 data and Corresponding allowed band.Here, compared with other cuits, the variation of abrasion loss P1 to the disturbance degree of remaining service life Ja most Greatly.Thus, for example, calculating change conditions (rate of change) of the data relative to allowed band of abrasion loss P1.Based on calculating Change conditions, calculate inputted abrasion loss P1 data reach allowed band it is outer until the required time, by the meter The time of calculating is as remaining service life Ja.

Compared with other cuits, influence of the variation of the bonding length P5 of both ends interconnecting piece 16B to remaining service life Ja Degree is also bigger, and therefore, change conditions (rate of change) of the data based on bonding length P5 relative to allowed band calculate institute The required time until the data of the bonding length P5 of input reach outside allowed band, using the calculated time as interim Remaining service life Jb2.Then, until the data of above-mentioned abrasion loss P1 can also being reached outside allowed band the required time as Interim remaining service life Jb1, by each interim remaining service life Jb1, Jb2In the shortest remaining service life as remaining service life Ja.

About other cuits (P2~P4, P6, P7), for example, if being input to the data of server 2 in allowed band It is interior, then calculate remaining service life Ja with not considering these data.On the other hand, if these data consider outside allowed band These data simultaneously calculate remaining service life Ja as following exemplifiedly.

Think: situation of the data of these cuits (P2~P4, P6, P7) outside allowed band within the allowable range The case where compare, it is big to the load of conveyer belt 12.Therefore, for these each cuits, setting keeps remaining service life Ja shorter The calculated COEFFICIENT K in ground (0 < K < 1).The size of the COEFFICIENT K be not it is the same, based on the real data accumulated before this, root It is weighted according to the different degree of each cuit, is made it different preferably according to cuit.

Then, firstly, not considering the data of cuit (P2~P4, P6, P7), it is computed as described above out the interim remaining longevity Order Jb.Then, in the case where these data are outside allowed band, by the COEFFICIENT K that each cuit is set (K1, K2, K3...) remaining service life Ja (Ja=Jb × K1 × K2...) is calculated multiplied by calculated interim remaining service life Jb.

In the present invention, based on calculated remaining service life Ja, the actual service life Jr of conveyer belt 12 is determined.That is, due to Conveyer belt 12 using sart point in time and calculate remaining service life Ja time point be it is known, therefore, clearly go out from making During sart point in time to the time point for calculating remaining service life Ja.It adds and calculates during can clearly go out to this Remaining service life Ja resulting period be determined as actual service life Jr.Actual service life Jr in the present invention refers in principle to be based on The service life that calculated remaining service life Ja is determined like this.

Operational part 3 calculates remaining service life Ja with defined period (for example, two weeks or one month).Preferably In, notify the Email in calculated remaining service life Ja to be sent to subscriber terminal's equipment 7 from server 2.

In the management system 1, further, pass through operational part 3 before conveyer belt 12 is secured to belt conveyer device 9 To calculate the predetermined age Jf of conveyer belt 12.As noted previously, as correlativity database 4d is input to storage unit 4, because This, becomes the data for the use condition (above-mentioned cuit P6, P7) that can use the conveyer belt 12 and the specification of the conveyer belt Data and correlativity database 4d, the composition of predetermined age Jf is calculated before using conveyer belt 12.

Here, use condition, each data with specification, actual service life Jr of the conveyer belt 12 used before tight are defeated Enter, store and updates in correlativity database 4e.As calculate the conveyer belt 12 predetermined age Jf when, after update Correlativity database 4e composition.

Therefore, each replacement used from now on the predetermined age Jf of conveyer belt 12a is used whenever replacement conveyer belt 12 The correlativity database 4e being updated when (12a) is being filled based on the replacement use condition of conveyer belt 12a and with specification It is calculated by operational part 3 before being connected to belt conveyer device 9.By updating correlativity database 4e, meeting like this Reflect the severity of nearest use condition.Therefore, the precision of prediction of the predetermined age Jf of conveyer belt 12 (12a) is mentioned It is high.Calculated predetermined age Jf is sent to subscriber terminal's equipment 7 from server 2.

Calculated predetermined age Jf has some errors.Therefore, it by being computed as described above out remaining service life Ja, is easy Determine the more appropriate replacement period of conveyer belt 12.

That is, in the present invention, other than above-mentioned remaining service life Ja, the predetermined longevity is also calculated before using conveyer belt 12 Order Jf.Since predetermined age Jf and remaining the two service life in service life Ja can be grasped, the service life of a side is not depended solely on, It is easily mastered the more appropriate replacement period of conveyer belt 12.Moreover, because predetermined age can be grasped before using conveyer belt 12 Jf, therefore, it is easy to ensure that for preparing the temporal of conveyer belt 12a of replacement, the surplus in fund.Therefore, it reduces and passes It send the extra inventory of band 12 (12a) or is become easy during shortening inventory, for reducing the operating cost of conveyer belt 12 It is advantageous.

It can evaluate are as follows: in the case where the difference of the actual service life Jr of the conveyer belt 12 and predetermined age Jf is small, in advance The precision of prediction for determining service life Jf is high, and in the case where the difference is big, the precision of prediction of predetermined age Jf is low.Accordingly it is also possible to When calculating the predetermined age Jf of the replacement that uses after the conveyer belt 12 with conveyer belt 12a, the reality based on the conveyer belt 12 Service life Jr compared with the predetermined age Jf of the conveyer belt 12, to correct the predetermined age Jf of replacement conveyer belt 12a.

For example, setting makes the correction coefficient T of actual service life Jr and predetermined age Jf diminution difference.Then, by meter The replacement of calculating corrects predetermined age Jf multiplied by correction coefficient T with the predetermined age Jf of conveyer belt 12a.Correction coefficient T setting Are as follows: make the size of the difference of actual service life Jr and predetermined age Jf for example reduce 30%~80% or 40%~80% or The value of person 50% or so.Correction coefficient T can also be set as making the size of the difference of actual service life Jr and predetermined age Jf The value for reducing 100% carries out making the consistent correction of the two.

Management system 1 of the invention can also be using the update and above-mentioned predetermined longevity for carrying out above-mentioned correlativity database 4d The composition of this two side of the correction of Jf is ordered, but the composition for only carrying out either one can also be used.

As the embodiment in this way, as the basis for calculating remaining service life Ja, if in addition to the abrasion loss of upper covering rubber 13a Except P1, also using at least one cuit in other cuits P2~P7, then for the use according to conveyer belt 12 The actual conditions at scene for suitable remaining service life Ja are advantageously to calculate.

In this embodiment, further, quantity in stock and transmission based on the conveyer belt 12 for being input to inventory database 4e With 12 calculated remaining service life Ja, the order of replacement conveyer belt 12a is sent from server 2 to subscriber terminal's equipment 7 The contact ordered is urged in the contact in period.

If describing in detail, then when operational part 3 calculates remaining service life Ja, confirm at the time point be input to inventory The quantity in stock of the conveyer belt 12 of database 4e.Then, in the length of the replacement conveyer belt 12a of needs than the quantity in stock that confirms In the case where length, low stock.In this case, specified time limit needed for considering delivery for calculated remaining service life Ja come Replacement is specified with the order period of conveyer belt 12a, the Email in order period is notified to be sent to subscriber's end from server 2 End equipment 7.The order period adjacent to when, urge the Email for ordering replacement conveyer belt 12a to be sent to and orders from server 2 Consumer's terminal device 7.Therefore, can adequately be prepared for the replacement of conveyer belt 12.

If issuing the contact for ordering replacement conveyer belt 12a from subscriber terminal's equipment 7, the contact is via server 2 It is sent to producer's terminal device 8, or is sent directly to producer's terminal device 8.Based on the order, producer is by order The conveyer belt 12a of specification and length delivers goods to the stock ground of subscriber.

It should be noted that if all length of conveyer belt 12, then can also replace whole (overall length), but longer in perimeter sometimes In the case where only replace necessary part (necessary length).Thus, for example the number that will be inputted about cuit (P1, P4, P5) Server 2 is input to according to together with the data of circumferential position that can determine conveyer belt 12 for the data.Needs can be grasped as a result, The position of the conveyer belt 12 of replacement and length.

Can also be stored in the storage unit 4 of server 2 input have replacement conveyer belt 12 required for expense database, Input has the database etc. for replacing the required time.In the case where using such composition, conveyer belt can will be replaced Cost information required for 12 is sent to subscriber terminal's equipment 7 from server 2.It is carried out in addition it is possible to use server 2 is unified Replace timetable management required for conveyer belt 12.

Permission in the case where being added the abrasion loss P1 of lower covering rubber 13b to cuit, to abrasion loss P1 Range (upper limit value) is pre-entered to allowed band database 4b.Then, it can also be constituted using following: be input to service In the case that the abrasion loss P1 of the lower covering rubber 13b of device 2 is outside allowed band, to subscriber terminal's equipment 7 or producer At least one party in terminal device 8, which sends, notifies Email of the abrasion loss P1 outside allowed band.Receive the mail Can subscriber, producer be coped with as follows: to rotation status (rotate), the In of the backing roll 10c of belt conveyer device 9 Whether there is or not skidding, scraper plate occurs to have contactless etc. checked with lower covering rubber 13b between conveyer belt 12 and belt wheel 10a, 10b. The unfavorable condition of belt conveyer device 9 can be eliminated in advance as a result,.

Symbol description

1 management system

2 servers

3 operational parts

4 storage units

4a band Specifications Database

4b allowed band database

4c use condition database

4d correlativity database

4e inventory database

5 input units

5a abrasion loss input unit

5b impact force input unit

5c tension input unit

5d core state input unit

The both ends 5e interconnecting piece state input unit

5f unit state input unit

5g use environment input unit

6 transmission units

7 subscriber terminal's equipment

8 producer's terminal devices

9 belt conveyer devices

10a driving pulley

10b driven pulley

10c backing roll

11 tensioning mechanisms

12 conveyer belts

Rubber is covered on 13a

Rubber is covered under 13b

13c width direction end rubber

14 core layers

15 cores (steel cord)

The non-both ends interconnecting piece of 16A

The both ends 16B interconnecting piece

C conveys object