A kind of temperature stress release structure for super long building structure

文档序号:1752261 发布日期:2019-11-29 浏览:20次 中文

阅读说明:本技术 一种用于超长建筑结构的温度应力释放结构 (A kind of temperature stress release structure for super long building structure ) 是由 吴双文 尹晓娜 于 2019-08-23 设计创作,主要内容包括:本发明公开了一种用于超长建筑结构的温度应力释放结构,包括具有超长钢筋混凝土结构的第一楼板和第二楼板,第一楼板和第二楼板中间设有“凹”字形槽沟,槽沟的上端面与楼板上表面平齐,槽沟下端面低于楼板下表面,槽沟内填充有砂石。本发明中,通过在楼板间设置“凹”字形槽沟,利用槽沟两侧壁的内缩或外扩,可有效引导楼板内温度应力的释放,改善梁柱之间的传力,大幅减小因楼板膨胀或收缩造成竖向构件所承受得水平。(The invention discloses a kind of temperature stresses for super long building structure to discharge structure, including the first floor and the second floor with over-long reinforced concrete structure, concave groove is equipped among first floor and the second floor, the upper surface of groove is concordant with floor upper surface, groove lower end surface is lower than floor lower surface, is filled with sandstone in groove.In the present invention, by the way that concave groove is arranged between floor, inside contracting or extending out using groove two sidewalls can effectively guide the release of temperature stress in floor, improve the power transmission between beam column, vertical member bears horizontal caused by substantially reducing because of floor expansion or shrinkage.)

1. a kind of temperature stress for super long building structure discharges structure, it is characterised in that: including with overlength reinforced concrete Concave groove, the upper end of groove are equipped among the first floor and the second floor of soil structure, the first floor and the second floor Face is concordant with floor upper surface, and groove lower end surface is lower than floor lower surface, is filled with sandstone in groove;Groove is armored concrete Structure, the first reinforcing bar, the second reinforcing bar, third reinforcing bar and distributing reinforcement including all having U-shaped structure, the first reinforcing bar constitute groove sidewall Principal rod on the outside of outside, slot bottom, the second reinforcing bar constitute the principal rod on the inside of groove sidewall, on the outside of slot bottom, and third reinforcing bar constitutes slot Principal rod on the inside of side-wall outer side, slot bottom, distributing reinforcement is along groove genesis analysis.

2. temperature stress according to claim 1 discharges structure, it is characterised in that: first reinforcing bar and the second reinforcing bar U-shaped both ends are folded in the first floor and the second floor respectively.

3. temperature stress according to claim 1 or 2 discharges structure, it is characterised in that: at the both ends of the third reinforcing bar Below floor.

4. temperature stress according to claim 1 or 2 discharges structure, it is characterised in that: first reinforcing bar and the second steel Along the longitudinally staggered configuration of groove, centre sets at regular intervals muscle.

5. temperature stress according to claim 4 discharges structure, it is characterised in that: adjacent the first reinforcing bar and the second reinforcing bar Centre is at least provided with a third reinforcing bar.

6. temperature stress according to claim 1 or 2 discharges structure, it is characterised in that: first reinforcing bar and the second steel Muscle sets the first reinforcing bar and second at regular intervals, adjacent among the longitudinally staggered configuration of groove, two adjacent first reinforcing bars Reinforcing bar is bound together side by side.

7. temperature stress according to claim 6 discharges structure, it is characterised in that: among two adjacent first reinforcing bars extremely It is equipped with a third reinforcing bar less.

8. temperature stress according to claim 1 or 2 discharges structure, it is characterised in that: the third reinforcing bar and the first steel Muscle and/or the second reinforcing bar are bound together side by side.

9. temperature stress according to claim 1 or 2 discharges structure, it is characterised in that: first floor and second building Plate is respectively arranged below with the first beam body and the second beam body, the first reinforcing bar, the second reinforcing bar both ends be located at the first beam body and The top of two beam bodies.

10. temperature stress according to claim 1 or 2 discharges structure, it is characterised in that: first reinforcing bar, the second steel The both ends of muscle and third reinforcing bar are equipped with barb, the barb on the first reinforcing bar and the second reinforcing bar downward, the barb on third reinforcing bar Towards inside groove.

Technical field

The present invention relates to super long building structure construction technology field more particularly to a kind of temperature for super long building structure Strain relief.

Background technique

With people to building using function requirement it is higher and higher, some public buildings gradually to large size warp, Comfortableization development, causes the large public building of overlength, ultra-wide also largely to occur.And temperature and concrete shrinkage act on overlength It is also easy to produce restrained deformation in concrete structure, causes to occur biggish tensile stress in the structure to make structure crack.But in view of building The globality and aesthetics for building object, often require that and are not provided with expansion joint.

Currently, solve overlength not setting the general fashion of seam to be setting post-cast strip to discharge concrete contraction distortion early period, if Set expansion reinforcing band compensation temperature contraction distortion, or the tensile stress etc. generated using the deformation of prestressing technique equilibrium temperature.Its In, post-cast strip can only discharge the contraction distortion of concrete, not can solve temperature deformation, and be unable to one-time-concreting completion;Expansion adds Strong band is limited due to resisting contraction distortion ability, and is not suitable for the excessive super-long structural of contraction distortion;And use prestressing force skill The difficulty of design and construction has then been significantly greatly increased in art, also increases the cost and cost of building structure.

Summary of the invention

The present invention in view of the above problems, provides a kind of temperature stress release structure for super long building structure, Concave groove is set between floor, and inside contracting or extending out using groove two sidewalls can effectively guide temperature stress in floor Release, improve beam column between power transmission, effectively reduce super long building inside configuration temperature stress and reduce cracks on floor slab.

The technical solution adopted by the invention is as follows:

A kind of temperature stress for super long building structure discharges structure, including the with over-long reinforced concrete structure One floor and the second floor, are equipped with concave groove among the first floor and the second floor, on the upper surface and floor of groove Flush, groove lower end surface are lower than floor lower surface, are filled with sandstone in groove;Groove is reinforced concrete structure, including The first reinforcing bar, the second reinforcing bar, third reinforcing bar and the distributing reinforcement of U-shaped structure are all had, the first reinforcing bar constitutes groove sidewall outside, slot bottom The principal rod in outside, the second reinforcing bar constitute the principal rod on the inside of groove sidewall, on the outside of slot bottom, third reinforcing bar constitutes on the outside of groove sidewall, Principal rod on the inside of slot bottom, distributing reinforcement is along groove genesis analysis.

Further, the U-shaped both ends of first reinforcing bar and the second reinforcing bar are folded to the first floor and the second floor respectively It is interior.

Further, the both ends of the third reinforcing bar are in below floor.

Further, along the longitudinally staggered configuration of groove, centre sets at regular intervals for first reinforcing bar and the second reinforcing bar;

Further, at least provided with a third reinforcing bar among adjacent the first reinforcing bar and the second reinforcing bar.

Further, first reinforcing bar and the second reinforcing bar are along the longitudinally staggered configuration of groove, two adjacent first reinforcing bars Centre sets the first reinforcing bar and the second reinforcing bar at regular intervals, adjacent and binds side by side together;

Further, at least provided with a third reinforcing bar among two adjacent first reinforcing bars.

Further, the third reinforcing bar and the first reinforcing bar and/or the second reinforcing bar are bound together side by side.

Further, first floor and the second floor are respectively arranged below with the first beam body and the second beam body, the first steel Muscle, the second reinforcing bar both ends be located at the top of the first beam body and the second beam body.

Further, the both ends of first reinforcing bar, the second reinforcing bar and third reinforcing bar are equipped with barb, the first reinforcing bar and Downward, barb on third reinforcing bar is towards inside groove for barb on two reinforcing bars.

In conclusion by adopting the above-described technical solution, the beneficial effects of the present invention are:

1, by the way that concave groove is arranged between floor, inside contracting or extending out using groove two sidewalls can be guided effectively The release of temperature stress in floor improves the power transmission between beam column, vertical member caused by substantially reducing because of floor expansion or shrinkage Bear to obtain horizontal force;

2, the steel reinforcement layout in concave groove is ingenious, and it is interior that three classes principal rod constitutes groove wall surface/bottom surface simultaneously Outer two sides so that floor is during contraction or expansion, groove stable structure itself, it is reliable, do not crack;

3, compared to the setting of post-cast strip and expansion reinforcing band, the present invention can primary concreting, and can combine super The anti-shrink and cracking resistance of long building structure;Compared to prestressing technique, design and construction of the invention is simple and easy to do, is also beneficial to Guarantee construction quality and reduces cost.

Detailed description of the invention

Examples of the present invention will be described by way of reference to the accompanying drawings, in which:

Fig. 1 is overall structure diagram of the invention;

Fig. 2 is the structural schematic diagram of the first reinforcing bar, the second reinforcing bar and third reinforcing bar;Wherein, the first reinforcing bar, the second reinforcing bar and Third reinforcing bar corresponds respectively to figure (A), figure (B) and figure (C).

Description of symbols:

The first floor of 11-, the second floor of 12-, 2- sandstone, the first reinforcing bar of 3-, the second reinforcing bar of 4-, 5- third reinforcing bar, 6- points Cloth muscle, the first beam body of 71-, the second beam body of 72-.

Specific embodiment

All features disclosed in this specification or disclosed all methods or in the process the step of, in addition to mutually exclusive Feature and/or step other than, can combine in any way.

Any feature disclosed in this specification unless specifically stated can be equivalent or with similar purpose by other Alternative features are replaced.That is, unless specifically stated, each feature is an example in a series of equivalent or similar characteristics .

The present invention relates to a kind of temperature stresses for super long building structure to discharge structure, including with overlength reinforced concrete Concave groove, the upper end of groove are equipped among the first floor and the second floor of soil structure, the first floor and the second floor Face is concordant with floor upper surface, and groove lower end surface is lower than floor lower surface, is filled with sandstone in groove.Groove is armored concrete Structure, the first reinforcing bar, the second reinforcing bar and third reinforcing bar including all having U-shaped structure, the first reinforcing bar constitute groove sidewall outside, slot Principal rod on the outside of bottom, the second reinforcing bar constitute the principal rod on the inside of groove sidewall, on the outside of slot bottom, and third reinforcing bar is constituted outside groove sidewall Principal rod on the inside of side, slot bottom is also equipped with distributing reinforcement in groove along longitudinal direction.

In the present invention, by the way that concave groove is arranged between floor, inside contracting or extending out using groove two sidewalls can have The release of temperature stress, improves the power transmission between beam column, erects caused by substantially reducing because of floor expansion or shrinkage in effect guidance floor Horizontal force is born to obtain to component;Moreover, the steel reinforcement layout in concave groove is ingenious, three classes principal rod constitutes slot simultaneously Inside and outside ditch wall surface/bottom surface so that floor is during contraction or expansion, groove stable structure itself, it is reliable, do not open It splits.