A kind of artificial false lane construction method of anchor slab

文档序号:1768653 发布日期:2019-12-03 浏览:28次 中文

阅读说明:本技术 一种锚板人工假巷构筑方法 (A kind of artificial false lane construction method of anchor slab ) 是由 盛佳 张海云 *** *** 刘东锐 万兵 周益龙 王亚军 王玉丁 张为星 李士 于 2019-09-04 设计创作,主要内容包括:本发明公开的锚板人工假巷构筑方法,步骤一:依据上部矿体的工程需求,选定构筑位置与走向,并依据后期所需服务功能,制定空间尺寸;步骤二:依据位置、走向、尺寸,现场标记巷道线,并依据标记线每隔一定距离在顶板矿柱和底板矿岩进行锚杆孔的钻凿,锚杆孔上下对称,且在同一铅垂线上;步骤三:锚杆孔钻凿完毕后,进行锚杆的安装,插入顶板矿柱和底板矿岩的锚杆通过捆绑钢筋进行悬空钢筋连接形成内部竖筋,同时保证该内部竖筋结构在同一铅垂线上;步骤四:在顶板矿柱和底板矿岩之间连接的内部竖筋上,再等间距通过捆绑固定两端带螺纹的短筋;本发明工艺简单、安全性高,且构筑工期短,成本低廉、工程用料省。(The artificial false lane construction method of anchor slab disclosed by the invention, step 1: it is selected to construct position and trend according to the engineering demand of top ore body, and according to service function needed for the later period, formulate bulk;Step 2: according to position, trend, size, scene marks tunnel line, and carries out the Drilling of bolthole in top plate ore pillar and bottom plate ore-rock at a certain distance according to mark line, and bolthole is symmetrical above and below, and on same plumb line;Step 3: after bolthole Drilling, the installation of anchor pole, insertion top plate ore pillar and the anchor pole of bottom plate ore-rock is carried out and connects to form internal vertical bar by the hanging reinforcing bar of binding reinforcing bar progress, while guaranteeing the inside vertical bar structure on same plumb line;Step 4: in the inside vertical bar connected between top plate ore pillar and bottom plate ore-rock, then the equidistant short muscle for passing through bundled fixed TBE (threaded both ends);Present invention process is simple, highly-safe, and constructs short time limit, and low in cost, engineering materials save.)

1. a kind of artificial false lane construction method of anchor slab, it is characterised in that:

Step 1: it is selected to construct position and trend according to the engineering demand of top ore body, and according to service function needed for the later period, Formulate bulk;

Step 2: according to position, trend, size, scene marks tunnel line, and according to mark line at a certain distance in top plate mine Column and bottom plate ore-rock carry out the Drilling of bolthole, and bolthole is symmetrical above and below, and on same plumb line;

Step 3: after bolthole Drilling, the installation of anchor pole is carried out, the anchor pole for being inserted into top plate ore pillar and bottom plate ore-rock passes through bundle It ties up the hanging reinforcing bar of reinforcing bar progress to connect to form internal vertical bar, while guaranteeing the inside vertical bar structure on same plumb line;

Step 4: in the inside vertical bar connected between top plate ore pillar and bottom plate ore-rock, then equidistantly pass through bundled fixed both ends Threaded short muscle;

Step 5: according to field fabrication iron plate, and perforating on iron plate, and short muscle passes through the hole on iron plate, passes through pallet and nut Carry out the fixation of iron plate;

Step 6: after iron plate is fixed, space processed is enclosed to iron plate inside and carries out concreting;

Step 7: after concrete setting, the packing job in layering region to be filled can be carried out;

Step 8: after body solidification to be filled, higher slice region orebody mining is carried out, while at the reserved security personnel in lane position top Ore pillar, safety pillar and concreting anchor slab constitute artificial false lane.

2. the artificial false lane construction method of anchor slab according to claim 1, it is characterised in that: step 2 anchor pole eyelet depth is work Journey situation takes 1 ~ 1.5m;0.5 ~ 1.2m is divided between bolthole.

3. the artificial false lane construction method of anchor slab according to claim 1, it is characterised in that: anchor pole described in step 3 is resin anchor Bar, 0.5 ~ 1.5m of anchor pole protruded length.

4. the artificial false lane construction method of anchor slab according to claim 1, which is characterized in that step 4: at top plate ore pillar and bottom On the hanging reinforcing bar connected between plate ore-rock, pass through the short muscle of bundled fixed TBE (threaded both ends), short muscle length at a certain distance 0.2~0.6m。

5. the artificial false lane construction method of anchor slab according to claim 1, which is characterized in that step 4 and step 5 pass through band spiral shell The concreting space that the fixed each iron plate of short muscle, pallet and the nut of line is formed can rotate depth by control nut It controls and pours thickness between two iron plates.

6. the artificial false lane construction method of anchor slab according to claim 1, which is characterized in that concreting can be into step 6 The gradation of row from bottom to top is poured.

7. the artificial false lane construction method of anchor slab according to claim 1, which is characterized in that step 8, safety pillar is with a thickness of 2 ~4m。

Technical field

The present invention relates to underground mine exploitation engineering technical fields, more specifically, more particularly to it is a kind of be suitable on to The artificial false lane construction method of anchor slab during horizontally grouped top-coal drawing mining method mine.

Background technique

During metallic ore underground mining, artificial false lane is constructed there are certain objective factors needs to adjust down-hole mining System.Synthesis can be classified as two aspect: on the one hand due in range ore-rock be pooled out, formed goaf, original tunnel is destroyed Or completely disappear, cause the ore of lower step higher slice digging to be difficult to transport;On the other hand due to digging early period roadway layout system The limitation of system causes regional area that need to construct artificial false lane and carries out production adjustment, realizes the back production of mine safety stability and high efficiency.Currently In the mining methods of various artificial false lane structures, traditional artificial false lane structural shape is mostly concrete casting, brick coagulation Soil and precast concrete erection etc., long construction period, at high cost, large labor intensity become the artificial false lane structure application of restriction A key factor, seeking simple and feasible artificial tunnel, to construct new process significant.

Summary of the invention

It is an object of the invention in view of the above-mentioned problems of the prior art, provide a kind of simple process, highly-safe, Short time limit is constructed, and low in cost and engineering materials save anchor slab manually false lane construction method.

The technical solution adopted by the present invention is that: a kind of artificial false lane construction method of anchor slab,

Step 1: it is selected to construct position and trend according to the engineering demand of top ore body, and according to service function needed for the later period, Formulate bulk;

Step 2: according to position, trend, size, scene marks tunnel line, and according to mark line at a certain distance in top plate mine Column and bottom plate ore-rock carry out the Drilling of bolthole, and bolthole is symmetrical above and below, and on same plumb line;

Step 3: after bolthole Drilling, the installation of anchor pole is carried out, the anchor pole for being inserted into top plate ore pillar and bottom plate ore-rock passes through bundle It ties up the hanging reinforcing bar of reinforcing bar progress to connect to form internal vertical bar, while guaranteeing the inside vertical bar structure on same plumb line;

Step 4: in the inside vertical bar connected between top plate ore pillar and bottom plate ore-rock, then equidistantly pass through bundled fixed both ends Threaded short muscle;

Step 5: according to field fabrication iron plate, and perforating on iron plate, and short muscle passes through the hole on iron plate, passes through pallet and nut Carry out the fixation of iron plate;

Step 6: after iron plate is fixed, space processed is enclosed to iron plate inside and carries out concreting;

Step 7: after concrete setting, the packing job in layering region to be filled can be carried out;

Step 8: after body solidification to be filled, higher slice region orebody mining is carried out, while at the reserved security personnel in lane position top Ore pillar, safety pillar and concreting anchor slab constitute artificial false lane.

Preferably, step 2 anchor pole eyelet depth is that project situation takes 1 ~ 1.5m;It is divided into 0.5 between bolthole ~ 1.2m。

Preferably, anchor pole described in step 3 is resin anchor, 0.5 ~ 1.5m of anchor pole protruded length.

Preferably, on the hanging reinforcing bar that step 4 connects between top plate ore pillar and bottom plate ore-rock, lead at a certain distance Cross the short muscle of bundled fixed TBE (threaded both ends), 0.2 ~ 0.6m of short muscle length.

Preferably, step 4 is formed with step 5 by the fixed each iron plate of threaded short muscle, pallet and nut Concreting space, can be rotated by control nut between deep-controlled two iron plate and pour thickness.

Preferably, concreting can carry out the pouring of gradation from bottom to top in step 6.

Preferably, in step 8 safety pillar with a thickness of 2 ~ 4m.

Compared with prior art, the invention has the following advantages that

The present invention uses hanging connection anchor pole, and encloses progress concrete in space processed using the fixed iron plate of short muscle, pallet and nut and pour It builds and what is formed pours anchor slab, and it is good artificial quickly, simply to have constructed with the safety pillar at top security performance together False lane.Using the fixed iron plate of short muscle, pass through the controllable range for enclosing space processed of the rotation depth of thread;It can be consolidated using iron plate junction Determine multilayer iron plate, ensure that the closed of space;The infiltration of inside and outside slurry is prevented, structure is reliable, ensure that artificial false lane mined out Safety and stability in area's filling and subsequent production use process.

In conclusion present invention process is simple, highly-safe, and short time limit is constructed, low in cost, engineering materials save, and apply The artificial false lane intensity that work is completed is high, security performance is good, especially suitable for ore and rock stability preferably, ore value it is higher, on Into horizontally grouped top-coal drawing mining method, artificial vacation lane is constructed.

Detailed description of the invention

The present invention is described in further detail for embodiment in reference to the accompanying drawing, but does not constitute to of the invention Any restrictions.

Fig. 1 is schematic structural view of the invention.

Fig. 2 is I-I cross-sectional view in Fig. 1.

Fig. 3 is II-II cross-sectional view in Fig. 1.

In figure: 1- anchor bar;Vertical bar inside 2-;The short muscle of 3-;4- pallet and nut;5- iron plate;6- iron plate overlap joint;7- people The lane Gong Jia;The region to be filled 8-;9- top plate ore pillar;10- bottom plate ore-rock;11- higher slice back production region.

Specific embodiment

With reference to the accompanying drawings and embodiments to a kind of artificial false lane construction method of anchor slab,

Step 1: it is selected to construct position and trend according to the engineering demand of top ore body, and according to service function needed for the later period, Formulate bulk;

Step 2: according to position, trend, size, scene marks tunnel line, and according to mark line at a certain distance in top plate mine Column and bottom plate ore-rock carry out the Drilling of bolthole, and bolthole is symmetrical above and below, and on same plumb line;

Preferably, anchor pole eyelet depth of the present invention is that project situation takes 1 ~ 1.5m;It is divided into 0.5 between bolthole ~ 1.2m。

Step 3: after bolthole Drilling, carrying out the installation of anchor pole, and the anchor pole for being inserted into top plate ore pillar and bottom plate ore-rock is logical It crosses the hanging reinforcing bar of binding reinforcing bar progress to connect to form internal vertical bar, while guaranteeing the inside vertical bar structure on same plumb line;

The present invention has evaded the limitation due to face height, causes too long anchor pole to be not easy the case where transport is with installation, uses The method of binding reinforcing bar hanging bar splicing, ensure that the formation of internal vertical bar;

Preferably, anchor pole of the present invention is resin anchor, 0.5 ~ 1.5m of anchor pole protruded length, naturally it is also possible to use other tool The anchor pole of standby same function material.

Step 4: in the inside vertical bar connected between top plate ore pillar and bottom plate ore-rock, then equidistantly pass through bundled fixed The short muscle of TBE (threaded both ends);

Preferably, on the hanging reinforcing bar that the present invention connects between top plate ore pillar and bottom plate ore-rock, pass through bundle at a certain distance The strapped short muscle for determining TBE (threaded both ends), 0.2 ~ 0.6m of short muscle length;

Preferably, it is mixed in step 4 and step 5 by what the fixed each iron plate of threaded short muscle, pallet and nut was formed Solidifying soil casting space can be rotated between deep-controlled two iron plate by control nut and pour thickness.

Step 5: according to field fabrication iron plate, and perforating on iron plate, and short muscle passes through the hole on iron plate, by pallet with The fixation of nut progress iron plate;

Step 6: after iron plate is fixed, space processed is enclosed to iron plate inside and carries out concreting;

Preferably, concreting can carry out the pouring of gradation from bottom to top in step 6 of the present invention, can effectively shorten construction Duration.It can also be poured using method for distinguishing.

Preferably, the present invention can also ensure that the closed of space in the fixed multilayer iron plate in iron plate junction;It is poured in the later period It will not come out and leak when filling concrete.

Step 7: after concrete setting, the packing job in layering region to be filled can be carried out;

Step 8: after body solidification to be filled, higher slice region orebody mining is carried out, while at the reserved security personnel in lane position top Ore pillar, safety pillar and concreting anchor slab constitute artificial false lane.

Preferably, in step 8 safety pillar with a thickness of 2 ~ 4m.

In the description of the present invention, it is to be understood that, term " center ", "upper", "lower", "front", "rear", "vertical", The orientation or positional relationship of the instructions such as "horizontal", "top", "bottom", "inner", "outside", " axial direction ", " radial direction ", " circumferential direction " be based on Orientation or positional relationship shown in the drawings, is merely for convenience of description of the present invention and simplification of the description, rather than indication or suggestion institute The device or element of finger must have a particular orientation, be constructed and operated in a specific orientation, therefore should not be understood as to this hair Bright limitation.

In addition, term " first ", " second " are used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance Or implicitly indicate the quantity of indicated technical characteristic.Define " first " as a result, the feature of " second " can be expressed or Person implicitly includes at least one this feature.

In the present invention unless specifically defined or limited otherwise, term " installation ", " connected ", " connection ", " fixation " Equal terms shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integral;It can be machine Tool connection is also possible to be electrically connected or can communicate each other;Can be directly connected, can also indirectly connected through an intermediary, It can be the connection inside two elements or the interaction relationship of two elements, unless otherwise restricted clearly.For ability For the those of ordinary skill in domain, the specific meanings of the above terms in the present invention can be understood according to specific conditions.

In the present invention unless specifically defined or limited otherwise, fisrt feature in the second feature " on " or " down " can be with It is that the first and second features directly contact or the first and second features pass through intermediary mediate contact.Moreover, fisrt feature It can be fisrt feature in second feature " top " to be directly above or diagonally above the second feature, or be merely representative of fisrt feature water Flat height is higher than second feature.Fisrt feature second feature " lower section " can be fisrt feature immediately below second feature or Obliquely downward, or first feature horizontal height is merely representative of less than second feature.

In the description of this specification, reference term " embodiment ", " specific embodiment ", " example " or " specific example " Deng description to mean that particular features, structures, materials, or characteristics described in conjunction with this embodiment or example are contained in of the invention In at least one embodiment or example.In the present specification, schematic expression of the above terms are necessarily directed to identical Embodiment or example.Moreover, particular features, structures, materials, or characteristics described can be in any one or more embodiments Or it can be combined in any suitable manner in example.In addition, without conflicting with each other, those skilled in the art can be by this The feature of different embodiments or examples and different embodiments or examples described in specification is combined.

Although the embodiments of the present invention has been shown and described above, it is to be understood that above-described embodiment is example Property, it is not considered as limiting the invention, those skilled in the art within the scope of the invention can be to above-mentioned Embodiment is changed, modifies, replacement and variant.