Pipeline laying and suspended ceiling integrated construction system for industrial and commercial places

文档序号:1872603 发布日期:2021-11-23 浏览:34次 中文

阅读说明:本技术 一种工商业场所的管线布设与吊顶集成施工系统 (Pipeline laying and suspended ceiling integrated construction system for industrial and commercial places ) 是由 徐勖 谢钰莹 周德银 于 2021-09-01 设计创作,主要内容包括:本发明涉及一种工商业场所的管线布设与吊顶集成施工系统,包括吊管、上横管、下横管、中间龙骨、侧边龙骨、吊顶模块,上横管上悬挂有托板吊码,托板吊码底部悬挂有线缆托板;下横管底部安装有中间龙骨吊码和侧边龙骨吊码,中间龙骨悬挂在中间龙骨吊码上,侧边龙骨悬挂在侧边龙骨吊码上,吊顶模块能够安装在两根相邻的中间龙骨之间、侧边龙骨与相邻的中间龙骨之间;下横管上还安装有抱箍机构。有益效果是:实现了管线布设与吊顶的集成施工系统,使管线布设与吊顶实现部分结构共用减少材料浪费,使用空间分层无干扰,减少对建筑物天花板的结构破坏;线缆具有独立的布设空间、操作方便,线缆散热分离,避免热量聚集引发火灾。(The invention relates to a pipeline laying and ceiling integrated construction system in an industrial and commercial place, which comprises a hanging pipe, an upper transverse pipe, a lower transverse pipe, a middle keel, side keels and a ceiling module, wherein a supporting plate hanging weight is hung on the upper transverse pipe, and a cable supporting plate is hung at the bottom of the supporting plate hanging weight; the bottom of the lower horizontal pipe is provided with a middle keel hanging code and a side keel hanging code, the middle keel is hung on the middle keel hanging code, the side keel is hung on the side keel hanging code, and the ceiling module can be arranged between two adjacent middle keels and between the side keel and the adjacent middle keel; the lower horizontal tube is also provided with a hoop mechanism. The beneficial effects are that: the integrated construction system of the pipeline layout and the suspended ceiling is realized, partial structures of the pipeline layout and the suspended ceiling are shared, the material waste is reduced, the used space is layered without interference, and the structural damage to the building ceiling is reduced; the cable has independent laying space, convenient operation, and the cable heat dissipation separation avoids the heat accumulation to cause the conflagration.)

1. The utility model provides a pipeline of industry and commerce place lays and integrated construction system of furred ceiling which characterized in that: the ceiling comprises a vertical hanging pipe, an upper transverse pipe, a lower transverse pipe, a middle keel, side keels and a ceiling module, wherein two ends of the upper transverse pipe are respectively connected with the side surfaces of the hanging pipe, and the lower transverse pipe is connected with the bottom end of the hanging pipe; a supporting plate hanging weight is hung on the upper transverse pipe, and a cable supporting plate is hung at the bottom of the supporting plate hanging weight; the ceiling module can be arranged between two adjacent middle keels, and can also be arranged between the side keel and the adjacent middle keel; and the lower transverse pipe is also provided with a hoop mechanism for fixing the pipeline.

2. The pipeline laying and ceiling integrated construction system according to claim 1, wherein: the middle part of the supporting plate hanging weight is provided with a clamping groove used for being clamped on an upper transverse pipe, one side of the supporting plate hanging weight is provided with an upper transverse pipe inlet communicated with the clamping groove, the height of the upper transverse pipe inlet is larger than the thickness of the upper transverse pipe, and the bottom of the supporting plate hanging weight is provided with a supporting plate hook plate used for hooking a cable supporting plate.

3. The pipeline laying and ceiling integrated construction system according to claim 2, wherein: the cable support plate is characterized in that a U-shaped support plate hanging hook groove is formed in the top of the cable support plate, the support plate hook plate is inserted into the support plate hanging hook groove, a U-shaped cable support groove is formed in the bottom of the cable support plate, and the support plate hanging hook groove and the cable support groove are located on the same side of the cable support plate.

4. The pipeline laying and ceiling integrated construction system according to claim 1, wherein: the middle keel is formed by bending a metal plate, the middle keel is sequentially divided into a horizontal facing section, two symmetrical horizontal supporting sections, two symmetrical outer clamping sections and two symmetrical inner clamping sections from bottom to top, a U-shaped keel hanging hook groove is formed between each outer clamping section and the adjacent inner clamping section, and the bottom surface of each inner clamping section is an inclined surface facing the adjacent outer clamping section.

5. The pipeline laying and ceiling integrated construction system according to claim 4, wherein: the utility model discloses a keel hanging device, including middle fossil fragments hang yard, the middle fossil fragments hang yard and include the vertical hanger plate section of two sections symmetries and the horizontal installation section of two sections symmetries, and the lower part of every section vertical hanger plate section is equipped with the changeover portion of outside salient, the top of changeover portion is equipped with the fossil fragments hook plate, the fossil fragments hook plate can insert in the fossil fragments hang yard hook groove.

6. The pipeline laying and ceiling integrated construction system according to claim 5, wherein: the spacing distance between the two sections of the inner clamping sections is equal to the spacing distance between the outer side surfaces of the two sections of the vertical hanging plate sections.

7. The pipeline laying and ceiling integrated construction system according to claim 5, wherein: the side keel is half of the middle keel longitudinally cut along the longitudinal plane where the long axis is located, and the side keel hanging code is half of the middle keel hanging code longitudinally cut along the longitudinal plane where the long axis is located.

8. The pipeline laying and ceiling integrated construction system according to claim 1, wherein: the head of the lower transverse pipe is connected with the adjacent building wall through a right-angle corner connector and an expansion bolt, and the head of the lower transverse pipe is connected with the head of the adjacent lower transverse pipe through a straight corner connector and a screw.

9. The pipeline laying and ceiling integrated construction system according to claim 1, wherein: the hoop mechanism comprises a concave-shaped clamping plate, a pipeline U-shaped hoop and a locknut, two ends of the clamping plate are bent by 90 degrees to the same side to form a limiting plate, a round hole is formed in the center of the limiting plate, the head of the pipeline U-shaped hoop penetrates through the round hole from top to bottom and then is in threaded connection with the locknut, and the width of a groove in the middle of the clamping plate is equal to the width of a lower transverse pipe.

Technical Field

The invention relates to the technical field of suspended ceilings, in particular to a pipeline laying and suspended ceiling integrated construction system in an industrial and commercial place.

Background

The existing suspended ceiling mainly uses external thread rods, hanging codes, main keels and secondary keels to build a suspended ceiling mounting framework below a building ceiling, and then a suspended ceiling module is clamped at the bottom of the secondary keels or placed between the secondary keels; the pipelines under the ceilings of the industrial and commercial places are numerous, and the bridges with stable and firm structures are hung under the ceilings of the buildings.

The existing mounting structure has the following problems: 1. the external thread rod of the suspended ceiling, the main keel and the bridge frame of the pipeline are repeated, space interference exists among the external thread rod and the main keel, materials are wasted, the number of holes formed in the building ceiling is increased by the external thread rod, and the structural damage to the building ceiling is large; 2. cables in the existing bridge frame lack independent space, are disordered in cable arrangement, are concentrated in heat, and are easy to interfere and cause fire; 3. the secondary joist of current furred ceiling and the mounting structure of hanging sign indicating number can influence the installation of furred ceiling module.

Disclosure of Invention

The invention aims to overcome the problems in the prior art and provides a pipeline laying and ceiling integrated construction system in industrial and commercial places.

In order to achieve the technical purpose and achieve the technical effect, the invention is realized by the following technical scheme:

a pipeline laying and suspended ceiling integrated construction system for industrial and commercial places comprises vertical hanging pipes, upper transverse pipes, lower transverse pipes, middle keels, side keels and suspended ceiling modules, wherein two ends of each upper transverse pipe are respectively connected with the side faces of the hanging pipe, and the lower transverse pipes are connected with the bottom ends of the hanging pipes; a supporting plate hanging weight is hung on the upper transverse pipe, and a cable supporting plate is hung at the bottom of the supporting plate hanging weight; the ceiling module can be arranged between two adjacent middle keels, and can also be arranged between the side keel and the adjacent middle keel; and the lower transverse pipe is also provided with a hoop mechanism for fixing the pipeline.

The middle part of the supporting plate hanging weight is provided with a clamping groove used for being clamped on an upper transverse pipe, one side of the supporting plate hanging weight is provided with an upper transverse pipe inlet communicated with the clamping groove, the height of the upper transverse pipe inlet is larger than the thickness of the upper transverse pipe, and the bottom of the supporting plate hanging weight is provided with a supporting plate hook plate used for hooking a cable supporting plate; the cable support plate is characterized in that a U-shaped support plate hanging hook groove is formed in the top of the cable support plate, the support plate hook plate is inserted into the support plate hanging hook groove, a U-shaped cable support groove is formed in the bottom of the cable support plate, and the support plate hanging hook groove and the cable support groove are located on the same side of the cable support plate.

The middle keel is formed by bending a metal plate, the middle keel is sequentially divided into a horizontal facing section, two symmetrical horizontal supporting sections, two symmetrical outer clamping sections and two symmetrical inner clamping sections from bottom to top, a U-shaped keel hanging hook groove is formed between each outer clamping section and each adjacent inner clamping section, and the bottom surface of each inner clamping section is an inclined surface facing the adjacent outer clamping section; the middle keel hanging code is formed by punching and bending a metal plate, the middle keel hanging code comprises two symmetrical vertical hanging plate sections and two symmetrical horizontal installation sections, the lower part of each vertical hanging plate section is provided with a transition section protruding outwards, the top of the transition section is provided with a keel hook plate, and the keel hook plate can be inserted into a keel hanging code hook groove; the spacing distance between the two sections of the inner clamping sections is equal to the spacing distance between the outer side surfaces of the two sections of the vertical hanging plate sections.

The side keel is a half of the middle keel longitudinally cut along the longitudinal plane where the long axis is located, and the side keel hanging code is a half of the middle keel hanging code longitudinally cut along the longitudinal plane where the long axis is located.

The head of the lower transverse pipe is connected with the adjacent building wall through a right-angle corner connector and an expansion bolt, and the head of the lower transverse pipe is connected with the head of the adjacent lower transverse pipe through a straight corner connector and a screw.

The hoop mechanism comprises a concave-shaped clamping plate, a pipeline U-shaped hoop and a locknut, two ends of the clamping plate are bent by 90 degrees to the same side to form a limiting plate, a round hole is formed in the center of the limiting plate, the head of the pipeline U-shaped hoop penetrates through the round hole from top to bottom and then is in threaded connection with the locknut, and the width of a groove in the middle of the clamping plate is equal to the width of a lower transverse pipe.

The invention has the beneficial effects that: the integrated construction system of the pipeline layout and the suspended ceiling is realized by combining a plurality of points, so that the pipeline layout and the suspended ceiling share partial structure, the material waste is reduced, the use space is layered without interference, and the structural damage to the building ceiling is reduced; the cable has independent layout space and convenient operation, and the cable is separated in heat dissipation, so that fire caused by heat accumulation is avoided; the mounting structure of middle fossil fragments hanger sign indicating number and middle fossil fragments is noiseless to the installation of furred ceiling module, and the mounting structure of side fossil fragments hanger sign indicating number and side fossil fragments is noiseless to the installation of furred ceiling module.

Drawings

The accompanying drawings, which are included to provide a further understanding of the invention and are incorporated in and constitute a part of this application, illustrate embodiment(s) of the invention and together with the description serve to explain the invention without limiting the invention. In the drawings:

FIG. 1 is a schematic structural diagram of an integrated construction system according to an embodiment of the present invention;

FIG. 2 is a schematic structural diagram of a cable tray in an embodiment of the invention;

FIG. 3 is a schematic structural diagram of a pallet sling according to an embodiment of the present invention;

figure 4 is a schematic structural view of a center keel in an embodiment of the invention;

figure 5 is a schematic structural view of a center keel hoist in an embodiment of the invention;

figure 6 is a schematic structural view of a lateral keel according to an embodiment of the invention;

figure 7 is a schematic structural view of a side keel hoist according to an embodiment of the invention;

fig. 8 is a schematic structural diagram of the hoop mechanism in the embodiment of the present invention.

Detailed Description

The present invention will be described in detail below with reference to the accompanying drawings in conjunction with embodiments.

As shown in fig. 1, the pipeline layout and ceiling integrated construction system for industrial and commercial places comprises a vertical hanging pipe 1, an upper horizontal pipe 2, a lower horizontal pipe 3, a middle keel 7, side keels 9 and a ceiling module 10, wherein two ends of the upper horizontal pipe 2 are respectively connected with the side surfaces of the hanging pipe 1, the lower horizontal pipe 3 is connected with the bottom end of the hanging pipe, and the upper horizontal pipe 2 is positioned above the lower horizontal pipe 3; a supporting plate hanging weight 4 is hung on the upper transverse pipe 2, and a cable supporting plate 5 is hung at the bottom of the supporting plate hanging weight 4; the bottom of the lower transverse pipe 3 is provided with a middle keel hanging code 6 and a side keel hanging code 8, the middle keel 7 is hung on the middle keel hanging code 6, the side keel 9 is hung on the side keel hanging code 8, the ceiling module 10 can be arranged between two adjacent middle keels 7, and the ceiling module 10 can also be arranged between the side keel 9 and the adjacent middle keel 7; the lower horizontal tube 3 is also provided with a hoop mechanism 11 for fixing the pipeline.

As shown in fig. 1, the head of the lower horizontal tube 3 is connected with the adjacent building wall through a right-angle corner connector 12 and an expansion bolt, the right-angle corner connector is connected with the head of the lower horizontal tube through a self-tapping screw, so that the firmness and the supporting strength of the head of the lower horizontal tube 3 are increased, and the support of a pipeline is facilitated, and the head of the lower horizontal tube 3 is connected with the head of the adjacent lower horizontal tube 3 through a straight-line corner connector (not shown in the figure) and a screw, so that the butt joint of the two lower horizontal tubes 3 on the same straight line is facilitated.

This embodiment utilizes the hanging tube to build the pipeline with violently the cooperation of pipe down and lays the installing support that shares with the furred ceiling, utilize to violently manage on, the cable is laid to layer board hanging sign indicating number and cable layer board cooperation, utilize violently the pipe is laid with the cooperation of staple bolt mechanism to manage down, utilize middle skeleton hanging sign indicating number, middle skeleton, side skeleton hanging sign indicating number, the side skeleton cooperation is installed and is violently managed the below under, the furred ceiling module can be installed between two adjacent middle skeletons and between adjacent middle skeleton and the side skeleton, to sum up several points have realized that the pipeline is laid and the integrated construction system of furred ceiling, it is extravagant to make the pipeline lay and realize partial structure sharing with the furred ceiling, the usage space layering is noiseless, reduce the structural damage to building ceiling.

As shown in fig. 2 and 3, a clamping groove 13 for clamping on the upper transverse pipe is arranged in the middle of the supporting plate hanging weight 4, an upper transverse pipe inlet 14 communicated with the clamping groove 13 is arranged on one side of the supporting plate hanging weight 4, the height of the upper transverse pipe inlet 14 is greater than the thickness of the upper transverse pipe 2, and a supporting plate hook plate 15 for hooking the cable supporting plate 5 is arranged at the bottom of the supporting plate hanging weight 4; the top of the cable supporting plate 5 is provided with a U-shaped supporting plate hanging hook groove 16, the supporting plate hook plate 15 is inserted into the supporting plate hanging hook groove 16, the cable supporting plate 5 is hung on the supporting plate hanging hook 4, the bottom of the cable supporting plate 5 is provided with a U-shaped cable bracket 17, and the supporting plate hanging hook groove 16 and the cable bracket 17 are located on the same side of the cable supporting plate 5, so that the gravity center stability is facilitated.

This technical scheme utilizes the cable to hold in the palm the groove and holds the cable, when the cable was wanted the side branch, the cable clamp was fixed the cable before and after the branch to installation line card on the cable layer board of branch department. The cable supporting plate enables adjacent cables to be mutually isolated, so that the trend and the layout of the cables are clear, and the cables are convenient to maintain and replace; interference between different cables can be blocked; but also can isolate the fire source, avoid causing the ignition of all cables when two cables are on fire.

As shown in fig. 4 and 5, the middle keel 7 is formed by bending a metal plate, the middle keel 7 is sequentially divided into a horizontal facing section 18, two symmetrical horizontal supporting sections 19, two symmetrical outer clamping sections 20 and two symmetrical inner clamping sections 21 from bottom to top, a U-shaped keel hanging hook groove 22 is formed between each outer clamping section 20 and each adjacent inner clamping section 21, and the bottom surface of each inner clamping section 21 is an inclined surface facing the adjacent outer clamping section 20; the middle keel hanging bracket 6 is formed by punching and bending a metal plate, the middle keel hanging bracket 6 comprises two symmetrical vertical hanging plate sections 23 and two symmetrical horizontal mounting sections 24, the horizontal mounting sections are connected with the lower horizontal pipe through screws, the lower part of each vertical hanging plate section 23 is provided with a transition section 25 protruding outwards, the top of each transition section 25 is provided with a keel hook plate 26, and the keel hook plates 26 can be inserted into the keel hanging bracket hook grooves 22; the spacing distance between the two inner clamping sections 21 is equal to the spacing distance between the outer side surfaces of the two vertical hanger plate sections 23. This middle fossil fragments hang sign indicating number lower part can insert in the middle fossil fragments to through fossil fragments hook plate and fossil fragments hang sign indicating number hook slot cooperation make the middle fossil fragments hang on middle fossil fragments hang sign indicating number, middle fossil fragments hang the sign indicating number and do not have the interference to the horizontal support section and the outer clamping section of middle fossil fragments, be favorable to the installation of furred ceiling module.

As shown in fig. 6 and 7, the side keel 8 is a half of the middle keel 7 longitudinally cut along a longitudinal plane where a long axis of the middle keel is located, that is, the side keel 8 is sequentially divided into a horizontal facing section 18, a horizontal supporting section 19, an outer clamping section 20 and an inner clamping section 21 from bottom to top, a U-shaped keel hanging hook groove 22 is formed between the outer clamping section 20 and the adjacent inner clamping section 21, and the bottom surface of the inner clamping section 21 is an inclined surface facing the adjacent outer clamping section 20; side fossil fragments hang sign indicating number 8 for middle fossil fragments hang sign indicating number 6 along half after its major axis place longitudinal plane rip cutting, and side fossil fragments hang sign indicating number 8 includes vertical hanger plate section 23 and horizontal installation section 24 of looks vertically promptly, for the horizontal installation section screw and horizontal union coupling down, the lower part of vertical hanger plate section 23 is equipped with outside outstanding changeover portion 25, the top of changeover portion 25 is equipped with fossil fragments hook plate 26, fossil fragments hook plate 26 can insert in fossil fragments hang sign indicating number hook slot 22. This curb plate fossil fragments hanging sign indicating number catches on the side fossil fragments from the one side of keeping away from the horizontal support section, and the side fossil fragments hanging sign indicating number is noiseless to the horizontal support section and the outer clamping section of side fossil fragments, is favorable to the installation of furred ceiling module.

As shown in fig. 8, the hoop mechanism 11 includes a concave-shaped clamp plate 27, a pipeline U-shaped hoop 28, and a lock nut 29, two ends of the clamp plate 27 are bent by 90 degrees to the same side to form a limit plate 30, a circular hole is formed in the center of the limit plate 30, the head of the pipeline U-shaped hoop 28 passes through the circular hole from top to bottom and then is screwed with the lock nut 29, and the width of the groove in the middle of the clamp plate 27 is equal to the width of the lower horizontal tube 3.

The foregoing shows and describes the general principles, essential features, and advantages of the invention. It will be understood by those skilled in the art that the present invention is not limited to the embodiments described above, which are described in the specification and illustrated only to illustrate the principle of the present invention, but that various changes and modifications may be made therein without departing from the spirit and scope of the present invention, which fall within the scope of the invention as claimed.