Construction device for toilet waterproof system and construction method thereof

文档序号:1885737 发布日期:2021-11-26 浏览:28次 中文

阅读说明:本技术 一种卫生间防水系统用施工装置及其施工方法 (Construction device for toilet waterproof system and construction method thereof ) 是由 胡长弟 于 2021-09-23 设计创作,主要内容包括:本申请涉及建筑装饰技术领域,尤其涉及一种卫生间防水系统用施工装置及其施工方法,施工装置包括涂料辊、储料箱、摩擦件和吸尘器,涂料辊内开设有空腔,涂料辊外周壁上开设有多个与空腔相连通的通孔,储料箱与涂料辊相互连通,涂料经储料箱传输至空腔中,再经通孔流到涂料辊外周壁;摩擦件有助于将地面和墙板上的凸块和尖刺磨平,吸尘器有助于将地面和墙板上的灰尘及混凝土碎渣清理、吸收干净。在设置涂料层,本申请具有避免往复蘸取防水涂料、提高卫生间防水施工效率的效果。(The application relates to the technical field of architectural decoration, in particular to a construction device for a toilet waterproof system and a construction method thereof, wherein the construction device comprises a coating roller, a storage box, a friction piece and a dust collector, a cavity is formed in the coating roller, a plurality of through holes communicated with the cavity are formed in the peripheral wall of the coating roller, the storage box is communicated with the coating roller, and coating is transmitted into the cavity through the storage box and then flows to the peripheral wall of the coating roller through the through holes; the friction piece helps to grind the bumps and the spikes on the ground and the wall board flat, and the dust collector helps to clean and absorb the dust and the concrete debris on the ground and the wall board. Set up the dope layer, this application has the effect of avoiding reciprocating dipping in water proof coating, improving the waterproof efficiency of construction in bathroom.)

1. The utility model provides a bathroom is construction equipment for waterproof system which characterized in that includes:

the storage assembly comprises a storage box (1) for storing paint;

the coating component is positioned below the storage box (1) and comprises a coating roller (2), a cavity (21) is formed in the coating roller (2), and a plurality of through holes (22) communicated with the cavity (21) are formed in the outer wall of the coating roller (2);

and an auxiliary assembly (3), the auxiliary assembly (3) being adapted to transfer paint from the magazine (1) into the cavity (21).

2. The construction device for the toilet waterproofing system according to claim 1, wherein the auxiliary assembly (3) comprises a water pump, and the water pump is communicated with the storage tank (1).

3. The construction device for the toilet waterproof system according to claim 2, wherein a hose (11) is arranged in the storage tank (1), and the hose (11) is outwardly arranged in the storage tank (1) and then communicated with the water pump.

4. A construction equipment for a toilet waterproofing system according to claim 3, wherein a weight block (111) is provided at an end of the hose (11) remote from the water pump.

5. A construction device for a waterproofing system for toilets according to claim 1, wherein said auxiliary assembly (3) comprises:

the outer peripheral wall of the push plate (32) is abutted against the inner peripheral wall of the material storage box (1);

the push plate (32) is driven to slide along a driving piece (33) on the inner wall of the storage box (1), one end of the driving piece (33) is fixedly connected to the side wall of one side of the push plate (32), and the other end of the driving piece (33) is fixedly connected to the inner side wall of one side of the storage box (1).

6. The construction device for the toilet waterproofing system according to claim 1, wherein: a friction piece (4) is arranged on one side of the coating roller (2);

a bearing plate (5) is arranged on the lower bottom surface of the material storage box (1);

the bearing plate (5) is provided with a motor (51) for driving the friction piece (4) to rotate and grind bumps and spikes on the ground and the wall.

7. The construction device for the toilet waterproofing system according to claim 6, wherein: a dust collector (52) is arranged on the bearing plate (5), and a dust suction pipe of the dust collector (52) penetrates through the bearing plate (5) downwards and is connected with a dust suction nozzle (521).

8. The construction method of a construction apparatus for a waterproof system of a toilet according to any one of claims 1 to 7, wherein: the method comprises the following steps:

step 1: a ground leveling layer (61) is arranged on the toilet ground base layer (6), and a wall body (7) leveling layer is arranged on the wall body (7);

step 2: leveling, cleaning and coating the ground leveling layer (61) and the wall body (7) leveling layer by using a construction device to form a ground coating layer (62) and a wall body (7) coating layer;

and step 3: arranging a filling layer (63) on the ground coating layer (62);

and 4, step 4: and a floor brick layer (64) is arranged on the filling layer (63), and a wall brick layer (73) is arranged on the paint layer of the wall body (7).

Technical Field

The application relates to the technical field of architectural decoration, in particular to a construction device for a toilet waterproof system and a construction method of the construction device.

Background

Building leakage, referred to as building "cancer," has become the second biggest problem affecting building quality in addition to building structure, having a significant impact on building safety and building life. Among other things, toilet leakage is a large proportion of many building leakage problems due to the uniqueness of toilet nature and structure. Therefore, how to make the toilet water leakage is an extremely important and indispensable component for solving the problem of building leakage.

In the related art, in order to solve the problem of water resistance of a toilet, a leveling layer, a waterproof coating layer, a tile layer and other structural layers are generally arranged on a base layer of the toilet, and when a waterproof coating layer is arranged, a constructor is generally required to use a coating roller to coat the leveling layer.

In view of the above-mentioned related technologies, the inventor believes that when a waterproof layer is applied, a constructor needs to put a paint roller into a container filled with paint to dip the paint once every time the constructor applies the paint, which not only wastes time and labor, but also greatly slows down the construction efficiency.

Disclosure of Invention

In order to avoid reciprocating dipping waterproof coating, improve the waterproof construction efficiency in bathroom, the application provides a construction equipment for bathroom waterproof system and bathroom waterproof system's construction method.

The application provides a construction equipment for bathroom waterproofing system and construction method of bathroom waterproofing system, adopts following technical scheme:

a construction device for a toilet waterproof system, comprising:

the storage assembly comprises a storage box for storing paint;

the coating assembly is positioned below the storage box and comprises a coating roller, a cavity is formed in the coating roller, and a plurality of through holes communicated with the cavity are formed in the outer wall of the coating roller;

and an auxiliary assembly for transferring paint in the storage bin from the storage bin into the cavity.

Through adopting above-mentioned technical scheme, the storage incasement is packed into to the coating that will stir, in the cavity in transmitting the coating roller through auxiliary assembly with the coating in the storage incasement, coating flows out to the coating roller surface through the through-hole, promote construction equipment and make the coating roller rotate on ground and wall body, coating is along with the coating roller rotates and is scribbled and roll on ground and wall, in the whole process, the constructor can continuously scribble and roll, coating consumption up to the storage incasement is gone up, need not to scribble and roll and just dip in once to the storage incasement and get coating, time saving and labor saving not only, still help improving bathroom waterproofing efficiency.

Optionally, the auxiliary assembly comprises a water pump, and the water pump is communicated with the storage tank.

Through adopting above-mentioned technical scheme, open the water pump, in the cavity in storage incasement coating pumped to the applicator roll through the water pump, coating lasted again and flowed from the through-hole, helped the incessant coating of paining of constructor to avoided the applicator roll to dip in coating from the storage incasement reciprocal.

Optionally, a hose is arranged in the storage box, and the hose penetrates through the storage box outwards and then is communicated with the water pump.

Through adopting above-mentioned technical scheme, when carrying out the coating with construction equipment to the wall, construction equipment takes place the slope, and the coating can be flowed to storage incasement relative low department under its self action of gravity, and the hose easily buckles to help making the hose end deflect to storage incasement relative low department under its self action of gravity.

Optionally, one end of the hose, which is far away from the water pump, is provided with a balancing weight.

Through adopting above-mentioned technical scheme, the balancing weight slides toward the storage incasement relative low department under its self action of gravity, and the balancing weight slides and then helps further to drive the end that the hose kept away from water pump one end and remove to the storage incasement relative low department in the lump to help carrying the coating in the storage incasement to the cavity.

Optionally, the auxiliary assembly includes:

the outer peripheral wall of the push plate is abutted against the inner peripheral wall of the material storage box;

the drive the push pedal is followed the gliding driving piece of storage case inner wall, driving piece one end fixed connection in push pedal one side lateral wall, the driving piece other end fixed connection in storage case one side inside wall.

Through adopting above-mentioned technical scheme, start the driving piece, the driving piece promotes the push pedal and slides along the storage tank wall, and the push pedal then promotes coating and removes to keeping away from driving piece one end for the coating in the storage tank fills up the cavity of keeping away from driving piece one side in the storage tank all the time, thereby helps carrying the coating in the storage tank to the cavity in.

Optionally, a friction piece is arranged on one side of the coating roller;

a bearing plate is arranged on the lower bottom surface of the material storage box;

the bearing plate is provided with a motor for driving the friction piece to rotate and grind bumps and spikes on the ground and the wall.

By adopting the technical scheme, the motor is started, the motor drives the friction piece to rotate, the friction piece is in contact with the convex block or the sharp thorn and the convex block or the sharp thorn is polished to be smooth after continuous friction, not only is subsequent coating construction facilitated, but also the time for polishing the ground and the wall by using a polishing tool independently is saved, and the improvement of the waterproof construction efficiency of a toilet is facilitated.

Optionally, a dust collector is arranged on the bearing plate, and a dust collection pipe of the dust collector penetrates through the bearing plate downwards and is connected with a dust collection nozzle.

Through adopting above-mentioned technical scheme, when the friction piece was polished lug and spine, can produce a large amount of dusts and concrete disintegrating slag, the dust catcher helps absorbing dust and concrete disintegrating slag, not only makes things convenient for following coating construction, still helps preventing that the dust from being inhaled the dust by constructor and causing the influence to constructor health.

On the other hand, the construction method of the construction device for the toilet waterproof system provided by the application adopts the following technical scheme:

a construction method of a construction device for a toilet waterproofing system comprises the following steps:

step 1: arranging a ground leveling layer on the ground base layer of the toilet and arranging a wall leveling layer on the wall;

step 2: leveling, cleaning and coating the ground leveling layer and the wall leveling layer by using a construction device to form a ground coating layer and a wall coating layer;

and step 3: arranging a filling layer on the ground coating layer;

and 4, step 4: and a floor brick layer is arranged on the filling layer, and a wall brick layer is arranged on the wall coating layer.

By adopting the technical scheme, the ground leveling layer and the wall leveling layer are arranged, so that the waterproof coating can be conveniently smeared; leveling and cleaning, namely further grinding the bumps and the sharp spines on the ground leveling layer and the wall leveling layer, and cleaning up dust, so that the waterproof coating can be adhered to the ground leveling layer and the wall leveling layer more closely; the filling layer is arranged to help adjust the height of the toilet; the provision of floor tiles and wall tiles helps to further enhance the waterproofing of the toilet waterproofing system.

In summary, the present application includes at least one of the following beneficial technical effects:

1. the stirred paint is filled into the storage box, the paint in the storage box is transmitted into a cavity in the paint roller through the auxiliary assembly, the paint flows out of the outer surface of the paint roller through the through hole, the construction device is pushed, the paint roller rotates on the ground and a wall, the paint is coated and rolled on the ground and the wall along with the rotation of the paint roller, and in the whole process, a constructor can continuously coat and roll until the paint in the storage box is consumed, and the paint is not required to be dipped into the storage box once every time the paint is coated and rolled, so that the time and the labor are saved, and the waterproof construction efficiency of a toilet is improved;

2. the motor is started, the motor drives the friction piece to rotate, the friction piece is in contact with the convex block or the sharp thorn and the convex block or the sharp thorn is polished to be smooth after continuous friction, not only is subsequent coating construction facilitated, but also the time for polishing the ground and the wall by using a polishing tool independently is saved, and the waterproof construction efficiency of a toilet is improved.

Drawings

Fig. 1 is an overall schematic view of a construction apparatus for a toilet waterproofing system according to embodiment 1 of the present application.

Fig. 2 is an overall schematic view of a construction apparatus for a toilet waterproofing system according to embodiment 1 of the present application.

Fig. 3 is a sectional view of a plan view of a construction apparatus for a waterproof system of a toilet according to embodiment 1 of the present application.

Fig. 4 is an overall schematic view of a construction apparatus for a toilet waterproofing system according to embodiment 2 of the present application.

Fig. 5 is a sectional view of a plan view of a construction apparatus for a toilet waterproofing system according to embodiment 2 of the present application.

Description of reference numerals:

1. a material storage box; 11. a hose; 111. a balancing weight; 12. a delivery pipe; 121. a valve; 2. a paint roller; 21. a cavity; 22. a through hole; 23. rolling fur; 3. an auxiliary component; 31. a flow guide pipe; 32. pushing the plate; 33. a drive member; 4. a friction member; 5. a carrier plate; 51. an electric motor; 511. a transmission rod; 52. a vacuum cleaner; 521. a dust suction nozzle; 53. a protective cover; 531. a roller; 54. a grab bar; 541. a hinge; 542. a connecting belt; 543. a waistband; 544. magic tape; 55. a connecting rod; 6. a ground substrate; 61. a ground leveling layer; 62. a ground coating layer; 63. a filling layer; 64. a floor tile layer; 7. a wall body; 71. a wall leveling layer; 72. a wall coating layer; 73. and (5) a wall brick layer.

Detailed Description

The present application is described in further detail below with reference to figures 1-5.

The embodiment of the application discloses bathroom is construction equipment for waterproof system.

Example 1

Referring to fig. 2-3, the present application provides a construction apparatus for a toilet waterproofing system, including a storage component, a coating component, and an auxiliary component 3;

the storage assembly comprises a storage box 1 for storing paint, the storage box 1 is in a hollow cylindrical shape, a conveying pipe 12 is communicated with the storage box 1, the conveying pipe 12 is used for injecting the paint into the storage box 1, a valve 121 is arranged on the conveying pipe 12, and the valve 121 controls the opening and closing of the conveying pipe 12.

Be provided with hose 11 in the storage case 1, fixedly connected with balancing weight 111 is established to hose 11 one end department cover near the top, and when using construction equipment to carry out coating to the wall, the coating flows to storage case 1 interior relative low department along with its self gravity, and balancing weight 111 helps making hose 11 end be located storage case 1 interior relative low department all the time.

Hose 11 keeps away from balancing weight 111 one end and communicates in auxiliary assembly 3, and auxiliary assembly 3 sets up to the water pump, and hose 11 communicates in the water pump input, and water pump output end communicates has honeycomb duct 31, and honeycomb duct 31 keeps away from water pump one end and communicates in coating components.

Coating assembly includes applicator roll 2, applicator roll 2 is located storage tank 1 below, cavity 21 has been seted up in applicator roll 2, honeycomb duct 31 rotates to be connected in 2 roller axle one ends of applicator roll, and communicate in cavity 21, set up a plurality of through-holes 22 that are linked together with cavity 21 on the 2 outer walls of applicator roll, a plurality of through-holes 22 evenly distributed is in 2 periphery walls of applicator roll, not only the ejection of compact is fast, and at the 2 rotation in-process of applicator roll, 2 periphery walls of applicator roll and ground or wall contact department, all there is the coating to flow out, it paints inhomogeneous condition appearance to have reduced the coating.

The coating roller 2 is sleeved with a fur roll 23 fixedly connected with the coating roller, and the fur roll 23 can be made of materials with strong adsorbability, such as wool or synthetic fibers, and is beneficial to coating and rolling the coating more uniformly.

The upper surface of the bearing plate 5 is fixedly connected with a motor 51, an output shaft of the motor 51 penetrates through the bearing plate 5 downwards and then is fixedly connected with a transmission rod 511, one end, far away from the motor 51, of the transmission rod 511 is fixedly connected with a friction piece 4, and the friction piece 4 can be a friction plate or a grinding wheel. The friction piece 4 and the bearing plate 5 are horizontally arranged.

The dust collector 52 is arranged between the motor 51 and the storage box 1, a dust suction pipe of the dust collector 52 downwards penetrates through the bearing plate 5 and then is sleeved with the dust suction nozzle 521, the dust suction nozzle 521 is arranged in parallel with the coating roller 2, the dust suction nozzle 521 is opened towards one end far away from the bearing plate 5, dust and concrete debris can be conveniently absorbed, the length of the dust suction nozzle 521 is equal to that of the coating roller 2, and the absorption range is larger.

The lower bottom surface fixedly connected with loading board 5 of storage case 1 is connected with protection casing 53 on the loading board 5 lateral wall, and friction member 4 all is located protection casing 53 with dust absorption mouth 521. When pushing away construction equipment and scribbling coating, the friction piece 4 rubs each other with lug or spine and produces dust and concrete disintegrating slag easily, and protection casing 53 not only helps preventing dust loss and the sputtering of concrete disintegrating slag, still helps preventing friction piece 4 accidental injury constructor. The side of the shield 53 away from the carrier plate 5 is rotatably connected with rollers 531 to reduce friction between the shield 53 and the ground, specifically, two rollers 531 are disposed on two side walls parallel to the paint roller 2 in this embodiment.

The lower surface of the bearing plate 5 is fixedly connected with the handrails 54, so that a constructor can conveniently operate the construction device, the number of the handrails 54 is two, and the two handrails 54 are arranged in parallel. The grab bar 54 is hinged to the loading plate 5 by a hinge 541 so as to adjust the angle between the loading plate 5 and the grab bar 54, thereby adapting to construction conditions of different slopes.

Two connecting rods 55 are fixedly connected to the side walls of the two sides of the bearing plate, and the two connecting rods 55 are respectively and rotatably connected to roll shafts at the two ends of the coating roller 2.

Be provided with connecting band 542 on handrail 54, it is concrete, connecting band 542 fixed connection is on two handrail 54 in this embodiment, connecting band 542 keeps away from handrail 54 one end fixedly connected with waistband 543, waistband 543 comprises cotton material, waistband 543 width sets up to 15cm, waistband 543 keeps away from connecting band 542 one end and sets up magic subsides 544 of laminating each other, tie up waistband 543 at constructor waist, not only help sharing the handheld construction device's of constructor weight, the vibration that produces when construction device work also helps massaging the constructor waist, alleviate the waist fatigue that constructor long-term work produced.

The application embodiment 1 a construction equipment for toilet waterproofing system's implementation principle does: opening a valve 121, injecting the uniformly stirred coating into the storage box 1 from the conveying pipe 12, and closing the valve 121; the water pump is started to convey the paint in the storage tank 1 to the cavity 21 in the paint roller 2, the paint flows out through the through hole 22, the dust collector 52 and the motor 51 are started, the friction piece 4 is beneficial to grinding bumps and sharp spines on the ground and the wall, the dust collector 52 is beneficial to absorbing dust and concrete broken slag generated by the friction piece 4, the protective cover 53 is beneficial to preventing dust from escaping and concrete broken slag from sputtering, the hand-held rod 54 is held to push the construction device, so that the paint roller 2 rotates, and the paint can be coated on the ground and the wall along with the rotation of the paint roller 2.

In the case of the example 2, the following examples are given,

referring to fig. 4 to 5, the present embodiment differs from embodiment 1 in that: the auxiliary assembly 3 includes push pedal 32 and cylinder, push pedal 32 sets to the cylindrical form, push pedal 32 periphery wall and the complete butt of storage case 1 internal perisporium, applicator roll 2 roller bearing one end runs through there is honeycomb duct 31, the honeycomb duct 31 other end runs through storage case 1 one side lateral wall and is close to loading board 5 department, driving piece 33 can be cylinder or pneumatic cylinder, adopt the cylinder in this embodiment, piston rod of the cylinder fixed connection is in push pedal 32 one side, push pedal 32 one end fixed connection is kept away from to the cylinder and is close to handle 542 one side lateral wall in storage case 1.

Referring to fig. 1, an embodiment of the present application discloses a construction method of a construction device for a toilet waterproofing system, the construction method including the steps of:

step 1: a ground leveling layer 61 is arranged on the toilet ground base layer 61, and a wall body 7 leveling layer is arranged on the wall body 7;

the method comprises the following steps: leveling, cleaning and coating the ground leveling layer 61 and the wall body 7 leveling layer by using a construction device to form a ground coating layer 62 and a wall body 7 coating layer;

the method comprises the following steps: a filling layer 63 is arranged on the ground coating layer 62;

the method comprises the following steps: and a floor brick layer 64 is arranged on the filling layer 63, and a wall brick layer 73 is arranged on the paint layer of the wall body 7.

The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.