Mounting method of steam turbine condenser

文档序号:1949941 发布日期:2021-12-10 浏览:14次 中文

阅读说明:本技术 一种汽轮机凝汽器的安装方法 (Mounting method of steam turbine condenser ) 是由 岳伟伟 曹秀景 王东兴 王春雨 于 2021-08-06 设计创作,主要内容包括:本发明公开了一种汽轮机凝汽器的安装方法,先在空压机冷却器基础和凝汽器基础之间的间隙中安装垂直安装工装,使确保运输至凝汽器基础的道路通畅;再通过运输移动平台将凝汽器经过垂直安装工装运输到凝汽器基础的正上方;在垂直安装工装的两侧设置有可拆卸支撑件,可拆卸支撑件的下端设置有第一千斤顶,通过第一千斤顶将可拆卸支撑件和凝汽器一起顶起,再将运输移动平台移出;在凝汽器基础上侧原来运输移动平台所在的位置设置若干个第二千斤顶,将凝汽器顶起,调整凝汽器的标高,同时使可拆卸支撑件与凝汽器分开脱离,将可拆卸支撑件和第一千斤顶一起取出。本发明操作简单,可以将凝汽器快速、安全地垂直提升至安装位置,并完成调整工作。(The invention discloses an installation method of a steam turbine condenser, which comprises the steps of firstly installing a vertical installation tool in a gap between an air compressor cooler foundation and a condenser foundation to ensure that a road transported to the condenser foundation is smooth; then, transporting the condenser to the position right above a condenser foundation through a vertical installation tool by using a transport mobile platform; detachable supporting pieces are arranged on two sides of the vertical installation tool, a first jack is arranged at the lower end of each detachable supporting piece, the detachable supporting pieces and the condenser are jacked up together through the first jacks, and then the transportation moving platform is moved out; the position of original transport moving platform place of upside sets up a plurality of second jack on condenser basis, with condenser jack-up, the elevation of adjustment condenser makes detachable support piece and condenser separately break away from simultaneously, will detach support piece and first jack and take out together. The invention has simple operation, can quickly and safely vertically lift the condenser to the installation position and finish the adjustment work.)

1. A method for installing a turbine condenser is characterized by comprising the following steps:

s1: a vertical installation tool (4) is installed in a gap between the air compressor cooler foundation (1) and the condenser foundation (2), and the upper end face of the vertical installation tool (4) is flush with the upper end faces of the air compressor cooler foundation (1) and the condenser foundation (2), so that the smooth road for transporting to the condenser foundation (2) is ensured;

s2: the condenser (8) is transported to the position right above the condenser foundation (2) through the vertical installation tool (4) by the transport mobile platform (3);

s3: detachable supporting pieces (5) are arranged on two sides of the vertical installation tool (4), at least one first jack (6) is arranged at the lower end of each detachable supporting piece (5), the detachable supporting pieces (5) and the condenser (8) are jacked up through the first jacks (6), and then the transportation moving platform (3) is moved out of one side of the condenser foundation (2);

s4: arranging a plurality of second jacks (9) at the position of the original transportation moving platform (3) on the upper side of the condenser foundation (2), jacking the condenser (8), adjusting the elevation of the condenser (8), separating the detachable support piece (5) from the condenser (8), and taking out the detachable support piece (5) and the first jack (6) together;

s5: and taking out the vertical installation tool (4) between the air compressor cooler foundation (1) and the condenser foundation (2).

2. The method of installing a turbine condenser according to claim 1, wherein: the vertical installation tool (4) comprises a plurality of supporting legs and a cross beam arranged at the upper ends of the supporting legs, and the length of the cross beam is matched with the width of a gap between the air compressor cooler foundation (1) and the condenser foundation (2).

3. The method of installing a turbine condenser according to claim 2, wherein: and a base plate (11) crossing the air compressor cooler foundation (1) and the condenser foundation (2) is laid on the upper side of the vertical installation tool (4).

4. The method of installing a turbine condenser according to claim 1, wherein: the transportation moving platform (3) is composed of a frame supporting plate and a plurality of roller mechanisms positioned at the lower end of the supporting plate, and the protruding part at the lower end of the condenser (8) is placed on the frame supporting plate.

5. The method of installing a turbine condenser according to claim 1, wherein: the detachable supporting piece (5) is an H-shaped steel beam, and first jacks (6) are mounted at two ends of the lower side of the detachable supporting piece.

6. The method of installing a turbine condenser according to claim 1, wherein: the upside of condenser basis (2) be provided with a plurality of and reserve hole (10), condenser basis (2) on be provided with the steel sheet that will reserve hole (10) and cover.

Technical Field

The invention relates to the field of large-scale equipment installation and construction, in particular to an installation method of a steam turbine condenser.

Background

In recent years, with the increase of large-scale refining projects and coal chemical projects, steam turbines are increasingly applied, and the installation method and the installation accuracy of the steam condenser as an important component of the steam turbine are particularly important. According to the past construction experience, the condenser is located under the steam turbine, the steam turbine needs high-strength concrete support due to the fact that the steam turbine is heavy, the condenser is located under the steam turbine, and the steam turbine is hoisted firstly and then the condenser is hoisted. The operation space between the condenser and the steam turbine is narrow, the steam turbine and the condenser are in seamless connection and have no adjustable space, only the gap between the basic sizing blocks can be used as a transportation space and a vertical adjustment space, a crane cannot be used normally for hoisting, and the steam turbine can be conveyed into the space only by a horizontal transportation tool.

Disclosure of Invention

The invention provides a method for installing a steam turbine condenser, which can quickly and safely vertically lift the steam condenser to an installation position and finish the adjustment work.

In order to achieve the purpose, the invention provides the following technical scheme: a method for installing a turbine condenser comprises the following steps:

s1: a vertical installation tool is installed in a gap between the air compressor cooler foundation and the condenser foundation, and the upper end face of the vertical installation tool is flush with the upper end faces of the air compressor cooler foundation and the condenser foundation, so that the smooth road for transporting to the condenser foundation is ensured;

s2: transporting the condenser to the position right above a condenser foundation through a vertical installation tool by using a transport mobile platform;

s3: detachable supporting pieces are arranged on two sides of the vertical installation tool, at least one first jack is arranged at the lower end of each detachable supporting piece, the detachable supporting pieces and the condenser are jacked up together through the first jacks, and then the transportation moving platform is moved out from one side of the condenser foundation;

s4: arranging a plurality of second jacks at the position of the original transportation mobile platform on the upper side of the base of the condenser, jacking the condenser, adjusting the elevation of the condenser, separating the detachable supporting piece from the condenser, and taking out the detachable supporting piece and the first jack together;

s5: and taking out the vertical installation tool between the cooler foundation and the condenser foundation of the air compressor.

Preferably, the vertical installation tool comprises a plurality of support legs and a cross beam arranged at the upper ends of the support legs, and the length of the cross beam is matched with the width of a gap between the air compressor cooler foundation and the condenser foundation.

Preferably, a base plate crossing the air compressor cooler foundation and the condenser foundation is laid on the upper side of the vertical installation tool.

Preferably, the transportation moving platform consists of a frame supporting plate and a plurality of roller mechanisms positioned at the lower end of the supporting plate, and the protruding part at the lower end of the condenser is placed on the frame supporting plate.

Preferably, the detachable supporting piece is an H-shaped steel beam, and first jacks are mounted at two ends of the lower side of the detachable supporting piece.

Preferably, the upside of condenser basis be provided with a plurality of and reserve the hole, condenser basis on be provided with the steel sheet that will reserve the hole and cover.

Compared with the prior art, the invention has the beneficial effects that:

the condenser is transported to the condenser foundation by utilizing the transporting and moving platform, the jack is used for multiple times, the limited position capable of bearing force at the bottom of the condenser is skillfully utilized, the transporting and moving platform and the detachable supporting piece are taken out, meanwhile, the jacking and adjusting of the condenser are also met, tools used in the method can be reused, the problems of vertical transportation and installation are solved, and the method is also suitable for the transportation work of other large-scale equipment in a limited space.

Drawings

FIG. 1 is a schematic top view of the installation process of the present invention;

fig. 2 is a front view of the installation process of the present invention.

Reference numerals:

1. air compressor machine cooler basis, 11, backing plate, 2, condenser basis, 3, transportation moving platform, 4, perpendicular installation frock, 5, can dismantle support piece, 6, first jack, 7, steam turbine, 8, condenser, 9, second jack, 10, reservation hole.

Detailed Description

In the following, the technical solutions in the embodiments of the present invention will be clearly and completely described with reference to the drawings in the embodiments of the present invention, and it should be noted that all directional indicators (such as up, down, left, right, front, and back) in the embodiments of the present invention are only used for explaining a relative position relationship between components, a motion situation, and the like in a certain specific posture (as shown in the drawings), and if the specific posture is changed, the directional indicator is changed accordingly.

In addition, the descriptions related to "first", "second", etc. in the present invention are only for descriptive purposes and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include at least one such feature. In the description of the present invention, "a plurality" means at least two, e.g., two, three, etc., unless explicitly specifically defined otherwise.

In the present invention, unless otherwise expressly stated or limited, the terms "connected," "secured," and the like are to be construed broadly, and for example, "secured" may be a fixed connection, a removable connection, or an integral part; can be mechanically or electrically connected; they may be directly connected or indirectly connected through intervening media, or they may be connected internally or in any other suitable relationship, unless expressly stated otherwise. The specific meanings of the above terms in the present invention can be understood by those skilled in the art according to specific situations.

In addition, the technical solutions in the embodiments of the present invention may be combined with each other, but it must be based on the realization of those skilled in the art, and when the technical solutions are contradictory or cannot be realized, such a combination of technical solutions should not be considered to exist, and is not within the protection scope of the present invention.

As shown in fig. 1-2, the present invention relates to an embodiment, specifically to a method for installing a turbine condenser, comprising the steps of:

firstly, a gap exists between a condenser foundation 2 and an air compressor cooler foundation 1, a vertical installation tool 4 is installed in the gap between the air compressor cooler foundation 1 and the condenser foundation 2, the upper end face of the vertical installation tool 4 is flush with the upper end faces of the air compressor cooler foundation 1 and the condenser foundation 2, so that the smoothness of a road transported to the condenser foundation 2 is ensured, the vertical installation tool 4 comprises a plurality of support legs and a cross beam arranged at the upper ends of the support legs, the length of the cross beam is matched with the width of the gap between the air compressor cooler foundation 1 and the condenser foundation 2, the vertical installation tool 4 is used for paving roads, and the gap between the air compressor cooler foundation 1 and the condenser foundation 2 is consistent or has small size difference under common conditions, so that the vertical installation tool 4 can be commonly used in different places;

in this embodiment, the vertical installation tool 4 may also be designed to have a height and width adjustable structure, for example, a vertical telescopic support leg and a horizontal telescopic beam are adopted, so that the universality of the vertical installation tool 4 can be increased.

Then, the condenser 8 is transported to the position right above the condenser foundation 2 through the vertical installation tool 4 by the transportation moving platform 3, the transportation moving platform 3 consists of a frame supporting plate and a plurality of roller mechanisms positioned at the lower end of the supporting plate, the rollers can be universal wheels or transportation tankers, the transportation moving platform 3 can be driven by self power or external force to perform multi-directional translation, the accurate and stable transportation of the condenser 8 is ensured, the bulge at the lower end of the condenser 8 is arranged on the frame supporting plate, a groove matched with the convex part at the lower end of the condenser 8 can be arranged on the frame supporting plate of the transportation moving platform 3, the position of the lower end of the condenser 8, which is only the convex part, can be used as a reliable stress point, the condenser 8 is deformed by using the jack at other positions, and the transportation of the condenser 8 is stable due to the structural design;

after condenser 8 transported to the right place, the both sides of installing frock 4 perpendicularly are provided with detachable support piece 5, detachable support piece 5's lower extreme be provided with at least one first jack 6, particularly, detachable support piece 5 preferably H shaped steel crossbeam, first jack 6 is all installed at its downside both ends, detachable support piece 5 contacts with condenser 8 as the atress part, owing to adopt the face contact of large-span, make condenser 8 and detachable support piece 5 contact position of atress can not take place to deform, will detach support piece 5 and condenser 8 through first jack 6 and jack up together like this, transport moving platform 3 this moment just separates with condenser 8, shift out transport moving platform 3 from one side of condenser basis 2 again, use the jack for the first time is in order to realize taking out of transport moving platform 3.

Secondly, using the jacks for the second time, arranging a plurality of second jacks 9 at the positions of the original transporting and moving platforms 3 on the upper side of the condenser foundation 2, namely the positions of the protruding parts at the lower ends of the condensers 8, jacking the condensers 8 through the second jacks 9, adjusting the elevation of the condensers 8, enabling the condensers 8 to be installed in a butt joint mode with the steam turbine 7 above, and enabling the detachable supporting piece 5 to be separated from the condensers 8 at the same time, so that the detachable supporting piece 5 and the first jacks 6 can be taken out together easily, and the detachable supporting piece 5 and the first jacks 6 can be reused;

after condenser 8 adjustment installation is accomplished, take out perpendicular installation frock 4 between air compressor machine cooler basis 1 and the condenser basis 2, will dismantle support piece 5, first jack 6, second jack 9 and transport moving platform 3 and concentrate and place, constitute the simple and easy built-up installation frock that can recycle, it is very convenient.

In order to improve the stability of the transportation moving platform 3 during transportation of the condenser 8, the upside of the vertical installation tooling 4 is laid with a backing plate 11 spanning the air compressor cooler foundation 1 and the condenser foundation 2, the backing plate 11 is a steel plate, the transportation moving platform 3 moves on the backing plate 11, and the requirement for the structure of the vertical installation tooling 4 can be reduced.

Simultaneously, the upside on condenser basis 2 often can be provided with a plurality of and reserve hole 10, in order to ensure that the haul road is unobstructed, does not set up the parallels on reserving hole 10, condenser basis 2 on be provided with the steel sheet that will reserve hole 10 and cover, the steel sheet height keeps unanimous with perpendicular installation frock.

Therefore, the invention utilizes the transportation mobile platform to transport the condenser to the condenser foundation, repeatedly uses the jack and skillfully utilizes the limited position capable of bearing force at the bottom of the condenser to realize the taking out of the transportation mobile platform and the detachable supporting piece, simultaneously satisfies the jacking and adjustment of the condenser, can repeatedly utilize the tools used in the method, solves the problems of vertical transportation and installation, is also suitable for the transportation work of other large-scale equipment in a limited space, greatly shortens the construction period, greatly improves the hoisting safety and achieves the purpose of rapidness and safety.