Building construction mud separation treatment facility

文档序号:199672 发布日期:2021-11-05 浏览:7次 中文

阅读说明:本技术 一种建筑土木施工泥浆分离处理设备 (Building construction mud separation treatment facility ) 是由 潘静 于 2021-07-22 设计创作,主要内容包括:本发明公开了一种建筑土木施工泥浆分离处理设备,所述泥浆池后端安装有泥渣分离装置,所述泥渣分离装置顶部安装有泥浆回收入口,所述泥渣分离装置左侧上部安装有泥渣排放出口,且泥渣分离装置左侧下部安装有清理口,所述泥浆池后端安装有连通装置,且通过连通装置将泥浆池与泥渣分离装置相连接,所述泥浆池顶部前端安装有顶部盖板,所述泥浆池前端右下角安装有泥浆出口,所述泥浆出口上方安装有开关把手,所述泥浆池前端中部安装有泥浆显示条,且泥浆池前端左下角安装有搅拌把手。本发明可通过泥渣分离装置将回收的泥浆中的渣土进行过滤,并通过连通装置将过滤后的泥浆通往泥浆池备用,泥浆池前端可通过泥浆显示条显示泥浆池内部泥浆储量。(The invention discloses a mud separating and treating device for building and civil construction, wherein a mud separating device is installed at the rear end of a mud pool, a mud recovery inlet is installed at the top of the mud separating device, a mud discharge outlet is installed at the upper part of the left side of the mud separating device, a cleaning port is installed at the lower part of the left side of the mud separating device, a communicating device is installed at the rear end of the mud pool, the mud pool is connected with the mud separating device through the communicating device, a top cover plate is installed at the front end of the top of the mud pool, a mud outlet is installed at the lower right corner of the front end of the mud pool, a switch handle is installed above the mud outlet, a mud display strip is installed at the middle part of the front end of the mud pool, and a stirring handle is installed at the lower left corner of the front end of the mud pool. According to the invention, the dregs in the recovered slurry can be filtered through the sludge separation device, the filtered slurry is led to the slurry tank for standby through the communication device, and the front end of the slurry tank can display the slurry storage amount in the slurry tank through the slurry display bar.)

1. The utility model provides a building and civil engineering construction mud separation treatment facility, includes mud pit (1), mud separator (2), mud recovery entry (3), mud sediment discharge outlet (4), clearance mouth (5), intercommunication device (6), top apron (7), mud export (8), switch handle (9), mud display strip (10), stirring handle (11), its characterized in that: a sludge separation device (2) is arranged at the rear end of the sludge tank (1), a sludge recovery inlet (3) is arranged at the top of the sludge separation device (2), a sludge discharge outlet (4) is arranged at the upper part of the left side of the sludge separation device (2), a cleaning opening (5) is arranged at the lower part of the left side of the sludge separating device (2), a communicating device (6) is arranged at the rear end of the sludge tank (1), and the mud pit (1) is connected with the mud-residue separating device (2) through a communicating device (6), a top cover plate (7) is arranged at the front end of the top of the mud pit (1), a mud outlet (8) is arranged at the lower right corner of the front end of the mud pit (1), a switch handle (9) is installed above the slurry outlet (8), a slurry display strip (10) is installed in the middle of the front end of the slurry tank (1), and a stirring handle (11) is installed at the lower left corner of the front end of the slurry tank (1).

2. The building and civil engineering construction mud separation treatment apparatus of claim 1, characterized in that: the mud residue separating device (2) is characterized by further comprising fixed lugs (12), connecting rods (13), fixed arms (14), screening nets (15), sliding grooves (16), connecting sheets (17), vibrators (18) and connecting rods (19), wherein the fixed lugs (12) are installed inside the mud residue separating device (2), the connecting rods (13) are installed inside the fixed lugs (12), the fixed arms (14) are installed on two sides of the connecting rods (13), the screening nets (15) are installed inside the fixed arms (14) on two sides, the sliding grooves (16) are installed at the rear ends of mud residue discharge outlets (4), the connecting sheets (17) are installed inside the sliding grooves (16) and are connected with the left sides of the screening nets (15) through the connecting sheets (17), the vibrators (18) are installed above the inner left sides of the mud residue separating device (2), and the bottoms of the vibrators (18) are connected with the left sides of the screening nets (15) through the connecting rods (19), and can drive the screening net (15) to shake and separate the sludge.

3. The building and civil engineering construction mud separation treatment apparatus of claim 1, characterized in that: the slurry separation device is characterized in that the communicating device (6) further comprises a communicating groove (20), a bottom inlet (21) and a top outlet (22), the communicating groove (20) is formed in the communicating device (6), the bottom inlet (21) is formed in the bottom of the rear end of the communicating groove (20), the top outlet (22) is formed in the top of the front end of the communicating groove (20), the communicating device (6) is connected with the slurry separation device (2) through the bottom inlet (21), and the communicating device (6) is connected with the slurry tank (11) through the top outlet (22).

4. The building and civil engineering construction mud separation treatment apparatus of claim 1, characterized in that: the mud display strip (10) further comprises an inner chute (23), a lifting magnetic buoy (24), an outer chute (25), a magnetic sliding block (26), a communicating port (27) and a ventilation port (28), wherein the inner chute (23) and the outer chute (25) are respectively formed in the mud display strip (10), the lifting magnetic buoy (24) is installed in the inner chute (23), the magnetic sliding block (26) is installed in the outer chute (25), the magnetic sliding block (26) and the lifting magnetic buoy (24) slide up and down together through magnetic force, the communicating port (27) is formed in the bottom of the inner chute (23) and is connected with the mud pit (1) through the communicating port (27), and the ventilation port (28) is formed in the tops of the inner chute (23) and the outer chute (25).

5. The building and civil engineering construction mud separation treatment apparatus of claim 1, characterized in that: the mud separation treatment equipment for building and civil construction further comprises a rack (29), a ratchet wheel (30), a gear (31), a fluted disc (32), a connecting column (33), a rotating disc (34) and stirring blades (35), the inner part of the stirring handle (11) is connected with a rack (29), the bottom end of the mud pit (1) is provided with a ratchet wheel (30), the ratchet wheel (30) can be driven in a single direction through the rack (29), the gear (31) is arranged at the bottom of the ratchet wheel (30), the fluted disc (32) is arranged on the right side of the gear (31), the gear (31) is meshed with a fluted disc (32), the top of the fluted disc (32) is provided with a connecting column (33), and the top of the connecting column (33) is connected with a rotating disc (34) arranged at the bottom end in the mud pit (1), six stirring blades (35) are arranged on the periphery of the top of the rotating disc (24) and used for stirring mud in the mud pool (1).

Technical Field

The invention relates to a mud separation treatment device for building and civil construction.

Background

The mud protecting wall is the mud skin formed on the wall of the underground continuous wall and the drilling of the cast-in-situ bored pile under the condition that the mud protecting wall is filled with mixed liquid of water, bentonite, CMC and other additives, and can effectively prevent the collapse of the wall of the underground continuous wall and the wall of the hole due to the static pressure of the mud on the wall of the hole. The slurry also has the functions of carrying slag and cooling and lubricating machines, and the slurry with certain viscosity can be discharged together with the sludge. The slurry can be used as a lubricating and cooling agent for the machine tool, and can also be used for cooling the machine tool while flushing the machine tool. Prevent the groove wall from collapsing or peeling off, and maintain the dug shape unchanged.

And construction and civil construction mud separation treatment equipment is used for underwater construction, drilling slag and mud are screened and separated, the mud is recycled, the screened stone drilling slag is conveyed to a peripheral maintenance sidewalk, and a construction site or a village road is paved, so that the outward transportation and the slag discarding quantity of the mud are greatly reduced, the river water is ensured to be pollution-free, and the environment is protected and reaches the standard.

Disclosure of Invention

The invention aims to provide a mud separation treatment device for building and civil engineering construction, which solves the problems in the background technology.

In order to achieve the purpose, the invention provides the following technical scheme:

a mud separation treatment device for building and civil construction comprises a mud tank, a mud separating device, a mud recovery inlet, a mud discharge outlet, a cleaning port, a communicating device, a top cover plate, a mud outlet, a switch handle, a mud display bar and a stirring handle, wherein the mud separating device is installed at the rear end of the mud tank, the mud recovery inlet is installed at the top of the mud separating device, the mud discharge outlet is installed at the upper part of the left side of the mud separating device, the cleaning port is installed at the lower part of the left side of the mud separating device, the communicating device is installed at the rear end of the mud tank, the mud tank is connected with the mud separating device through the communicating device, the top cover plate is installed at the front end of the top of the mud tank, the mud outlet is installed at the lower right corner of the front end of the mud tank, the switch handle is installed above the mud outlet, and the mud display bar is installed at the middle part of the front end of the mud tank, and a stirring handle is arranged at the left lower corner of the front end of the mud pit.

Preferably: mud sediment separator is still including fixed lug, connecting rod, fixed arm, screening net, sliding tray, connection piece, vibrator and connecting rod of taking, mud sediment separator internally mounted has fixed lug of taking, install the connecting rod in the fixed lug of taking, the fixed arm is all installed to the connecting rod both sides, and installs the screening net in the fixed arm of both sides, the sliding tray is installed to mud sediment discharge outlet rear end, install the connection piece in the sliding tray, and be connected with screening net left side through the connection piece, the vibrator is installed to the inside left side top of mud sediment separator, the vibrator bottom is connected with screening net left side through the connecting rod to can drive screening net vibrations separation mud sediment.

Preferably: the communicating device further comprises a communicating groove, a bottom inlet and a top outlet, the communicating groove is formed in the communicating device, the bottom inlet is formed in the bottom of the rear end of the communicating groove, the top outlet is formed in the top of the front end of the communicating groove, the communicating device is connected with the slurry separating device through the bottom inlet, and the communicating device is connected with the slurry tank through the top outlet.

Preferably: the mud display strip further comprises an inner sliding groove, a lifting magnetic buoy, an outer sliding groove, a magnetic sliding block, a communicating port and a ventilating port, the inner sliding groove and the outer sliding groove are respectively formed in the mud display strip, the lifting magnetic buoy is installed in the inner sliding groove, the magnetic sliding block is installed in the outer sliding groove, the magnetic sliding block and the lifting magnetic buoy slide up and down together through magnetic force, the communicating port is formed in the bottom of the inner sliding groove and connected with the inside of the mud tank through the communicating port, and the ventilating port is formed in the tops of the inner sliding groove and the outer sliding groove.

Preferably: building construction mud separation and treatment equipment is still including rack, ratchet, gear, fluted disc, spliced pole, rolling disc and stirring vane, the stirring handle is inside to be connected with the rack, the ratchet is installed to mud pond bottom, and ratchet accessible rack one-way drive, the gear is installed to the ratchet bottom, the fluted disc is installed on the gear right side, and the gear meshes with the fluted disc mutually, the spliced pole is installed at the fluted disc top, and the spliced pole top is connected with the rolling disc of installing in the inside bottom of mud pond, six stirring vane are installed to rolling disc top a week for stir the inside mud in mud pond.

The invention has the beneficial effects that: according to the invention, the sludge in the recovered slurry can be filtered through the sludge separation device, the filtered slurry is led to the slurry tank for standby through the communication device, the slurry storage amount in the slurry tank can be displayed through the slurry display bar at the front end of the slurry tank, and the slurry in the slurry tank can be stirred through the stirring handle to prevent sedimentation.

Drawings

FIG. 1 is a schematic structural view of a mud separating and treating apparatus for civil engineering construction of the present invention;

FIG. 2 is a schematic structural view of a sludge separating device of the mud separating and treating equipment for building and civil construction of the invention;

FIG. 3 is a schematic structural view of a communicating device of the mud separating and treating apparatus for civil engineering construction of the present invention;

FIG. 4 is a schematic structural view of a mud display bar of the mud separating and treating apparatus for civil engineering construction of the present invention;

FIG. 5 is a schematic structural view of a stirring mechanism of the mud separating and treating apparatus for civil engineering construction of the present invention;

FIG. 6 is a schematic structural diagram of a stirring mechanism of the mud separation treatment equipment for civil engineering construction of the invention.

In the figure: 1. the device comprises a mud pit, 2, a mud-residue separation device, 3, a mud recovery inlet, 4, a mud-residue discharge outlet, 5, a cleaning port, 6, a communication device, 7, a top cover plate, 8, a mud outlet, 9, a switch handle, 10, a mud display bar, 11, a stirring handle, 12, a fixed lug, 13, a connecting rod, 14, a fixed arm, 15, a sieving net, 16, a sliding groove, 17, a connecting sheet, 18, a vibrator, 19, a connecting rod, 20, a communication groove, 21, a bottom inlet, 22, a top outlet, 23, an inner sliding groove, 24, a lifting magnetic buoy, 25, an outer sliding groove, 26, a magnetic sliding block, 27, a communication port, 28, an air hole, 29, a rack, 30, a ratchet wheel, 31, a gear, 32, a fluted disc, 33, a connecting column, 34, a rotating disc, 35 and a stirring blade.

Detailed Description

The invention will be further elucidated with reference to the following figures and specific embodiments:

as shown in fig. 1-6, a mud separating and processing device for building and civil construction comprises a mud pit 1, a mud separating device 2, a mud recovering inlet 3, a mud discharging outlet 4, a cleaning outlet 5, a communicating device 6, a top cover plate 7, a mud outlet 8, a switch handle 9, a mud display bar 10 and a stirring handle 11, wherein the mud separating device 2 is installed at the rear end of the mud pit 1, the mud recovering inlet 3 is installed at the top of the mud separating device 2, the mud discharging outlet 4 is installed at the upper part of the left side of the mud separating device 2, the cleaning outlet 5 is installed at the lower part of the left side of the mud separating device 2, the communicating device 6 is installed at the rear end of the mud pit 1, the mud pit 1 and the mud separating device 2 are connected through the communicating device 6, the top cover plate 7 is installed at the front end of the mud pit 1, the mud outlet 8 is installed at the lower right corner of the front end of the mud pit 1, a switch handle 9 is installed above the slurry outlet 8, a slurry display strip 10 is installed in the middle of the front end of the slurry pool 1, and a stirring handle 11 is installed at the lower left corner of the front end of the slurry pool 1. Mud sediment separator 2 is still including fixed lug 12, connecting rod 13, fixed arm 14, screening net 15, sliding tray 16, connection piece 17, vibrator 18 and connecting rod 19, mud sediment separator 2 internally mounted has fixed lug 12, install connecting rod 13 in the fixed lug 12, fixed arm 14 is all installed to connecting rod 13 both sides, and installs screening net 15 in the fixed arm 14 of both sides, sliding tray 16 is installed to 4 rear ends of mud sediment discharge outlet, install connection piece 17 in the sliding tray 16, and be connected with screening net 15 left side through connection piece 17, vibrator 18 is installed to the inside left side top of mud sediment separator 2, vibrator 18 bottom is connected with screening net 15 left side through connecting rod 19 to can drive screening net 15 vibrations separation mud. The communicating device 6 further comprises a communicating groove 20, a bottom inlet 21 and a top outlet 22, the communicating groove 20 is formed in the communicating device 6, the bottom of the rear end of the communicating groove 20 is provided with the bottom inlet 21, the top of the front end of the communicating groove 20 is provided with the top outlet 22, the communicating device 6 is connected with the slurry separating device 2 through the bottom inlet 21, and the communicating device 6 is connected with the slurry tank 11 through the top outlet 22. The mud display strip 10 further comprises an inner chute 23, a lifting magnetic buoy 24, an outer chute 25, a magnetic slider 26, a communicating port 27 and a ventilating port 28, the inner chute 23 and the outer chute 25 are respectively formed in the mud display strip 10, the lifting magnetic buoy 24 is installed in the inner chute 23, the magnetic slider 26 is installed in the outer chute 25, the magnetic slider 26 and the lifting magnetic buoy 24 slide up and down together through magnetic force, the communicating port 27 is formed in the bottom of the inner chute 23 and is connected with the mud pit 1 through the communicating port 27, and the ventilating port 28 is formed in the tops of the inner chute 23 and the outer chute 25. Building civil construction mud separation treatment facility is still including rack 29, ratchet 30, gear 31, fluted disc 32, spliced pole 33, rolling disc 34 and stirring vane 35, 11 inside and rack 29 are connected to stirring handle, ratchet 30 is installed to 1 bottom in mud pond, and ratchet 30 accessible rack 29 one-way drive, gear 31 is installed to ratchet 30 bottom, fluted disc 32 is installed on gear 31 right side, and gear 31 meshes with fluted disc 32 mutually, spliced pole 33 is installed at fluted disc 32 top, and spliced pole 33 top is connected with rolling disc 34 of installing in the inside bottom in mud pond 1, six stirring vane 35 are installed to 24 top a week of rolling disc for stir the inside mud in mud pond 1.

The working principle of the invention is as follows: mud of retrieving entry 3 recovery through the mud at mud sediment separator 2 top, and filter the dregs in the mud through screening net 15, and lead to mud pool 1 through intercommunication device 6 with the mud after filtering for subsequent use, mud pool 1 front end accessible mud shows strip 10 and shows the inside mud reserves of mud pool 1, and accessible stirring handle 11 drives rack 29 drive ratchet 29, gear 31 drive fluted disc 32 rotates, and the messenger rotates mud pool 1 inside rolling disc 34 together with stirring vane 35, drive the mud and stir, prevent to precipitate.

It will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, and that the present invention may be embodied in other specific forms without departing from the spirit or essential attributes thereof. The embodiments are therefore to be considered in all respects as illustrative and all changes which come within the meaning and range of equivalency are therefore intended to be embraced therein.