阅读说明:本技术 大高径比的焦炭塔 (Coke tower with large height-diameter ratio ) 是由 牛永峰 田振宝 张阳 李雪 张东伟 徐仁策 于 2021-10-15 设计创作,主要内容包括:本发明涉及生物质能产业技术领域,具体为大高径比的焦炭塔,包括塔体、安装架和安装杆,塔体顶部固定连接有安装管,安装管顶部活动连接有密封盖,塔体顶部固定连接有排气管,安装件一端固定连接有进料口,安装杆底部设置有用于清洁塔体内部焦体残留的清洁机构;本发明通过设置清洁机构,当塔体内部的焦炭由底部排出后,通过将安装杆由安装管插入塔体内部扇形的活动板展开,高压喷头可以对塔体内部残留的焦炭进行冲刷,通过安装块一侧的工业摄像头可以观察塔体内部残留焦炭的准确位置,通过驱动电机运行可以使高压喷头通过环形齿槽和弹簧在安装块内部上下移动,以此来调整高压喷头的喷射角度,使塔体内部的焦炭去除的更为完全,防止残留。(The invention relates to the technical field of biomass energy industry, in particular to a coke tower with a large height-diameter ratio, which comprises a tower body, an installation frame and an installation rod, wherein the top of the tower body is fixedly connected with an installation pipe; according to the invention, the cleaning mechanism is arranged, after coke in the tower body is discharged from the bottom, the mounting rod is inserted into the fan-shaped movable plate in the tower body through the mounting pipe and is unfolded, the high-pressure nozzle can wash away residual coke in the tower body, the accurate position of the residual coke in the tower body can be observed through the industrial camera on one side of the mounting block, and the high-pressure nozzle can move up and down in the mounting block through the annular tooth socket and the spring by the operation of the driving motor, so that the spraying angle of the high-pressure nozzle is adjusted, the coke in the tower body is completely removed, and the residual coke is prevented.)

1. Coke drum of big height-diameter ratio, including tower body (1), mounting bracket (4) and installation pole (10), tower body (1) swing joint be in inside mounting bracket (4), tower body (1) top fixedly connected with installation pipe (2), installation pipe (2) top swing joint has sealed lid (3), tower body (1) top fixedly connected with blast pipe (9), blast pipe (9) with tower body (1) is inside to be linked together, tower body (1) bottom swing joint has installed part (7), installed part (7) one end fixedly connected with feed inlet (8), its characterized in that:

a cleaning mechanism for cleaning coke residues in the tower body (1) is arranged at the bottom of the mounting rod (10), an auxiliary blanking assembly for buffering the tower body (1) is arranged in the mounting frame (4) and on the side wall of the tower body (1), and a guide assembly for guiding residual oil during feeding is arranged in the mounting member (7);

clean mechanism includes fly leaf (11), connecting piece (12), loose axle (13) and electric putter (14), loose axle (13) rotate to be connected inside installation pole (10), fly leaf (11) fixed connection be in loose axle (13) lateral wall, electric putter (14) fixed connection be in inside installation pole (10), connecting piece (12) swing joint be in installation pole (10) lateral wall with between fly leaf (11) top.

2. The large aspect ratio coke drum of claim 1, wherein: connecting piece (12) one end sliding connection be in installation pole (10) lateral wall, electric putter (14) one end fixed connection be in connecting piece (12) one side, fly leaf (11) pass through loose axle (13) swing joint be in installation pole (10) bottom.

3. The large aspect ratio coke drum of claim 1, wherein: the movable plate (11) is composed of a rectangular connecting block and a fan-shaped fixing block.

4. The large aspect ratio coke drum of claim 1, wherein: the cleaning mechanism further comprises a water delivery hose (15), a hydraulic rod (16), an installation block (17), a gear (18), a high-pressure sprayer (19), a rotating shaft (20) and a driving motor (22), wherein the hydraulic rod (16) is fixedly connected inside the movable plate (11), the installation block (17) is fixedly connected at one end of the hydraulic rod (16), the driving motor (22) is fixedly connected on one side of the installation block (17), the rotating shaft (20) is rotatably connected inside the installation block (17), one end of the rotating shaft (20) is fixedly connected at the output end of the driving motor (22), the gear (18) is fixedly connected on the side wall of the rotating shaft (20), a spring is fixedly connected between the side wall of the high-pressure sprayer (19) and the inner wall of the installation block (17), an annular tooth socket is formed in one end of the high-pressure sprayer (19), and the annular tooth socket is meshed with the gear (18), the high-pressure spray head (19) is movably connected with the spring inside the mounting block (17) through the gear (18), the water delivery hose (15) is fixedly connected between the water pump and the connecting end of the high-pressure spray head (19), and the water delivery hose (15) is located inside the movable plate (11) and the mounting rod (10).

5. The large aspect ratio coke drum of claim 1, wherein: hydraulic stem (16) one end fixedly connected with industry camera (21), industry camera (21) are located installation piece (17) one side, just industry camera (21) with driving motor (22) correspond the setting.

6. The large aspect ratio coke drum of claim 1, wherein: supplementary unloading subassembly is including solid fixed ring (6) and fixing bolt, gu fixed ring (6) fixed connection be in tower body (1) lateral wall, fixing bolt swing joint be in gu fixed ring (6) are inside, gu fixed ring (6) pass through fixing bolt fixed mounting be in mounting bracket (4) top, gu fixed ring (6) one side with fixedly connected with spring between mounting bracket (4) top, the spring is located the fixing bolt lateral wall.

7. The large aspect ratio coke drum of claim 1, wherein: supplementary unloading subassembly includes support (5), fixed column (23), spliced pole (24) and connecting plate (25), support (5) swing joint is inside mounting bracket (4), fixed column (23) fixed connection is inside mounting bracket (4), just fixed column (23) sliding connection be in inside support (5), spliced pole (24) fixed connection be in inside mounting bracket (4), connecting plate (25) fixed connection be in support (5) lateral wall, just connecting plate (25) sliding connection be in spliced pole (24) lateral wall, connecting plate (25) one side with fixedly connected with spring between mounting bracket (4) is inside, the spring is located spliced pole (24) lateral wall.

8. The large aspect ratio coke drum of claim 1, wherein: the water conservancy diversion subassembly includes slider (26), water conservancy diversion frame (28), mounting (29) and collar (27), slider (26) fixed connection be in collar (27) lateral wall, the inside spout that is provided with of installed part (7), slider (26) sliding connection be in inside the spout, collar (27) pass through slider (26) sliding connection be in inside installed part (7), slider (26) one side with fixedly connected with spring between the spout inner wall, water conservancy diversion frame (28) fixed connection be in inside collar (27), mounting (29) fixed connection be in inside water conservancy diversion frame (28).

9. The large aspect ratio coke drum of claim 1, wherein: a partition plate (30) is arranged inside the tower body (1), the partition plate (30) is fixedly connected to one end, close to the top, of the inner wall of the tower body (1), a heat conducting plate is arranged inside the tower body (1), and the height-diameter ratio of the tower body (1) is 6: 1.

Technical Field

The invention relates to the technical field of biomass energy industry, in particular to a coke tower with a large height-diameter ratio.

Background

The coke tower is the main equipment of the coking device, is the place for carrying out coking reaction and the place for generating petroleum coke, and is the mark of the coking device, and the coking process generally refers to the process of carbonizing and zooming organic substances. The dry distillation of coal means high-temperature dry distillation. The coking chemical industry is an important part of the coal chemical industry, and the main processing methods of the coal are three methods of high-temperature coking (950-1050 ℃), medium-temperature coking, low-temperature coking and the like. The metallurgical industry typically employs high temperature coking to obtain coke and recover chemical products.

The inside coke that can produce of tower body is remaining after refining petroleum to the coke drum today, and the coke can closely glue on the tower body inner wall, generally adopts the manual work to remove the coke and remains today, and this can seriously influence production efficiency, leads to production efficiency to reduce by a wide margin, and the gas that residual coke produced also can influence workman's healthy.

Disclosure of Invention

The invention aims to provide a coke tower with a large height-diameter ratio, which comprises a tower body, an installation frame and an installation rod, wherein the tower body is movably connected inside the installation frame, the top of the tower body is fixedly connected with an installation pipe, the top of the installation pipe is movably connected with a sealing cover, the top of the tower body is fixedly connected with an exhaust pipe, the exhaust pipe is communicated with the inside of the tower body, the bottom of the tower body is movably connected with an installation part, one end of the installation part is fixedly connected with a feed inlet, the bottom of the installation rod is provided with a cleaning mechanism for cleaning coke residue inside the tower body, the inside of the installation frame and the side wall of the tower body are provided with auxiliary blanking assemblies for buffering the tower body, and the inside of the installation part is provided with a flow guide assembly for guiding residual oil during feeding; clean mechanism includes fly leaf, connecting piece, loose axle and electric putter, the loose axle rotates to be connected inside the installation pole, fly leaf fixed connection be in the loose axle lateral wall, electric putter fixed connection be in inside the installation pole, connecting piece swing joint be in installation pole lateral wall with between the fly leaf top.

Optionally, one end of the connecting piece is slidably connected to the side wall of the mounting rod, one end of the electric push rod is fixedly connected to one side of the connecting piece, and the movable plate is movably connected to the bottom of the mounting rod through the movable shaft.

Optionally, the movable plate is composed of a rectangular connecting block and a fan-shaped fixing block.

Optionally, the cleaning mechanism further comprises a water delivery hose, a hydraulic rod, an installation block, a gear, a high-pressure nozzle, a rotating shaft and a driving motor, wherein the hydraulic rod is fixedly connected inside the movable plate, the installation block is fixedly connected at one end of the hydraulic rod, the driving motor is fixedly connected at one side of the installation block, the rotating shaft is rotatably connected inside the installation block, one end of the rotating shaft is fixedly connected at the output end of the driving motor, the gear is fixedly connected at the side wall of the rotating shaft, a spring is fixedly connected between the side wall of the high-pressure nozzle and the inner wall of the installation block, one end of the high-pressure nozzle is provided with an annular tooth socket, the annular tooth socket is meshed with the gear, the high-pressure nozzle is movably connected inside the installation block through the gear and the spring, the water delivery hose is fixedly connected between the water pump and the connecting end of the high-pressure nozzle, the water delivery hose is located inside the movable plate and the mounting rod.

Optionally, one end of the hydraulic rod is fixedly connected with an industrial camera, the industrial camera is located on one side of the mounting block, and the industrial camera and the driving motor are correspondingly arranged.

Optionally, supplementary unloading subassembly is including solid fixed ring and fixing bolt, the fixed ring fixed connection be in tower body side wall, fixing bolt swing joint be in gu fixed ring is inside, gu fixed ring passes through fixing bolt fixed mounting be in the mount frame top, gu fixed ring one side with fixedly connected with spring between the mount frame top, the spring is located the fixing bolt lateral wall.

Optionally, supplementary unloading subassembly includes support, fixed column, spliced pole and connecting plate, support swing joint is in inside the mounting bracket, fixed column fixed connection is in inside the mounting bracket, just fixed column sliding connection be in inside the support, spliced pole fixed connection be in inside the mounting bracket, connecting plate fixed connection be in the support lateral wall, just connecting plate sliding connection be in the spliced pole lateral wall, connecting plate one side with fixedly connected with spring between the mounting bracket is inside, the spring is located the spliced pole lateral wall.

Optionally, the water conservancy diversion subassembly includes slider, water conservancy diversion frame, mounting and collar, slider fixed connection be in the collar side wall, the inside spout that is provided with of installed part, slider sliding connection is in inside the spout, the collar passes through slider sliding connection is in inside the installed part, slider one side with fixedly connected with spring between the spout inner wall, water conservancy diversion frame fixed connection be in inside the collar, mounting fixed connection be in inside the water conservancy diversion frame.

Optionally, a partition plate is arranged inside the tower body, the partition plate is fixedly connected to one end, close to the top, of the inner wall of the tower body, a heat conducting plate is arranged inside the tower body, and the height-diameter ratio of the tower body is 6: 1.

Compared with the prior art, the invention has the beneficial effects that:

1. according to the invention, the cleaning mechanism is arranged, after coke in the tower body is discharged from the bottom, the mounting rod is inserted into the fan-shaped movable plate in the tower body through the mounting pipe and is unfolded, the high-pressure nozzle can wash away residual coke in the tower body, the accurate position of the residual coke in the tower body can be observed through the industrial camera on one side of the mounting block, and the high-pressure nozzle can move up and down in the mounting block through the annular tooth socket and the spring by the operation of the driving motor, so that the spraying angle of the high-pressure nozzle is adjusted, the coke in the tower body is completely removed, and the residual coke is prevented.

2. According to the invention, the auxiliary blanking assembly is arranged, the spring is arranged between the fixing ring and the mounting frame, the vibration generated in the operation process of the tower body can be reduced, after petroleum refining is completed by the coke tower, the spring is arranged on one side of the side wall connecting plate of the support, the buffering effect is achieved in the blanking process of the coke tower, meanwhile, the blanking of the coke tower can be assisted by the force of the vibration, the blanking of the coke tower is faster and better, the support can be prevented from falling off by arranging the connecting plate, and the support can slide more stably by arranging the fixing column and the connecting column to play a role of a guide rail.

3. According to the invention, the installation ring is arranged in the installation part through the flow guide assembly, the feed inlet is more uniform in feeding through the flow guide frame and the fixing part in the installation ring, the phenomenon that the coke tower inclines to one side due to the fact that the material is sprayed to one side in the feeding process is prevented, and the blocking phenomenon caused by backflow in the feeding process can also be prevented through the flow guide frame and the fixing part.

4. The heat-conducting plate is arranged in the tower body, so that the petroleum refining process can be uniformly heated, and the refining efficiency is improved.

Drawings

FIG. 1 is a schematic structural view of the present invention;

FIG. 2 is a partial cross-sectional view of the present invention;

FIG. 3 is an enlarged view of the structure of area A of FIG. 2 according to the present invention;

FIG. 4 is a schematic view of a mounting block structure according to the present invention;

FIG. 5 is a schematic view of a movable plate structure of the present invention;

FIG. 6 is an enlarged view of the structure of the area D in FIG. 5 according to the present invention;

FIG. 7 is an enlarged view of the area B of FIG. 2 according to the present invention;

FIG. 8 is an enlarged view of the structure of area C of FIG. 2;

fig. 9 is a schematic view of an installation ring structure of the present invention.

The reference numbers illustrate:

1. a tower body; 2. installing a pipe; 3. a sealing cover; 4. a mounting frame; 5. a support; 6. a fixing ring; 7. a mounting member; 8. a feed inlet; 9. an exhaust pipe; 10. mounting a rod; 11. a movable plate; 12. a connecting member; 13. a movable shaft; 14. an electric push rod; 15. a water delivery hose; 16. a hydraulic lever; 17. mounting blocks; 18. a gear; 19. a high pressure spray head; 20. a rotating shaft; 21. an industrial camera; 22. a drive motor; 23. fixing a column; 24. connecting columns; 25. a connecting plate; 26. a slider; 27. a mounting ring; 28. a flow guiding frame; 29. a fixing member; 30. a separator.

The objects, features, and advantages of the present invention will be further explained with reference to the accompanying drawings.

Detailed Description

The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.

Referring to fig. 1-9, the invention provides a coke tower with a large height-diameter ratio, comprising a tower body 1, an installation frame 4 and an installation rod 10, wherein the tower body 1 is movably connected inside the installation frame 4, the top of the tower body 1 is fixedly connected with an installation tube 2, the top of the installation tube 2 is movably connected with a sealing cover 3, the top of the tower body 1 is fixedly connected with an exhaust pipe 9, the exhaust pipe 9 is communicated with the inside of the tower body 1, the bottom of the tower body 1 is movably connected with an installation piece 7, one end of the installation piece 7 is fixedly connected with a feed inlet 8, the bottom of the installation rod 10 is provided with a cleaning mechanism for cleaning coke residues inside the tower body 1, the inside of the installation frame 4 and the side wall of the tower body 1 are provided with auxiliary blanking assemblies for buffering the tower body 1, the inside of the installation piece 7 is provided with a flow guide assembly for guiding residual oil during feeding, the inside of the tower body 1 is provided with a partition plate 30, the partition plate 30 is fixedly connected at one end, close to the top, of the inner wall of the tower body 1, the heat conducting plate is arranged in the tower body 1, and the height-diameter ratio of the tower body 1 is 6: 1. According to the mechanism of needle coke formation in the coke tower, the lateral pressure and the shearing force generated by gas escape in the later stage of the intermediate phase are increased, the larger the force is, the deeper the deformation suffered by parallel formation planes in the intermediate phase is, and the higher the anisotropy degree is achieved by the smaller the distance between the layer planes. Compared with the conventional height-diameter ratio of 2-4:1, the large height-diameter ratio well solves the problem of insufficient lateral pressure and shearing force.

Demolish bottom installed part 7 after 1 inside oil of tower body is burnt through setting up installation pipe 2 at tower body 1 top, make the coke whereabouts of 1 inside of tower body discharge, can prevent inside gas leakage at the oil refining in-process through setting up sealed lid 3 at installation pipe 2 top, the heat that leads to is lost, through setting up blast pipe 9 at tower body 1 top and can making the gas that oil produced at the refining in-process discharge by blast pipe 9, can make the oil refining in-process be heated evenly through setting up the heat-conducting plate in tower body 1 inside, improve refining efficiency, the heat-conducting plate material is the aluminium nitride heat-conducting plate.

Referring to fig. 2, 3, 4 and 5, the cleaning mechanism includes a movable plate 11, a connecting member 12, a movable shaft 13 and an electric push rod 14, the movable shaft 13 is rotatably connected inside the mounting rod 10, the movable plate 11 is fixedly connected to a side wall of the movable shaft 13, the electric push rod 14 is fixedly connected inside the mounting rod 10, the connecting member 12 is movably connected between a side wall of the mounting rod 10 and a top of the movable plate 11, one end of the connecting member 12 is slidably connected to a side wall of the mounting rod 10, one end of the electric push rod 14 is fixedly connected to one side of the connecting member 12, the movable plate 11 is movably connected to a bottom of the mounting rod 10 through the movable shaft 13, the movable plate 11 is composed of a rectangular connecting block and a fan-shaped fixing block, the cleaning mechanism further includes a water hose 15, a hydraulic rod 16, a mounting block 17, a gear 18, a high-pressure nozzle 19, a rotating shaft 20 and a driving motor 22, the hydraulic rod 16 is fixedly connected inside the movable plate 11, the mounting block 17 is fixedly connected to one end of the hydraulic rod 16, the driving motor 22 is fixedly connected to one side of the mounting block 17, the rotating shaft 20 is rotatably connected to the inside of the mounting block 17, one end of the rotating shaft 20 is fixedly connected to the output end of the driving motor 22, the gear 18 is fixedly connected to the side wall of the rotating shaft 20, a spring is fixedly connected between the side wall of the high-pressure nozzle 19 and the inner wall of the mounting block 17, an annular tooth groove is formed in one end of the high-pressure nozzle 19 and is meshed with the gear 18, the high-pressure nozzle 19 is movably connected to the inside of the mounting block 17 through the gear 18 and the spring, the water delivery hose 15 is fixedly connected between the connecting end of the water pump and the high-pressure nozzle 19, the water delivery hose 15 is located inside the movable plate 11 and the mounting rod 10, one end of the hydraulic rod 16 is fixedly connected with the industrial camera 21, the industrial camera 21 is located on one side of the mounting block 17, and the industrial camera 21 is arranged corresponding to the driving motor 22; after coke in the tower body 1 is discharged from the bottom, the mounting rod 10 is inserted into the tower body 1 through the mounting pipe 2, the connecting piece 12 is pulled through the electric push rod 14 to drive the movable plate 11 through the connecting piece 12, the movable plate 11 is movable at the bottom of the mounting rod 10 through the movable shaft 13 to move the movable plate 11 upwards, the fan-shaped movable plate 11 is unfolded, then the mounting block 17 is pushed out of the movable plate 11 through the hydraulic rod 16 in the movable plate 11, a water source can be conveyed into the high-pressure nozzle 19 through the water pump and the water hose 15, the high-pressure nozzle 19 can wash the residual coke in the tower body 1, the accurate position of the residual coke in the tower body 1 can be observed through the industrial camera 21 on one side of the mounting block 17, the coke can be accurately taken out, the rotating shaft 20 can be driven to rotate through the operation of the driving motor 22, and the gear 18 on the side wall can be driven to rotate through the rotation of the rotating shaft 20, the gear 18 rotates to drive the annular tooth socket engaged with the gear to move, so that the high-pressure nozzle 19 moves up and down in the mounting block 17 through the annular tooth socket and the spring, the injection angle of the high-pressure nozzle 19 is adjusted, coke in the tower body 1 is completely removed, and residue is prevented.

Referring to fig. 1, 2 and 7, the auxiliary blanking assembly comprises a fixing ring 6 and a fixing bolt, the fixing ring 6 is fixedly connected to the side wall of the tower body 1, the fixing bolt is movably connected inside the fixing ring 6, the fixing ring 6 is fixedly installed at the top of the mounting frame 4 through the fixing bolt, a spring is fixedly connected between one side of the fixing ring 6 and the top of the mounting frame 4, the spring is located on the side wall of the fixing bolt, the auxiliary blanking assembly comprises a support 5, a fixing column 23, a connecting column 24 and a connecting plate 25, the support 5 is movably connected inside the mounting frame 4, the fixing column 23 is fixedly connected inside the mounting frame 4, the fixing column 23 is slidably connected inside the support 5, the connecting column 24 is fixedly connected inside the mounting frame 4, the connecting plate 25 is fixedly connected to the side wall of the support 5, the connecting plate 25 is slidably connected to the side wall of the connecting column 24, the spring is fixedly connected between one side of the connecting plate 25 and the inside the mounting frame 4, the spring is positioned on the side wall of the connecting column 24; through set up the spring between solid fixed ring 6 and mounting bracket 4, can reduce the vibrations that tower body 1 produced at the operation in-process, after the coke drum was accomplished the petroleum refining, through 25 side wall connecting plate springs of support 5, play the cushioning effect at coke drum unloading in-process, the coke drum unloading can be assisted to the power through vibrations simultaneously, it is better faster to make the coke drum unloading, also can prevent support 5 to drop through setting up connecting plate 25, play the effect of guide rail through setting up fixed column 23 and spliced pole 24 and make support 5 slide more stable.

Referring to fig. 2, 8 and 9, the flow guiding assembly includes a sliding block 26, a flow guiding frame 28, a fixing member 29 and a mounting ring 27, the sliding block 26 is fixedly connected to a side wall of the mounting ring 27, a sliding groove is formed in the mounting member 7, the sliding block 26 is slidably connected to the inside of the sliding groove, the mounting ring 27 is slidably connected to the inside of the mounting member 7 through the sliding block 26, a spring is fixedly connected between one side of the sliding block 26 and an inner wall of the sliding groove, the flow guiding frame 28 is fixedly connected to the inside of the mounting ring 27, and the fixing member 29 is fixedly connected to the inside of the flow guiding frame 28; through set up collar 27 in the inside of installed part 7, make feed inlet 8 more even when the feeding through inside water conservancy diversion frame 28 of collar 27 and mounting 29, prevent during the feeding that the material from spouting to one side and leading to the coke drum to incline to one side, also can prevent the jam phenomenon that the backward flow leads to during the feeding through water conservancy diversion frame 28 and mounting 29.

The working process and principle of the invention are as follows: the installation ring 27 is arranged in the installation part 7, the feed inlet 8 is more uniform in feeding through the flow guide frame 28 and the fixing part 29 in the installation ring 27, the phenomenon that a coke tower inclines to one side due to the fact that the materials are sprayed out to one side in the feeding process is prevented, the blocking phenomenon caused by backflow in the feeding process can be prevented through the flow guide frame 28 and the fixing part 29, the installation pipe 2 is arranged at the top of the tower body 1, the installation part 7 at the bottom is detached after petroleum in the tower body 1 is coked, coke in the tower body 1 falls and is discharged, the sealing cover 3 is arranged at the top of the installation pipe 2, internal air leakage can be prevented in the petroleum refining process, and heat loss is caused, the gas generated in the refining process of the petroleum can be discharged through the exhaust pipe 9 by arranging the exhaust pipe 9 at the top of the tower body 1, the heat conducting plate is arranged in the tower body 1, and the refining efficiency is improved, the heat conducting plate is made of an aluminum nitride heat conducting plate, a spring is arranged between the fixing ring 6 and the mounting frame 4, vibration generated in the operation process of the tower body 1 can be reduced, after petroleum refining is completed by the coke tower, a buffering effect is achieved in the blanking process of the coke tower through a side wall connecting plate 25 side spring of the support 5, blanking of the coke tower can be assisted through vibration force, blanking of the coke tower is faster and better, falling off of the support 5 can be prevented through the connecting plate 25, the support 5 can slide more stably through the effect of the guide rail formed by arranging the fixing column 23 and the connecting column 24, after coke in the tower body 1 is discharged from the bottom, the mounting rod 10 is inserted into the tower body 1 through the mounting pipe 2, the connecting piece 12 is pulled through the electric push rod 14 to drive the movable plate 11, the movable plate 11 is movable at the bottom of the mounting rod 10 through the movable shaft 13, and the movable plate 11 moves upwards, the sector-shaped movable plate 11 is unfolded, and then the mounting block 17 is pushed out of the interior of the movable plate 11 by the hydraulic rod 16 inside the movable plate 11, water can be delivered to the interior of the high-pressure nozzle 19 through the water pump and the water delivery hose 15, so that the high-pressure nozzle 19 can flush the residual coke in the tower body 1, the accurate position of the residual coke in the tower body 1 can be observed through the industrial camera 21 at one side of the mounting block 17, the coke can be accurately taken out, the rotation shaft 20 can be driven to rotate by the operation of the driving motor 22, the gear 18 of the side wall can be driven to rotate by the rotation shaft 20, the gear 18 can drive the annular tooth socket engaged with the gear to move, so that the high-pressure spray head 19 moves up and down in the mounting block 17 through the annular tooth socket and the spring, the injection angle of the high-pressure nozzle 19 is adjusted in this way, so that the coke in the tower body 1 is completely removed and the residual coke is prevented.

While the invention has been described in further detail in connection with specific embodiments thereof, it will be understood that the invention is not limited thereto, and that various other modifications and substitutions may be made by those skilled in the art without departing from the spirit of the invention, which should be considered to be within the scope of the invention as defined by the appended claims.