Temporary unloading platform for building construction floor

文档序号:4314 发布日期:2021-09-17 浏览:47次 中文

阅读说明:本技术 一种建筑施工楼层临时卸料平台 (Temporary unloading platform for building construction floor ) 是由 付裕 王涛 李鹏 刘玉昊 黄运昌 李朝朋 于 2021-07-29 设计创作,主要内容包括:本发明公开一种建筑施工楼层临时卸料平台,包括水平设置的两个主梁,两个主梁并列设置且高度相同,两个主梁末端铺设有水平的承重底板,承重底板上设置有水平的堆放底板,承重底板和堆放底板之间安装有重量传感器,用于检测堆放底板上堆放物料的重量,还包括连接重量传感器的控制器和连接控制器的报警器。通过承重底板和堆放底板形成双层底板结构,并在两层底板之间设置重量传感器,承重底板连接主梁,堆放底板上堆放物料,将压力传递至重量传感器,实时监测堆放材料重量,在堆放材料达到或者超过允许重量时启动报警,确保卸料平台使用的安全性。(The invention discloses a temporary unloading platform for building construction floors, which comprises two horizontally arranged main beams, wherein the two main beams are arranged in parallel and have the same height, horizontal bearing bottom plates are laid at the tail ends of the two main beams, horizontal stacking bottom plates are arranged on the bearing bottom plates, a weight sensor is arranged between the bearing bottom plates and the stacking bottom plates and used for detecting the weight of stacked materials on the stacking bottom plates, and the temporary unloading platform also comprises a controller connected with the weight sensor and an alarm connected with the controller. Form double-deck bottom plate structure through bearing bottom plate and stack bottom plate to set up weight sensor between two-layer bottom plate, the girder is connected to the bearing bottom plate, stacks the material on the bottom plate, with pressure transfer to weight sensor, real-time supervision stacks material weight, starts the warning when stacking the material and reaching or surpassing the allowable weight, ensures the security of the platform use of unloading.)

1. The utility model provides a building construction floor platform of unloading temporarily, its characterized in that, including two girder (1) that the level set up, two girder (1) set up side by side and highly the same, two horizontal bearing bottom plate (2) are laid to girder (1) end, be provided with horizontally stack bottom plate (3) on bearing bottom plate (2), bearing bottom plate (2) with stack and install weighing transducer (4) between bottom plate (3) for detect stack the weight of stacking the material on bottom plate (3), still including connecting controller (5) and the connection of weighing transducer (4) alarm (6) of controller (5).

2. Construction floor temporary discharge platform according to claim 1, characterized in that a plurality of said weight sensors (4) are evenly distributed under said stacking floor (3).

3. The temporary discharging platform for building construction floors as claimed in claim 1, wherein guardrails (7) are provided above both side edges and a distal edge of the stacking bottom plate (3).

4. A temporary discharge platform for building construction floors according to claim 3, wherein protection plates (8) attached to the guardrails (7) are installed above both side edges and the end edge of the stacking bottom plate (3).

5. A temporary discharge platform for building construction floors according to claim 4, characterized in that the controller (5) and the alarm (6) are installed on the upper portion of the protection plate (8).

6. The temporary discharging platform for building construction floors according to claim 5, wherein a limiting piece (9) is arranged inside the guardrail (7), and a baffle (10) is arranged below the middle part of the main beam (1).

7. Construction floor temporary discharge platform according to claim 6, characterized in that said guardrail (7) comprises a plurality of cross bars and vertical bars arranged in a staggered manner.

8. The construction floor temporary discharge platform according to claim 1, characterized in that said weight sensor (4) is connected to said controller (5) through a conditioning and switching circuit (11).

9. The building construction floor temporary discharge platform according to claim 1, characterized in that said alarm (6) is embodied as an acoustic alarm.

10. The temporary discharging platform of a building construction floor according to any one of claims 1 to 9, characterized in that the main beam (1) is provided with a discharging lifting ring (12) and a lifting ring (13).

Technical Field

The invention relates to the field of building construction, in particular to a temporary discharging platform for a building construction floor.

Background

At present, a bottom plate is laid on a main beam of a floor temporary unloading platform of a building construction site, materials are stacked on the bottom plate, but the main beam and the bottom plate are limited in strength, so that the materials cannot be stacked without an upper limit.

In order to limit the upper weight limit of the stacked materials on each bottom plate, in the prior art, the amount of the stacked materials is controlled by hanging weight limit cards, and the upper weight limit is calculated and then marked on the weight limit cards. However, the above method cannot monitor whether the weight of the actually stacked material is overweight, and overweight conditions may occur, so that the safety has great hidden danger.

Therefore, how to provide a stable and safe temporary discharging platform for the construction floor is a technical problem to be solved by those skilled in the art at present.

Disclosure of Invention

The invention aims to provide a temporary unloading platform for a building construction floor, which has a double-layer bottom plate structure, wherein a weight sensor is arranged between two bottom plates, so that an alarm can be started when the weight of stacked materials reaches or exceeds the allowable weight, the weight of the stacked materials is monitored in real time, and the use safety of the unloading platform is ensured.

In order to solve the technical problem, the invention provides a temporary unloading platform for a building construction floor, which comprises two horizontally arranged main beams, wherein the two main beams are arranged in parallel and have the same height, horizontal bearing bottom plates are laid at the tail ends of the two main beams, horizontal stacking bottom plates are arranged on the bearing bottom plates, weight sensors are arranged between the bearing bottom plates and the stacking bottom plates and used for detecting the weight of stacked materials on the stacking bottom plates, and the temporary unloading platform also comprises a controller connected with the weight sensors and an alarm connected with the controller.

Preferably, a plurality of said weight sensors are evenly distributed under said stacking floor.

Preferably, guardrails are arranged above the two side edges and the tail end edge of the stacking bottom plate.

Preferably, protection plates attached to the guardrails are installed above the edges of the two sides and the edge of the tail end of the stacking bottom plate.

Preferably, the controller and the alarm are mounted on the upper portion of the protection plate.

Preferably, the guardrail inboard is provided with the locating part, girder middle part below is provided with the baffle.

Preferably, the guard rail comprises a plurality of cross bars and vertical bars arranged in a staggered manner.

Preferably, the weight sensor is connected with the controller through a conditioning conversion circuit.

Preferably, the alarm is embodied as an audible alarm.

Preferably, the main beam is provided with an unloading hanging ring and a hoisting hanging ring.

The invention provides a temporary unloading platform for a building construction floor, which comprises two horizontally arranged main beams, wherein the two main beams are arranged in parallel and have the same height, horizontal bearing bottom plates are laid at the tail ends of the two main beams, horizontal stacking bottom plates are arranged on the bearing bottom plates, a weight sensor is arranged between the bearing bottom plates and the stacking bottom plates and used for detecting the weight of stacked materials on the stacking bottom plates, and the temporary unloading platform also comprises a controller connected with the weight sensor and an alarm connected with the controller.

Form double-deck bottom plate structure through bearing bottom plate and stack bottom plate to set up weight sensor between two-layer bottom plate, the girder is connected to the bearing bottom plate, stacks the material on the bottom plate, with pressure transfer to weight sensor, real-time supervision stacks material weight, starts the warning when stacking the material and reaching or surpassing the allowable weight, ensures the security of the platform use of unloading.

Drawings

Fig. 1 is a front sectional view of a temporary discharging platform for a construction floor according to an embodiment of the present invention;

FIG. 2 is an external elevation view of one embodiment of a temporary discharge platform for a construction floor provided in accordance with the present invention;

fig. 3 is a schematic top view of a temporary discharging platform for a building construction floor according to an embodiment of the present invention.

Detailed Description

The core of the invention is to provide a temporary unloading platform for a building construction floor, a weight sensor is arranged between two bottom plates through a double-layer bottom plate structure, and the temporary unloading platform can start an alarm when the weight of stacked materials reaches or exceeds the allowable weight, monitor the weight of the stacked materials in real time and ensure the use safety of the unloading platform.

In order that those skilled in the art will better understand the disclosure, the invention will be described in further detail with reference to the accompanying drawings and specific embodiments.

Referring to fig. 1 to 3, fig. 1 is a front sectional view of a temporary discharging platform for a building construction floor according to an embodiment of the present invention; FIG. 2 is an external elevation view of one embodiment of a temporary discharge platform for a construction floor provided in accordance with the present invention; fig. 3 is a schematic top view of a temporary discharging platform for a building construction floor according to an embodiment of the present invention.

The invention provides a temporary unloading platform for a building construction floor, which comprises two horizontally arranged main beams 1, wherein the two main beams 1 are arranged in parallel and have the same height, the head ends of the main beams 1 are used for fixed connection, the tail ends of the two main beams 1 are paved with horizontal bearing bottom plates 2, namely the bearing bottom plates 2 are rectangular plates, the two main beams 1 are arranged below one group of opposite edges in the bearing bottom plates 2 and are in contact fixed connection with the main beams 1, the distance between the two main beams 1 is equal to the width of the bearing bottom plate 2, and the head ends and the tail ends of the bearing bottom plates 2 are arranged on the other group of opposite edges. Other arrangement modes can be adopted, and the connection modes can be adjusted according to conditions, for example, the two side edges of the bearing bottom plate 2 exceed the main beam 1, and the invention is within the protection scope.

Meanwhile, a horizontal stacking bottom plate 3 is arranged on the bearing bottom plate 2, a gap is arranged between the bearing bottom plate 2 and the stacking bottom plate 3, a weight sensor 4 is installed in the gap, namely the weight sensor 4 is installed between the bearing bottom plate 2 and the stacking bottom plate 3 and used for detecting the weight of stacked materials on the stacking bottom plate 3, and the stacking bottom plate further comprises a controller 5 connected with the weight sensor 4 and an alarm 6 connected with the controller 5.

Form double-deck bottom plate structure through bearing bottom plate 2 and stacking bottom plate 3, and set up weight sensor 4 between two-layer bottom plate, girder 1 is connected to bearing bottom plate 2, stack the material on the bottom plate 3, transmit pressure to weight sensor 4, real-time supervision stacks material weight, weight sensor 4 will detect data and send to controller 5, after reaching predetermined numerical value, controller 5 control alarm 6 sends out the police dispatch newspaper, remind personnel not to add the material again, start the warning when stacking the material and reach or exceed and allow weight, ensure the security of the platform use of unloading.

Specifically, weight sensor 4 is through conditioning converting circuit 11 connection director 5, and controller 5 is single chip microcomputer control, and wherein, alarm 6 specifically is sound alarm, reminds personnel through sound, also can adopt light alarm, further promotes alarm effect, still can increase a display, can show weight detection result in real time.

In the temporary discharging platform for the building construction floor provided by the embodiment of the invention, a plurality of weight sensors 4 are uniformly distributed below the stacking bottom plate 3, so that stable support is provided, system redundancy is provided, and the reliability of the system is ensured. Specifically, four weight sensors 4 may be provided, evenly arranged along the extending direction of the main beam 1.

In order to improve the safety of use, guardrails 7 are arranged above the two side edges and the tail end edge of the stacking bottom plate 3. Further, protection plates 8 are arranged above the edges of the two sides and the edge of the tail end of the stacking bottom plate, and the protection plates 8 are attached to the guardrails 7. The inner side of the guardrail 7 is provided with a limiting part 9, and the middle lower part of the main beam 1 is provided with a baffle plate 10.

Specifically, guardrail 7 is including a plurality of horizontal poles and the montant of staggered arrangement, and horizontal pole and montant form the rectangular frame who splices in proper order, promote support stability, also can adopt other arrangement methods, like the triangle-shaped frame, stability is better.

Install controller 5 and alarm 6 on 8 upper portions of guard plate, protection device prevents to collide with, and alarm 6 sets up in the top can arouse personnel's attention better simultaneously.

On the basis of the temporary unloading platform of the building construction floor provided by each specific embodiment, the main beam 1 is provided with an unloading hanging ring 12 and a hoisting hanging ring 13 for unloading and hoisting each part. The components can be connected by welding, clamping or bolt connection, and the invention is in the protection scope.

The temporary discharging platform for the building construction floor provided by the invention is described in detail above. The principles and embodiments of the present invention are explained herein using specific examples, which are presented only to assist in understanding the method and its core concepts. It should be noted that, for those skilled in the art, it is possible to make various improvements and modifications to the present invention without departing from the principle of the present invention, and those improvements and modifications also fall within the scope of the claims of the present invention.