Metal pipeline support for steel structure engineering construction

文档序号:447253 发布日期:2021-12-28 浏览:13次 中文

阅读说明:本技术 一种用于钢结构工程施工的金属管道支架 (Metal pipeline support for steel structure engineering construction ) 是由 闫海涛 于 2020-06-25 设计创作,主要内容包括:本发明涉及管道支架技术领域,且公开了一种用于钢结构工程施工的金属管道支架,包括固定框a,所述固定框a两侧的下端均固定安装有插块,所述固定框a的下侧活动设置有固定框b;所述固定框b两侧的上端均固定安装有托架,所述托架远离固定框b一侧的外表面活动设置有插座。该装置通过设置插座、插块和管道放置件,在使用时,首先将固定框a置于钢结构横梁上,然后将固定框b置于固定框a的下侧,并转动两个插座插在相应的插块上,然后利用螺栓a将插座固定在插块上,接着将管道通过管道放置架右侧的开口置于管道放置架的内部,并旋转螺纹杆调整管道放置架的高度即可,相较于现有技术,本申请安装方便,有效提高了现有技术的实用性。(The invention relates to the technical field of pipeline supports, and discloses a metal pipeline support for steel structure engineering construction, which comprises a fixed frame a, wherein the lower ends of two sides of the fixed frame a are fixedly provided with inserting blocks, and the lower side of the fixed frame a is movably provided with a fixed frame b; the upper end of fixed frame b both sides is equal fixed mounting has the bracket, the surface activity that fixed frame b one side was kept away from to the bracket is provided with the socket. The device is through setting up the socket, the piece is placed to inserted block and pipeline, when using, at first arrange fixed frame a in on the steel construction crossbeam, then arrange fixed frame b in fixed frame a's downside, and rotate two sockets and insert on corresponding inserted block, then utilize bolt an to fix the socket on the inserted block, the inside of pipeline rack is arranged in to the opening that passes through pipeline rack right side with the pipeline after that, and the height of rotatory threaded rod adjustment pipeline rack can, compare in prior art, this application simple to operate, prior art's practicality has effectively been improved.)

1. The utility model provides a metal pipeline support for steel construction engineering construction, includes fixed frame a (1), its characterized in that: the lower ends of two sides of the fixed frame a (1) are fixedly provided with inserting blocks (2), and the lower side of the fixed frame a (1) is movably provided with a fixed frame b (3);

brackets (4) are fixedly mounted at the upper ends of two sides of the fixed frame b (3), a socket (5) is movably arranged on the outer surface of one side, far away from the fixed frame b (3), of each bracket (4), and a bolt a (6) is movably connected to the top side of each socket (5) in a penetrating mode;

bolts b (7) are spirally connected to two ends of the bottom side of the fixing frame b (3), and the two bolts b (7) are respectively and movably connected with two ends of the bottom side of the fixing plate (9) through bearings a (8) at the top ends;

a threaded pipe (10) is fixedly installed at the middle end of the bottom side of the fixed frame b (3), a threaded rod (11) is spirally connected inside the threaded pipe (10), the threaded rod (11) is movably connected with a pipeline placing piece (13) through a bearing b (12) at the bottom end, bolts c (14) are spirally connected to the front side and the rear side of the top end of the pipeline placing piece (13), and pressing blocks (16) are movably connected to the bottom ends of the two bolts c (14) through bearings c (15);

2. the metal pipeline bracket for steel structure engineering construction according to claim 1, characterized in that: the lower ends of the two sides of the threaded rod (11) are fixedly provided with rotating handles (17).

3. The metal pipeline bracket for steel structure engineering construction according to claim 1, characterized in that: an opening (18) is formed in the right side of the socket (5), the opening (18) extends to the left side of the socket (5), and the insertion block (2) movably penetrates through the opening (18).

4. The metal pipeline bracket for steel structure engineering construction according to claim 1, characterized in that: rubber pads are bonded on the bottom side of the pressing block (16) and the top side of the fixing plate (9).

5. The metal pipeline bracket for steel structure engineering construction according to claim 1, characterized in that: the front side cross section of the socket (5) is of an inverted L shape, and one end, close to the fixed frame a (1), of the socket (5) is abutted to the outer side wall of the fixed frame a (1).

6. The metal pipeline bracket for steel structure engineering construction according to claim 1, characterized in that: the bottom end of the bolt a (6) is spirally connected with the top side wall surface of the insert block (2).

Technical Field

The invention relates to the technical field of pipeline supports, in particular to a metal pipeline support for steel structure engineering construction.

Background

Because steel construction factory building individual layer height, the air conditioner water piping erection that obviously applies in the factory building need with the help of the metal shaped steel support, with the metal shaped steel support mounting on steel construction main beam.

Through the retrieval, a metal pipeline support for steel construction engineering construction of current patent (publication number is CN210088176U), including fixed frame, the quantity of fixed frame is two, two the first inoxidizing coating of the equal fixedly connected with of inner wall of fixed frame, two the both sides difference fixedly connected with first connecting plate and the second connecting plate of fixed frame, the quantity of first connecting plate and second connecting plate is two. This a metal pipeline support for steel construction engineering construction, it is connected with the steel construction main beam to set up two fixed frames, and set up the first inoxidizing coating and the second inoxidizing coating of rubber material respectively at the inner wall of fixed frame and pipe clamp, can protect steel construction main beam and metal pipeline, prevent that pipeline support from leading to the fact the damage to its body and fire prevention material, safety protection's purpose has been reached, it fixes fixed frame and pipe clamp to set up the bolt, can make things convenient for constructor to install it fixedly, the purpose of the installation of being convenient for has been reached.

The prior art has the following technical problems:

1. when the existing metal pipeline support is used, the structure below the two fixing frames needs to be supported after the two fixing frames are installed, and then the metal pipeline support is installed inconveniently.

2. When the existing metal pipeline support is used and used for fixing a pipeline, the pipeline needs to be supported and then the pipe clamp needs to be fixed, and labor is wasted.

Disclosure of Invention

Technical problem to be solved

Aiming at the defects of the prior art, the invention provides the metal pipeline bracket for steel structure engineering construction, which has the advantages of simple installation, time and labor saving and the like, and solves the problems of complex and inconvenient installation and the need of supporting the pipeline during fixing in the prior art.

(II) technical scheme

In order to achieve the purpose, the invention provides the following technical scheme: a metal pipeline support for steel structure engineering construction comprises a fixed frame a, wherein insert blocks are fixedly arranged at the lower ends of two sides of the fixed frame a, and a fixed frame b is movably arranged at the lower side of the fixed frame a;

brackets are fixedly arranged at the upper ends of two sides of the fixed frame b, a socket is movably arranged on the outer surface of one side of each bracket, which is far away from the fixed frame b, and a bolt a is movably connected to the top side of each socket in a penetrating manner;

bolts b are spirally connected to two ends of the bottom side of the fixing frame b, and the two bolts b are respectively and movably connected with two ends of the bottom side of the fixing plate through bearings a at the top ends;

a threaded pipe is fixedly installed at the middle end of the bottom side of the fixed frame b, a threaded rod is spirally connected inside the threaded pipe, the threaded rod is movably connected with a pipeline placing piece through a bearing b at the bottom end, bolts c are spirally connected on the front side and the rear side of the top end of the pipeline placing piece, and the bottom ends of the two bolts c are movably connected with pressing blocks through bearings c;

preferably, the lower ends of the two sides of the threaded rod are fixedly provided with rotating handles.

Through above-mentioned scheme, can utilize to change the rotation threaded rod, adjust the interval of pipeline mounting and screwed pipe.

Preferably, the right side of the socket is provided with an opening, the opening extends to the left side of the socket, and the insertion block movably penetrates through the opening.

Through the scheme, the fixing frame b can be hung on the fixing frame a by using the socket, so that the fixing frame a and the fixing frame b can be conveniently connected.

Preferably, rubber pads are bonded to the bottom side of the pressing block and the top side of the fixing plate.

Through above-mentioned scheme, can improve the compactness of briquetting and pipe connection, improve the compactness that the fixed plate is connected the steel construction crossbeam.

Preferably, the front cross section of the socket is in an inverted L shape, and one end of the socket close to the fixing frame a abuts against the outer side wall of the fixing frame a.

Through the scheme, the position of the socket can be limited, so that the bolt a and the insertion block are connected in a screwing mode.

Preferably, the bottom end of the bolt a is spirally connected with the top side wall surface of the insert block.

Through the scheme, the socket can be fixed on the plug block by utilizing the bolt a.

Compared with the prior art, the invention provides a metal pipeline bracket for steel structure engineering construction, which has the following beneficial effects:

1. this a metal pipeline support for steel construction engineering construction, through setting up the socket, the piece is placed to inserted block and pipeline, when using, at first arrange fixed frame an in on the steel construction crossbeam, then arrange fixed frame b in the downside of fixed frame an, and rotate two sockets and insert on corresponding inserted block, then utilize bolt an to fix the socket on the inserted block, the inside of pipeline rack is arranged in to the opening that passes through pipeline rack right side with the pipeline after that, and the height of rotatory threaded rod adjustment pipeline rack can, compare in prior art, this application simple to operate, prior art's practicality has effectively been improved.

2. This a metal pipeline support for steel construction engineering construction, through, when using, after accomplishing the installation of fixed frame an and fixed frame b and accomplishing placing of pipeline, the fixed plate is further impeld to two rotatory bolts b of accessible, and two rotatory bolts c, further impels the briquetting to stabilize the stability between fixed frame an and fixed frame b and the steel construction crossbeam, and further fixed pipeline, effectively improved prior art's practicality.

Drawings

FIG. 1 is a schematic front view of the present invention;

FIG. 2 is a top view of the tube placement member of the present invention;

FIG. 3 is a perspective view of the socket of the present invention;

fig. 4 is a top view of the bracket of the present invention.

Wherein: 1. a fixed frame a; 2. inserting a block; 3. a fixed frame b; 4. a bracket; 5. a socket; 6. a bolt a; 7. a bolt b; 8. a bearing a; 9. a fixing plate; 10. a threaded pipe; 11. a threaded rod; 12. a bearing b; 13. a pipe placement member; 14. a bolt c; 15. a bearing c; 16. briquetting; 17. turning a handle; 18. and (4) opening.

Detailed Description

The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.

Referring to fig. 1 to 4, a metal pipe bracket for steel structural engineering construction includes a fixing frame a1, wherein insert blocks 2 are fixedly mounted at the lower ends of both sides of the fixing frame a1, and a fixing frame b3 is movably disposed at the lower side of the fixing frame a 1;

the upper ends of two sides of the fixed frame b3 are fixedly provided with brackets 4, the outer surface of one side of the bracket 4, which is far away from the fixed frame b3, is movably provided with a socket 5, the socket 5 is used for hanging the fixed frame b3 on the insert block 2, the cross section of the front side of the socket 5 is of an inverted L shape, one end, which is close to the fixed frame a1, of the socket 5 is abutted against the outer side wall of the fixed frame a1, the right side of the socket 5 is provided with an opening 18, the opening 18 extends to the left side of the socket 5, the opening 18 is used for enabling the insert block 2 to pass through the socket 5, the insert block 2 movably penetrates through the opening 18, the top side of the socket 5 is movably and penetratingly connected with a bolt a6, the bottom end of the bolt a6 is spirally connected with the top side wall surface of the insert block 2, and the bolt a is used for fixing the insert block 2 and the socket 5;

bolts b7 are spirally connected to two ends of the bottom side of the fixed frame b3, two bolts b7 are movably connected to two ends of the bottom side of the fixed plate 9 through bearings a8 at the top ends, and the fixed plate 9 is pushed by the two bolts b7 to abut against a steel structure beam;

the middle end of the bottom side of the fixing frame b3 is fixedly provided with a threaded pipe 10, the interior of the threaded pipe 10 is spirally connected with a threaded rod 11, the threaded rod 11 and the threaded pipe 10 are used for adjusting the height of a pipeline placing piece, the lower ends of two sides of the threaded rod 11 are fixedly provided with rotating handles 17, the rotating handles 17 are used for rotating the threaded rod 11, the threaded rod 11 is movably connected with a pipeline placing piece 13 through a bearing b12 at the bottom end, the front side and the rear side of the top end of the pipeline placing piece 13 are respectively and spirally connected with a bolt c14, the bottom ends of the two bolts c14 are respectively and movably connected with a pressing block 16 through a bearing c15, the pressing block 16 is used for pressing the pipeline, rubber pads are bonded on the bottom side of the pressing block 16 and the top side of the fixing plate 9, and are used for improving the friction force of the pressing block 16 and the fixing plate 9 on the surface of a jointed object;

when in use, the fixing frame a1 is firstly placed on the steel structure beam, then the fixing frame b3 is placed at the lower side of the fixing frame a1, two sockets 5 are rotated to be inserted on the corresponding insertion blocks 2, then the sockets 5 are fixed on the insertion blocks 2 by using the bolts a6, then the pipeline is placed in the pipeline placing frame 13 through the opening at the right side of the pipeline placing frame 13, the threaded rod 11 is rotated to adjust the height of the pipeline placing frame 13, then the fixing plate 9 is further pushed by rotating the two bolts b7, the pressing block 16 is further pushed by rotating the two bolts c14, so that the stability between the fixing frame a1 and the fixing frame b3 and the steel structure beam is stabilized, the pipeline is further fixed, and the practicability of the prior art is effectively improved.

Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

7页详细技术资料下载
上一篇:一种医用注射器针头装配设备
下一篇:一种立式管道可调抗震支吊架及使用方法

网友询问留言

已有0条留言

还没有人留言评论。精彩留言会获得点赞!

精彩留言,会给你点赞!

技术分类