Pipe clamp device of novel finned economizer pipe

文档序号:447256 发布日期:2021-12-28 浏览:4次 中文

阅读说明:本技术 一种新型翅片式省煤器管的管夹装置 (Pipe clamp device of novel finned economizer pipe ) 是由 王新 田忠权 管亿 孙建涛 于 2021-11-04 设计创作,主要内容包括:本发明公开了一种新型翅片式省煤器管的管夹装置,旨在提供一种有效的保护管子的新型翅片式省煤器管的管夹装置,其技术方案要点是包括架体,所述架体上还设有夹持装置,所述夹持装置包括位于架体两侧设有的移动杆及位于移动杆连接有的夹持框,所述夹持框内还设有若干夹紧装置,所述夹紧装置两侧还设有固定装置,所述夹紧装置包括位于夹持框内设有的若干叠放的伸缩框及位于伸缩框两端上设有的伸缩杆。(The invention discloses a pipe clamping device of a novel finned economizer pipe, and aims to provide a pipe clamping device of the novel finned economizer pipe for effectively protecting the pipe.)

1. The utility model provides a pipe clamp device of novel finned economizer pipe which characterized in that: including support body (1), still be equipped with clamping device (2) on support body (1), clamping device (2) still are equipped with a plurality of clamping device (3) including the carriage release lever (21) that are located support body (1) both sides and the centre gripping frame (22) that are located carriage release lever (21) and are connected, still be equipped with in centre gripping frame (22), clamping device (3) both sides still are equipped with fixing device (4), a plurality of flexible frame (31) of stacking that clamping device (3) were equipped with including being located centre gripping frame (22) and being located telescopic link (32) that are equipped with on flexible frame (31) both ends.

2. The pipe clamping device of the novel finned economizer pipe as claimed in claim 1, wherein: the fixing device (4) comprises a through hole (41) formed in the telescopic frame (31), a plurality of placing holes (42) formed in the frame body (1) and fixing bolts (43) which are arranged in the placing holes (42) and connected with the through hole (41) in a threaded mode.

3. The pipe clamping device of the novel finned economizer pipe as claimed in claim 2, wherein: the bottom of the telescopic frame (31) is also provided with an anti-collision pad (5).

4. The pipe clamping device of the novel finned economizer pipe as claimed in claim 3, wherein: the frame body (1) is provided with an upper block and a lower block, and the frame body (1) is further provided with a plurality of inserting blocks (6) and inserting grooves (7) matched with the inserting blocks (6).

5. The pipe clamping device of the novel finned economizer pipe as claimed in claim 1, wherein: support body (1) one side still is equipped with connecting rod (8), support body (1) opposite side is equipped with adapter sleeve (9) that match with connecting rod (8).

6. The pipe clamping device of the novel finned economizer pipe as claimed in claim 5, wherein: the connecting sleeve (9) is further provided with a tightening bolt (10), and the connecting rod (8) is provided with a slotted hole (11) matched with the tightening bolt (10).

Technical Field

The invention relates to the field of economizer equipment, in particular to a pipe clamp device of a novel finned economizer pipe.

Background

The Economizer (Economizer) is a device which is arranged at the lower part of a flue at the tail part of a boiler and is used for recovering the waste heat of exhausted smoke, water fed by the boiler is heated into a heating surface of saturated water under the pressure of a steam drum, and the Economizer is called as the Economizer because the Economizer absorbs the heat of high-temperature smoke, reduces the exhaust temperature of the smoke, saves energy and improves the efficiency.

The steel pipe type economizer is not limited by pressure, can be used as a boiling type economizer and is generally made of carbon steel pipes with the outer diameter of 32-51 mm. Fins and fins are sometimes added to the tube to improve heat transfer. The steel pipe type economizer consists of parallel elbow pipes (commonly called coiled pipes) which are horizontally arranged.

However, the existing common economizer pipe clamps are all in a light pipe type, the pipe clamps of the finned pipes are all spliced by steel plates, the welding amount is large, time and labor are wasted, the construction period is long, the installation and the disassembly are inconvenient, and the pipe clamps are easy to displace and deform in the transportation process.

Disclosure of Invention

The invention aims to provide a pipe clamping device of a novel finned economizer pipe, which has the advantages of effectively ensuring that the pipe clamping of the finned pipe is not damaged in the transportation process and being convenient to install and store.

The technical purpose of the invention is realized by the following technical scheme:

the utility model provides a novel pipe clamp of fin formula economizer pipe, includes the support body, still be equipped with clamping device on the support body, clamping device is including the carriage release lever that is equipped with and the centre gripping frame that is connected that is located the carriage release lever, still be equipped with a plurality of clamping device in the centre gripping frame, the clamping device both sides still are equipped with fixing device, clamping device is including being located the flexible frame that a plurality of stacks that are equipped with in the centre gripping frame and being located the telescopic link that is equipped with on the flexible frame both ends.

Through adopting above-mentioned technical scheme, the flexible frame that is equipped with can be effectual pulls out whole as required to form the flexible frame that expands one by one under the effect of cooperation telescopic link, thereby can effectually protect whole pipe, use two the same support bodies simultaneously from top to bottom can all effectually wrap up the upper and lower of pipe wherein, thereby because whole flexible frame preparation becomes two flexible frame cooperation from top to bottom of concave, with the pipe parcel reach the purpose of protection pipe in.

Further setting: the fixing device comprises a through hole arranged on the telescopic frame, a plurality of placing holes arranged on the frame body and a fixing bolt which is arranged in the placing holes and is in threaded connection with the through hole.

Through adopting above-mentioned technical scheme, the fixing device that is equipped with can be effectual carry out the installation fixed after flexible frame reaches the assigned position, also makes things convenient for the dismantlement in later stage, and fixing bolt sets up can effectually accomodate whole flexible frame on the support body simultaneously.

Further setting: the bottom of the telescopic frame is also provided with an anti-collision pad.

Through adopting above-mentioned technical scheme, the crashproof pad that is equipped with can effectual reduction damage.

Further setting: the frame body is equipped with two from top to bottom, still be equipped with a plurality of inserted blocks and the slot that matches with the inserted block on the frame body respectively.

Through adopting above-mentioned technical scheme to interconnect between two upper and lower support bodies of being convenient for, the setting of staggering with the slot of inserted block between two support bodies simultaneously, thereby can make the inserted block insert in the slot when merging.

Further setting: the support body one side still is equipped with the connecting rod, the support body opposite side is equipped with the adapter sleeve that matches with the connecting rod.

Through adopting above-mentioned technical scheme, the connecting rod that is equipped with and the convenient a plurality of support body interconnect between transversely of adapter sleeve are in the same place.

Further setting: the connecting sleeve is further provided with a tightening bolt, and the connecting rod is provided with a slotted hole matched with the tightening bolt.

Through adopting above-mentioned technical scheme, thereby can effectual fixed corresponding adapter sleeve accomplish the stable installation of whole equipment.

In conclusion, the invention has the following beneficial effects: the integral structure not only saves a lot of welding amount, but also the pipe clamp, the pipe and the frame form a whole body which can not move and shift in the transportation process, thereby being safer. The whole weight is located at the bottom of the frame, and the pipe is supported, so that the pipe clamp device is convenient to manufacture, simple to mount and dismount, small in welding amount, and greatly shortened in manufacturing period and difficulty.

Drawings

The invention is further described below with reference to the accompanying drawings.

Fig. 1 is a schematic view of the overall structure of a pipe clamping device of the novel finned economizer pipe.

In the figure, 1, a frame body; 2. a clamping device; 21. a travel bar; 22. a clamping frame; 3. a clamping device; 31. a telescopic frame; 32. a telescopic rod; 4. a fixing device; 41. a through hole; 42. placing holes; 43. fixing the bolt; 5. an anti-collision pad; 6. inserting a block; 7. a slot; 8. a connecting rod; 9. connecting sleeves; 10. screwing down the bolt; 11. a slot hole.

Detailed Description

The following further describes the embodiments of the present invention with reference to the drawings.

The technical scheme adopted by the invention is as follows: a pipe clamp device of a novel finned economizer pipe, which is shown in figure 1 and comprises a frame body 1, wherein the frame body 1 is provided with an upper block and a lower block, the frame body 1 is respectively provided with a plurality of inserting blocks 6 and inserting grooves 7 matched with the inserting blocks 6, the top end of the frame body 1 is also provided with a clamping device 2, the clamping device 2 comprises moving rods 21 arranged at the two sides of the frame body 1 and a clamping frame 22 connected with the moving rods 21, a plurality of clamping devices 3 are also arranged in the clamping frame 22, each clamping device 3 comprises a plurality of overlapped telescopic frames 31 arranged in the clamping frame 22, crash pads 5 are also arranged at the bottoms of the telescopic frames 31, the two ends of the telescopic frame 31 are provided with telescopic rods 32, which is convenient for pulling out the telescopic frame 31 which is stacked, meanwhile, fixing devices 4 are further arranged on two sides of the clamping device 3, and each fixing device 4 comprises a through hole 41 formed in the telescopic frame 31, a plurality of placing holes 42 formed in the frame body 1 and fixing bolts 43 which are arranged in the placing holes 42 and are in threaded connection with the through holes 41.

A connecting rod 8 is further arranged on one side of the frame body 1, a connecting sleeve 9 matched with the connecting rod 8 is arranged on the other side of the frame body 1, a tightening bolt 10 is further arranged on the connecting sleeve 9, and a slotted hole 11 matched with the tightening bolt 10 is formed in the connecting rod 8, so that the connecting sleeve 9 and the connecting piece can be conveniently connected with each other.

The main working principle is as follows: through pulling out the flexible frame 31 that stacks on the support body 1 in the use, flexible frame 31 pulls out under the effect of telescopic link 32, thereby place on the pipe, and because support body 1 has about two, consequently can live whole pipe parcel from the top down, the crashproof pad 5 that is equipped with simultaneously can effectual reduction to the damage of pipe, can carry out corresponding card through slot 7 and the jack that matches each other on support body 1 after the position alignment and go into, and connecting rod 8 through both sides and the adapter sleeve 9 on the adjacent support body 1 are connected side by side each other, thereby form a holistic, two support bodies 1 can effectually link together through the fixing bolt 43 that is equipped with simultaneously, thereby guarantee holistic stability, this structure is simple relatively, and the operability is stronger, be fit for a large amount of uses.

The present invention is not intended to be limited to the particular embodiments shown above, but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

6页详细技术资料下载
上一篇:一种医用注射器针头装配设备
下一篇:一种高温蒸汽氧化实验管道三向限位装置及其安装方法

网友询问留言

已有0条留言

还没有人留言评论。精彩留言会获得点赞!

精彩留言,会给你点赞!

技术分类