Aluminum square tube furred ceiling mounting structure with shape reinforcement design of preapring for an unfavorable turn of events

文档序号:63831 发布日期:2021-10-01 浏览:43次 中文

阅读说明:本技术 一种具有防变形加固设计的铝方通吊顶安装结构 (Aluminum square tube furred ceiling mounting structure with shape reinforcement design of preapring for an unfavorable turn of events ) 是由 徐胡善 周鑫 何宸竹 张明武 邢新 杨胜凯 李曰剑 王昌兰 纪春伟 杜宝年 梁玉 于 2021-08-11 设计创作,主要内容包括:本发明公开了一种具有防变形加固设计的铝方通吊顶安装结构,包括:吊杆、吊顶龙骨、铝方通和防变形板,吊顶龙骨的顶板通过吊杆固定安装在建筑顶面上,吊顶龙骨的底板上设置有沿吊顶龙骨长度方向等距布置的若干个缺口,铝方通上设置有沿自身长度放置布置的安装槽,铝方通通过紧固件固定安装在吊顶龙骨上,紧固件的头部滑动连接在安装槽内,紧固件的杆体卡接在缺口内,防变形板放置在吊顶龙骨的底板上,紧固件的杆体穿过防变形板上的通孔并通过螺母固定。本发明相较于现有技术,铝方通通过紧固螺栓固定安装在吊顶龙骨上,并且吊顶龙骨通过多重方式进行防变形加固,有效防止铝方通的安装松动,保证铝方通吊顶的装饰效果。(The invention discloses an aluminum square tube ceiling mounting structure with an anti-deformation reinforcement design, which comprises: the jib, the furred ceiling fossil fragments, aluminium square tube and anti-deformation board, the roof of furred ceiling fossil fragments passes through jib fixed mounting on building top surface, be provided with a plurality of breach of arranging along furred ceiling fossil fragments length direction equidistance on the bottom plate of furred ceiling fossil fragments, be provided with on the aluminium square tube and place the mounting groove of arranging along self length, the aluminium square tube passes through fastener fixed mounting on the furred ceiling fossil fragments, the head sliding connection of fastener is in the mounting groove, the body of rod joint of fastener is in the breach, anti-deformation board is placed on the bottom plate of furred ceiling fossil fragments, the body of rod of fastener passes the through-hole on the anti-deformation board and fixes through the nut. Compared with the prior art, the aluminum square tube is fixedly installed on the ceiling keel through the fastening bolt, and the ceiling keel is subjected to deformation prevention and reinforcement in a multiple mode, so that the installation looseness of the aluminum square tube is effectively prevented, and the decorative effect of the aluminum square tube ceiling is ensured.)

1. The utility model provides an aluminium square tube furred ceiling mounting structure with design is consolidated to shape of preapring for an unfavorable turn of events, a serial communication port, includes: suspender (1), ceiling keel (2), aluminum square tube (3) and deformation-preventing plate (4), the cross-section of ceiling keel (2) is "C" type, roof (21) of ceiling keel (2) is through suspender (1) fixed mounting on the building top surface, be provided with on bottom plate (22) of ceiling keel (2) along a plurality of breach (221) that ceiling keel (2) length direction equidistance was arranged, be provided with on aluminum square tube (3) along self length place the mounting groove (31) of arranging, the cross-section of mounting groove (31) is "T" type of inversion, aluminum square tube (3) pass through fastener (5) fixed mounting on ceiling keel (2), the head sliding connection of fastener (5) is in mounting groove (31), the body of rod joint of fastener (5) is in breach (221), prevent that deformation board (4) are placed furred ceiling fossil fragments (2) on bottom plate (22), the body of rod of fastener (5) passes through prevent that the through-hole on deformation board (4) is fixed through the nut.

2. The aluminum square tube suspended ceiling mounting structure with the deformation-preventing and reinforcing design according to claim 1, wherein a first clamping seat (211) is arranged on the top plate (21), a second clamping seat (222) corresponding to the first clamping seat (211) in position is arranged on the bottom plate (22), one end of the support member (6) is clamped in the first clamping seat (211), and the other opposite end of the support member is clamped in the second clamping seat (222).

3. The aluminum square tube suspended ceiling mounting structure with deformation-preventing reinforcement design according to claim 2, wherein the supporting member (6) comprises a first clamping plate (61), a second clamping plate (62) and a connecting rod (63), the first clamping plate (61) and the second clamping plate (62) are symmetrically arranged at two ends of the connecting rod (63), the first clamping plate (61) is clamped in the first clamping seat (211), and the second clamping plate (62) is clamped in the second clamping seat (222).

4. The aluminum square tube suspended ceiling mounting structure with the deformation-preventing and reinforcing design according to claim 3, wherein the connecting rod (63) comprises an upper rod body (631) and a lower rod body (632), the upper rod body (631) is screwed in the lower rod body (632), the first clamping plate (61) is fixedly mounted on the upper rod body (631), and the second clamping plate (62) is fixedly mounted on the lower rod body (632).

5. The aluminum square tube ceiling mounting structure with the anti-deformation reinforcement design according to claim 2, wherein the second snap seat (222) and the notch (221) are arranged at intervals.

6. The aluminum square tube suspended ceiling mounting structure with the deformation-preventing and reinforcing design according to claim 5, wherein symmetrically arranged clamping grooves (223) are arranged on two sides of the second clamping seat (222), and the end parts of the deformation-preventing plate (4) are clamped in the clamping grooves (223).

7. The aluminum square tube suspended ceiling mounting structure with the anti-deformation reinforcement design according to claim 1, wherein the suspension rod (1) comprises a first rod body (11) and a second rod body (12), the first rod body (11) is fixedly mounted on the top surface of the building, the second rod body (12) is screwed in the first rod body (11), and the top plate (21) is fixedly mounted at the bottom of the second rod body (12).

8. The aluminum square tube suspended ceiling mounting structure with the anti-deformation reinforcement design according to claim 7, characterized in that the first rod body (11) is fixedly mounted on the building top surface through a strip-shaped plate (13), and the strip-shaped plate (13) is parallel to the aluminum square tube (3).

9. The aluminum square tube ceiling mounting structure with deformation reinforcement design according to claim 1, characterized in that the width of the gap (221) is equal to the diameter of the fastener (5) rod body.

Technical Field

The invention belongs to the field of assembly type buildings, and particularly relates to an aluminum square tube ceiling mounting structure with an anti-deformation reinforcing design.

Background

The aluminum square tube is formed by cutting and corner cutting through die pressing on the basis of an aluminum alloy plate, and various aluminum square tube products are obtained by processing various coatings on the surface of the aluminum square tube. The aluminum square tube is mainly divided into two types, one is a home decoration aluminum square tube, and the other is an engineering aluminum square tube. With the rapid development of the decoration industry, people have higher and higher decoration requirements on public spaces. In order to meet the requirements of people on layered public space and natural and transparent light, the aluminum square tube is widely applied to the decoration design of the public space. Super special-shaped wood grain aluminium square tube in house ornamentation aluminium square tube uses when decorating in public space to light metal material is the element, through the nature impression, conveys whole interior space, has satisfied the decoration requirement of people to public space greatly.

Current structure furred ceiling is when installation aluminium square tube, and aluminium square tube is mostly through the mode fixed mounting that articulates in furred ceiling fossil fragments below. Chinese patent CN201621011614.0 discloses a card formula aluminium square tube fossil fragments furred ceiling mounting structure, its main joist that includes equidistant arrangement and the aluminium square tube of equidistant arrangement along main joist extending direction, in the equidistant piece that hangs that is provided with of main joist's top surface, hang the piece and fix with the jib respectively, the equipartition has the plug-in components of hanging on the body of main joist extending direction, the aluminium square tube is fixed with the completion after hanging the plug-in components grafting in proper order, and beneficial effect is: hanging plug-in components are evenly distributed on the body in the extending direction of the main keel, plug-in wings are formed at the free ends of the hanging plug-in components, slots are formed in the side portions of the aluminum square tube, and the plug-in wings of the hanging plug-in components are sequentially plugged in the aluminum square tube to be fixed. Chinese patent 201821949255.2 discloses a U-shaped aluminium square tube and down lamp combination furred ceiling, include two at least through hanging the furred ceiling fossil fragments of muscle fixed mounting on the ceiling, the bottom of furred ceiling fossil fragments on install the couple that is the shape of falling T, the notch of U-shaped aluminium square tube is hung and is established on the couple, U-shaped aluminium square tube in be provided with the down lamp, the down lamp on install the support frame, the support frame erects in the notch department of U-shaped aluminium square tube, set up the light trap that quantity is no less than down lamp quantity on the low bottom surface of U-shaped aluminium square tube, the size of light trap is not less than the size that the down lamp is close to light trap one end. Can be when adjacent U-shaped aluminium square tube interval is less than down lamp width, install the down lamp in U-shaped aluminium square tube inboard to through the effect of light trap, can not influence the illuminating effect of down lamp, establish a section of thick bamboo lighting fixture on U-shaped aluminium square tube through the support frame, can need not to punch the installation on the roof, the mounting form is more convenient, labour saving and time saving.

When the aluminium square tube is installed through the mode that articulates, the installation is insecure, and aluminium square tube atress is inhomogeneous, hang the department and appear warping easily, and the furred ceiling fossil fragments of aluminium square tube furred ceiling also take place to warp easily under the action of gravity of aluminium square tube, lead to the installation of aluminium square tube not hard up, influence the decorative effect of aluminium square tube furred ceiling.

Disclosure of Invention

The invention aims to: the utility model provides an aluminium square tube furred ceiling mounting structure with shape reinforcement design of preapring for an unfavorable turn of events, aluminium square tube passes through fastening bolt fixed mounting on furred ceiling fossil fragments to furred ceiling fossil fragments are preapred for an unfavorable turn of events through multiple mode and are strengthened, effectively prevent that the installation of aluminium square tube is not hard up, guarantee the decorative effect of aluminium square tube furred ceiling.

In order to achieve the purpose, the invention adopts the following technical scheme: the utility model provides an aluminium square tube furred ceiling mounting structure with design is consolidated to shape of preapring for an unfavorable turn of events, includes: the jib, the furred ceiling fossil fragments, aluminium square tube and anti-deformation board, the cross-section of furred ceiling fossil fragments is "C" type, the roof of furred ceiling fossil fragments passes through jib fixed mounting on building top surface, be provided with a plurality of breach of arranging along furred ceiling fossil fragments length direction equidistance on the bottom plate of furred ceiling fossil fragments, be provided with on the aluminium square tube and place the mounting groove of arranging along self length, the cross-section of mounting groove is "T" type of inversion, the aluminium square tube passes through fastener fixed mounting on the furred ceiling fossil fragments, the head sliding connection of fastener is in the mounting groove, the body of rod joint of fastener is in the breach, anti-deformation board is placed on the bottom plate of furred ceiling fossil fragments, the body of rod of fastener passes the through-hole on the anti-deformation board and fixes through the nut.

As a further description of the above technical solution:

the top plate is provided with a first clamping seat, the bottom plate is provided with a second clamping seat, the position of the second clamping seat corresponds to that of the first clamping seat, one end of the support piece is clamped in the first clamping seat, and the other end of the support piece is clamped in the second clamping seat.

As a further description of the above technical solution:

the support piece comprises a first clamping plate, a second clamping plate and a connecting rod, the first clamping plate and the second clamping plate are symmetrically arranged at two ends of the connecting rod, the first clamping plate is clamped in the first clamping seat, and the second clamping plate is clamped in the second clamping seat.

As a further description of the above technical solution:

the connecting rod includes the body of rod and the lower body of rod, goes up body of rod threaded connection in the lower body of rod, and first joint board fixed mounting is on the body of rod, and second joint board fixed mounting is on the body of rod down.

As a further description of the above technical solution:

the second clamping seat and the notch are arranged at intervals.

As a further description of the above technical solution:

the two sides of the second clamping seat are provided with symmetrically arranged clamping grooves, and the end parts of the anti-deformation plates are clamped in the clamping grooves.

As a further description of the above technical solution:

the jib includes the first body of rod and the second body of rod, and first body of rod fixed mounting is on the building top surface, and second body of rod threaded connection is internal at the first body of rod, and roof fixed mounting is in the second body of rod bottom.

As a further description of the above technical solution:

the first rod body is fixedly installed on the top surface of the building through a strip-shaped plate, and the strip-shaped plate is parallel to the aluminum square tube.

As a further description of the above technical solution:

the width of the gap is equal to the diameter of the fastener body.

In summary, due to the adoption of the technical scheme, the invention has the beneficial effects that:

1. when the aluminum square tube is installed, the ceiling keel is fixedly installed on the top surface of a building through the hanging rod, the head of the fastener is connected into the installation groove of the aluminum square tube in a sliding mode, the anti-deformation plate is sleeved on the rod body of the fastener, the aluminum square tube is abutted to the lower portion of the ceiling keel, the fastener is slid, the rod body of the fastener is clamped in the notch, the anti-deformation plate is placed on the bottom plate of the ceiling keel at the moment, and finally the fastener is locked through the nut, so that the aluminum square tube is installed. Compare in articulate formula installation aluminium square tube, the aluminium square tube passes through the fastener (like fastening bolt) firmly fixed, and the head of fastening bolt is compared in the couple of aluminium square tube when articulating, has increased the area of contact with the aluminium square tube for the aluminium square tube installation is firm, and the junction is difficult for appearing warping.

2. In the invention, in order to prevent the ceiling keel from deforming under the action of the gravity of the aluminum square tube, the aluminum square tube is installed loosely, the supporting piece is arranged between the top plate and the bottom plate of the ceiling keel, and two ends of the supporting piece are respectively clamped and fixed through the first clamping seat and the second clamping seat, so that the ceiling keel is prevented from deforming. Simultaneously, the deformation board is prevented through the draw-in groove location in second joint seat both sides, further improves the shape ability of preapring for an unfavorable turn of events of furred ceiling fossil fragments.

Drawings

In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings needed to be used in the embodiments will be briefly described below, it should be understood that the following drawings only illustrate some embodiments of the present invention and therefore should not be considered as limiting the scope, and for those skilled in the art, other related drawings can be obtained according to the drawings without inventive efforts.

Fig. 1 is a schematic structural diagram of an aluminum square tube ceiling mounting structure with an anti-deformation reinforcement design.

Fig. 2 is a schematic structural diagram of a ceiling keel in an aluminum square tube ceiling mounting structure with an anti-deformation reinforcement design.

FIG. 3 is a schematic diagram of a suspended ceiling keel hanging in an aluminum square tube suspended ceiling mounting structure with an anti-deformation reinforcement design.

Fig. 4 is a schematic structural view of a hanger bar in an aluminum square tube ceiling mounting structure having a deformation prevention reinforcement design.

FIG. 5 is a schematic view of a split of a hanging structure of an aluminum square tube in an aluminum square tube ceiling mounting structure with an anti-deformation reinforcement design.

Illustration of the drawings:

1. a boom; 11. a first rod body; 12. a second rod body; 13. a strip plate; 2. a ceiling keel; 21. a top plate; 211. a first clamping seat; 22. a base plate; 221. a notch; 222. a second clamping seat; 223. a card slot; 3. an aluminum square tube; 31. mounting grooves; 4. an anti-deformation plate; 5. a fastener; 6. a support member; 61. a first clamping connection plate; 62. a second clamping plate; 63. a connecting rod; 631. a rod body is arranged; 632. and (5) lowering the rod body.

Detailed Description

In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are some, but not all, embodiments of the present invention. The components of embodiments of the present invention generally described and illustrated in the figures herein may be arranged and designed in a wide variety of different configurations.

Thus, the following detailed description of the embodiments of the present invention, presented in the figures, is not intended to limit the scope of the invention, as claimed, but is merely representative of selected embodiments of the invention. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.

It should be noted that: like reference numbers and letters refer to like items in the following figures, and thus, once an item is defined in one figure, it need not be further defined and explained in subsequent figures.

In the description of the embodiments of the present invention, it should be noted that the terms "upper", "inner", and the like refer to orientations or positional relationships based on the orientations or positional relationships shown in the drawings or orientations or positional relationships that are conventionally arranged when the products of the present invention are used, and are used only for convenience in describing the present invention and simplifying the description, but do not indicate or imply that the devices or elements referred to must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention.

In the description of the present invention, it should also be noted that, unless otherwise explicitly specified or limited, the terms "disposed," "mounted," "connected," and "connected" are to be construed broadly and may, for example, be fixedly connected, detachably connected, or integrally connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meanings of the above terms in the present invention can be understood in specific cases to those skilled in the art.

Referring to fig. 1-5, the present invention provides a technical solution: the utility model provides an aluminium square tube furred ceiling mounting structure with design is consolidated to shape of preapring for an unfavorable turn of events, includes: suspender 1, furred ceiling fossil fragments 2, aluminium square tube 3 and deformation prevention plate 4, the cross-section of furred ceiling fossil fragments 2 is "C" type, furred ceiling fossil fragments 2's roof 21 passes through 1 fixed mounting of jib on the building top surface, be provided with on furred ceiling fossil fragments 2's the bottom plate 22 along a plurality of breach 221 that 2 length direction equidistance of furred ceiling fossil fragments were arranged, be provided with on the aluminium square tube 3 along self length place the mounting groove 31 of arranging, the cross-section of mounting groove 31 is the "T" type of inversion, 3 through 5 fixed mounting of fastener on furred ceiling fossil fragments 2 of aluminium square tube, the head sliding connection of fastener 5 is in mounting groove 31, fastener 5's the body of rod joint is in lacking a221, deformation prevention plate 4 places on furred ceiling fossil fragments 2's bottom plate 22, fastener 5's the body of rod passes the through-hole on deformation prevention plate 4 and fixes through the nut.

The top plate 21 is provided with a first clamping seat 211, the bottom plate 22 is provided with a second clamping seat 222 corresponding to the first clamping seat 211 in position, one end of the support member 6 is clamped in the first clamping seat 211, and the other opposite end is clamped in the second clamping seat 222. The support member 6 includes a first engaging plate 61, a second engaging plate 62 and a connecting rod 63, the first engaging plate 61 and the second engaging plate 62 are symmetrically disposed at both ends of the connecting rod 63, the first engaging plate 61 is engaged in the first engaging seat 211, and the second engaging plate 62 is engaged in the second engaging seat 222. Support piece 6 be provided with can effectively restrict the distance between bottom plate 22 and the roof 21, the distance can not the grow also can not diminish, effectively avoids furred ceiling keel to warp, guarantees that the mounting structure of aluminium square tube is firm.

The connecting rod 63 includes an upper rod 631 and a lower rod 632, the upper rod 631 is screwed into the lower rod 632, the first engaging plate 61 is fixedly mounted on the upper rod 631, and the second engaging plate 62 is fixedly mounted on the lower rod 632. The height of the supporting piece 6 is adjustable, and the ceiling keel 2 with different heights can be better adapted.

The second clamping seat 222 and the notch 221 are arranged at intervals, clamping grooves 223 which are symmetrically arranged are formed in two sides of the second clamping seat 222, and the end portion of the deformation-preventing plate 4 is clamped in the clamping grooves 223. The interval arrangement of second joint seat 222 and breach 221 has improved the shape reinforcing effect of preapring for an unfavorable turn of events of shape board 4 to bottom plate 22, further avoids the furred ceiling fossil fragments to warp, guarantees that the mounting structure of aluminium square tube is firm.

The suspender 1 comprises a first rod body 11 and a second rod body 12, wherein the first rod body 11 is fixedly arranged on the top surface of a building, the second rod body 12 is in threaded connection with the first rod body 11, and a top plate 21 is fixedly arranged at the bottom of the second rod body 12. The length of the suspender 1 is adjustable, the installation height of the aluminum square tube is convenient to adjust, and the installation efficiency and the decoration effect are improved.

The first rod body 11 is fixedly installed on the top surface of a building through a strip-shaped plate 13, and the strip-shaped plate 13 is parallel to the aluminum square tube 3. The area of contact of the first body of rod 11 of increase and building top surface is set up to bar 13, and first body of rod 11 is fixed more firm, avoids the basic unit connection structure of aluminium square tube to warp, become invalid.

The width of the notch 221 is equal to the diameter of the shank of the fastener 5 so that the notch 221 effectively locates the fastener 5.

The working principle is as follows: when installation aluminium square tube, pass through jib fixed mounting on the building top surface earlier with the furred ceiling fossil fragments, then with the head sliding connection of fastener in the mounting groove on the aluminium square tube, will prevent the shape board cover and establish on the body of rod of fastener, then support the aluminium square tube in furred ceiling fossil fragments below, slide fastener makes the body of rod joint of fastener in the breach, the shape board of preventing an unfavorable turn of events is placed on the bottom plate of furred ceiling fossil fragments this moment, through nut locking fastener at last, accomplishes the installation of aluminium square tube. Compare in articulate formula installation aluminium square tube, the aluminium square tube passes through the fastener (like fastening bolt) firmly fixed, and the head of fastening bolt is compared in the couple of aluminium square tube when articulating, has increased the area of contact with the aluminium square tube for the aluminium square tube installation is firm, and the junction is difficult for appearing warping. In order to prevent that furred ceiling fossil fragments from taking place to warp under the action of gravity of aluminium square tube, the installation that leads to the aluminium square tube is not hard up, is provided with support piece between furred ceiling fossil fragments's roof and the bottom plate, and the support piece both ends are fixed through first joint seat, second joint seat joint respectively, prevent that furred ceiling fossil fragments warp. Simultaneously, the deformation board is prevented through the draw-in groove location in second joint seat both sides, further improves the shape ability of preapring for an unfavorable turn of events of furred ceiling fossil fragments.

The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and the technical solutions and the inventive concepts thereof according to the present invention should be equivalent or changed within the scope of the present invention.

10页详细技术资料下载
上一篇:一种医用注射器针头装配设备
下一篇:一种连锁砌块墙体线盒固定构造及其施工方法

网友询问留言

已有0条留言

还没有人留言评论。精彩留言会获得点赞!

精彩留言,会给你点赞!