Road engineering construction noise reduction device matched with breaking hammer for use

文档序号:88017 发布日期:2021-10-08 浏览:13次 中文

阅读说明:本技术 一种配合破碎锤使用的道路工程施工降噪装置 (Road engineering construction noise reduction device matched with breaking hammer for use ) 是由 苏要勒图 于 2021-07-16 设计创作,主要内容包括:本发明的目的是为了解决破碎锤的噪音问题,公开了一种配合破碎锤使用的道路工程施工降噪装置,包括罩板,所述罩板表面右侧固定安装有过滤筒,所述过滤筒右端固定连接有第二连接管,所述第二连接管右端固定连接有连接罩,所述罩板表面左侧固定安装有第一水泵,所述第一水泵与过滤筒之间连接有第一连接管,所述罩板上表面固定安装有斜架,所述斜架上表面固定安装有固定架,所述固定架上侧固定安装有第二水泵,所述第二水泵与罩板之间连接有第五连接管。本发明通过第一水泵和第二水泵的配合,可以对破碎锤破碎位置的地面进行反复通水,对破碎锤的锤头进行覆盖,这样就可以让破碎锤在水中对地面破碎,极大减少噪音的产生,起到了降噪的作用。(The invention aims to solve the noise problem of a breaking hammer and discloses a road engineering construction noise reduction device matched with the breaking hammer, which comprises a cover plate, wherein a filter cylinder is fixedly arranged on the right side of the surface of the cover plate, a second connecting pipe is fixedly connected to the right end of the filter cylinder, a connecting cover is fixedly connected to the right end of the second connecting pipe, a first water pump is fixedly arranged on the left side of the surface of the cover plate, a first connecting pipe is connected between the first water pump and the filter cylinder, an inclined frame is fixedly arranged on the upper surface of the cover plate, a fixing frame is fixedly arranged on the upper surface of the inclined frame, a second water pump is fixedly arranged on the upper side of the fixing frame, and a fifth connecting pipe is connected between the second water pump and the cover plate. According to the invention, through the cooperation of the first water pump and the second water pump, water can be repeatedly fed to the ground at the crushing position of the crushing hammer, and the hammer head of the crushing hammer is covered, so that the crushing hammer can crush the ground in water, the generation of noise is greatly reduced, and the noise reduction effect is achieved.)

1. The utility model provides a road engineering construction noise reduction device that cooperation quartering hammer used, includes cover plate (1), its characterized in that: the water purifier is characterized in that a filter cartridge (4) is fixedly mounted on the right side of the surface of the cover plate (1), a second connecting pipe (6) is fixedly connected to the right end of the filter cartridge (4), a connecting cover (5) is fixedly connected to the right end of the second connecting pipe (6), a first water pump (2) is fixedly mounted on the left side of the surface of the cover plate (1), a first connecting pipe (3) is connected between the first water pump (2) and the filter cartridge (4), an inclined frame (7) is fixedly mounted on the upper surface of the cover plate (1), a fixing frame (8) is fixedly mounted on the upper surface of the inclined frame (7), a second water pump (9) is fixedly mounted on the upper side of the fixing frame (8), a fifth connecting pipe (18) is connected between the second water pump (9) and the cover plate (1), a fourth connecting pipe (11) is connected to the water inlet end of the second water pump (9), a third connecting pipe (10) is connected between the first water pump (2) and the fourth connecting pipe (11), the utility model discloses a scaffold, including cant frame (7), slide pipe (13), inside cover of slide pipe (13) has balladeur train (12), fixedly connected with coil spring (17) between slide pipe (13) lower extreme and balladeur train (12), balladeur train (12) left side fixed mounting has cardboard (14), cardboard (14) both sides wall symmetry cover has screw rod (15), screw rod (15) inner fixed mounting has splint (16).

2. The device of claim 1, wherein the breaking hammer is adapted to reduce noise during road construction, and the device comprises: the cover plate (1) is of a hollow structure, and through holes are uniformly formed in the lower surface of the cover plate.

3. The device of claim 1, wherein the breaking hammer is adapted to reduce noise during road construction, and the device comprises: the filter cartridge (4) is uniformly sleeved with an active carbon layer, and the filter cartridge (4) is respectively communicated with the first connecting pipe (3) and the second connecting pipe (6).

4. The device of claim 1, wherein the breaking hammer is adapted to reduce noise during road construction, and the device comprises: the sliding frame (12) is in sliding fit with the sliding pipe (13).

5. The device of claim 1, wherein the breaking hammer is adapted to reduce noise during road construction, and the device comprises: the screw rod (15) is in threaded fit with the clamping plate (14), and the screw rod (15) is hinged with the clamping plate (16).

6. The device of claim 1, wherein the breaking hammer is adapted to reduce noise during road construction, and the device comprises: the clamping plate (14) is of a U-shaped structure.

7. The device of claim 1, wherein the breaking hammer is adapted to reduce noise during road construction, and the device comprises: the second connecting pipe (6) is made of carbon steel and has a telescopic structure.

Technical Field

The invention relates to the field of engineering construction, in particular to a road engineering construction noise reduction device matched with a breaking hammer.

Background

In road construction, in order to renovate ground, need carry out the breakage to ground, and use the quartering hammer to ground breakage when broken, although the quartering hammer has brought the convenience for the construction, but when carrying out the construction, the quartering hammer is long-time to the ground striking, can produce great noise, if there is the resident near, will seriously influence resident's life, form noise pollution, near some office buildings also can appear the maintenance and renovation to ground equally, can use the quartering hammer to carry out broken ground, it is very critical to the processing of the noise pollution problem that produces in the work progress, therefore, the road engineering construction that the cooperation quartering hammer used of the urgent need design falls the device and solves the problem of making an uproar when the quartering hammer uses.

Disclosure of Invention

The invention aims to overcome the defects in the prior art and provides a road engineering construction noise reduction device matched with a breaking hammer.

The invention is realized by the following technical scheme:

a road engineering construction noise reduction device matched with a breaking hammer comprises a cover plate, wherein a filter cylinder is fixedly arranged on the right side of the surface of the cover plate, a second connecting pipe is fixedly connected to the right end of the filter cylinder, a connecting cover is fixedly connected to the right end of the second connecting pipe, a first water pump is fixedly arranged on the left side of the surface of the cover plate, a first connecting pipe is connected between the first water pump and the filter cylinder, an inclined frame is fixedly arranged on the upper surface of the cover plate, a fixing frame is fixedly arranged on the upper surface of the inclined frame, a second water pump is fixedly arranged on the upper side of the fixing frame, a fifth connecting pipe is connected between the second water pump and the cover plate, a fourth connecting pipe is connected at the water inlet end of the second water pump, a third connecting pipe is connected between the first water pump and the fourth connecting pipe, a sliding pipe is fixedly connected at the left end of the inclined frame, a sliding frame is sleeved inside the sliding pipe, and a spiral spring is fixedly connected between the lower end of the sliding pipe and the sliding frame, the sliding frame is characterized in that a clamping plate is fixedly installed on the left side face of the sliding frame, screws are symmetrically sleeved on two side walls of the clamping plate, and clamping plates are fixedly installed at the inner ends of the screws.

Preferably, the cover plate is of a hollow structure, and the lower surface of the cover plate is uniformly provided with through holes.

Preferably, the inside of the filter cartridge is uniformly sleeved with an activated carbon layer, and the filter cartridge is respectively communicated with the first connecting pipe and the second connecting pipe.

Preferably, the carriage is in sliding engagement with the slide tube.

Preferably, the screw rod is in threaded fit with the clamping plate, and the screw rod is hinged with the clamping plate.

Preferably, the clamping plate is of a U-shaped structure.

Preferably, the second connecting pipe is made of carbon steel and has a telescopic structure.

Compared with the prior art, the invention has the beneficial effects that:

according to the invention, through the arrangement of the first water pump and the second water pump, water can be introduced to the construction position of the breaking hammer through the cover plate, the breaking hammer is covered by water flow, so that the breaking hammer can work in water, the generation of noise can be greatly reduced during the breaking operation, the noise pollution is avoided, in addition, through the filtration of the filter cylinder, the circulation purification can be carried out on the accumulated water on the ground after the breaking hammer is broken, so that the reasonable reuse of water resources is realized, through the arrangement of the spiral spring, the cover plate can be stably attached to the ground, so that the water flow can be guided by the cover plate, the noise reduction of the breaking hammer is realized through the coverage of the water, through the threaded matching of the screw rod and the clamping plate, the device can be stably clamped on the breaking hammer for use, and the installation is more convenient. According to the invention, through the cooperation of the first water pump and the second water pump, water can be repeatedly fed to the ground at the crushing position of the crushing hammer, and the hammer head of the crushing hammer is covered, so that the crushing hammer can crush the ground in water, the generation of noise is greatly reduced, and the noise reduction effect is achieved.

Drawings

FIG. 1 is a schematic structural diagram of the present invention.

Figure 2 is a side view of a card of the present invention.

Figure 3 is a side view of the shroud of the present invention.

Fig. 4 is a schematic view of the present invention in cooperation with a demolition hammer.

Description of reference numerals: 1. the cover plate, 2, first water pump, 3, first connecting pipe, 4, cartridge filter, 5, connecting cover, 6, second connecting pipe, 7, sloping frame, 8, mount, 9, second water pump, 10, third connecting pipe, 11, fourth connecting pipe, 12, balladeur train, 13, slide pipe, 14, cardboard, 15, screw rod, 16, splint, 17, coil spring, 18, fifth connecting pipe.

Detailed Description

The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.

Referring to fig. 1-4, the present invention provides a technical solution:

a road engineering construction noise reduction device matched with a breaking hammer comprises a cover plate 1, wherein a filter cylinder 4 is fixedly arranged on the right side of the surface of the cover plate 1, a second connecting pipe 6 is fixedly connected to the right end of the filter cylinder 4, a connecting cover 5 is fixedly connected to the right end of the second connecting pipe 6, a first water pump 2 is fixedly arranged on the left side of the surface of the cover plate 1, a first connecting pipe 3 is connected between the first water pump 2 and the filter cylinder 4, an inclined frame 7 is fixedly arranged on the upper surface of the cover plate 1, a fixing frame 8 is fixedly arranged on the upper surface of the inclined frame 7, a second water pump 9 is fixedly arranged on the upper side of the fixing frame 8, a fifth connecting pipe 18 is connected between the second water pump 9 and the cover plate 1, a fourth connecting pipe 11 is connected to the water inlet end of the second water pump 9, a third connecting pipe 10 is connected between the first water pump 2 and the fourth connecting pipe 11, and a slide pipe 13 is fixedly connected to the left end of the inclined frame 7, the sliding pipe 13 is sleeved with a sliding frame 12, a spiral spring 17 is fixedly connected between the lower end of the sliding pipe 13 and the sliding frame 12, a clamping plate 14 is fixedly installed on the left side face of the sliding frame 12, screw rods 15 are symmetrically sleeved on two side walls of the clamping plate 14, and clamping plates 16 are fixedly installed at the inner ends of the screw rods 15.

The cover plate 1 is of a hollow structure, and through holes are uniformly formed in the lower surface of the cover plate.

An activated carbon layer is uniformly sleeved in the filter cartridge 4, and the filter cartridge 4 is respectively communicated with the first connecting pipe 3 and the second connecting pipe 6.

The carriage 12 is in sliding engagement with the slide tube 13.

The screw rod 15 is in threaded fit with the clamping plate 14, and the screw rod 15 is hinged with the clamping plate 16.

The card 14 is of a U-shaped configuration.

The second connecting pipe 6 is made of carbon steel and has a telescopic structure.

The method comprises the following operation steps: in order to greatly reduce the noise of the breaking hammer, the device is arranged on the breaking hammer, when the device is arranged specifically, a screw rod 15 is adjusted, a clamping plate 16 and a clamping plate 14 are matched, the device is stably clamped on the breaking hammer, a bucket is placed on an engineering vehicle or near a construction position, a fourth connecting pipe 11 is inserted into the bucket, then a switch of a first water pump 2 is turned on, the first water pump 2 can pass water to a cover plate 1, water flows to the direction of the breaking hammer through the cover plate 1 and covers the breaking hammer, so that the breaking hammer can work under the cover of the water, the generation of the noise is greatly reduced, a medium for sound transmission is changed, a second connecting pipe 6 is bent, a connecting cover 5 faces the position of the breaking hammer, the switch of a second water pump 9 is turned on, the water near the breaking hammer is pumped into the bucket through the second water pump 9, the purification to water is realized through the active carbon in the cartridge filter 4, realizes the recycling to water, uses water to cover the quartering hammer, greatly reduces the noise of quartering hammer.

The present embodiment is only for explaining the present invention, and not for limiting the present invention, and those skilled in the art can make modifications without inventive contribution to the present embodiment as needed after reading the present specification, but all of which are protected by patent law within the scope of the claims of the present invention.

7页详细技术资料下载
上一篇:一种医用注射器针头装配设备
下一篇:宽频带折叠背腔微穿孔吸声结构

网友询问留言

已有0条留言

还没有人留言评论。精彩留言会获得点赞!

精彩留言,会给你点赞!