Marine wind tower false flange frock

文档序号:888985 发布日期:2021-03-23 浏览:4次 中文

阅读说明:本技术 海上风塔假法兰工装 (Marine wind tower false flange frock ) 是由 孙梓铭 陈洪良 于 2020-11-12 设计创作,主要内容包括:本发明公开了一种海上风塔假法兰工装,包括盘状工装本体,工装本体上设有环形阵列布置的减重孔,工装本体上设有用于起吊直径6000mm以下法兰的吊环以及用于起吊直径6000mm以上法兰的吊耳。本发明能满足法兰直径4300mm至6500mm范围内使用;根据现场使用情况来看,相较于原来2片式假法兰,操作步骤减少许多,安装难度也明显减小,使用范围也明显变广,减少了假法兰的数量和规格,省略了假法兰使用前的对比和选型工作,减少使用错误率。(The invention discloses a false flange tool for an offshore wind tower, which comprises a disc-shaped tool body, wherein lightening holes are arranged on the tool body in an annular array mode, and a lifting ring for lifting a flange with the diameter of below 6000mm and a lifting lug for lifting a flange with the diameter of above 6000mm are arranged on the tool body. The invention can meet the use requirement of the flange with the diameter ranging from 4300mm to 6500 mm; according to the field use condition, compared with the original 2-piece type false flange, the number of operation steps is reduced, the installation difficulty is obviously reduced, the use range is obviously widened, the number and the specification of the false flanges are reduced, the comparison and type selection work before the false flanges are used is omitted, and the use error rate is reduced.)

1. The tooling for the false flange of the offshore wind tower is characterized by comprising a disc-shaped tooling body, lightening holes arranged in an annular array mode are formed in the tooling body, and lifting rings used for lifting flanges with the diameter being below 6000mm and lifting lugs used for lifting flanges with the diameter being above 6000mm are arranged on the tooling body.

2. The offshore wind tower false flange tool according to claim 1, wherein the tool body is further provided with a ladder stand and a stepping member, and the tool body is further provided with eight support bars, wherein the support bars are arranged in a central annular array of the tool body; eight lightening holes are formed.

3. The offshore wind tower false flange tool according to claim 2, wherein the upper portion of the tool body is provided with lifting lugs for lifting and turning over the false flange, a plurality of stepping rods made of round steel are arranged in the middle area of the tool body at intervals from top to bottom, and two crawling ladders are respectively and fixedly arranged on two sides of the middle area of the tool body.

4. The offshore wind tower false flange tool according to claim 3, wherein the ladder comprises two vertical columns fixedly arranged on the surface of the tool body, a plurality of transverse stepping rods are fixedly arranged between the two vertical columns, rope accommodating grooves are formed in the vertical columns, elastic ropes are accommodated in the rope accommodating grooves, one ends of the elastic ropes are fixedly connected to the inner walls of the rope accommodating grooves of the vertical columns, the other ends of the elastic ropes are exposed out of the rope accommodating grooves, annular spring buckles are fixedly arranged at the end parts of the elastic ropes exposed out of the rope accommodating grooves, and the annular spring buckles are matched with the annular spring buckles on a protection waistband between the waist of an operator.

Technical Field

The invention relates to a false flange tool for an offshore wind tower.

Background

Along with the large batch of accepting of steel construction cause division marine wind tower, cause the specification of required false flange to increase gradually, according to the general false flange frock that can adapt to various specification products, convenient construction and management.

Disclosure of Invention

The invention aims to overcome the defects in the prior art and provide a false flange tool for an offshore wind tower, which can meet the requirement that the diameter of a flange is in a range of 4300mm to 6500 mm; according to the field use condition, compared with the original 2-piece type false flange, the number of operation steps is reduced, the installation difficulty is obviously reduced, the use range is obviously widened, the number and the specification of the false flanges are reduced, the comparison and type selection work before the false flanges are used is omitted, and the use error rate is reduced.

In order to achieve the purpose, the technical scheme of the invention is to design a false flange tool for an offshore wind tower, which comprises a disc-shaped tool body, wherein lightening holes are arranged on the tool body in an annular array mode, and a lifting ring for lifting a flange with the diameter of below 6000mm and a lifting lug for lifting a flange with the diameter of above 6000mm are arranged on the tool body. The single false flange can bear 100 tons; according to the analysis of the lifting stress condition, 2 groups of lifting devices are designed, a lifting ring lifts a flange with the diameter of below 6000mm, and a lifting lug lifts a flange with the diameter of above 6000 mm; a large number of round steel steps, pedals and 2 crawling ladders for climbing and hanging safety belts are added, so that the convenience and safety operation of constructors are met to the greatest extent; in order to meet the requirements of 8 fixing points, 8 supporting strip structures are designed, and each supporting strip is provided with one fixing point; 3 lifting lugs for lifting and turning over the false flange are designed.

The tool body is also provided with eight support bars which are arranged in a central annular array of the tool body; eight lightening holes are formed.

The technical scheme is that the upper portion of the tool body is provided with lifting lugs for lifting and turning over the false flange, a plurality of stepping rods made of round steel are arranged in the middle area of the tool body from top to bottom at intervals, and two crawling ladders are fixedly arranged on two sides of the middle area of the tool body respectively.

A further technical scheme does, the cat ladder is including fixed two vertical posts that set up on frock body surface, the fixed pole of transversely marking time that sets up a plurality of between two vertical posts, be equipped with on the vertical post and hold the grooving, it is equipped with the elasticity rope to hold the grooving, the one end fixed connection of elasticity rope is on its inslot wall that holds the grooving of vertical post, the other end of elasticity rope exposes and holds the grooving setting and expose the end fixing that holds the grooving and set up annular spring and detain, annular spring detains and the annular spring on the protection waistband between operation workman's waist and detains looks adaptation. Due to the arrangement of the elastic rope and the annular spring buckles, an operator can protect the ladder when climbing the ladder, the situation that the rope is externally hung can be avoided due to the elastic rope, the high elastic rope climbed by the operator can be extended to be long, the elastic rope can be retracted when the operator returns to the bottom end of the ladder, and the elastic rope can be retracted when the connection state of the two annular spring buckles is released.

The invention has the advantages and beneficial effects that: due to the arrangement of the elastic rope and the annular spring buckles, an operator can protect the ladder when climbing the ladder, the situation that the rope is externally hung can be avoided due to the elastic rope, the high elastic rope climbed by the operator can be extended to be long, the elastic rope can be retracted when the operator returns to the bottom end of the ladder, and the elastic rope can be retracted when the connection state of the two annular spring buckles is released. The flange diameter can be in the range of 4300mm to 6500 mm; according to the field use condition, compared with the original 2-piece type false flange, the number of operation steps is reduced, the installation difficulty is obviously reduced, the use range is obviously widened, the number and the specification of the false flanges are reduced, the comparison and type selection work before the false flanges are used is omitted, and the use error rate is reduced.

Drawings

FIG. 1 is a schematic diagram of a false flange tool of an offshore wind tower according to the present invention;

FIG. 2 is a side view of FIG. 1;

figure 3 is an enlarged schematic view of the lower end portion of the ladder of figure 1;

fig. 4 is a schematic view of the operator in fig. 3 after the operator has been seated.

In the figure: 1. a tool body; 2. lightening holes; 3. a hoisting ring; 4. lifting lugs; 5. climbing a ladder; 6. a step member; 7. a supporting strip; 8. a stepping rod; 9. a rope accommodating groove; 10. an annular spring buckle; 11. protecting the waistband.

Detailed Description

The following description of the embodiments of the present invention will be made with reference to the accompanying drawings. The following examples are only for illustrating the technical solutions of the present invention more clearly, and the protection scope of the present invention is not limited thereby.

As shown in fig. 1 to 4, the invention relates to a false flange tool for an offshore wind tower, which comprises a disc-shaped tool body 1, wherein lightening holes 2 arranged in an annular array are formed in the tool body 1, and a lifting ring 3 for lifting a flange with the diameter of below 6000mm and a lifting lug 4 for lifting a flange with the diameter of above 6000mm are arranged on the tool body 1. The tool body 1 is also provided with a ladder 5 and a stepping piece 6, the tool body 1 is also provided with eight support bars 7, and the support bars 7 are arranged in a central annular array of the tool body 1; eight lightening holes 2 are arranged. The upper portion of the tool body 1 is provided with lifting lugs 4 for lifting and turning over the false flange, a plurality of stepping rods 8 made of round steel are arranged in the middle region of the tool body 1 from top to bottom at intervals, and two sides of the middle region of the tool body 1 are respectively fixedly provided with a crawling ladder 5.

The cat ladder 5 is including two vertical posts of fixed setting on 1 surface of frock body, the fixed pole 8 of transversely marking time that sets up a plurality of roots between two vertical posts, be equipped with on the vertical post and hold grooving 9, it is equipped with the elasticity rope to hold grooving 9 inside, the one end fixed connection of elasticity rope is on its inslot wall that holds grooving 9 of vertical post, the other end of elasticity rope exposes and holds grooving 9 settings and expose the end fixing that holds grooving 9 and set up annular spring and detain 10, annular spring detain 10 and the annular spring on the protection waistband 11 between the operation workman's waist and detain 10 looks adaptations.

The foregoing is only a preferred embodiment of the present invention, and it should be noted that, for those skilled in the art, various modifications and decorations can be made without departing from the technical principle of the present invention, and these modifications and decorations should also be regarded as the protection scope of the present invention.

8页详细技术资料下载
上一篇:一种医用注射器针头装配设备
下一篇:治具结构及柔性屏幕支撑结构制作方法

网友询问留言

已有0条留言

还没有人留言评论。精彩留言会获得点赞!

精彩留言,会给你点赞!

技术分类