Antenna balancing system and balancing method
阅读说明:本技术 天线平衡系统及平衡方法 (Antenna balancing system and balancing method ) 是由 邓波 罗曼 周龙俊 罗双华 王勇 邢亮 李朋飞 程晗 徐欢 张�林 刘振吉 李 于 2020-07-03 设计创作,主要内容包括:本公开提供了一种天线平衡系统及平衡方法,属于天线技术领域。天线平衡系统包括平衡锤、调节绳、平衡塔、卷扬机、动滑轮和定滑轮;平衡塔包括塔身和设置在塔身上的滑轨,滑轨用于支撑平衡锤;定滑轮固定设置在塔身的顶部,动滑轮与平衡锤连接;调节绳具有天线幕连接端和平衡锤连接端,调节绳的平衡锤连接端依次绕过动滑轮和定滑轮后,缠绕在卷扬机的卷筒上;定滑轮上设有用于检测调节绳上的张力的张力监测装置,卷扬机上设有控制模块,控制模块用于获取张力监测装置检测到的调节绳上的张力,并根据调节绳上的张力控制卷扬机收放调节绳。该天线平衡系统可以根据调节绳张力变化自主收放调节绳长度来改变天线幕的垂度,调节范围更大、更加灵活。(The disclosure provides an antenna balancing system and a balancing method, and belongs to the technical field of antennas. The antenna balance system comprises a balance weight, an adjusting rope, a balance tower, a winch, a movable pulley and a fixed pulley; the balance tower comprises a tower body and a slide rail arranged on the tower body, and the slide rail is used for supporting the balance weight; the fixed pulley is fixedly arranged at the top of the tower body, and the movable pulley is connected with the balance weight; the adjusting rope is provided with an antenna screen connecting end and a balance weight connecting end, and the balance weight connecting end of the adjusting rope is wound on a winding drum of the winch after sequentially passing around the movable pulley and the fixed pulley; the fixed pulley is provided with a tension monitoring device for detecting tension on the adjusting rope, the winch is provided with a control module, and the control module is used for acquiring the tension on the adjusting rope detected by the tension monitoring device and controlling the winch to reel and reel the adjusting rope according to the tension on the adjusting rope. The antenna balance system can change the verticality of the antenna screen by automatically retracting and releasing the adjusting rope according to the tension change of the adjusting rope, and the adjusting range is larger and more flexible.)
1. An antenna balance system, characterized in that, the antenna balance system comprises a balance weight (10), an adjusting rope (20), a balance tower (30), a windlass (40), a movable pulley (50) and a fixed pulley (60)
The balance tower (30) comprises a tower body (31) and a slide rail (32) arranged on the tower body (31), and the slide rail (32) is used for supporting the balance weight (10);
the fixed pulley (60) is fixedly arranged at the top of the tower body (31), and the movable pulley (50) is connected with the balance weight (10);
the adjusting rope (20) is provided with an antenna screen connecting end and a balance weight connecting end, and the balance weight connecting end of the adjusting rope (20) sequentially rounds the movable pulley (50) and the fixed pulley (60) and then is wound on a winding drum of the winch (40);
the tension monitoring device is arranged on the fixed pulley (60) and used for detecting tension on the adjusting rope (20), the winch (40) is provided with a control module, the control module is used for acquiring the tension on the adjusting rope (20) detected by the tension monitoring device and controlling the winch (40) to retract and release the adjusting rope (20) according to the tension on the adjusting rope (20).
2. The antenna balancing system of claim 1, wherein the control module is configured to:
when the tension on the adjusting rope (20) detected by the tension monitoring device is larger than a set value, controlling the winch (40) to release the rope, so that the length of the adjusting rope (20) is increased;
when the tension monitoring device detects that the tension on the adjusting rope (20) is reduced, controlling the winch (40) to release the rope, so that the length of the adjusting rope (20) is reduced until the tension on the adjusting rope (20) detected by the tension monitoring device does not exceed the set value.
3. The antenna balance system according to claim 1, wherein the balance weight (10) comprises n weight bodies (11) connected in series, 2 ≤ n, the n weight bodies (11) are arranged side by side in sequence, the weight body arranged at the 1 st position along the arrangement direction of the n weight bodies (11) is a first weight body (11a), and the first weight body (11a) is connected with the movable pulley (50).
4. The antenna balancing system according to claim 3, characterized in that the counterweight (10) further comprises a rope (12), and the n hammer bodies (11) are sequentially connected in series by the rope (12).
5. The antenna balancing system according to claim 3, wherein the hammer body (11) comprises a body (111) and two pins (112), a through hole (111a) is formed in the middle of the body (111), the two pins (111) are respectively inserted into the through hole (111a) from two ends of the body (111), and a bearing is arranged in the through hole (111a) and located between the body (111) and the two pins (112).
6. The antenna balancing system according to claim 3, further comprising a spacing cable (70), wherein the spacing cable (70) has a hammer block connecting end (71) and a fixed end (72), the hammer block (11) is a second hammer block (11b) disposed at the nth hammer block along the arrangement direction of the n hammer blocks, and the second hammer block (11b) is connected with the hammer block connecting end (71) of the spacing cable (70).
7. The antenna balance system according to claim 1, wherein the slide rail (32) comprises an inclined section (32-1), a first transition section (32-2) and a horizontal section (32-3) which are connected in sequence, the inclined section (32-1) extends from the top of the tower body (31) along the direction from the top of the tower body (31) to the bottom of the tower body (31), the included angle between the tangent of the inclined section (32-1) and the horizontal direction gradually decreases along the direction from the top of the tower body (31) to the bottom of the tower body (31), the horizontal section (32-3) is arranged along the horizontal direction, and the first transition section (32-2) is a circular arc section.
8. The antenna balancing system according to claim 7, characterized in that the angle between the tangent of the inclined section (32-1) and the horizontal direction decreases gradually in the range of 0 ° to 90 ° in the direction from the top of the tower (31) to the bottom of the tower (31).
9. The antenna balance system of claim 7, wherein the slide rail (32) further comprises a second transition section (32-4) and a tail-ending section (32-5), one end of the second transition section (32-4) is connected with the horizontal section (32-3), the other end of the second transition section (32-4) is connected with the tail-ending section (32-5), the second transition section (32-4) is a circular arc section, the tail-ending section (32-5) is an inclined section extending from the bottom of the tower body (31) to the top of the tower body (31), and an included angle between a tangent of the tail-ending section (32-5) and the horizontal direction gradually increases along the bottom of the tower body (31) to the top of the tower body (31).
10. An antenna balancing method, wherein the antenna balancing system according to any one of claims 1 to 9 is adopted, and the antenna balancing method comprises:
connecting the antenna screen connecting end of the adjusting rope (20) with the antenna screen (S);
when the tension on the adjusting rope (20) detected by the tension monitoring device exceeds a set value, controlling the winch (40) to release the rope, so that the length of the adjusting rope (20) is increased;
when the tension monitoring device detects that the tension on the adjusting rope (20) is reduced, controlling the winch (40) to release the rope, so that the length of the adjusting rope (20) is reduced until the tension on the adjusting rope (20) detected by the tension monitoring device does not exceed the set value.
Technical Field
The present disclosure relates to the field of antenna technologies, and in particular, to an antenna balancing system and a balancing method.
Background
With the great increase of the number of antennas in recent years, the task of maintaining and adjusting the antenna screen is more and more important. The quality of the antenna screen maintenance is directly related to the broadcasting safety and the broadcasting quality. Due to the loosening of the stay ropes of the tower masts, the change of the verticality of the iron tower, natural disasters, the extension of the knitting and inserting structure of the large suspension wires and other factors, the antenna curtain sinks after being used for a long time, so that the antenna is ignited, and the broadcasting quality is poor or stopped. And when the tension on the antenna screen is too large, the antenna screen is also disconnected, so that the broadcasting is stopped.
Currently, the antenna screen is usually maintained by a counterweight system to adjust the sag of the antenna screen and keep the tension of the antenna screen balanced. The balance weight system comprises an adjusting line, a balance weight and a balance tower, and the balance weight is of a heavy cubic structure. The antenna curtain is connected with the balance weight through the adjusting wire, and under the external force action of the antenna curtain, the balance weight can be driven to move upwards or downwards along the track of the balance tower. For example, when the antenna screen is covered with ice or the wind load becomes large, the antenna screen pulls the counterweight to move upward along the track.
However, since the length of the adjusting rope in the counterweight system is not changed, the adjusting range of the antenna screen sag is limited, and when the counterweight moves to the top of the balancing tower and the tension value on the adjusting rope reaches a limit value, the antenna screen sag cannot be continuously adjusted. And when the tension value on the adjusting rope exceeds a limit value, the adjusting rope is easy to break, so that the balance weight falls down, and potential safety hazards exist.
Disclosure of Invention
The embodiment of the disclosure provides an antenna balance system and a balance method, which can change the sag of an antenna screen by automatically retracting and releasing the length of an adjusting rope according to the tension change on the adjusting rope, so that the adjusting range of the antenna screen sag is larger and more flexible. The technical scheme is as follows:
in one aspect, an antenna balancing system is provided, which comprises a balance weight, an adjusting rope, a balancing tower, a winch, a movable pulley and a fixed pulley;
the balance tower comprises a tower body and a slide rail arranged on the tower body, and the slide rail is used for supporting the balance weight;
the fixed pulley is fixedly arranged at the top of the tower body, and the movable pulley is connected with the balance weight;
the adjusting rope is provided with an antenna screen connecting end and a balance weight connecting end, and the balance weight connecting end of the adjusting rope sequentially rounds the movable pulley and the fixed pulley and then is wound on a winding drum of the winch;
the fixed pulley is provided with a tension monitoring device for detecting tension on the adjusting rope, the winch is provided with a control module, and the control module is used for acquiring the tension on the adjusting rope detected by the tension monitoring device and controlling the winch to retract and release the adjusting rope according to the tension on the adjusting rope.
Optionally, the control module is configured to:
when the tension on the adjusting rope detected by the tension monitoring device is larger than a set value, controlling the winch to release the rope, so that the length of the adjusting rope is increased;
and when the tension monitoring device detects that the tension on the adjusting rope is reduced, controlling the winch to release the rope, so that the length of the adjusting rope is reduced.
Optionally, adjust the rope and have antenna curtain link and counter weight link, the counter weight includes n hammer block of series connection, and 2 is not more than n, n hammer block sets up side by side in proper order, follows the array direction setting of n hammer block is first hammer block at 1 st hammer block, first hammer block with the movable pulley is connected.
Optionally, the counterweight further comprises a rope, and the n hammer bodies are sequentially connected in series through the rope.
Optionally, the hammer body comprises a body and two pin shafts, a through hole is formed in the middle of the body, the two pin shafts are inserted into the through hole from two ends of the body respectively, a bearing is arranged in the through hole, and the bearing is located between the body and the two pin shafts.
Optionally, the antenna balanced system still includes spacing cable, spacing cable has hammer block link and stiff end, the hammer block is followed the range direction setting of n hammer block is the second hammer block at nth hammer block, the second hammer block with spacing cable's hammer block link is connected.
Optionally, the slide rail includes consecutive slope section, first changeover portion and horizontal segment, the slope section is followed the top of shaft begins, follows the top of shaft extremely the bottom direction of shaft extends, just the tangent line of slope section is followed with the contained angle of horizontal direction the top of shaft extremely the bottom direction of shaft reduces gradually, the horizontal segment sets up along the horizontal direction, first changeover portion is the circular arc section.
Optionally, an included angle between a tangent of the inclined section and the horizontal direction gradually decreases in a range of 0 to 90 degrees along a direction from the top of the tower body to the bottom of the tower body.
Optionally, the slide rail still includes second changeover portion and receipts tail section, the one end of second changeover portion with the horizontal segment is connected, the other end of second changeover portion with the end section is connected, the second changeover portion is the circular arc section, it is followed to receive the tail section the bottom of shaft to the slope section that the top direction of shaft extends, the tangent line of receiving the tail section is followed with the contained angle of horizontal direction the bottom of shaft extremely the top direction of shaft increases gradually.
In a second aspect, there is provided an antenna balancing method using the antenna balancing system according to the first aspect, the antenna balancing method including:
Connecting the antenna screen connecting end of the adjusting rope with the antenna screen;
when the tension on the adjusting rope detected by the tension monitoring device is larger than a set value, controlling the winch to release the rope, so that the length of the adjusting rope is increased;
when the tension monitoring device detects that the tension on the adjusting rope is reduced, controlling the winch to release the rope, so that the length of the adjusting rope is reduced until the tension on the adjusting rope detected by the tension monitoring device does not exceed the set value.
The technical scheme provided by the embodiment of the disclosure has the following beneficial effects:
through setting up this antenna balanced system, when specifically using, if antenna curtain external load increases, under the drive of adjusting the rope, the balancing weight begins to rise along the balance tower. After the body of a tower top of balanced tower is moved to the counter weight, if antenna curtain external load continues to increase, tension monitoring devices detects that the tension on adjusting the rope exceeds the setting value, then the control module of hoist engine is according to the tension change on the regulation rope that tension monitoring devices detected, the control hoist engine begins the release and adjusts the rope, the length that makes the regulation rope increases, thereby can be so that the tension value on adjusting the rope reduces, and then can make the regulation rope continue to release the external load that the antenna curtain received, thereby can further adjust the antenna curtain degree of hanging down. On the contrary, if the external load of the antenna screen is reduced, the tension monitoring device detects that the tension on the adjusting rope is reduced, the winch starts to take up the adjusting rope, and the length of the adjusting rope is reduced. If the external load of the antenna screen continues to be reduced, and the tension monitoring device detects that the tension on the adjusting rope is not more than a set value, the balance weight starts to descend along the sliding rail, and the balance weight can move to the bottom of the balance tower. Therefore, the antenna balance system provided by the disclosure can automatically retract and release the adjusting rope length according to the tension change on the adjusting rope to change the sag of the antenna screen, so that the adjusting range of the antenna screen sag is larger and more flexible. And the tension value on the adjusting rope can be prevented from exceeding the limit value and being broken, so that the potential safety hazard is reduced.
Drawings
In order to more clearly illustrate the technical solutions in the embodiments of the present disclosure, the drawings needed to be used in the description of the embodiments are briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present disclosure, and it is obvious for those skilled in the art to obtain other drawings based on the drawings without creative efforts.
Fig. 1 is a schematic structural diagram of an antenna balancing system provided in an embodiment of the present disclosure;
fig. 2 is a schematic structural diagram of a counterweight provided in an embodiment of the present disclosure;
FIG. 3 is a cross-sectional view of a hammer block provided in accordance with an embodiment of the present disclosure;
FIG. 4 is a schematic view of a first ram coupled according to an embodiment of the present disclosure;
fig. 5 is a schematic partial structural diagram of an antenna balancing system provided in an embodiment of the present disclosure;
fig. 6 is a schematic structural diagram of a slide rail provided in the embodiment of the present disclosure;
FIG. 7 is a schematic structural diagram of a balancing tower provided in an embodiment of the present disclosure;
fig. 8 is a schematic structural diagram of another slide rail provided in the embodiment of the present disclosure;
fig. 9 is a flowchart of a method for balancing an antenna according to an embodiment of the present disclosure.
Detailed Description
To make the objects, technical solutions and advantages of the present disclosure more apparent, embodiments of the present disclosure will be described in detail with reference to the accompanying drawings.
Fig. 1 is a schematic structural diagram of an antenna balancing system according to an embodiment of the present disclosure, and as shown in fig. 1, the antenna balancing system includes a
The balancing tower 30 includes a tower body 31 and a
The fixed pulley 60 is fixedly arranged at the top of the tower body 31, and the movable pulley 50 is connected with the
The adjusting
The fixed pulley 60 is provided with a tension monitoring device (not shown) for detecting the tension on the adjusting
This disclosed embodiment is through setting up this antenna balanced system, when specifically using, if antenna curtain external load increases, under the drive of adjusting the rope, the counter weight begins to rise along the balanced tower. After the body of a tower top of balanced tower is moved to the counter weight, if antenna curtain external load continues to increase, tension monitoring devices detects that the tension on adjusting the rope exceeds the setting value, then the control module of hoist engine is according to the tension change on the regulation rope that tension monitoring devices detected, the control hoist engine begins the release and adjusts the rope, the length that makes the regulation rope increases, thereby can be so that the tension value on adjusting the rope reduces, and then can make the regulation rope continue to release the external load that the antenna curtain received, thereby can further adjust the antenna curtain degree of hanging down. On the contrary, if the external load of the antenna screen is reduced, the tension monitoring device detects that the tension on the adjusting rope is reduced, the winch starts to take up the adjusting rope, and the length of the adjusting rope is reduced. If the external load of the antenna screen continues to be reduced, and the tension monitoring device detects that the tension on the adjusting rope is not more than a set value, the balance weight starts to descend along the sliding rail, and the balance weight can move to the bottom of the balance tower. Therefore, the antenna balance system provided by the disclosure can automatically retract and release the adjusting rope length according to the tension change on the adjusting rope to change the sag of the antenna screen, so that the adjusting range of the antenna screen sag is larger and more flexible. And the tension value on the adjusting rope can be prevented from exceeding the limit value and being broken, so that the potential safety hazard is reduced.
It should be noted that, in this embodiment, the antenna balancing system further includes a communication module (not shown in the figure), where the communication module includes a first communication module connected to the tension monitoring device and a second communication module connected to the control module, and the first communication module is configured to send the tension on the adjusting
Illustratively, the first communication module and the second communication module can adopt wifi, Bluetooth or 3G/4G/5G network communication.
Illustratively, the tension monitoring device may be a tension sensor and the control module may be a programmable logic controller.
Optionally, the control module is configured to:
when the tension on the adjusting
when the tension on the adjusting
Alternatively, in this embodiment, the antenna balancing system may further include a diverting pulley 80, the diverting pulley 80 may be fixedly disposed on a tower higher than the antenna curtain S, and the counterweight connecting end of the adjusting
Fig. 2 is a schematic structural diagram of a balance weight provided in an embodiment of the present disclosure, and as shown in fig. 2, the
The balance weight is arranged to comprise n weight bodies which are connected in series, wherein n is more than or equal to 2, and the n weight bodies are arranged side by side in sequence, namely the balance weight with the original integral structure is divided into a plurality of weight bodies with lighter weight. And the hammer body arranged at the 1 st position along the arrangement direction of the n hammer bodies is connected with the adjusting rope. When specifically using, the antenna curtain link of adjusting the rope is connected with the antenna curtain, under the exogenic action of antenna curtain, can drive and adjust rope pulling counter weight and remove on the slide rail. At the moment, the n hammer bodies are started one by one, when the tension on the adjusting rope is increased to a certain value, the adjusting rope drives the first hammer body to ascend along the slide rail, if the tension on the adjusting rope is continuously increased, the first hammer body drives the next hammer body connected with the first hammer body to continuously ascend along the slide rail, and so on. Thus, less frictional and inertial forces need to be overcome to actuate the individual hammer blocks in turn than to actuate a counterweight of heavy cubic construction.
Wherein the
Illustratively, the antenna screen connection end of the
In the present embodiment, n is 3. If the number of n is too large, the volume occupied by the excessive number of the
The number of the
Alternatively, the
Illustratively, the total weight of the n hammer blocks 11 is 50 tons. If the weight of the
Optionally, the weight of the
Optionally, the weights of the
Optionally, the
By connecting
In one implementation of the present embodiment,
In another implementation manner of the present embodiment, the counter weight device includes a plurality of lengths of
Through the flexible connection between the
Optionally, the length of each
Fig. 3 is a cross-sectional view of a hammer body according to an embodiment of the present disclosure, as shown in fig. 3, the
Alternatively, the
Alternatively, the
By providing the
Illustratively, a knot may be made at the entrance end of the
Fig. 4 is a schematic connection diagram of a first hammer body according to an embodiment of the present disclosure, and as shown in fig. 4, the
In one implementation of the disclosed embodiment, the movable
In the present embodiment, the connecting
When the hammer is used specifically, the two pin
Optionally, the
Alternatively, the pin joint
Fig. 5 is a schematic partial structural diagram of an antenna balance system according to an embodiment of the present disclosure, and as shown in fig. 5, the antenna balance system further includes a limiting
In this embodiment, the hammer
It should be noted that in one implementation manner of the present embodiment, the
Optionally, the
Alternatively, the
In another implementation manner of the present embodiment, the body of each
Illustratively, as shown in fig. 1, in the present embodiment, three
Fig. 6 is a schematic structural diagram of a slide rail provided in an embodiment of the present disclosure, and as shown in fig. 6, the
When the balance weight moves on the inclined section, the slide rail can provide a vertical upward supporting force for the balance weight. And the tangent line of slope section and the contained angle of horizontal direction reduce gradually along the top of body of the tower to the bottom direction of body of the tower, then when the counter weight down moved from the top along the slope section, the vertical ascending holding power that the slide rail provided to the holding weight can crescent, and the decurrent resultant force that the counter weight received reduces gradually. When the balance weight is arranged at the bottommost end of the inclined section of the sliding rail, the downward resultant force borne by the balance weight is the smallest, and the pulling force required for pulling up the balance weight is the smallest. When the balance weight is arranged at the top end of the inclined section of the slide rail, the downward resultant force borne by the balance weight is the largest, and the frictional resistance required to be overcome by the downward movement is the smallest. Meanwhile, the horizontal section can also support the balance weight, so that the balance weight can stay in the horizontal section after moving from the inclined section. The first transition section can perform a transition function, so that the balance weight can be in balance transition from the inclined section to the horizontal section. Therefore, the balance tower provided by the disclosure can enable the balance weight to be in the most easily started state when moving from the bottom of the slide rail to the top of the slide rail or from the top of the slide rail to the bottom of the slide rail from a static state, so that the starting inertia of the balance weight moving on the balance tower can be reduced, and the movement of the balance weight is more flexible.
Optionally, the included angle between the tangent of the inclined section 32-1 and the horizontal direction gradually decreases in the range of 0 to 90 degrees along the direction from the top of the tower 31 to the bottom of the tower 31.
Illustratively, in the present embodiment, the angle between the tangent of the top of the inclined section 32-1 (i.e., the end at the top of the tower 31) and the horizontal direction is β, the angle between the tangent of the bottom of the inclined section 32-1 (i.e., the end at the bottom of the tower 31) and the horizontal direction is α, α < β, and α to β gradually decrease in the range of 0 ° to 90 °.
Optionally, the first transition segment 32-2 may correspond to a central angle of no more than 90 ° so as to ensure a smooth transition of the counterweight 100 from the inclined segment 32-1 to the horizontal segment 32-3.
When the central angle of the first transition section 32-2 is 90 °, the end of the first transition section 32-2 connected to the inclined section 32-1 is tangent to the inclined section 32-1, and the end of the first transition section 32-2 connected to the horizontal section 32-3 is tangent to the horizontal section 32-3.
Optionally, the length L1 of the angled section 32-1 is between 60m and 70 m. If the length L1 of the angled section 32-1 is too long, the overall volume of the equalization column 30 may be too large, resulting in wasted material. If the length L1 of the inclined section 32-1 is too short, the effect of reducing the starting inertia of the counterweight cannot be obtained.
In this embodiment, the length L1 of the angled section 32-1 may also be determined based on the tension adjustment range of the antenna screen.
Illustratively, the length L1 of the angled section 32-1 is 65 m.
Optionally, the length L2 of the horizontal segment 32-3 is 2-7 m. If the length L2 of the horizontal segment 32-3 is too long, the overall volume of the equalization column 30 may be too large, resulting in wasted material. If the length L2 of the horizontal segment 32-3 is too short, the
In this embodiment, the length L2 of the horizontal segment 32-3 may also be determined based on the tension adjustment range of the antenna screen.
Illustratively, the length L2 of horizontal segment 32-3 is 3.4 m.
Fig. 7 is a schematic structural diagram of a balancing tower according to an embodiment of the present disclosure, and as shown in fig. 7, a stopper 33 is disposed at one end of the
Alternatively, the stopper 33 may be a rectangular block structure.
The blocking piece 33 may be, for example, a cast iron piece, a cast steel piece, an alloy structural steel piece, or a carbon structural steel piece.
Optionally, two convex rails 321 are disposed on two sides of the sliding
Alternatively, the height of the two rails 321 is greater than the radius of the
The height of the two rails 321 is the distance from one side of the two rails 321 far away from the
Optionally, the
Illustratively, the slide rails 32 may be cast iron slide rails, cast steel slide rails, alloy structural steel slide rails, or carbon structural steel slide rails.
In this embodiment, the tower body 31 may be a concrete tower or a steel frame structure, and the tower body 31 is provided with an inclined surface matching with the
Fig. 8 is a schematic structural diagram of another slide rail provided in the embodiment of the present disclosure, as shown in fig. 8, the slide rail further includes a second transition section 32-4 and a final section 32-5, one end of the second transition section 32-4 is connected to the horizontal section 32-3, the other end of the second transition section 32-4 is connected to the final section 32-5, the second transition section 32-4 is an arc section, the final section 32-5 is an inclined section extending from the bottom of the tower body 31 to the top of the tower body 31, and an included angle between a tangent line of the final section 32-5 and the horizontal direction gradually increases along the direction from the bottom of the tower body 31 to the top of the tower body 31.
Through the arrangement of the second transition section 32-4, the
In the present embodiment, the height L3 of the final section 32-5 in the vertical direction is larger than the radius of the
Optionally, the included angle between the tangent of the ending section 32-5 and the horizontal direction gradually increases in the range of 0 to 90 degrees along the direction from the top of the tower body 31 to the bottom of the tower body 31.
Optionally, the second transition segment 32-4 corresponds to a central angle of no more than 90 °. Thereby ensuring a smooth transition of the counterweight 100 from the horizontal segment 32-3 to the final segment 32-5.
When the central angle corresponding to the second transition section 32-4 is 90 °, the end of the second transition section 32-4 connected to the horizontal section 32-3 is tangent to the horizontal section 32-3, and the end of the second transition section 32-4 connected to the final section 32-5 is tangent to the final section 32-5.
Fig. 9 is a flowchart of a method of an antenna balancing method according to an embodiment of the present disclosure, and as shown in fig. 9, the antenna balancing method employs the antenna balancing system according to the above embodiment, and the antenna balancing method includes:
And step 901, connecting the antenna screen connecting end of the adjusting rope with the antenna screen.
And 902, when the tension on the adjusting rope detected by the tension monitoring device exceeds a set value, controlling the winch to release the rope to increase the length of the adjusting rope.
And step 903, when the tension on the adjusting rope detected by the tension monitoring device is reduced, controlling the winch to release the rope to reduce the length of the adjusting rope until the tension on the adjusting rope detected by the tension monitoring device does not exceed a set value.
According to the antenna balancing method, by adopting the antenna balancing system, when the antenna screen is used specifically, if the external load of the antenna screen is increased, the balance weight starts to rise along the balancing tower under the driving of the adjusting rope. After the body of a tower top of balanced tower is moved to the counter weight, if antenna curtain external load continues to increase, tension monitoring devices detects that the tension on adjusting the rope exceeds the setting value, then the control module of hoist engine is according to the tension change on the regulation rope that tension monitoring devices detected, the control hoist engine begins the release and adjusts the rope, the length that makes the regulation rope increases, thereby can be so that the tension value on adjusting the rope reduces, and then can make the regulation rope continue to release the external load that the antenna curtain received, thereby can further adjust the antenna curtain degree of hanging down. On the contrary, if the external load of the antenna screen is reduced, the tension monitoring device detects that the tension on the adjusting rope is reduced, the winch starts to take up the adjusting rope, and the length of the adjusting rope is reduced. If the external load of the antenna screen continues to be reduced, and the tension monitoring device detects that the tension on the adjusting rope is not more than a set value, the balance weight starts to descend along the sliding rail, and the balance weight can move to the bottom of the balance tower. Therefore, the antenna balance method provided by the disclosure can automatically retract and release the length of the adjusting rope according to the tension change on the adjusting rope to change the sag of the antenna screen, so that the adjusting range of the antenna screen sag is larger and more flexible. And the tension value on the adjusting rope can be prevented from exceeding the limit value and being broken, so that the potential safety hazard is reduced.
The above description is intended to be exemplary only and not to limit the present disclosure, and any modification, equivalent replacement, or improvement made without departing from the spirit and scope of the present disclosure is to be considered as the same as the present disclosure.
- 上一篇:一种医用注射器针头装配设备
- 下一篇:天线组件及电子设备