Hook-type assembled steel chute

文档序号:1181203 发布日期:2020-09-22 浏览:8次 中文

阅读说明:本技术 一种勾挂式装配钢溜槽 (Hook-type assembled steel chute ) 是由 刘建国 谭小聪 姚平 于 2020-06-22 设计创作,主要内容包括:本发明涉及建筑施工领域,旨在解决现有的木溜槽为一次性且制作及组装木溜槽施工时间长的问题,提供一种勾挂式装配钢溜槽,其包括相互连通的主溜槽和次溜槽;主溜槽倾斜设置,次溜槽连通于主溜槽的侧面缺口处,且次溜槽的延伸方向和主溜槽错开;主溜槽由多个溜槽节段沿主溜槽的槽道方向依次拼接而成,并且,各溜槽节段的上端下表面上设有挂钩、下端下表面设有挂杆;位于下方的溜槽节段通过其上端的挂钩挂接于位于上方的溜槽节段的下端的挂杆上。本发明的有益效果是能够方便地导引混凝土分布至多点浇注,提高浇注效率,并且通过挂钩和挂杆配合的连接方式,能够方便地实现装置的快速拼接和拆除施工方便快捷且便于拆卸周转。(The invention relates to the field of building construction, aims to solve the problems that the existing wood chute is disposable and the construction time for manufacturing and assembling the wood chute is long, and provides a hook-type assembled steel chute which comprises a main chute and a secondary chute which are communicated with each other; the main chute is obliquely arranged, the secondary chute is communicated with the side gap of the main chute, and the extension direction of the secondary chute is staggered with the main chute; the main chute is formed by sequentially splicing a plurality of chute sections along the channel direction of the main chute, and the lower surface of the upper end of each chute section is provided with a hook, and the lower surface of the lower end of each chute section is provided with a hanging rod; the chute section located below is hung on the hanging rod at the lower end of the chute section located above through the hook at the upper end of the chute section. The invention has the advantages that the concrete can be conveniently guided to be distributed to multi-point pouring, the pouring efficiency is improved, and the quick splicing and dismantling construction of the device can be conveniently realized and the disassembly and turnover are convenient through the connecting mode of matching the hook and the hanging rod.)

1. The utility model provides a collude formula assembly steel chute which characterized in that:

comprises a main chute and a secondary chute which are communicated with each other; the main chute is obliquely arranged, the secondary chute is communicated with the side gap of the main chute, and the extension direction of the secondary chute is staggered with the main chute;

the main chute is formed by sequentially splicing a plurality of chute sections along the channel direction of the main chute, and the lower surface of the upper end of each chute section is provided with a hook, and the lower surface of the lower end of each chute section is provided with a hanging rod; the chute section located below is hung on the hanging rod at the lower end of the chute section located above through the hook at the upper end of the chute section.

2. The hook-type assembly steel chute of claim 1 wherein:

the hanging rod is a U-shaped rod with an upward opening, and the upper end of the hanging rod is fixedly connected to the lower end face of the chute section;

the hook comprises a rod part and a hook part, the rod part is connected to the chute section, the hook part extends upwards along the extension direction of the chute section, and the opening of the hook part is in the super-oblique downward direction.

3. The hook-type assembly steel chute of claim 1 wherein:

the hooks on each chute section are two, the hooks are arranged at intervals in the width direction of the chute section, and the width-direction distance between the hooks and the chute section does not exceed the width-direction length of the hanging rod, so that the two hooks can extend into the hanging rod.

4. The hook-type assembly steel chute of claim 3 wherein:

the distance between the outer side surfaces of the two hooks is equal to the distance between the inner side surfaces of the two vertical sections of the hanging rod.

5. The hook-type assembly steel chute of claim 4 wherein:

the chute section's tank bottom board upper end upwards stretches out and forms the baffle, the hook portion of couple stretches out outside the baffle, peg hookup location sets for the distance department for upwards squinting from the tank bottom board of chute section, and under peg and couple complex state, the baffle of connecting in the chute section of below extends to keeping off on the lower terminal surface of the chute section who is located the top upwards.

6. The hook-type assembly steel chute of claim 1 wherein:

the hanging rod and the hook are respectively connected to the chute sections in a welding mode.

Technical Field

The invention relates to the field of building construction, in particular to a hook-type assembled steel chute.

Background

The basement bottom plate concrete placement volume is big, adopts wooden chute as the bottom plate concrete placement passageway usually, shortens the time that the concrete reaches the bottom plate to practice thrift the time limit for a project. However, the wooden chute is disposable, the turnover utilization rate is low, the construction cost is high, and the construction time for manufacturing and assembling the wooden chute is long.

Disclosure of Invention

The invention aims to provide a hook-type assembled steel chute, which solves the problems that the existing wood chute is disposable and the construction time for manufacturing and assembling the wood chute is long.

The embodiment of the invention is realized by the following steps:

a hook-type assembled steel chute comprises a main chute and a secondary chute which are communicated with each other; the main chute is obliquely arranged, the secondary chute is communicated with the side gap of the main chute, and the extension direction of the secondary chute is staggered with the main chute;

the main chute is formed by sequentially splicing a plurality of chute sections along the channel direction of the main chute, and the lower surface of the upper end of each chute section is provided with a hook, and the lower surface of the lower end of each chute section is provided with a hanging rod; the chute section located below is hung on the hanging rod at the lower end of the chute section located above through the hook at the upper end of the chute section.

The formula of colluding in this scheme assembles the steel chute and passes through the forked type setting of primary and secondary chute, conveniently guides concrete distribution to the multiple spot pouring, improves pouring efficiency to through couple and peg complex connected mode, can conveniently realize the concatenation of device and demolish, have the beneficial effect that construction convenience is swift and convenient to detach has the turnover.

In one embodiment:

the hanging rod is a U-shaped rod with an upward opening, and the upper end of the hanging rod is fixedly connected to the lower end face of the chute section; the hook comprises a rod part and a hook part, the rod part is connected to the chute section, the hook part extends upwards along the extension direction of the chute section, and the opening of the hook part is in the super-oblique downward direction.

Under this mode of setting, the chute festival section of below stretches into the space between peg and the chute bottom plate through its hook portion after, falls and moves down to the state that makes the couple hook on the peg and can accomplish the connection. The connection is convenient to operate, and the connection between the two is reliable under the action of gravity, so that the two are not easy to separate.

In one embodiment:

the hooks on each chute section are two, the hooks are arranged at intervals in the width direction of the chute section, and the width-direction distance between the hooks and the chute section does not exceed the width-direction length of the hanging rod, so that the two hooks can extend into the hanging rod.

In one embodiment:

the distance between the outer side surfaces of the two hooks is equal to the distance between the inner side surfaces of the two vertical sections of the hanging rod. This arrangement enables the relative widthwise displacement of the two chute sections to be limited after the hook is hung from the peg.

In one embodiment:

the chute section's tank bottom board upper end upwards stretches out and forms the baffle, the hook portion of couple stretches out outside the baffle, peg hookup location sets for the distance department for upwards squinting from the tank bottom board of chute section, and under peg and couple complex state, the baffle of connecting in the chute section of below extends to keeping off on the lower terminal surface of the chute section who is located the top upwards.

The setting of baffle can accept the concrete that the seam crossing of adjacent chute festival section fell, avoids extravagant.

In one embodiment:

the hanging rod and the hook are respectively connected to the chute sections in a welding mode.

Through welded connection, the chute sections and the hooks and the hanging rods on the chute sections can be called as an integral structure, so that the chute sections are convenient to integrally use, transport, splice and disassemble.

Drawings

In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings referred to in the embodiments will be briefly described below, it should be understood that the following drawings only illustrate some embodiments of the present invention and therefore should not be considered as limiting the scope, and for those skilled in the art, other related drawings may be obtained from these drawings without inventive effort.

FIG. 1 is a schematic structural view of a hook-type assembled steel chute in an embodiment of the present invention;

FIG. 2 is a schematic illustration of a main chute splice configuration;

FIG. 3 is a schematic view of a chute segment;

FIG. 4 is a front view of a trough segment at a peg;

figure 5 is a front view of a trough section at the point of hooking.

Icon: the steel chute 10, the main chute 11, the secondary chute 12, the chute sections 13, the hook 14, the hanging rod 15, the rod part 16, the hook part 17 and the baffle 18 are assembled in a hook-type manner.

Detailed Description

In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are some, but not all, embodiments of the present invention. The components of embodiments of the present invention generally described and illustrated in the figures herein may be arranged and designed in a wide variety of different configurations.

Thus, the following detailed description of the embodiments of the present invention, presented in the figures, is not intended to limit the scope of the invention, as claimed, but is merely representative of selected embodiments of the invention. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.