Multi-fixed flexible ceiling and installation method thereof

文档序号:129913 发布日期:2021-10-22 浏览:36次 中文

阅读说明:本技术 一种多重固定式柔性吊顶及其安装方法 (Multi-fixed flexible ceiling and installation method thereof ) 是由 丁欣欣 丁泽成 周东珊 王聪聪 余广 于 2021-07-26 设计创作,主要内容包括:本发明涉及吊顶装饰技术领域,具体为一种多重固定式柔性吊顶及其安装方法。一种多重固定式柔性吊顶,包括弹性夹持件,用于夹住软膜的边缘;弹性支撑件,竖向设置,顶端与墙顶连接、底端与所述弹性夹持件顶部连接;限位架,包括限位架本体,以及与所述限位架本体连接并与所述软膜顶部且靠近边缘位置抵撑连接的抵撑体;支撑架,竖向设置,顶端与墙顶连接、底端与所述限位架本体顶部连接。本发明的柔性吊顶,安装操作简单便捷,安装成本低,省时省力,所采用的弹性夹持件、弹性支撑件、限位架、支撑架结构简单,材料成本低,且吊顶安装完成后,结构稳定牢靠,不会出现褶皱、变形、下榻现象,美观度高。(The invention relates to the technical field of suspended ceiling decoration, in particular to a multiple fixed flexible suspended ceiling and an installation method thereof. A multiple fixed flexible suspended ceiling comprises an elastic clamping piece, a flexible supporting piece and a flexible supporting piece, wherein the elastic clamping piece is used for clamping the edge of a flexible film; the elastic supporting piece is vertically arranged, the top end of the elastic supporting piece is connected with the top of the wall, and the bottom end of the elastic supporting piece is connected with the top of the elastic clamping piece; the limiting frame comprises a limiting frame body and a support body which is connected with the limiting frame body and is connected with the top of the soft film in a supporting manner at a position close to the edge; the support frame is vertically arranged, the top end of the support frame is connected with the top of a wall, and the bottom end of the support frame is connected with the top of the limiting frame body. The flexible ceiling disclosed by the invention is simple and convenient to install and operate, low in installation cost, time-saving and labor-saving, the adopted elastic clamping piece, the elastic supporting piece, the limiting frame and the supporting frame are simple in structure and low in material cost, and after the ceiling is installed, the structure is stable and firm, the phenomena of folding, deformation and tatting cannot occur, and the ceiling is high in attractiveness.)

1. The utility model provides a multiple fixed flexible furred ceiling which characterized in that: comprises that

The elastic clamping piece (1) is used for clamping the edge of the soft film (2);

the elastic supporting piece (3) is vertically arranged, the top end of the elastic supporting piece is connected with the top of a wall, and the bottom end of the elastic supporting piece is connected with the top of the elastic clamping piece (1);

the limiting frame comprises a limiting frame body (4) and a support body (5) which is connected with the limiting frame body (4) and is connected with the top of the soft film (2) in a supporting manner at a position close to the edge;

the supporting frame (6) is vertically arranged, the top end of the supporting frame is connected with the top of a wall, and the bottom end of the supporting frame is connected with the top of the limiting frame body (4);

the limiting frame body (4) is in a square tube shape;

the supporting body (5) comprises

A first supporting plate (5-1);

the second supporting plate (5-2) is connected with the first supporting plate (5-1) in an included angle shape;

the third supports the fagging (5-3), the first long avris with the outside corner of spacing body (4) is connected, the second long avris with the first contained angle internal connection that supports fagging (5-1), second and support fagging (5-2).

2. A multiple fixed flexible suspended ceiling according to claim 1 in which: the first supporting plate (5-1) and the second supporting plate (5-2) are connected in a right-angle shape, and the included angles of the first supporting plate (5-1) and the second supporting plate (5-2) are arranged in a fillet shape.

3. A multiple fixed flexible suspended ceiling according to claim 2 in which: and reinforcing ribs are arranged at the joints of the third supporting plate (5-3), the first supporting plate (5-1) and the second supporting plate (5-2).

4. A multiple fixed flexible suspended ceiling according to claim 1 in which: the support frame (6) comprises

The first axial end of the first support rod (6-1) is connected with the limiting frame body (4), and the second axial end of the first support rod is provided with a threaded connector;

a second supporting rod (6-2), wherein a thread butt joint port which is matched and connected with the threaded connector is arranged at the first axial end;

and the connecting seat (6-3) is connected with the axial second end of the second supporting rod (6-2) and is used for being detachably connected with the wall top.

5. A multiple fixed flexible suspended ceiling according to claim 1 in which: the elastic clamping piece (1) comprises

The first clamping plate (1-1) is provided with a first clamping bulge at the first long side;

the second splint (1-2), its first long avris is equipped with the protruding two of centre gripping, the second long avris of second splint (1-2) with the second long avris of first splint (1-1) is contained angle form and connects in order to form the mantle centre gripping chamber, the protruding two of centre gripping with the protruding one of centre gripping sets up in order to form mantle centre gripping mouth in opposite directions.

6. A multiple fixed flexible suspended ceiling according to claim 5 in which: the elastic support (3) comprises

A spring body, the first free end of which is connected with the elastic clamping piece (1);

and the second connecting seat is connected with the second free end of the spring body and is used for being detachably connected with the wall top.

7. A multiple fixed flexible suspended ceiling according to claim 5 in which: the elastic clamping piece (1) also comprises

The flexible film winding rod allows the edge of the flexible film (2) to be wound on the rod body of the flexible film winding rod, and the elastic clamping piece (1) allows the flexible film winding rod to enter the flexible film clamping cavity from the flexible film clamping opening.

8. The mounting method of the multiple fixed flexible suspended ceiling is characterized in that: comprises the steps of

S1, determining the installation positions of the elastic support (3) and the support frame (6) on the top of the wall;

s2, connecting the elastic supporting piece (3) together with the elastic clamping piece (1) with the wall top, and connecting the supporting frame (6) together with the limiting frame with the wall top;

s3, winding the edge of the soft film (2) on the soft film winding rod, and enabling the distance from the contact position of the soft film (2) and the support body (5) to the soft film winding rod to be smaller than the distance from the contact position of the support body (5) and the soft film (2) to the soft film clamping opening;

s4, the soft film (2) is lifted upwards until the soft film (2) is in abutting connection with the support body (5);

s5, the edge of the soft film (2) is rotated upwards around the support body (5) until the soft film winding rod is positioned below the soft film clamping opening of the elastic clamping piece (1);

s6 pulling down the elastic clamping piece (1) to clamp the film winding rod into the film clamping cavity from the film clamping opening.

Technical Field

The invention relates to the technical field of suspended ceiling decoration, in particular to a multiple fixed flexible suspended ceiling and an installation method thereof.

Background

The soft film ceiling is widely applied to indoor ceiling decoration in recent years due to small weight and various styles. At present, the mounting structure of soft membrane furred ceiling has two kinds: 1. the closed installation structure is shown in fig. 6 and 7, the soft membrane is plugged into the soft F-shaped keel only by virtue of the PVC plugging strip as a whole, but when the area of the soft membrane is too large or the PVC plugging strip is aged after long-term use, the dead weight of the soft membrane can sink, and finally the service life of the soft membrane suspended ceiling of the structure is short; 2. open-type mounting structure, as shown in fig. 8, install the mantle inside the fossil fragments through the metal layering, but the mantle furred ceiling of this structure, overall structure is comparatively complicated, and material cost and installation cost are all higher, and also higher to installation master's technical level for the installation time of furred ceiling is long, the installation effectiveness is low.

Disclosure of Invention

Aiming at the problems in the prior art, the invention provides a multi-fixed flexible ceiling which is simple, convenient and efficient to disassemble and assemble, low in installation cost and good in installation effect and an installation method thereof.

The technical scheme adopted by the invention for solving the technical problems is as follows: a multiple fixed flexible suspended ceiling comprises

The elastic clamping piece is used for clamping the edge of the soft film;

the elastic supporting piece is vertically arranged, the top end of the elastic supporting piece is connected with the top of the wall, and the bottom end of the elastic supporting piece is connected with the top of the elastic clamping piece;

the limiting frame comprises a limiting frame body and a support body which is connected with the limiting frame body and is connected with the top of the soft film in a supporting manner at a position close to the edge;

the supporting frame is vertically arranged, the top end of the supporting frame is connected with the top of the wall, and the bottom end of the supporting frame is connected with the top of the limiting frame body;

the limiting frame body is in a square tube shape;

the supporting body comprises

A first supporting plate;

the second supporting plate is connected with the first supporting plate in an included angle shape;

the fagging is supported to the third, first long avris with the outside corner of spacing body is connected, the long avris of second with first fagging, the second contained angle internal connection who supports the fagging.

The flexible ceiling structure is simple and convenient to install and operate, low in installation cost, time-saving and labor-saving, the elastic clamping piece, the elastic supporting piece, the limiting frame and the supporting frame are simple in structure and low in material cost, and after the ceiling is installed, the structure is stable and firm, the phenomena of folding, deformation and lying down are avoided, and the ceiling structure is high in attractiveness.

Preferably, the first fagging that supports with the second supports the fagging and is the right angle form and connects, just first fagging, the second supports the contained angle outside of fagging and is the radius angle setting.

Preferably, the third support plate, the first support plate and the second support plate are provided with reinforcing ribs at the joints.

Preferably, the support frame comprises

The first axial end of the first support rod is connected with the limiting frame body, and the second axial end of the first support rod is provided with a threaded connector;

the first end of the second supporting rod in the axial direction is provided with a threaded butt joint which is in matched connection with the threaded connector;

and the connecting seat is connected with the axial second end of the second supporting rod and is used for being detachably connected with the wall top.

Preferably, the elastic clamping member comprises

The first long side of the first clamping plate is provided with a first clamping bulge;

the second splint, its first long avris is equipped with the protruding two of centre gripping, the long avris of second splint with the long avris of second of first splint is the contained angle form and connects in order to form the mantle centre gripping chamber, the protruding two of centre gripping with the protruding one of centre gripping sets up in order to form the mantle centre gripping mouth in opposite directions.

Preferably, the elastic support comprises

The first free end of the spring body is connected with the elastic clamping piece;

and the second connecting seat is connected with the second free end of the spring body and is used for being detachably connected with the wall top.

Preferably, the elastic clamping piece further comprises

The flexible film winding rod allows the edge of the flexible film to be wound on the rod body of the flexible film winding rod, and the elastic clamping piece allows the flexible film winding rod to enter the flexible film clamping cavity from the flexible film clamping opening.

The method for installing multiple fixed flexible suspended ceilings comprises the following steps

S1, determining the mounting positions of the elastic supporting piece and the supporting frame on the top of the wall;

s2, connecting the elastic supporting piece and the elastic clamping piece with the wall top, and connecting the supporting frame and the limiting frame with the wall top;

s3, winding the edge of the soft film on the soft film winding rod, and making the distance from the contact position of the soft film and the support body to the soft film winding rod smaller than the distance from the contact position of the support body and the soft film to the soft film clamping opening;

s4, lifting the soft film upwards until the soft film is in abutting connection with the support body;

s5 making the edge of the soft film rotate upward around the support body until the soft film winding rod is positioned below the soft film clamping opening of the elastic clamping piece;

s6 pulling down the elastic clamp to clip the flexible film winding rod from the flexible film clamping opening into the flexible film clamping cavity.

By the ceiling mounting method, the soft membrane ceiling is simple and convenient to mount and operate, time-saving and labor-saving, low in mounting cost, good in effect after being mounted, stable in structure and free of wrinkles, deformation and tatting.

Advantageous effects

The flexible ceiling disclosed by the invention is simple and convenient to install and operate, low in installation cost, time-saving and labor-saving, the adopted elastic clamping piece, the elastic supporting piece, the limiting frame and the supporting frame are simple in structure and low in material cost, and after the ceiling is installed, the structure is stable and firm, the phenomena of folding, deformation and tatting cannot occur, and the ceiling is high in attractiveness.

Drawings

FIG. 1 is a schematic structural view of the multiple fixed flexible suspended ceiling of the present invention after installation;

FIG. 2 is a schematic structural view of a limiting frame and a supporting frame according to the present invention;

FIG. 3 is a side view of the stop frame and the support frame of FIG. 2;

FIG. 4 is a schematic structural view of the elastic clamping member and the elastic supporting member according to the present invention;

FIG. 5 is a side view of the resilient clip and the resilient support of FIG. 4;

FIG. 6 is a schematic structural view of a prior art closed mounting structure for a flexible membrane ceiling;

FIG. 7 is another schematic view of a prior art enclosed mounting structure for a flexible membrane ceiling;

fig. 8 is a schematic structural view of an open type installation structure of a soft membrane suspended ceiling in the prior art.

Detailed Description

The technical scheme of the invention is further explained by the specific implementation mode in combination with the attached drawings.

As shown in fig. 1 to 5, a multiple fixed flexible suspended ceiling includes an elastic clamping member 1, an elastic supporting member 3, a limiting frame, and a supporting frame 6. The elastic clamp 1 is used for clamping the edge of the soft membrane 2. The elastic supporting piece 3 is vertically arranged, the top end of the elastic supporting piece is connected with the top of a wall, and the bottom end of the elastic supporting piece is connected with the top of the elastic clamping piece 1. The limiting frame comprises a limiting frame body 4 and a support body 5 which is connected with the limiting frame body 4 and is connected with the top of the soft film 2 and is close to the edge in a support mode. The support frame 6 is vertically arranged, the top end of the support frame is connected with the top of a wall, and the bottom end of the support frame is connected with the top of the limiting frame body 4.

When the suspended ceiling is installed, the elastic supporting piece 3 and the elastic clamping piece 1 are connected with the wall top, the supporting frame 6 and the limiting frame are connected with the wall top, then the soft film 2 is lifted upwards until the soft film 2 is in abutting connection with the abutting body 5, then the edge of the soft film 2 is rotated upwards around the abutting body 5 to be in abutting connection with the soft film clamping opening of the elastic clamping piece 1, and finally the elastic clamping piece 1 is pulled downwards to clamp the edge of the soft film 2 into the soft film clamping cavity from the soft film clamping opening, so that the installation is very simple and convenient.

The limiting frame body 4 is in a square tube shape, and the support body 5 can be axially connected with a corner outside the square tube-shaped limiting frame body 4. The limiting frame body 4 is arranged in a square tube shape, and the supporting body 5 can be conveniently connected with the limiting frame body 4 in a positioning way.

The support body 5 comprises a first support plate 5-1, a second support plate 5-2 and a third support plate 5-3. The second supporting plate 5-2 is connected with the first supporting plate 5-1 in an included angle shape, and the outside of the connection part of the included angle is used for being in contact connection with the soft membrane 2, so that on one hand, the soft membrane 2 can be sufficiently tensioned and unfolded, and the phenomena of wrinkles, deformation and couch descending of the soft membrane 2 are prevented, and the attractiveness of the soft membrane ceiling is improved; on the other hand, can form the effort that offsets with the ascending pulling force cooperation of elasticity holder 1 for the structural stability of whole mantle furred ceiling is better. The third supports the first long avris of fagging 5-3 and the outside corner of spacing frame body 4 is connected, the second long avris with first supporting plate 5-1, the second supports the contained angle internal connection of fagging 5-2 for support body 5's transversal personally submits the arrow point form.

The first supporting plate 5-1 and the second supporting plate 5-2 are connected in a right-angle shape, the outside of the included angle between the first supporting plate 5-1 and the second supporting plate 5-2 is in a fillet shape, and the supporting effect of the supporting body 5 of the structure on the soft film 2 is the best. The joints of the third supporting plate 5-3 and the first supporting plate 5-1 and the second supporting plate 5-2 are provided with reinforcing ribs, and the arrangement of the reinforcing ribs improves the structural strength of the whole supporting body 5, so that the supporting effect of the supporting body 5 on the soft film 2 is further improved.

The support frame 6 comprises a first support rod 6-1, a second support rod 6-2 and a connecting seat 6-3. The first axial end of the first support rod 6-1 is connected with the limiting frame body 4, and the second axial end is provided with a threaded connector. The first axial end of the second support rod 6-2 is provided with a threaded butt joint port which is in fit connection with the threaded joint, and the second support rod 6-2 can rotate relative to the threaded joint of the first support rod 6-1 through the threaded butt joint port, so that the whole axial length of the support frame 6 can be adjusted, and the distance from the contact side position of the support body 5 and the soft film 2 to the soft film clamping port of the elastic clamping piece 1 can be adjusted. The connecting seat 6-3 is connected with the axial second end of the second supporting rod 6-2 and is used for being detachably connected with the wall top.

The elastic clamping piece 1 comprises a first clamping plate 1-1 and a second clamping plate 1-2, a first long side of the first clamping plate 1-1 is provided with a first clamping protrusion, a first long side of the second clamping plate 1-2 is provided with a second clamping protrusion, a second long side of the second clamping plate 1-2 and the second long side of the first clamping plate 1-1 are connected in an included angle mode to form a soft film clamping cavity, and the second clamping protrusion and the first clamping protrusion are oppositely arranged to form a soft film clamping opening. The elastic clamp 1 is used to tightly clamp the edge of the soft membrane 2 to provide an upward supporting force to the soft membrane 2.

The elastic supporting piece 3 comprises a spring body and a second connecting seat. The first free end of the spring body is connected with the elastic clamping piece 1, and the second connecting seat is connected with the second free end of the spring body and used for being detachably connected with a wall top. The part that mantle 2 is used for being held by elasticity holder 1 is to being less than the distance (mantle 2 and elasticity holder 1 are not connected) that supports 5 contact position to the distance of mantle centre gripping mouth with supporting body 5 and mantle 2 contact position, make only can be connected elasticity holder 1 and mantle 2 through the mode of drop-down elasticity holder 1, after mantle 2 is connected with elasticity holder 1, mantle 2 can be tightly stretched firmly by elasticity holder 1 through the elasticity restoring force of the spring body, again through the cooperation of supporting with supporting body 5, make the installation effectiveness of mantle 2 fabulous.

The elastic clamping piece 1 further comprises a soft film winding rod, the soft film winding rod allows the edge of the soft film 2 to be wound on the rod body of the soft film winding rod, and the elastic clamping piece 1 allows the soft film winding rod to enter the soft film clamping cavity from the soft film clamping opening. The setting of mantle winding pole is convenient for on the one hand with in the mantle centre gripping chamber is installed to mantle 2 edge, and on the other hand makes mantle 2 edge be difficult for droing from the mantle centre gripping chamber, and then makes mantle 2 better, connect more stably with the connection effect of elasticity holder 1.

The invention also discloses an installation method of the multiple fixed flexible suspended ceiling, which comprises the following steps

S1, determining the mounting positions of the elastic supporting members 3 and the supporting frames 6 on the wall top, specifically determining the mounting positions of the elastic supporting members 3 and the supporting frames 6 by snapping lines on the wall top. The number of the elastic supports 3 needs to be determined according to the actual size of the soft membrane 2 to ensure that the elastic supports 3 can effectively support the soft membrane 2.

S2, the elastic supporting piece 3 together with the elastic clamping piece 1 is connected with the wall top, and the supporting frame 6 together with the limiting frame is connected with the wall top. Connecting a second connecting seat on the spring body with the wall top to finish hoisting the spring body and the elastic clamping piece 1; then the axial length of the support frame 6 is adjusted, so that after the support frame 6 is connected with the wall top, the distance from the contact side position of the support body 5 and the soft film 2 to the soft film clamping opening of the elastic clamping piece 1 is approximately the required length.

S3, the edge of the soft film 2 is wound on the soft film winding rod, and the distance from the contact position of the soft film 2 and the support body 5 to the soft film winding rod is smaller than the distance from the contact position of the support body 5 and the soft film 2 to the soft film clamping opening. The elastic clamping piece 1 is arranged at a position higher than the support body 5.

S4, the soft film 2 is lifted upwards until the soft film 2 is in interference connection with the support body 5.

S5 the edge of the soft film 2 is rotated upward around the support body 5 until the soft film winding rod is positioned below the soft film clamping opening of the elastic clamping piece 1. The best is that the soft film 2 on the soft film winding rod is just contacted with the outside of the soft film clamping opening. If the distance between the flexible film 2 on the flexible film winding rod and the outer part of the flexible film clamping opening is larger due to errors in the actual installation process, the flexible film 2 on the flexible film winding rod can be released in a mode of rotating the flexible film winding rod until the flexible film 2 on the flexible film winding rod is just contacted with the outer part of the flexible film clamping opening; if the distance between the soft film 2 on the soft film winding rod and the outer part of the soft film clamping opening is too small (namely the soft film 2 is not completely pulled out) due to errors in the actual installation process, the soft film 2 can be continuously wound on the soft film winding rod by rotating the soft film winding rod until the soft film 2 on the soft film winding rod is just contacted with the outer part of the soft film clamping opening. The setting up of mantle winding pole makes 2 edges of mantle finely tune more convenient, and then has improved the installation effectiveness and the installation effect of mantle 2.

S6 pulls down the elastic clamp 1 to clip the flexible film winding bar into the flexible film clamping chamber from the flexible film clamping opening. After the soft film winding rod and the elastic clamping piece 1 are installed, the soft film 2 can be tightly pulled by the elastic clamping piece 1 through the elastic resetting force of the spring body, and then the soft film 2 is well installed through the supporting matching with the supporting body 5.

By the ceiling mounting method, the soft membrane ceiling is simple and convenient to mount and operate, time-saving and labor-saving, low in mounting cost, good in effect after being mounted, stable in structure and free of wrinkles, deformation and tatting.

The above-described embodiments are merely illustrative of the preferred embodiments of the present invention and do not limit the spirit and scope of the present invention. Various modifications and improvements of the technical solutions of the present invention may be made by those skilled in the art without departing from the design concept of the present invention, and the technical contents of the present invention are all described in the claims.

14页详细技术资料下载
上一篇:一种医用注射器针头装配设备
下一篇:一种多功能装配式吊顶收边平接模块

网友询问留言

已有0条留言

还没有人留言评论。精彩留言会获得点赞!

精彩留言,会给你点赞!