Construction method for mounting multi-split equipment and pipeline in steel structure building

文档序号:1488095 发布日期:2020-02-28 浏览:20次 中文

阅读说明:本技术 一种钢结构建筑内多联机设备及管道安装的施工方法 (Construction method for mounting multi-split equipment and pipeline in steel structure building ) 是由 郭金虎 石建明 贺雷刚 郝晶 雷亚丽 于 2019-11-21 设计创作,主要内容包括:本发明涉及飞机库、检修车间、停车列检库等大跨距的钢结构建筑内多联机设备及管道安装的施工领域,针对钢结构建筑内机电设备安装时禁止一切在钢结构上打孔或者焊接的作业,发明一种操作简单、可实施的不打眼、不焊接,钢结构建筑内多联机设备及管道安装的施工方法,具体为一种钢结构建筑内多联机设备及管道安装的施工方法,包括多联机设备支架安装、多联机管道钢索安装和多联机管道吊环安装。本发明不打眼、不焊接,解决了大跨距钢结构建筑内机电设备及管线安装的难题。采用钢索作为基础支点对多联机管线进行安装,以吊环作为多联机管线增设的吊点,在保证多联机冷空调煤管安装的同时,又可安装多联机空调冷凝管。(The invention relates to the construction field of multi-online equipment and pipeline installation in large-span steel structure buildings such as hangars, repair workshops and parking train inspection storehouses, aiming at prohibiting all operations of punching or welding on a steel structure when electromechanical equipment in the steel structure building is installed, the invention provides a construction method for installing the multi-online equipment and the pipeline in the steel structure building, which is simple to operate and can be implemented without punching and welding, in particular to a construction method for installing the multi-online equipment and the pipeline in the steel structure building, which comprises the steps of multi-online equipment support installation, multi-online pipeline steel cable installation and multi-online pipeline hanging ring installation. The invention does not need drilling and welding, and solves the difficult problem of mounting electromechanical equipment and pipelines in large-span steel structure buildings. The steel cable is used as a basic fulcrum to install the multi-split air-conditioning pipeline, the hanging ring is used as a hanging point additionally arranged on the multi-split air-conditioning pipeline, and the multi-split air-conditioning condensation pipe can be installed while the installation of the multi-split air-conditioning coal pipe is ensured.)

1. A construction method for installing multi-online equipment and pipelines in a steel structure building is characterized by comprising the installation of a multi-online equipment bracket, the installation of a multi-online pipeline steel cable and the installation of a multi-online pipeline hanging ring,

the multi-split air conditioner equipment bracket mounting device comprises the following steps: the multi-split equipment support comprises a triangular support and a pair of cross arms, the triangular support comprises C-shaped steel (3), a triangular support inclined strut (7) and a triangular support (8), an inner side plate of the C-shaped steel (3) is provided with holes at equal intervals from top to bottom and a nut is welded at the hole position of the inner side plate of the C-shaped steel (3), the C-shaped steel (3) is vertically buckled at the edge of a flange plate of an H-shaped steel structure column, a bolt is in contact with the inner side of the edge of the flange plate of the H-shaped steel structure column through the hole of the nut, so that the outer side plate of the C-shaped steel (3) is tightly attached to the outer side of the flange plate of the H-shaped steel structure column, the C-shaped steel (3) is fixed on the H-shaped steel structure column, the upper end of the triangular support inclined strut (7) is welded on the outer side plate of the C-shaped steel (3), the, the device comprises a tripod support (8), a plurality of equipment support cross arms (9) and a plurality of multi-split devices, wherein the tripod support (8) is provided with two holes in the longitudinal direction and used for fixing the equipment support cross arms (9), the distance between the two holes is consistent with the distance between two longitudinal lifting lugs (11) of the multi-split devices, the two equipment support cross arms (9) in the front and at the back in the longitudinal direction are fixed through the tripod supports (8) on two groups of tripod supports, each equipment support cross arm (9) is provided with two holes in the transverse direction and used for installing a lifting wire for lifting equipment, the distance between the two holes is consistent with the distance between the two transverse lifting lugs (11) of the multi-split devices, the lifting wire is fixed on the equipment support cross arm (9) through nuts, each multi-split device;

the multi-split pipeline steel cable installation device comprises the following steps: the multi-split pipeline steel cable is transversely paved and installed along the H-shaped steel structural column, and is used for a steel clamping plate (12), a bracket bottom support (16), a bracket arm (17), an L-shaped clamping lug (18) and a steel cable clamp (15); an inner side plate of a C-shaped steel clamping plate (12) is provided with a hole and welded with a nut, the C-shaped steel clamping plate (12) is buckled at the edge of a flange plate of an H-shaped steel structure column, a bolt is contacted with the inner side of the edge of the flange plate of the H-shaped steel structure column through the hole of the nut, so that an outer side plate of the steel clamping plate (12) is tightly attached to the outer side of the edge of the H-shaped steel structure column, the C-shaped steel clamping plate (12) is fixed on the edge of the flange plate of the H-shaped steel structure column by the bolt and the nut, the steel clamping plate (12) is respectively fixed on the H-shaped steel structure columns at the two ends of a multi-split pipeline, the outer side plate of the C-shaped steel clamping plate (12) is provided with a hole for fixing a steel cable (14), the steel cable bracket is welded and manufactured by a bracket bottom bracket (16) and a bracket arm (17) and is fixed on the H-shaped steel structure column between the two, two holes are formed in two ends of a support base (16), L-shaped clamping lugs (18) are attached to the inner sides of flange plates of an H-shaped steel structure column, two ends of the support base (16) are respectively connected with the L-shaped clamping lugs (18) through bolts and nuts, a support base (16) is installed on the steel structure column in an anchor ear mode, a support arm (17) is vertically welded on the support base (16), a steel cable clamp (15) is vertically installed on the support arm (17), two ends of a steel cable (14) are respectively connected with steel clamping plates (12) at two end portions of a multi-split pipe through basket bolts (13), and the steel cable (14) is fixed through the steel cable clamp (15) when passing through a steel cable support;

the installation of the multi-split pipeline hanging ring comprises the following steps: after the steel cable is installed, the multi-split air conditioner pipeline lifting rings are reasonably and uniformly arranged and installed according to the distance between the two structural columns, each lifting ring is composed of an upper lifting ring (21) and a lower lifting ring (22), the upper lifting ring (21) is used for supporting a multi-split air conditioner refrigerant pipe (23), and the lower lifting ring (22) is used for supporting a multi-split air conditioner condenser pipe (24).

2. The construction method for installing the multi-split equipment and the pipelines in the steel structure building as claimed in claim 1, wherein the rear half part of the outer side plate of the steel clamping plate (12) is perpendicular to the front half part, the rear half part is tightly attached to the H-shaped steel structure column, and the opening on the outer side plate is positioned on the front half part.

Technical Field

The invention relates to the construction field of multi-online equipment and pipeline installation in large-span steel structure buildings such as hangars, repair workshops and parking and train inspection storehouses, and aims at prohibiting all operations of punching or welding on a steel structure when electromechanical equipment in the steel structure building is installed.

Background

With the development of science and technology and the improvement of industrial automation level, people have higher and higher requirements on engineering construction speed and project economic benefit. To meet this requirement, the steel construction industry has developed unprecedented in civil engineering and has taken an irreplaceable position in some construction fields. In large-scale industrial plants or processing workshops with large span and the construction and use of parking train inspection storehouses in a rail transit system, compared with non-steel structures such as brick-concrete structures and wood structures in civil engineering, the steel structure has the unique advantages in the aspects of construction speed and service performance.

In steel structure buildings, there are related professional devices and pipelines, such as power lighting systems, ventilation and air conditioning systems, fire protection systems, environmental control systems, communication signal systems, etc., which are provided to meet the requirements of building functions and process production. However, due to the particularity of the steel structure, the drilling or welding operation mode is forbidden to be adopted on the steel structure when the pipeline supporting and hanging frames of the systems are installed, and the rigid requirement brings great difficulty to the normal installation of the electromechanical equipment pipeline.

In an urban rail transit system, steel structure buildings are built in a vehicle section and a parking lot, as the name suggests, a steel structure is a structure formed by steel materials, a wall body mainly comprises steel plates, section steel, steel columns and the like, a roof mainly comprises steel beams, trusses and other members, and in order to guarantee the safety of the steel structure building and the scientificity of load, all operations of punching or welding on the steel structure are forbidden when electromechanical equipment in the building is installed.

Therefore, there is a need for an installation method that can hold equipment and associated piping in place without the need for drilling or welding holes in the steel structure.

Disclosure of Invention

According to the invention, by considering some special requirements of electromechanical equipment installation in a steel structure building, on the premise of not adopting a punching and welding operation mode, the multi-split indoor unit and the multi-split pipeline are installed in the steel structure building according to a design drawing, and meanwhile, the reasonable bearing of the steel structure building is ensured.

The invention is realized by adopting the following technical scheme: a construction method for installing multi-online equipment and pipelines in a steel structure building is characterized by comprising the installation of a multi-online equipment bracket, the installation of a multi-online pipeline steel cable and the installation of a multi-online pipeline hanging ring,

the multi-split air conditioner equipment bracket mounting device comprises the following steps: the multi-split equipment support comprises a triangular support and a pair of cross arms, the triangular support comprises C-shaped steel, triangular support inclined struts and triangular support supports, holes are formed in an inner side plate of the C-shaped steel at equal intervals from top to bottom, nuts are welded at holes of the inner side plate of the C-shaped steel, the C-shaped steel is vertically buckled at the edges of flanges of an H-shaped steel structure column, bolts are in contact with the inner sides of the edges of the flanges of the H-shaped steel structure column through the holes of the nuts, so that an outer side plate of the C-shaped steel is tightly attached to the outer sides of the edges of the flanges of the H-shaped steel structure column, the C-shaped steel is fixed on the H-shaped steel structure column, the upper ends of the triangular support inclined struts are welded on the outer side plate of the C-shaped steel, the lower ends of the triangular support inclined struts are welded on the triangular support supports, one end of the triangular support is vertically welded, the method comprises the following steps that longitudinal front and rear equipment support cross arms are fixed through tripod supports on two groups of triangular supports, each equipment support cross arm is provided with two holes in the transverse direction and used for installing a suspension wire for equipment hoisting, the distance between the two holes is consistent with the distance between two transverse lifting lugs of the multi-split equipment, the suspension wire is fixed on the equipment support cross arm through nuts, each multi-split lifting lug is fixed at the lower end of the suspension wire through an upper nut and a lower nut, the four lifting lugs of the multi-split equipment are connected in the method, and the multi-split equipment is hoisted;

the multi-split pipeline steel cable installation device comprises the following steps: the multi-split pipeline steel cable is transversely paved and installed along the H-shaped steel structural column, and is used for a steel clamping plate, a bracket bottom support, a bracket arm, an L-shaped clamping lug and a steel cable clamp; the inner side plate of the C-shaped steel splint is perforated and welded with a nut, the C-shaped steel splint is buckled at the edge of the flange plate of the H-shaped steel structure column, a bolt is contacted with the inner side of the edge of the flange plate of the H-shaped steel structure column through a hole of the nut, so that the outer side surface of the steel splint is tightly attached to the outer side of the edge of the H-shaped steel structure column, the C-shaped steel splint is fixed on the edge of the flange plate of the H-shaped steel structure column by the bolt and the nut, the steel splints are respectively fixed on the H-shaped steel structure columns at the two end parts of the multi-connected pipeline, the outer side plate of the C-shaped steel splint is perforated for fixing a steel cable, the cable bracket is formed by welding a bracket bottom support and a bracket arm and is fixed on the H-shaped steel structure column between the two ends of the multi-connected pipeline, the bracket bottom support is horizontally arranged at the, the two holes are respectively positioned on two sides of a flange plate of an H-shaped steel structure column, L-shaped clamping lugs are attached to the inner side of the flange plate of the H-shaped steel structure column, two ends of a support base are respectively connected with the L-shaped clamping lugs through bolts and nuts, a support base hoop is installed on a steel structure column, a support arm is vertically welded on the support base to form a T-shaped steel cable support, a steel cable clamp is vertically installed on the support arm, two ends of a steel cable are respectively connected with steel clamping plates at two end parts of a multi-connected pipeline through a flower basket bolt, and the steel cable is fixed by the steel cable clamp when passing through the steel cable support;

the installation of the multi-split pipeline hanging ring comprises the following steps: after the steel cable is installed, the multiple online pipeline lifting rings are reasonably and uniformly arranged and installed according to the distance between the two structural columns, each lifting ring consists of an upper layer lifting ring and a lower layer lifting ring, the upper layer lifting rings are used for supporting multiple online refrigerant pipes, and the lower layer lifting rings are used for supporting multiple online condenser pipes.

Preferably, the rear half part of the outer side plate of the steel splint is perpendicular to the front half part, the rear half part is tightly attached to the H-shaped steel structural column, and the opening on the outer side plate is positioned in the front half part. After the outer side plate of the steel clamping plate is specially designed, the front half part is not tightly attached to the H-shaped steel structural column, and the connection with the turnbuckle is not affected.

Compared with the prior art, the invention has the following advantages:

(1) the method has the advantages of no drilling and no welding, and solves the difficult problem of electromechanical equipment and pipeline installation in the large-span steel structure building.

(2) The steel cable is used as a basic fulcrum to install the multi-split air-conditioning pipeline, the hanging ring is used as a hanging point additionally arranged on the multi-split air-conditioning pipeline, and the multi-split air-conditioning condensation pipe can be installed while the installation of the multi-split air-conditioning coal pipe is ensured.

(3) The operation difficulty is obviously reduced, and the construction efficiency is obviously enhanced.

(4) The installation cost of the whole electromechanical equipment can be effectively reduced, the construction period is shortened, and the construction task is efficiently completed with high quality.

Drawings

Fig. 1 is a structural view illustrating a tripod mounting of a multi-split apparatus stand according to the present invention.

Fig. 2 is a schematic structural view of cross arm mounting of a multi-split apparatus support according to the present invention.

Fig. 3 is a schematic view illustrating a structure of a multi-split pipeline cable installation according to the present invention.

Fig. 4 is a schematic structural diagram of the installation of the multi-split condenser tube lifting ring of the invention.

Fig. 5 is a schematic view illustrating a top view of a multi-split pipe cable support according to the present invention.

FIG. 6 is a schematic top view of the C-shaped steel clamping plate of the present invention.

In the figure: 1-M12 hex head bolt; 2-M12 hex nut; 3-C section steel; 4-M10 hex nut; 5-M10 hex head bolt; 6-spring washer; 7-tripod diagonal bracing; 8-tripod support; 9-equipment support cross arm; 10-M10 suspension wires; 11-a lifting lug; 12-steel splints; 13-turnbuckle; 14-a steel cord; 15-steel cable clamps; 16-bracket base support; 17-a support arm; 18-L-shaped clamping ears; 19-M8 hex head bolt; 20-cable clamp nut; 21-upper layer hanging ring; 22-lower layer hanging ring; 23-a multi-split refrigerant pipe; 24-multi-connected condensing tube.

Detailed Description

A construction method for installing multi-split equipment and pipelines in a steel structure building comprises the following steps:

firstly, mounting a multi-split equipment support:

the materials for mounting the multi-split air conditioning system bracket comprise: m12 hex head bolt 1, M12 hex head nut 2, C shaped steel 3, M10 hex head nut 4, M10 hex head bolt 5, spring washer 6, tripod bracing 7, tripod support 8, equipment support cross arm 9, M10 plumb wire 10. Many online equipment support comprises A-frame and a pair of cross arm, A-frame is by C shaped steel 3, tripod bracing 7, 8 welding of tripod support form, the equidistant trompil of the vertical direction of interior side plate at C shaped steel 3 welds M12 hexagon nut 2 in the inboard hole position of C shaped steel 3, C shaped steel 3 is detained at H shaped steel structure post flange board border, four M12 hexagon head bolts 1 are through the hole of hexagon nut 2 and the inboard contact in H shaped steel structure post flange board border for many online equipment support is fixed in on the H shaped steel structure post. The tripod support 8 is provided with two holes for fixing the equipment support cross arm 9, the distance W between the two holes is consistent with the distance between the two longitudinal lifting lugs 11 of the multi-split equipment, and the tripod support 8 and the equipment support cross arm 9 are fixed by an M10 hexagon head bolt 5 and an M10 hexagon nut 4. Each equipment support cross arm 9 is provided with two holes for installing M10 suspension wires 10 for equipment hoisting, the distance L between the two holes is consistent with the distance between two transverse lifting lugs 11 of the multi-split equipment, and the M10 suspension wires 10 are fixed on the equipment support cross arms 9 by using two M10 hexagon nuts 4. Each multi-connected lifting lug 11 is fixed at the lower end of the M10 suspension wire 10 by an upper M10 hexagonal nut and a lower M10 hexagonal nut, and four lifting lugs of the multi-connected equipment are connected in the method, so that the equipment is lifted.

The multi-online equipment support is an essential accessory for normal installation of equipment. The angle steel with proper length is cut out from the materials used for installing the multi-split air conditioner equipment support according to the transverse size of the multi-split air conditioner to serve as the equipment support cross arm 9, and holes are drilled on the cross arm according to the distance between the multi-split air conditioner lifting lugs and used for installing the equipment lifting wires. The cross arms and the triangular supports are fixed by bolts and nuts of M10, and the distance between the two cross arms is consistent with the width of the multi-connected wire. And mounting the processed bracket on the H-shaped steel structural column by adopting a hoop mounting mode, and fixing by using a bolt M12. When the multi-split air conditioner is installed, due to high-altitude operation, the safety of operators must be guaranteed, and safety belts and safety helmets must be worn during operation. After the equipment is installed on the support, the levelness of the equipment is controlled by the leveling rod, the equipment is in a horizontal position by adjusting the length of the suspension wire, and then the installed equipment is protected.

Secondly, installing a multi-split pipeline steel cable:

the installation is transversely laid along the steel structure post to the many online pipeline cable wire, and the material that the many online pipeline cable wire installation was used includes: m12 hex bolts 1, M12 hex nuts 2, steel clamping plate 12, basket bolts 13, steel cable 14, steel cable clamp 15, support base 16, support arm 17, L-shaped clamping lug 18, M8 hex head bolts 19 and steel cable clamp nuts 20. Two holes are formed in the inner side plate of the steel clamping plate 12 for installing the M12 hexagon nut 2, and a hole is formed in the outer side plate of the steel clamping plate 12 for fixing the steel cable 14. Two M12 hexagon nuts 2 are welded at two holes of the inner side plate of the steel splint 12, the steel splint 12 is buckled at the edge of the flange plate of the H-shaped steel structure column, and the steel splint 12 is firmly fixed on the H-shaped steel structure column by using M12 hexagon head bolts 1 and M12 hexagon nuts 2. The T-shaped steel cable support is manufactured by welding a support base 16 and support arms 17, two holes are formed in two ends of the support base 16 and used for fixing L-shaped clamping lugs 18, and a steel cable support hoop is installed on a steel structure column through an M8 hexagon head bolt 19 and matched nuts. Two holes are arranged on the bracket arm 17 according to the distance between two legs of the steel cable clamp 15 for installing the steel cable clamp 15. The ends of the cable 14 are connected to the steel clamp plate 12 by means of the turn buckle 13, and the cable 14 is clamped to the bracket arms 17 by means of the cable clamp 15 and the cable clamp nut 20 as the cable 14 passes through the cable bracket. The looseness of the steel cable 14 is adjusted by adjusting and changing the length of the turn buckle 13, so that the elasticity of the steel cable 14 tends to be proper.

The multi-split pipeline is transversely paved and installed along the steel structure column, so that the steel cable is also transversely installed along the steel structure column. The total length of the multi-split air-conditioning system pipeline is 114 meters, the condition that the equipment pipeline does not sink at the middle position is difficult to guarantee only by fixing two ends of the steel cable, and in order to meet the requirement of the appearance quality that the mounted multi-split air-conditioning system pipeline is horizontal, flat and vertical, a steel cable support is arranged on each steel structure column and used for supporting and fixing the whole steel cable.

The installation mode of the steel cable bracket and the steel clamping plate is fixed by the hoop installation mode, and the hoop is fixed by the hexagon head bolt, the nut and the matched auxiliary lifting lug. The steel clamping plates at two ends and the steel cable bracket in the middle are hooped on the steel structure column, and all the steel cable brackets and the steel clamping plates are positioned on the same horizontal line after installation. The steel clamping plates 12 are respectively installed on the steel structure columns at the two ends of the multi-split pipeline in a hoop installation mode, the two steel clamping plates 12 are used as supporting points for horizontal stretching of the steel cable, and the two ends of the steel cable 14 are connected with the steel clamping plates 12 through turn buckle bolts. Because the steel cable 14 has certain elasticity, the turnbuckle can adjust the looseness of the whole steel cable 14, straightens the steel cable 14 to the maximum extent, and avoids the middle part of the steel cable from sinking. The cable is fixed by the cable clamp 15 when passing through the cable bracket, on one hand, the cable is used for ensuring that the installed cable cannot swing left and right, and on the other hand, the cable is used for dispersing the tension of the cable on the steel clamping plates 15 at two ends.

Three, multi-online pipeline rings installation

After the steel cable is installed, the multiple online pipeline hanging rings are reasonably and uniformly arranged and installed according to the distance between the two structural columns, each hanging ring is composed of an upper layer hanging ring 21 and a lower layer hanging ring 22, the upper layer hanging rings 21 are used for supporting multiple online refrigerant pipes 23, and the lower layer hanging rings 22 are used for supporting multiple online condenser pipes 24.

The distance between two steel structure columns is 6 meters, the distance between two steel cable supports is also 6 meters, and the support of big span can't satisfy the normal installation of multi-connected refrigerant pipe and condenser pipe, consequently need add the pipeline hoisting point on the cable wire between two steel cable supports, can not sink because of self gravity after messenger's refrigerant pipe and condenser pipe installation. In order to realize the aesthetic property and usability of the finished product pipeline after installation, 3 lifting points are additionally arranged, 6 meters are divided into four sections, and each 1.5 meter is provided with a lifting ring. A group of lifting rings are arranged on the steel cable at equal intervals, two lifting rings are arranged up and down, the multi-split refrigerant pipe is arranged in the upper layer lifting ring 21, and the condensation pipe is arranged in the lower layer lifting ring 22.