Integrated fire-fighting water pump house structure and construction method

文档序号:150144 发布日期:2021-10-26 浏览:43次 中文

阅读说明:本技术 一体式消防水泵房结构及施工方法 (Integrated fire-fighting water pump house structure and construction method ) 是由 徐强 李家宏 卿伟 钟林 邹小卫 龚斌 黄德熙 刘旭阳 于 2021-07-24 设计创作,主要内容包括:本发明涉及建筑施工技术领域,尤其是涉及一种一体式消防水泵房结构及施工方法,其包括条形基础,其特征在于:所述条形基础的顶部设置有预制钢结构框架,所述预制钢结构框架的内部铺设并固定有底板,所述预制钢结构框架的外侧壁固定安装有墙体板,且所述预制钢结构框架的内部呈竖直固定有若干隔板,若干所述隔板将所述钢筋构框架沿长度方向依次分隔成沉沙池、回水池、水泵间,所述水泵间远离回水池的一侧开设有入口,所述预制钢结构框架安装有用于启闭所述入口的活动门,所述预制钢结构框架的顶部固定安装有屋面。本申请具有缩减施工时间,方便周转利用的效果。(The invention relates to the technical field of building construction, in particular to an integrated fire pump house structure and a construction method, wherein the integrated fire pump house structure comprises a strip foundation and is characterized in that: the top of bar foundation is provided with prefabricated steel structural framework, prefabricated steel structural framework's inside is laid and is fixed with the bottom plate, prefabricated steel structural framework's lateral wall fixed mounting has the wall body board, just prefabricated steel structural framework's inside is vertical a plurality of baffles of being fixed with, and is a plurality of the baffle will reinforced steel structural framework separates into desilting pond, return water pond, between the water pump along length direction in proper order, the entry has been seted up to one side of keeping away from the return water pond between the water pump, prefabricated steel structural framework installs and is used for opening and close the dodge gate of entry, prefabricated steel structural framework's top fixed mounting has the roofing. This application has the effect that reduces the engineering time, convenient turnover utilized.)

1. The utility model provides an integral type fire water pump house structure, includes bar basis (1), its characterized in that: the top of bar foundation (1) is provided with prefabricated steel structural framework (2), the inside of prefabricated steel structural framework (2) is laid and is fixed with bottom plate (4), the lateral wall fixed mounting of prefabricated steel structural framework (2) has wall body board (5), just the inside of prefabricated steel structural framework (2) is vertical being fixed with a plurality of baffles (6), and is a plurality of baffle (6) will reinforced steel structural framework separates into sand basin (7), return water pond (8), water pump room (9) in proper order along length direction, one side of keeping away from return water pond (8) has seted up entry (10) between water pump room (9), prefabricated steel structural framework (2) are installed and are used for opening and close the dodge gate (11) of entry (10), the top fixed mounting of prefabricated steel structural framework (2) has roofing (12).

2. An integrated fire-fighting water pump house structure according to claim 1, characterized in that: the top of bar basis (1) with be provided with coupling assembling (3) between the lateral wall of prefabricated steel structural framework (2), bar basis (1) with prefabricated steel structural framework (2) pass through coupling assembling (3) can dismantle the connection.

3. An integrated fire-fighting water pump house structure according to claim 2, characterized in that: 3. coupling assembling (3) are including dead lever (31), connecting rod (32) and fixed block (33), fixed block (33) with the bottom fixed connection of prefabricated steel structural framework (2), the one end of connecting rod (32) with fixed block (33) are through a chain (15) fixed connection, the one end of dead lever (31) with the top fixed connection of bar basis (1), connecting rod (32) are kept away from the one end of fixed block (33) is fixed with barb (34), dead lever (31) are kept away from the one end of bar basis (1) is fixed with hangers (35).

4. An integrated fire-fighting water pump house structure according to claim 3, characterized in that: the lateral wall cover of connecting rod (32) is equipped with protective sheath (36), just the lateral wall of connecting rod (32) is provided with stopper (37), stopper (37) are used for the restriction protective sheath (36) breaks away from connecting rod (32), the inside wall of protective sheath (36) is provided with the internal thread, the lateral wall of dead lever (31) be provided with protective sheath (36) matched with external screw thread.

5. An integrated fire-fighting water pump house structure according to claim 1, characterized in that: the top of the prefabricated steel structure frame (2) is provided with a lifting hook (13), and the lifting hook (13) penetrates through the roof (12) and extends out of the top of the roof (12).

6. An integrated fire-fighting water pump house structure according to claim 1, characterized in that: and the outer side of the water return tank (8) and the outer side of the sand settling tank (7) are both provided with a heat insulation layer (14).

7. The construction method of the integrated fire pump house structure is applied to the integrated fire pump house structure as claimed in any one of claims 1 to 6, and is characterized by comprising the following steps:

s1, pouring the strip foundation (1);

s2, placing the prefabricated steel structure frame (2) on the top of the strip foundation (1);

s3, hooking the barb (34) and the hanging lug (35);

s4, connecting and fixing the protective sleeve (36) and the fixing rod (31) through threads;

s5, welding the bottom plate (4) at the bottom of the prefabricated steel structure frame (2);

s6, welding the wall body plates (5) on the side walls of the prefabricated steel structure frame (2);

s7, arranging a plurality of partition plates (6) along the length direction of the prefabricated steel structure frame, and vertically welding the partition plates inside the prefabricated steel structure frame (2);

s8, arranging the heat insulation layer (14) on the side wall of the sand sedimentation tank (7) and the side wall of the water return tank (8);

s9, installing the movable door (11) at the opening of the prefabricated steel structure frame (2);

and S10, fixedly mounting the roof (12) on the top of the prefabricated steel structure frame (2).

8. The construction method of the integrated fire pump house structure according to claim 7, wherein: the partition plate (6) is made of a steel plate material with the thickness of 6-10 mm.

9. The construction method of the integrated fire pump house structure according to claim 7, wherein: the bottom plate (4) and the prefabricated steel structure frame (2) are arranged between the wall body plates (5) and the prefabricated steel structure frame (2), and the partition plates (6) and the steel structure frame are welded through fusion.

10. The construction method of the integrated fire pump house structure according to claim 7, wherein: the prefabricated steel structure frame (2), the bottom plate (4), the wall body plate (5) and the partition plate (6) are all subjected to anticorrosion painting treatment.

Technical Field

The invention relates to the technical field of building construction, in particular to an integrated fire pump room structure and a construction method.

Background

In order to ensure the fire safety of the construction engineering site, after the engineering enters the main body, a fire pool and a high-pressure water pump are usually arranged on the construction site, and once a fire occurs, the high-pressure water pump is started to send fire-fighting water to a fire-starting place for fire extinguishment.

In the prior art, the method of the temporary water pump house in the construction site comprises the following steps: the ground is level, and ground concrete hardens, and the water tank basis is built by laying bricks or stones, and the water tank is erect, and the pump house is built, and the water pump is installed, the pipe connection. Thereby completing the construction of the water pump house.

In view of the above-mentioned related technologies, the inventor believes that the method has many processes, takes a long time for construction, and cannot be recycled after being constructed, and cannot achieve the purpose of making the best use of the materials for temporary construction sites.

Disclosure of Invention

In order to reduce the construction time and facilitate turnover utilization, the application provides an integrated fire-fighting water pump house structure and a construction method.

The application provides an integral type fire pump room structure and construction method adopts following technical scheme:

first aspect, an integral type fire water pump house structure, including the bar basis, its characterized in that: the top of bar foundation is provided with prefabricated steel structural framework, prefabricated steel structural framework's inside is laid and is fixed with the bottom plate, prefabricated steel structural framework's lateral wall fixed mounting has the wall body board, just prefabricated steel structural framework's inside is vertical a plurality of baffles of being fixed with, and is a plurality of the baffle will reinforced steel structural framework separates into desilting pond, return water pond, between the water pump along length direction in proper order, the entry has been seted up to one side of keeping away from the return water pond between the water pump, prefabricated steel structural framework installs and is used for opening and close the dodge gate of entry, prefabricated steel structural framework's top fixed mounting has the roofing.

Through adopting the above technical scheme, during the construction, building the bar basis earlier, then will prefabricate the steel construction frame setting at the top of bar basis, and install the bottom plate respectively, wall body board and baffle, and install fixed roofing, at last at the installation dodge gate, accomplish the building to the water pump room, set up like this, can prefabricate the steel construction frame in advance, effectively reduce the engineering time, and the water pump room of buildding temporarily, when need not using, can be through demolising outside pipeline, be favorable to wholly transporting, the turnover is to next building site, build the bar basis again, just can accomplish the building, the very big time of secondary construction that has shortened.

Optionally, the top on bar basis with be provided with coupling assembling between prefabricated steel structural framework's the lateral wall, the bar basis with prefabricated steel structural framework passes through coupling assembling can dismantle the connection.

Through adopting above-mentioned technical scheme, coupling assembling's setting has improved the stability of being connected between prefabricated steel structural framework and the bar foundation under the condition of having guaranteed the dismantlement connection between prefabricated steel structural framework and the bar foundation.

Optionally, coupling assembling includes dead lever, connecting rod and fixed block, the fixed block with prefabricated steel construction frame's lateral wall fixed connection, the one end of connecting rod with the fixed block passes through a chain fixed connection, the one end of dead lever with the top fixed connection on bar basis, the connecting rod is kept away from the one end of fixed block is fixed with the barb, the dead lever is kept away from the one end on bar basis is fixed with the hangers.

Through adopting above-mentioned technical scheme, during the installation, rotate the connecting rod and make barb and hangers to be aligned, then hook the hangers with the barb, realized that bar basis and prefabricated steel construction frame can dismantle the effect of being connected through coupling assembling, are favorable to improving bar basis and the stability of being connected of prefabricated steel construction frame.

Optionally, the lateral wall cover of connecting rod is equipped with the protective sheath, just the lateral wall of connecting rod is provided with the stopper, the stopper is used for the restriction the protective sheath breaks away from the connecting rod, the inside wall of protective sheath is provided with the internal thread, the lateral wall of dead lever be provided with protective sheath matched with external screw thread.

Through adopting above-mentioned technical scheme, the setting of protective sheath can play the guard action to barb and hangers to the life of barb and hangers has been improved.

Optionally, a lifting hook is arranged at the top of the prefabricated steel structure frame, and the lifting hook penetrates through the roof and extends out of the top of the roof.

Through adopting above-mentioned technical scheme, the setting of lifting hook makes things convenient for the workman to hang the lifting hook through the crane when carrying fire water pump room to be favorable to the transport.

Optionally, the outside in return water pond and the outside in desilting pond all is provided with the insulating layer.

Through adopting above-mentioned technical scheme, the setting of insulating layer can play thermal-insulated effect of protection to return water pond and desilting pond to be favorable to the storage water resource.

In a second aspect, a construction method of an integrated fire pump room structure comprises the following steps:

s1, pouring the strip foundation;

s2, placing the prefabricated steel structure frame on the top of the strip foundation;

s3, hooking the barb and the hanging lug;

s4, connecting and fixing the protective sleeve and the fixed rod through threads;

s5, welding the bottom plate to the bottom of the prefabricated steel structure frame;

s6, welding the wall body plates on the side walls of the prefabricated steel structure frame;

s7, arranging a plurality of partition plates along the length direction of the prefabricated steel structure frame, and vertically welding the partition plates inside the prefabricated steel structure frame;

s8, arranging the heat insulation layer on the side wall of the sand sedimentation tank and the side wall of the water return tank;

s9, installing the movable door at the opening of the prefabricated steel structure frame;

and S10, fixedly mounting the roof on the top of the prefabricated steel structure frame.

Optionally, the partition plate is made of a steel plate material with the thickness of 6-10mmmm

By adopting the technical scheme, the iron plate made of the steel plate material with the thickness of 6-10mmm has better overall strength, thereby being beneficial to improving the overall strength of the fire pump room.

Optionally, the bottom plate and the prefabricated steel structure frame, the wall body plate and the prefabricated steel structure frame, the partition plate and the steel structure frame are welded by penetration welding

Through adopting above-mentioned technical scheme, between bottom plate and the prefabricated steel construction frame, between wall body board and the prefabricated steel construction frame, the baffle with all adopt the penetration welding between the steel construction frame, penetration welding's welding quality and welding speed are superior to general argon arc and are welded.

Optionally, the prefabricated steel structure frame, the bottom plate, the wall body plate and the partition plate are all subjected to anti-corrosion painting treatment.

Through adopting above-mentioned technical scheme, structure through anticorrosive mopping is handled can effectual improvement life to be favorable to improving the whole life in fire pump room.

In summary, the present application includes at least one of the following beneficial technical effects:

1. during construction, the bar foundation is built firstly, then the prefabricated steel structure frame is arranged at the top of the bar foundation, the bottom plate, the wall body plate and the partition plate are respectively installed, the roof is installed and fixed, and finally the movable door is installed to complete the construction of the water pump house;

2. due to the arrangement of the connecting assembly, the connecting stability between the prefabricated steel structure frame and the strip foundation is improved under the condition that the detachable connection between the prefabricated steel structure frame and the strip foundation is ensured;

3. the arrangement of the heat insulation layer can play a role in heat insulation and protection for the backwater pool and the desilting pool, thereby being beneficial to storing water resources;

4. between bottom plate and the prefabricated steel structure frame, between wall body board and the prefabricated steel structure frame, the baffle with all adopt the penetration welding between the steel structure frame, penetration welding's welding quality and welding speed are superior to general argon arc and are welded.

Drawings

Fig. 1 is a side view of an integrated fire water pump house structure in an embodiment of the present application.

Fig. 2 is a front view of an integrated fire water pump room structure in the embodiment of the present application.

Fig. 3 is a schematic structural diagram of a prefabricated steel structural frame in the embodiment of the application.

Fig. 4 is a sectional view of the internal structure of an integrated fire pump room structure in the embodiment of the present application.

Fig. 5 is a schematic structural diagram of a connection assembly of an integrated fire-fighting water pump room structure in an embodiment of the present application.

Description of reference numerals:

1. a strip foundation; 2. prefabricating a steel structure frame; 21. main frame square steel; 22. a secondary frame square steel; 3. a connecting assembly; 31. fixing the rod; 32. a connecting rod; 33. a fixed block; 34. a barb; 35. hanging a lug; 36. a protective sleeve; 361. a limiting part; 37. a limiting block; 4. a base plate; 5. a wall plate; 6. a partition plate; 7. a desilting pool; 8. returning to the water tank; 9. a water pump room; 10. an inlet; 11. a movable door; 12. a roof; 13. a hook; 14. a thermal insulation layer; 15. a chain; 16. and (5) fixing the column.

Detailed Description

The present application is described in further detail below with reference to figures 1-5.

First aspect, the embodiment of the application discloses an integral type fire pump room structure. Referring to fig. 1 and 2, an integral type fire pump room structure includes bar basis 1, and the top of bar basis 1 is provided with prefabricated steel structural framework 2. Be provided with coupling assembling 3 between prefabricated steel construction frame 2's lateral wall and the bar foundation 1, and prefabricated steel construction frame 2 can dismantle with bar foundation 1 through coupling assembling 3 and be connected. The inside of prefabricated steel construction frame 2 is laid and is fixed with bottom plate 4, and the lateral wall fixed mounting of prefabricated steel construction frame 2 has wall body board 5, and the inside of prefabricated steel construction frame 2 is vertical and is fixed with a plurality of baffles 6, and a plurality of baffles 6 separate into sand basin 7, return water pond 8, 9 between the water pump in proper order with steel construction frame's inside along length direction. An inlet 10 is formed in one side, away from the water return pool 8, of the water pump room 9, a movable door 11 used for opening and closing the inlet 10 is installed on the prefabricated steel structure frame, and a roof 12 is fixedly installed at the top of the prefabricated steel structure frame.

Referring to fig. 3, the prefabricated steel structural frame 2 is formed by alternately welding a plurality of main frame square steels 21 and a plurality of secondary frame square steels 22. And one side of the prefabricated steel structure frame 2 in the width direction is correspondingly provided with an inlet 10. Specifically, in the present embodiment, the main frame square steel 21 is made of 100 × 100m square steel material, and the sub frame square steel 22 is made of 40 × 40m square steel material.

Referring to fig. 4, the bottom plate 4 is made of a steel material, and the bottom of the prefabricated steel structural frame 2 is welded and fixed to the bottom plate 4. The wall body plates 5 are made of steel materials, and the side walls of the prefabricated steel structure frame 2 in the vertical direction except the inlet 10 side are welded and fixed with the wall body plates 5. In the present embodiment, the number of the plurality of separators 6 is set to three, and three separators 6 are made of a steel material. The three partition plates 6 are vertically arranged along the length direction of the prefabricated steel structure frame 2 and are welded and fixed with the main frame of the prefabricated steel structure frame 2.

Specifically, the partition 6 is made of a steel plate having a thickness of 6 to 10mm, and in the present embodiment, a steel plate having a thickness of 8mm is preferable.

Further, between bottom plate 4 and prefabricated steel construction frame 2, between wall body board 5 and prefabricated steel construction frame 2, all adopt the penetration welding between baffle 6 and the steel construction frame. Compared with the common argon arc welding, the device can effectively improve the welding quality and the welding speed, thereby shortening the construction time.

Referring to fig. 5, the connection assembly 3 includes a fixing rod 31, a connecting rod 32 and a fixing block 33, the fixing block 33 is fixedly connected to the sidewall of the prefabricated steel structural frame 2, and one end of the connecting rod 32 is fixedly connected to the fixing block 33 through a chain 15. One end of the chain 15 is fixedly connected with the bottom of the fixed block 33, and the other end of the chain 15 is fixedly connected with the end of the connecting rod 32. One end of the fixing rod 31 is fixedly connected with the top of the strip-shaped foundation 1, one end, far away from the fixing block 33, of the connecting rod 32 is fixedly provided with a barb 34, and one end, far away from the strip-shaped foundation 1, of the fixing rod 31 is fixedly provided with a hanging lug 35.

Further, the outer side wall cover of connecting rod 32 is equipped with protective sheath 36, and the outer side wall of connecting rod 32 is provided with stopper 37. Specifically, protective sheath 36 is made by steel material, and protective sheath 36 is close to the one end of fixed block 33 and is provided with spacing portion 361, and spacing portion 361 and the lateral wall butt of connecting rod 32 and the cooperation of sliding, and protective sheath 36 and connecting rod 32 rotate to be connected. The stopper 37 is fixed to the outer side wall of the connecting rod 32 on the side near the end. When the protective sleeve 36 slides to the maximum distance towards the side far away from the fixed block 33, the limiting part 361 of the protective sleeve 36 abuts against the limiting block 37 to limit the protective sleeve 36 to be separated from the connecting rod 32. The inner side wall of the protective sleeve 36 at the end of the protective sleeve 36 far away from the fixed block 33 is provided with an internal thread, and the outer side wall of the fixed rod 31 is provided with an external thread matched with the protective sleeve 36. With the arrangement, the protective sleeve 36 can be sleeved and screwed with the fixing button, so that the protective sleeve 36 is locked on the outer side wall of the fixing rod 31, and the barb 34 and the hanging lug 35 are protected.

Referring to fig. 4, the roof 12 is formed by welding color steel tiles and steel frameworks. The roof 12 is located the top of prefabricated steel structural framework 2, and roof 12 is through a plurality of fixed column 16 fixed mounting that are vertical setting at the top of prefabricated steel structural framework 2. Specifically, the eaves around the roof 12 all stretch out in the outer 20 centimeters' length of prefabricated steel structural framework 2 to shelter from better.

Referring to fig. 4, a hook 13 is arranged at the top of the prefabricated frame, the hook 13 is vertically arranged, and the hook 13 is made of color steel tiles and extends out of the top of the roof 12. The setting of lifting hook 13 makes things convenient for the workman to hang lifting hook 13 through the crane when carrying the fire water pump room to be favorable to the transport.

Referring to fig. 4, a heat insulation layer 14 is disposed on the outer side of the water return tank 8 and the outer side of the sand basin 7. The insulating layer 14 is made of a sponge material. Set up like this, can play thermal-insulated protection's effect to return water pond 8 and desilting pond 7 to be favorable to the storage water resource.

The implementation principle of an integral type fire pump room structure of the embodiment of the application is:

during the construction, build bar foundation 1 earlier, then set up prefabricated steel structural framework 2 at bar foundation 1's top, and respectively with bottom plate 4, wall body board 5 and 6 welded fastening of baffle, then the roofing 12 is fixed in the installation, at last at installation dodge gate 11, the completion is to the building of water pump house, set up like this, can prefabricate steel structural framework 2 in advance, effectively reduce the engineering time, and the water pump house of buildding temporarily, when need not using, can be through demolising the outside pipeline, and remove bar foundation 1 and prefabricated steel structural framework 2's relation of connection through removing coupling assembling 3, then transport prefabricated steel structural framework 2, the turnover is to next building site, build bar foundation 1 again, just can accomplish the building, the very big time of having shortened the secondary construction.

In a second aspect, the embodiment of the present application further discloses a construction method of the integrated fire pump room structure, which includes the following steps:

s1, pouring the strip foundation 1;

s2, placing the prefabricated steel structure frame 2 on the top of the strip foundation 1;

s3, hooking the barb 34 and the hanging lug 35;

s4, sliding the protective sleeve 36 towards one side of the fixed rod 31 and fixedly connecting the protective sleeve with the fixed rod 31 in a threaded manner;

s5, welding the bottom plate 4 at the bottom of the prefabricated steel structure frame 2;

s6, welding the wall body plates 5 on the side walls of the prefabricated steel structure frame 2;

s7, arranging the three partition plates 6 along the length direction of the prefabricated steel structure frame, vertically welding the three partition plates inside the prefabricated steel structure frame 2, and performing anti-corrosion painting treatment on the whole to prolong the service life of the water pump room.

S8, arranging a heat insulation layer 14 on the side wall of the sand basin 7 and the side wall of the water return basin 8;

s9, installing the movable door 11 at the opening of the prefabricated steel structure frame 2;

and S10, fixedly mounting the roof 12 on the top of the prefabricated steel structure frame 2.

The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.