Installation method of building engineering pouring template

文档序号:1587766 发布日期:2020-02-04 浏览:21次 中文

阅读说明:本技术 一种建筑工程浇筑模板的安装方法 (Installation method of building engineering pouring template ) 是由 冯胜荣 张勇 冯英杰 于法浩 刘艳晶 胡存美 于 2019-11-05 设计创作,主要内容包括:本发明公开了一种建筑工程浇筑模板,包括外挡板,内挡板和固定卡扣,所述外挡板与内挡板均呈长方形,且所述外挡板和内挡板的厚度至少为5cm,所述外挡板一侧与内挡板平行固定,所述外挡板与内挡板顶端设有固定卡扣,所述固定卡扣两侧设有卡杠,所述卡杠顶端设有方孔,卡杠顶端设有连接杠,所述连接杠顶端设有三角楞固定件,所述三角楞固定件与连接杠为一体设置,所述方孔内侧顶端设有三角凹槽,所述三角凹槽与三角楞固定件相匹配,该种建筑工程浇筑模板结构简单合理,使用方便,且牢固性极佳,对不同环境的适应性大幅提升,适合人们的使用。(The invention discloses a building engineering pouring template which comprises an outer baffle, an inner baffle and a fixing buckle, wherein the outer baffle and the inner baffle are rectangular, the thicknesses of the outer baffle and the inner baffle are at least 5cm, one side of the outer baffle is fixed in parallel with the inner baffle, the top ends of the outer baffle and the inner baffle are provided with the fixing buckle, two sides of the fixing buckle are provided with clamping bars, the top ends of the clamping bars are provided with square holes, the top ends of the clamping bars are provided with connecting bars, the top ends of the connecting bars are provided with triangular ridge fixing pieces, the triangular ridge fixing pieces and the connecting bars are integrally arranged, the top ends of the inner sides of the square holes are provided with triangular grooves, and the triangular grooves are matched with the triangular ridge fixing pieces.)

1. The utility model provides a building engineering pours template, includes outer baffle (1), interior baffle (2) and fixed buckle (3), its characterized in that: outer baffle (1) and interior baffle (2) all are rectangle, just the thickness of outer baffle (1) and interior baffle (2) is 5cm at least, outer baffle (1) one side is fixed with interior baffle (2) parallel, outer baffle (1) is equipped with fixed buckle (3) with interior baffle (2) top, fixed buckle (3) both sides are equipped with card thick stick (13), card thick stick (13) top is equipped with square hole (15), and card thick stick (13) top is equipped with connecting bar (12), connecting bar (12) top is equipped with the stupefied mounting of triangle (14), the stupefied mounting of triangle (14) sets up as an organic whole with connecting bar (12), the inboard top in square hole (15) is equipped with triangle recess (16), the stupefied mounting of triangle (16) and triangle (14) phase-match.

2. The construction work pouring template as claimed in claim 1, wherein: outer fixed plate (1) and inner fixed plate (2) both ends are equipped with closes scute (4) close scute (4) one end and be equipped with strake board (5), close scute (4) one end and be equipped with s shape bayonet socket (6) top is equipped with unsmooth piece (601), unsmooth piece (601) top is the arc, unsmooth piece (601) one side is equipped with recess (602), unsmooth piece (601) and recess (602) shape complementary.

3. The construction work pouring template as claimed in claim 2, wherein: the two ends of the straight-moving plate (5) are respectively provided with a first return hook (7) and a second return hook (8), the first return hook (7) and the second return hook (8) are opposite hooks, and the protruding parts of the first return hook (7) and the second return hook (8) are both arc-shaped.

4. The construction work pouring template as claimed in claim 1, wherein: outer baffle (1) and interior baffle (2) are the composite sheet, just outer baffle (1) and interior baffle (2) top are equipped with first steel sheet (9), first steel sheet (9) bottom fire prevention polyethylene layer (10), fire prevention polyethylene layer bottom is equipped with second steel sheet (11).

5. The construction work pouring template as claimed in claim 1, wherein: the triangular prism fixing pieces (14) are inclined angles (triangles), and the distance between the triangular prism fixing pieces (14) is smaller than 1 cm.

6. The construction work pouring template as claimed in claim 1, wherein: the outer baffle (1) and the inner baffle (2) are provided with corner closing plates (4) at two ends, and the inner sides of the corner closing plates (4) are connected and fixed by straight-going plates (5).

7. The construction work pouring template as claimed in claim 1, wherein: the square hole (15) is at least 2cm higher than the connecting bar (12).

8. The mounting method of the building engineering pouring template is characterized by comprising the following steps of: the method specifically comprises the following steps:

s1, firstly, fixing the outer baffle 1 and the inner baffle 2 to a required thickness;

s2, fixing the fixing buckle 3 between the outer baffle plate 1 and the inner baffle plate 2;

and S3, finally, the triangular ridge fixing piece 14 on the connecting rod 12 tightly fixes the clamping rod 13 on the outer baffle plate 1 and the inner baffle plate 2.

Technical Field

The invention relates to the technical field of constructional engineering, in particular to a constructional engineering pouring template.

Background

The building formwork is a temporary supporting structure, which is manufactured according to the design requirements, so that the concrete structure and the members are formed according to the specified positions and geometric dimensions, the correct positions of the concrete structure and the members are kept, and the self weight of the building formwork and the external load acting on the building formwork are borne. The purpose of the template engineering is to ensure the quality and the construction safety of the concrete engineering, accelerate the construction progress and reduce the engineering cost.

However, the existing building template is labor-consuming to install, inconvenient to use, heavy in structural body and inconvenient for people to use.

Therefore, how to design a pouring template for construction engineering becomes a problem to be solved currently.

Disclosure of Invention

The invention aims to provide a building engineering pouring template to solve the problems in the background technology.

In order to realize the purpose, the invention provides the following technical scheme: the utility model provides a building engineering pouring template, includes outer baffle, interior baffle and fixed buckle, outer baffle all is rectangle with interior baffle, just the thickness of outer baffle and interior baffle is 5cm at least, outer baffle one side is fixed with interior baffle parallel, outer baffle is equipped with fixed buckle with interior baffle top, fixed buckle both sides are equipped with the card thick stick, card thick stick top is equipped with the square hole, and card thick stick top is equipped with the connecting bar, the connecting bar top is equipped with the stupefied mounting of triangle, the stupefied mounting of triangle sets up with connecting bar as an organic whole, the inboard top in square hole is equipped with the triangle recess, the triangle recess matches with the stupefied mounting of triangle.

Preferably, the outer fixing plate and the inner fixing plate are provided with corner closing plates at two ends, a straight plate is arranged at one end of each corner closing plate, an s-shaped bayonet is arranged at one end of each corner closing plate, a concave-convex block is arranged at the top end of the s-shaped bayonet, the top end of the concave-convex block is arc-shaped, a groove is formed in one side of the concave-convex block, and the shapes of the concave-convex block and the groove are complementary.

Preferably, the two ends of the straight plate are respectively provided with a first return hook and a second return hook, the first return hook and the second return hook are opposite reverse hooks, and the protruding parts of the first return hook and the second return hook are both arc-shaped.

Preferably, outer baffle and interior baffle are the composite sheet, just outer baffle and interior baffle top are equipped with first steel sheet, first steel sheet bottom fire prevention polyethylene layer, fire prevention polyethylene layer bottom is equipped with the second steel sheet.

Preferably, the triangular prism fixing pieces are in an inclined angle triangle shape, and the distance between the triangular prism fixing pieces is smaller than 1 cm.

Preferably, the two ends of the outer baffle and the inner baffle are provided with corner closing plates, and the inner sides of the corner closing plates are connected and fixed by straight plates

Preferably, the square hole is at least 2cm higher than the connecting bar.

The invention also provides an installation method of the building engineering pouring template, which is characterized by comprising the following steps: the method specifically comprises the following steps:

s1, firstly, fixing the outer baffle 1 and the inner baffle 2 to a required thickness;

s2, fixing the fixing buckle 3 between the outer baffle plate 1 and the inner baffle plate 2;

and S3, finally, the triangular ridge fixing piece 14 on the connecting rod 12 tightly fixes the clamping rod 13 on the outer baffle plate 1 and the inner baffle plate 2.

Compared with the prior art, the invention has the beneficial effects that:

1. this copper alloy shift fork, outer baffle and interior baffle top are equipped with fixed buckle for should pour the template through the firm of fixed interior baffle of fixed buckle and outer baffle, it is hard to have solved the installation in the past, uses inconvenient problem, thereby has made things convenient for people's work, has reduced people's working strength.

2. This copper alloy shift fork, triangle arris mounting are angle of inclination triangle-shaped, and the interval is less than 1cm between the stupefied mounting of triangle for the width of this pouring template can be adjusted, has solved template width regulation difficulty in the past, can not satisfy the problem of construction requirement, thereby makes the suitability of this pouring template promote by a wide margin, makes people's work simpler.

3. This copper alloy shift fork closes scute one end and is equipped with s shape bayonet socket top is equipped with unsmooth piece, and unsmooth piece top is the arc, has solved and has pour the problem that the template angle is difficult to adjust in the past to make and pour the template in the course of the work and can change the size of angle according to people's different demands, make things convenient for construction on next step.

4. This copper alloy shift fork, outer baffle and interior baffle top are equipped with first steel sheet, and first steel sheet bottom fire prevention polyethylene layer, fire prevention polyethylene layer bottom are equipped with the second steel sheet, and it is heavy to have solved and pour the template structure in the past, use inconvenient problem to make this template transportation all lighter with the installation, made things convenient for people's work and reduced people's working strength.

5. This copper alloy shift fork, outer baffle and interior baffle both ends are equipped with and close the scute, close the scute inboard and connect fixedly by the craspedodrome board, have solved in the past and pour the problem that the template is difficult to orderly range for operational environment is regular more, and makes things convenient for the construction on people next step.

Drawings

FIG. 1 is a schematic diagram of the overall structure of the invention;

FIG. 2 is a schematic view of the inventive baffle structure;

FIG. 3 is a schematic view of the internal structure of the inventive baffle;

fig. 4 is a schematic view of the fixing buckle structure of the invention.

In the figure: 1. an outer baffle; 2. an inner baffle; 3. fixing the buckle; 4. closing the angle plate; 5. a straight board; 6. an s-shaped buckle; 7. a first back hook; 8. a second back hook; 9. a first steel plate; 10. a protective polyethylene layer; 11. a second steel plate; 12. a connecting bar; 13. clamping the lever; 14. triangular ridge fixing pieces; 15. a square hole; 16. a triangular groove; 601. a concave-convex block; 602. and (4) a groove.

Detailed Description

The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.

9页详细技术资料下载
上一篇:一种医用注射器针头装配设备
下一篇:吊模设备

网友询问留言

已有0条留言

还没有人留言评论。精彩留言会获得点赞!

精彩留言,会给你点赞!