Coal chemical gasification pretreatment drainage and drainage system

文档序号:1633984 发布日期:2020-01-17 浏览:8次 中文

阅读说明:本技术 煤化工气化预处理排水排液系统 (Coal chemical gasification pretreatment drainage and drainage system ) 是由 辛勃 陈新阳 程俊淋 于 2019-10-30 设计创作,主要内容包括:本发明涉及煤化工气化预处理排水排液系统,属于煤化工气体预处理技术领域。本发明主要是克服现有技术中的不足之处,提出一种排液不畅的煤化工气化预处理排水排液系统,包括过滤分离装置、总排放管、三通、涡旋制冷罐和安装在所述涡旋制冷罐上的涡流管,所述涡旋制冷罐底部设有冷却排水管、样气进入管,所述样气进入管与过滤分离装置连通,所述过滤分离装置底部设有排出管,所述排出管、冷却排水管、总排放管分别与三通连通。本发明可以让预处理系统正常运作的同时,还有有效避免冷却液排不出去甚至倒灌进入仪表的问题。(The invention relates to a drainage and drainage system for coal chemical gasification pretreatment, and belongs to the technical field of coal chemical gas pretreatment. The invention mainly overcomes the defects in the prior art and provides a coal chemical gasification pretreatment drainage system with unsmooth drainage, which comprises a filtering and separating device, a main drainage pipe, a tee joint, a vortex refrigeration tank and a vortex pipe arranged on the vortex refrigeration tank, wherein the bottom of the vortex refrigeration tank is provided with a cooling drainage pipe and a sample gas inlet pipe, the sample gas inlet pipe is communicated with the filtering and separating device, the bottom of the filtering and separating device is provided with a drainage pipe, and the drainage pipe, the cooling drainage pipe and the main drainage pipe are respectively communicated with the tee joint. The invention can ensure that the pretreatment system can normally operate and also effectively avoid the problem that the cooling liquid cannot be discharged or even flows backwards into the instrument.)

1. Coal chemical industry gasification preliminary treatment drainage flowing back system, its characterized in that includes filtering separation device (5), total discharge pipe (6), tee bend (7), vortex refrigeration jar (1) and installs vortex tube (2) on vortex refrigeration jar (1), vortex refrigeration jar (1) bottom is equipped with cooling drain pipe (3), sample gas admission pipe (4) and filtering separation device (5) intercommunication, filtering separation device (5) bottom is equipped with discharge pipe (8), cooling drain pipe (3), total discharge pipe (6) communicate with tee bend (7) respectively.

2. The coal chemical gasification pretreatment drainage system according to claim 1, wherein the discharge pipe (8) and the cooling drain pipe (3) are provided with valves (9).

3. The coal chemical gasification pretreatment drainage system of claim 2, wherein the valve (9) is a needle valve.

4. The coal chemical gasification pretreatment drainage system according to claim 1 or 3, wherein the cooling drainage pipe (3) is a large-aperture drainage pipe.

Technical Field

The invention relates to a drainage and drainage system for coal chemical gasification pretreatment, and belongs to the technical field of coal chemical gas pretreatment.

Background

As is well known, refrigeration in the coal chemical industry pretreatment drainage system is the most important link at present, and most of gas to be measured in the coal chemical industry can only appear in the appropriate temperature range of a measuring instrument after being cooled by a refrigeration technology.

However, because the sample gas contains air water molecules, the sample gas is condensed into liquid drops when meeting the condensation, the water condensed at the bottom of the vortex refrigeration tank needs to be discharged, and the water in the refrigeration tank is difficult to discharge even if the water in the refrigeration tank is increased to a certain degree due to double reasons of negative pressure and water tension, so that the problem often occurs even if a water pump filter is additionally arranged below the refrigeration tank, and even in serious cases, the water which cannot be discharged below is directly pumped into the instrument due to the negative pressure, so that the water enters the instrument.

And current technical scheme is with the direct discharge instrument of drainage export, corresponds normal outside air pressure, and in fact many times the instrument in order to let gas transport smoothly, inside all is the negative pressure compared with the outside, and this has also led to the outlet outside atmospheric pressure too big, and hard is the vacuum that forms in the below, has hindered the drainage of water.

Disclosure of Invention

Aiming at the problems, the invention mainly overcomes the defects in the prior art and provides a coal chemical gasification pretreatment drainage system with unsmooth drainage.

The technical scheme provided by the invention for solving the technical problems is as follows: coal chemical industry gasification preliminary treatment drainage flowing back system, including filtering separation device, total delivery pipe, tee bend, vortex refrigeration jar and install vortex tube on the vortex refrigeration jar, vortex refrigeration tank bottoms portion is equipped with cooling drain pipe, appearance gas admission pipe and filtering separation device intercommunication, filtering separation device bottom is equipped with the discharge pipe, cooling drain pipe, total delivery pipe communicate with the tee bend respectively.

The further technical proposal is that the discharge pipe and the cooling water discharge pipe are both provided with valves.

The further technical scheme is that the valve is a needle valve.

The further technical scheme is that the cooling water drainage pipe adopts a drainage pipe with a large aperture.

The invention has the following beneficial effects: the invention can ensure that the pretreatment system can normally operate and also effectively avoid the problem that the cooling liquid cannot be discharged or even flows backwards into the instrument.

Drawings

FIG. 1 is a schematic structural diagram of the present invention.

Detailed Description

The present invention will be further described with reference to the following examples and the accompanying drawings.

As shown in fig. 1, the coal chemical gasification pretreatment drainage and drainage system comprises a filtering and separating device 5, a main discharge pipe 6, a tee joint 7, a vortex refrigeration tank 1 and a vortex pipe 2 installed on the vortex refrigeration tank 1, wherein a cooling drain pipe 3 and a sample gas inlet pipe 4 are arranged at the bottom of the vortex refrigeration tank 1, the sample gas inlet pipe 4 is communicated with the filtering and separating device 5, a discharge pipe 8 is arranged at the bottom of the filtering and separating device 5, and the discharge pipe 8, the cooling drain pipe 3 and the main discharge pipe 6 are respectively communicated with the tee joint 7.

The cooling water discharge pipe 3 is connected to the main discharge pipe 6 through the tee joint 7, the main discharge pipe 6 and the water discharge system are in a same system, but the flow of the main discharge pipe 6 is larger, so that the pressure is smaller than the internal normal point, a reasonable pressure difference interval is formed compared with the pressure of the cooling water discharge pipe 3, and water is easier to discharge.

In order to control the discharge, it is preferable that the discharge pipe 8 and the cooling water discharge pipe 3 are provided with valves 9, and the valves 9 are needle valves.

In order to further improve the drainage efficiency in this embodiment, it is preferable that the cooling drain pipe 3 is a drain pipe with a large aperture. Therefore, the generation of water tension factors can be reduced as much as possible by enlarging the aperture of the lower drainage pipeline.

Although the present invention has been described with reference to the above embodiments, it should be understood that the present invention is not limited to the above embodiments, and those skilled in the art can make various changes and modifications without departing from the scope of the present invention.