阅读说明:本技术 一种航天发动机燃烧室内壁毛坯的制造方法 (Manufacturing method of inner wall blank of combustion chamber of aerospace engine ) 是由 张航 吴斌 庾高峰 马明月 张琦 王聪利 赵鸣 李涛涛 靖林 于 2021-08-05 设计创作,主要内容包括:本发明公开了一种航天发动机燃烧室内壁毛坯的制造方法,包括S1、称取Cu、Cr、Zr材料;S2、将S1所得材料进行真空感应熔炼,得到合金溶液;S3、浇铸S2所得合金溶液,得到合金铸锭;S4、对S3所得合金铸锭进行锻造、镦粗、拔长和冲孔处理,得到燃烧室内壁坯料;S5、对步骤S4所得燃烧室内壁坯料进行固热溶处理;S6、对S5处理后的燃烧室内壁坯料进行镦粗和二次扩孔处理;S7、对处理后的燃烧室内壁坯料进行粗车、时效热处理、性能检测和精车处理,得到燃烧室内壁毛坯;S8、对S7所得燃烧室内壁毛坯进行尺寸检测和外观检测,包装;本发明工艺设计合理,所得燃烧室内壁毛坯能够满足航天发动机燃烧室高强度、高散热的要求,适宜大量推广。(The invention discloses a manufacturing method of a blank of the inner wall of a combustion chamber of an aerospace engine, which comprises S1, weighing Cu, Cr and Zr materials; s2, carrying out vacuum induction melting on the material obtained in the step S1 to obtain an alloy solution; s3, casting the alloy solution obtained in the step S2 to obtain an alloy ingot; s4, forging, upsetting, drawing and punching the alloy ingot obtained in the step S3 to obtain a blank of the inner wall of the combustion chamber; s5, carrying out solid heat dissolving treatment on the blank of the inner wall of the combustion chamber obtained in the step S4; s6, upsetting and carrying out secondary hole expanding treatment on the blank of the inner wall of the combustor after the step S5; s7, performing rough turning, aging heat treatment, performance detection and finish turning on the processed blank of the inner wall of the combustion chamber to obtain a blank of the inner wall of the combustion chamber; s8, carrying out size detection and appearance detection on the combustion chamber inner wall blank obtained in the step S7, and packaging; the process of the invention has reasonable design, and the obtained blank on the inner wall of the combustion chamber can meet the requirements of high strength and high heat dissipation of the combustion chamber of the aerospace engine, and is suitable for mass popularization.)

1. A manufacturing method of a blank of the inner wall of a combustion chamber of an aerospace engine is characterized by comprising the following steps:

s1, blending;

respectively weighing 0.5-1.2% of Cr according to the mass percent; 0.03-0.3% of Zr and the balance of Cu; the Cu is added in an electrolytic copper plate mode, the Cr is added in a form of an intermediate alloy CuCr25, the Zr is added in a form of an intermediate alloy CuZr50, and both the intermediate alloy CuCr25 and the intermediate alloy CuZr50 are wrapped by copper sheets;

s2, smelting;

smelting by adopting a vacuum intermediate frequency induction furnace, firstly spreading a layer of electrolytic copper plate obtained in the step S1 in a crucible of the vacuum intermediate frequency induction furnace, then spreading intermediate alloy CuCr25 and CuZr50 wrapped by the copper sheet obtained in the step S1 on the surface of the electrolytic copper plate, and finally spreading the rest electrolytic copper plate at the uppermost end of the crucible, controlling the heating temperature of the vacuum intermediate frequency induction furnace to be 950-; starting to smelt, and obtaining an alloy solution after smelting is finished;

s3, casting;

casting the alloy solution obtained in the step S2 into a mold, and cooling the alloy solution to room temperature to obtain an alloy ingot; wherein, the casting speed is firstly slow and then fast and then slow during casting, and the casting temperature is controlled to be 1220-1300 ℃;

s4, forging;

s40, heating the alloy ingot obtained in the step S3 to 950 ℃ of 900-; after the forging treatment is finished, obtaining an alloy blank;

s41, heating the alloy blank obtained in the step S40 to 850-; wherein the upsetting height of the alloy blank is 45-60% of the original height of the alloy blank, the height after drawing is 2-3 times of the height before drawing, and the upsetting and drawing processes are repeated for 2-4 times; obtaining an alloy blank;

s42, punching the alloy blank obtained in the step S41 by using a conical punch to obtain a cylindrical blank; then, carrying out primary reaming on the cylindrical blank, and finally carrying out closing-up treatment on one end of the cylindrical blank after reaming to obtain a blank of the inner wall of the combustion chamber; wherein, the hole expanding and the closing diameter are carried out according to the designed diameter of the blank on the inner wall of the combustion chamber;

s5, solution heat treatment;

heating the inner wall blank of the combustion chamber obtained in the step S42 to 850-; continuously heating to 920-; then, carrying out heat preservation treatment on the combustion chamber inner wall blank at the temperature of 920-;

s6, cold forging;

upsetting the blank of the inner wall of the combustion chamber processed in the step S5, wherein the upsetting height is the design height of the blank of the inner wall of the combustion chamber; secondly, carrying out secondary reaming treatment on the blank of the inner wall of the upset combustor, wherein the secondary reaming size is carried out according to the design size of the blank of the inner wall of the combustor; finally, shaping the blank on the inner wall of the combustion chamber;

s7, secondary finishing;

firstly, roughly turning the blank of the inner wall of the combustion chamber processed in the step S6, removing large machining allowance, reducing the wall thickness, then carrying out aging heat treatment on the blank of the inner wall of the combustion chamber after rough turning, then carrying out performance detection on the blank of the inner wall of the combustion chamber after aging heat treatment, and finely turning the blank of the inner wall of the combustion chamber qualified through detection to obtain a blank of the inner wall of the combustion chamber;

s8, detecting a finished product;

and (5) carrying out size detection and appearance detection on the combustion chamber inner wall blank obtained in the step S7, then detecting the surface quality of the combustion chamber inner wall finished product through dye penetrant inspection, finally boxing, checking boxing information and checking the packaging box.

2. The method for manufacturing the blank of the inner wall of the combustion chamber of the aerospace engine as claimed in claim 1, wherein after step S6 is completed, the blank of the inner wall of the combustion chamber is put into a pickling solution at 40-60 ℃ for etching and cleaning, wherein the pickling solution is a mixture of 3-9% by mass of sulfuric acid, 2-5% by mass of hydrochloric acid and 2-7% by mass of potassium carbide solution according to a volume ratio of 1:1: 2.

3. The method for manufacturing the blank of the inner wall of the combustion chamber of the aerospace engine as claimed in claim 1, wherein after the step S7 is completed, the blank of the inner wall of the combustion chamber is subjected to a phosphating treatment, which comprises the following specific operations: placing the combustion chamber inner wall blank into phosphating solution composed of Zn (NO) for 10-30min, dripping for 1-2min, and washing with clear water for 3-5min3)2·6H2O、Ni(NO3)2·6H2O, citric acid, silicate solution and deionized water according to the volume ratio of 1:1:2:1: 4.

4. The method as claimed in claim 1, wherein in step S41, the alloy ingot is rotated by 5-15 ° for each elongation process, and then the alloy ingot is hammered and pressed for a circle, and then the next elongation process is performed until the alloy ingot is elongated to a desired length.

5. The method for manufacturing the blank of the inner wall of the combustion chamber of the aerospace engine as claimed in claim 1, wherein the step S42 is performed in a process of broaching the cylindrical blank, the small punch is firstly used for punching one end of the cylindrical blank, then the cylindrical blank is turned over by 180 degrees, the large punch is used for punching the other end of the cylindrical blank, and finally the through hole is formed in the cylindrical blank.

6. The method for manufacturing the blank of the inner wall of the combustion chamber of the aerospace engine as claimed in claim 1, wherein after the step S7 is completed, the blank of the inner wall of the combustion chamber is subjected to surface treatment for 15-35min under the conditions of a jet distance of 3-4cm and a jet pressure of 0.5-0.7MPa by using stainless steel pellets with a diameter of 0.02-0.05 mm.

7. The method for manufacturing the inner wall blank of the combustion chamber of the aerospace engine as claimed in claim 1, wherein in the step S41, the diameter draw ratio of the alloy blank is controlled to be not less than 2.

8. The method for manufacturing the blank of the inner wall of the combustion chamber of the aerospace engine as claimed in claim 1, wherein in the step S6, the secondary broaching of the blank of the inner wall of the combustion chamber is performed on a saddle, and the blank of the inner wall of the combustion chamber is continuously replaced by a punch with a large diameter as the radial wall thickness of the blank of the inner wall of the combustion chamber is continuously reduced.

9. The method for manufacturing the blank for the inner wall of the combustion chamber of the aerospace engine as claimed in claim 1, wherein in step S7, the aging heat treatment is performed by: 1) firstly, heating the blank on the inner wall of the combustion chamber to 350-400 ℃, wherein the heating rate is 5-8 ℃/min, and the heat preservation is 15-30 min; then continuously heating to 400-460 ℃, wherein the heating rate is 2-4 ℃/min; 2) the blank on the inner wall of the combustion chamber is subjected to heat preservation for 3-5h at the temperature of 400-460 ℃; 3) and discharging the blank on the inner wall of the combustion chamber after heat preservation, and cooling the blank to room temperature in the air.

10. The method as claimed in claim 9, wherein in step S40, the alloy ingot is rotated by 5-15 ° for each elongation process, and then the alloy ingot is hammered and pressed for a circle, and then the next elongation process is performed until the alloy ingot is elongated to a desired length.

Technical Field

The invention relates to the technical field of manufacturing of combustion chambers of space engines, in particular to a method for manufacturing inner wall blanks of the combustion chambers of the space engines.

Background

The liquid hydrogen liquid oxygen engine is widely applied as the power of a carrier rocket, and the inner wall of a combustion chamber of the liquid rocket engine bears the action of high temperature, high pressure and high speed airflow and bears very high thermal stress caused by pressure load and temperature gradients on two sides of the inner wall. Copper alloys and copper-based composites are compatible with rocket motor components for use as interior wall materials because they have higher thermal conductivities than other engineered materials. The engine combustion chamber is a core component for ensuring the normal operation of the rocket, and the working condition is very bad. If the engine is over-heated in the use process, overheating and over-burning phenomena can occur to the heat-bearing component, so that crystal grains of the internal structure of the material are coarse or crystal grain boundaries are oxidized or melted, the plasticity, impact toughness, fatigue performance, fracture toughness, stress resistance and corrosion resistance of the material are greatly reduced, and ablation, cracks and fracture faults of the hot end part are caused, so that the selection of the wall material in the combustion chamber meeting the requirements is particularly important. The damage part is the center of the cooling channel, the damage mode is high-temperature fatigue damage, and the thrust chamber and the combustion chamber of the liquid rocket engine are the generation points of high temperature and high heat flow density, and the inner wall bears a great pressure when being heated and expanded, so the inner wall materials of the thrust chamber and the combustion chamber are required to have high heat conductivity coefficient, high strength, high-temperature creep resistance and better low-cycle fatigue performance.

The most common material for the blank of the inner wall of the combustion chamber of the space engine at present is T2 copper, the electrical conductivity of the material can reach 100% IACS, the thermal conductivity can reach 380W/(m.k), but typical values of tensile strength, yield strength and elongation are as follows: 200MPa, 80MPa and 35 percent, the softening temperature is only 330 ℃, and the strength and the softening temperature are far lower than the working environment of an aerospace engine, so that the engine is difficult to adapt to a new generation of liquid hydrogen liquid oxygen engine; at present, a chromium-zirconium-copper material is used for manufacturing an inner wall blank of a combustion chamber of an aerospace engine, but a forging method is also used for forging a straight cylinder or a solid bar in the prior art and then machining and forming the straight cylinder or the solid bar.

The chromium-zirconium-copper material is an aging strengthening type copper alloy, wherein the Cr phase which is dispersed and distributed can play a strengthening role, so that the material has higher mechanical property. Meanwhile, the chromium zirconium copper contains about 99 percent of Cu element, so that the electric conductivity of the material can reach more than 83 percent IACS, and the heat conductivity can reach more than 330W/(m.k). Due to the aging strengthening effect of the Cr phase, the softening temperature of the material can reach more than 550 ℃, and the tensile strength can reach more than 300MPa at 350 ℃. Therefore, it is imperative to prepare a chromium-zirconium-copper alloy with high strength, high conductivity and high temperature resistance to meet the requirements of the technical field of aviation

Disclosure of Invention

Aiming at the technical problems, the invention provides a method for manufacturing a blank on the inner wall of a combustion chamber of an aerospace engine; the copper alloy combustion chamber inner wall blank can meet the requirements of high strength and high heat dissipation of the combustion chamber of the space engine; the heat dissipation device can particularly meet the requirements of the combustion chamber of the aerospace engine on low-temperature liquid and high-temperature heat dissipation.

The technical scheme of the invention is as follows: a manufacturing method of an inner wall blank of a combustion chamber of an aerospace engine comprises the following steps:

s1, blending;

respectively weighing 0.5-1.2% of Cr according to the mass percent; 0.03-0.3% of Zr and the balance of Cu; wherein, Cu is added in an electrolytic copper plate mode, Cr is added in a form of intermediate alloy CuCr25, Zr is added in a form of intermediate alloy CuZr50, and the intermediate alloys CuCr25 and CuZr50 are wrapped by copper sheets;

s2, smelting;

smelting by adopting a vacuum intermediate frequency induction furnace, firstly spreading a layer of electrolytic copper plate obtained in the step S1 in a crucible of the vacuum intermediate frequency induction furnace, then spreading intermediate alloy CuCr25 and CuZr50 wrapped by the copper sheet obtained in the step S1 on the surface of the electrolytic copper plate, and finally spreading the rest electrolytic copper plate at the uppermost end of the crucible, controlling the heating temperature of the vacuum intermediate frequency induction furnace to be 950-; starting to smelt, and obtaining an alloy solution after smelting is finished;

s3, casting;

casting the alloy solution obtained in the step S2 into a mold, and cooling the alloy solution to room temperature to obtain an alloy ingot; wherein, the casting speed is firstly slow and then fast and then slow during casting, and the casting temperature is controlled to be 1220-1300 ℃;

s4, forging;

s40, heating the alloy ingot obtained in the step S3 to 950 ℃ of 900-; after the forging treatment is finished, obtaining an alloy blank;

s41, heating the alloy blank obtained in the step S40 to 850-; wherein the upsetting height of the alloy blank is 45-60% of the original height of the alloy blank, the height after drawing is 2-3 times of the height before drawing, and the upsetting and drawing processes are repeated for 2-4 times; obtaining an alloy blank;

s42, punching the alloy blank obtained in the step S41 by using a conical punch to obtain a cylindrical blank; then, carrying out primary reaming on the cylindrical blank, and finally carrying out closing-up treatment on one end of the cylindrical blank after reaming to obtain a blank of the inner wall of the combustion chamber; wherein, the hole expanding and the closing diameter are carried out according to the designed diameter of the blank on the inner wall of the combustion chamber;

s5, solution heat treatment;

heating the inner wall blank of the combustion chamber obtained in the step S42 to 850-; continuously heating to 920-; then, carrying out heat preservation treatment on the combustion chamber inner wall blank at the temperature of 920-;

s6, cold forging;

upsetting the blank of the inner wall of the combustion chamber processed in the step S5, wherein the upsetting height is the design height of the blank of the inner wall of the combustion chamber; secondly, carrying out secondary reaming treatment on the blank of the inner wall of the upset combustor, wherein the size of the secondary reaming is carried out according to the design size of the blank of the inner wall of the combustor; finally, shaping the blank on the inner wall of the combustion chamber;

s7, secondary finishing;

firstly, roughly turning the blank of the inner wall of the combustion chamber processed in the step S6, removing large machining allowance, reducing the wall thickness, then carrying out aging heat treatment on the blank of the inner wall of the combustion chamber after rough turning, then carrying out performance detection on the blank of the inner wall of the combustion chamber after aging heat treatment, and finely turning the blank of the inner wall of the combustion chamber qualified through detection to obtain a blank of the inner wall of the combustion chamber;

s8, detecting a finished product;

and (5) carrying out size detection and appearance detection on the combustion chamber inner wall blank obtained in the step S7, then detecting the surface quality of the combustion chamber inner wall finished product through dye penetrant inspection, finally boxing, checking boxing information and checking the packaging box.

Further, in step S7, the aging heat treatment specifically includes: 1) firstly, heating the blank on the inner wall of the combustion chamber to 350-400 ℃, wherein the heating rate is 5-8 ℃/min, and keeping the temperature for 15-30 min; then continuously heating to 400-460 ℃, wherein the heating rate is 2-4 ℃/min; 2) the blank on the inner wall of the combustion chamber is subjected to heat preservation for 3-5h at the temperature of 400-460 ℃; 3) and discharging the blank on the inner wall of the combustion chamber after heat preservation, and cooling the blank to room temperature in the air.

Further, after the step S6 is finished, the inner wall blank of the combustion chamber is placed into a pickling solution at 40-60 ℃ for etching and cleaning, wherein the pickling solution is a mixture of 3-9% of sulfuric acid, 2-5% of hydrochloric acid and 2-7% of potassium carbide solution in percentage by mass according to a volume ratio of 1:1: 2; through carrying out the pickling to the combustor inner wall blank, can effectively get rid of combustor inner wall blank surface oxide skin, improve the smooth finish of combustor inner wall blank simultaneously.

Further, after step S7 is completed, performing a phosphating treatment on the blank of the inner wall of the combustion chamber, specifically: placing the combustion chamber inner wall blank into phosphating solution for 10-30min, dripping for 1-2min, washing with clear water for 3-5min, and allowing the phosphating solution to contain Zn (NO)3)2·6H2O、Ni(NO3)2·6H2The mixture consists of O, citric acid, silicate solution and deionized water according to the volume ratio of 1:1:2:1: 4; the blanks on the inner wall of the combustion chamber are subjected to phosphating treatment, so that the corrosion resistance of the blanks on the inner wall of the combustion chamber can be improved, and the performance of the space engine is improved.

Further, in the step S41, in the process of alloy blank drawing, each time the alloy blank is drawn, the alloy blank is rotated by 5 to 15 °, and then the alloy blank is hammered and pressed for a circle, and then the next drawing is performed until the alloy blank is drawn to the required length, so that the generation of end cracking defects in the process of alloy blank drawing can be avoided.

Further, in the step S42, in the primary reaming process of the cylindrical blank, firstly, a small punch is used to punch a hole at one end of the cylindrical blank, then the cylindrical blank is turned by 180 degrees, a large punch is used to punch a hole at the other end of the cylindrical blank, and finally a through hole is formed in the cylindrical blank; through the operation, the step formed inside the hole channel in the punching process can be effectively avoided, and the inner hole forming rate of the cylinder blank is improved.

Further, after the step S7 is finished, stainless steel shot with the diameter of 0.02-0.05mm is adopted, and the surface treatment is carried out on the inner wall blank of the combustion chamber for 15-35min under the conditions that the spraying distance is 3-4cm and the spraying pressure is 0.5-0.7 MPa; through the operation, the surface strength of the combustion chamber inner wall blank can be improved, so that the service life of the combustion chamber inner wall blank in an extreme environment is prolonged, and the reliability of the space engine is improved.

Further, in the process of step S41, the diameter elongation ratio of the alloy blank is controlled to be not less than 2, and the refinement degree and distribution uniformity of the crystal grains in the alloy blank are improved by controlling the diameter elongation ratio of the alloy blank.

Further, in step S6, performing secondary hole reaming on the blank of the inner wall of the combustion chamber on the trestle, and continuously replacing the blank of the inner wall of the combustion chamber with a large-diameter punch as the radial wall thickness of the blank of the inner wall of the combustion chamber is continuously reduced; through the operation, the forming resistance of the inner hole of the blank on the inner wall of the combustion chamber can be reduced, and meanwhile, the material flow is facilitated.

Compared with the prior art, the invention has the beneficial effects that: the invention has reasonable process design, and the whole process of copper-chromium-zirconium alloying is carried out in a vacuum state, thereby avoiding pollution caused by the interaction of the same gas phase; meanwhile, the zirconium material has strong deoxidizing capacity under the vacuum condition, and other deoxidizing agents are not required to be added, so that the pollution problem caused by the adoption of a metal deoxidizing agent for deoxidation is solved; the vacuum induction melting furnace process can accurately control the chemical components of the alloy, and can control active elements Al, Ti, B and the like with strong affinity with oxygen and nitrogen in a small range; the low-melting-point volatile metal impurities such as Pb, Bi, Sn, Sb and the like can be evaporated and removed, which plays an important role in improving the performance of the material; meanwhile, in the alloy forging process, the tool and equipment are simple, the universality is good, and the cost of the input tool and die is low; the alloy cast ingot can eliminate the casting defects in the raw materials through multiple upsetting and drawing, and can fully refine grains; according to the invention, aging heat treatment and solution heat treatment are carried out on the alloy material, so that the alloy can be fully strengthened, and higher mechanical property and electric and heat conduction properties can be obtained.

Drawings

FIG. 1 is a longitudinal sectional view of a blank for the inner wall of a combustion chamber of the present invention;

FIG. 2 is a cross-sectional view of the blank for the inner wall of the combustion chamber of the present invention.

Detailed Description

Example 1: the technical scheme of the invention is as follows: a manufacturing method of an inner wall blank of a combustion chamber of an aerospace engine comprises the following steps:

s1, blending;

respectively weighing 0.5 percent of Cr according to the mass percent; 0.03% of Zr and the balance of Cu; wherein, Cu is added in an electrolytic copper plate mode, Cr is added in a form of intermediate alloy CuCr25, Zr is added in a form of intermediate alloy CuZr50, and the intermediate alloys CuCr25 and CuZr50 are wrapped by copper sheets;

s2, smelting;

smelting by adopting a vacuum intermediate frequency induction furnace, firstly, flatly laying a layer of electrolytic copper plate obtained in the step S1 in a crucible of the vacuum intermediate frequency induction furnace, then flatly laying the intermediate alloy CuCr25 and CuZr50 wrapped by the copper sheet obtained in the step S1 on the surface of the electrolytic copper plate, and finally flatly laying the residual electrolytic copper plate at the uppermost end of the crucible, wherein the heating temperature of the vacuum intermediate frequency induction furnace is controlled to be 950 ℃, and the vacuum degree is 4 Pa; starting to smelt, and obtaining an alloy solution after smelting is finished;

s3, casting;

casting the alloy solution obtained in the step S2 into a mold, and cooling the alloy solution to room temperature to obtain an alloy ingot; wherein, the casting speed is firstly slow, then fast and then slow during casting, and the casting temperature is controlled to be 1220 ℃;

s4, forging;

s40, heating the alloy ingot obtained in the step S3 to 900 ℃, then preheating a forging tool and a clamp to 250 ℃, and starting forging the alloy ingot, wherein the initial forging temperature is controlled to be 850 ℃, and the final forging temperature is controlled to be 650 ℃; after the forging treatment is finished, obtaining an alloy blank;

s41, heating the alloy blank obtained in the step S40 to 850 ℃, and then carrying out upsetting and drawing treatment; wherein the upsetting height of the alloy blank is 45% of the original height of the alloy blank, the height after drawing is 2 times of the height before drawing, and the upsetting and drawing treatment is repeated for 2 times; obtaining an alloy blank;

s42, punching the alloy blank obtained in the step S41 by using a conical punch to obtain a cylindrical blank; then, carrying out primary reaming on the cylindrical blank, and finally carrying out closing-up treatment on one end of the cylindrical blank after reaming to obtain a blank of the inner wall of the combustion chamber; wherein, the hole expanding and the closing diameter are carried out according to the designed diameter of the blank on the inner wall of the combustion chamber;

s5, solution heat treatment;

heating the inner wall blank of the combustion chamber obtained in the step S42 to 850 ℃, wherein the heating rate is 8 ℃/min, and the heat preservation treatment is carried out for 15 min; continuously heating to 920 ℃, wherein the heating rate is 5 ℃/min; then, carrying out heat preservation treatment on the combustion chamber inner wall blank for 60min at the temperature of 920 ℃, discharging the combustion chamber inner wall blank after heat preservation is finished, adding water and cooling to room temperature at the cooling speed of 3 ℃/s;

s6, cold forging;

upsetting the blank of the inner wall of the combustion chamber processed in the step S5, wherein the upsetting height is the design height of the blank of the inner wall of the combustion chamber; secondly, carrying out secondary reaming treatment on the blank of the inner wall of the upset combustor, wherein the size of the secondary reaming is carried out according to the design size of the blank of the inner wall of the combustor; finally, shaping the blank on the inner wall of the combustion chamber;

s7, secondary finishing;

firstly, roughly turning the blank of the inner wall of the combustion chamber processed in the step S6, removing large machining allowance, reducing the wall thickness, then carrying out aging heat treatment on the blank of the inner wall of the combustion chamber after rough turning, then carrying out performance detection on the blank of the inner wall of the combustion chamber after aging heat treatment, and finely turning the blank of the inner wall of the combustion chamber qualified through detection to obtain a blank of the inner wall of the combustion chamber; the aging heat treatment comprises the following specific operations: 1) firstly, heating the blank on the inner wall of the combustion chamber to 350 ℃, wherein the heating rate is 5 ℃/min, and keeping the temperature for 15 min; then, the temperature is continuously increased to 400 ℃, and the temperature increasing rate is 2 ℃/min; 2) keeping the blank on the inner wall of the combustion chamber at 400 ℃ for 3 h; 3) discharging the blank on the inner wall of the combustion chamber after heat preservation, and cooling the blank to room temperature in the air;

s8, detecting a finished product;

and (5) carrying out size detection and appearance detection on the combustion chamber inner wall blank obtained in the step S7, then detecting the surface quality of the combustion chamber inner wall finished product through dye penetrant inspection, finally boxing, checking boxing information and checking the packaging box.

Example 2: a manufacturing method of an inner wall blank of a combustion chamber of an aerospace engine comprises the following steps:

s1, blending;

respectively weighing 0.8% of Cr according to the mass percent; 0.15% of Zr and the balance of Cu; wherein, Cu is added in an electrolytic copper plate mode, Cr is added in a form of intermediate alloy CuCr25, Zr is added in a form of intermediate alloy CuZr50, and the intermediate alloys CuCr25 and CuZr50 are wrapped by copper sheets;

s2, smelting;

smelting by adopting a vacuum intermediate frequency induction furnace, firstly spreading a layer of electrolytic copper plate obtained in the step S1 in a crucible of the vacuum intermediate frequency induction furnace, then spreading intermediate alloy CuCr25 and CuZr50 wrapped by the copper sheet obtained in the step S1 on the surface of the electrolytic copper plate, and finally spreading the rest electrolytic copper plate at the uppermost end of the crucible, and controlling the heating temperature of the vacuum intermediate frequency induction furnace to 1150 ℃ and the vacuum degree to 4 Pa; starting to smelt, and obtaining an alloy solution after smelting is finished;

s3, casting;

casting the alloy solution obtained in the step S2 into a mold, and cooling the alloy solution to room temperature to obtain an alloy ingot; wherein, the casting speed is firstly slow, then fast and then slow during casting, and the casting temperature is controlled to be 1280 ℃;

s4, forging;

s40, heating the alloy cast ingot obtained in the step S3 to 935 ℃, then preheating a forging tool and a clamp to 310 ℃, and starting forging the alloy cast ingot, wherein the initial forging temperature is controlled to be 880 ℃, and the final forging temperature is controlled to be 725 ℃; after the forging treatment is finished, obtaining an alloy blank;

s41, heating the alloy blank obtained in the step S40 to 890 ℃, and then carrying out upsetting and drawing treatment; wherein the upsetting height of the alloy blank is 50% of the original height of the alloy blank, the height after drawing is 3 times of the height before drawing, and the upsetting and drawing processes are repeated for 3 times; obtaining an alloy blank; in the process of drawing the alloy blank, the alloy blank is rotated by 5 degrees every time the alloy blank is drawn, then the alloy blank is hammered and pressed for a circle, and then the next drawing is carried out until the alloy blank is drawn to the required length, and the generation of the defect of end cracking in the process of drawing the alloy blank can be avoided through the operation; the diameter elongation ratio of the alloy blank is controlled to be 2, and the refinement degree and the distribution uniformity of crystal grains in the alloy blank are favorably improved by controlling the diameter elongation ratio of the alloy blank;

s42, punching the alloy blank obtained in the step S41 by using a conical punch to obtain a cylindrical blank; then, carrying out primary reaming on the cylindrical blank, and finally carrying out closing-up treatment on one end of the cylindrical blank after reaming to obtain a blank of the inner wall of the combustion chamber; wherein, the hole expanding and the closing diameter are carried out according to the designed diameter of the blank on the inner wall of the combustion chamber; in the primary reaming process of the cylinder blank, firstly, a small punch is used for punching one end of the cylinder blank, then the cylinder blank is turned over by 180 degrees, a large punch is used for punching the other end of the cylinder blank, and finally a through hole is formed in the cylinder blank; through the operation, the step formed inside the pore channel in the punching process can be effectively avoided, and the inner hole forming rate of the cylinder blank is improved;

s5, solution heat treatment;

heating the inner wall blank of the combustion chamber obtained in the step S42 to 890 ℃, wherein the heating rate is 9 ℃/min, and the heat preservation treatment is carried out for 23 min; continuously heating to 950 ℃, wherein the heating rate is 5 ℃/min; then, carrying out heat preservation treatment on the combustion chamber inner wall blank for 90min at the temperature of 960 ℃, discharging the combustion chamber inner wall blank after heat preservation is finished, adding water into the combustion chamber inner wall blank, and cooling the combustion chamber inner wall blank to room temperature at the cooling speed of 3 ℃/s;

s6, cold forging;

upsetting the blank of the inner wall of the combustion chamber processed in the step S5, wherein the upsetting height is the design height of the blank of the inner wall of the combustion chamber; secondly, carrying out secondary reaming treatment on the blank of the inner wall of the upset combustor, wherein the size of the secondary reaming is carried out according to the design size of the blank of the inner wall of the combustor; finally, shaping the blank on the inner wall of the combustion chamber;

s7, secondary finishing;

firstly, roughly turning the blank of the inner wall of the combustion chamber processed in the step S6, removing large machining allowance, reducing the wall thickness, then carrying out aging heat treatment on the blank of the inner wall of the combustion chamber after rough turning, then carrying out performance detection on the blank of the inner wall of the combustion chamber after aging heat treatment, and finely turning the blank of the inner wall of the combustion chamber qualified through detection to obtain a blank of the inner wall of the combustion chamber; the aging heat treatment comprises the following specific operations: 1) firstly, heating the blank on the inner wall of the combustion chamber to 400 ℃, wherein the heating rate is 8 ℃/min, and keeping the temperature for 30 min; then, the temperature is continuously increased to 460 ℃, and the temperature increasing rate is 4 ℃/min; 2) keeping the temperature of the blank on the inner wall of the combustion chamber at 460 ℃ for 5 hours; 3) discharging the blank on the inner wall of the combustion chamber after heat preservation, and cooling the blank to room temperature in the air;

s8, detecting a finished product;

and (5) carrying out size detection and appearance detection on the combustion chamber inner wall blank obtained in the step S7, then detecting the surface quality of the combustion chamber inner wall finished product through dye penetrant inspection, finally boxing, checking boxing information and checking the packaging box.

Example 3: a manufacturing method of an inner wall blank of a combustion chamber of an aerospace engine comprises the following steps:

s1, blending;

respectively weighing 1.2% of Cr according to the mass percent; 0.3% of Zr and the balance of Cu; wherein, Cu is added in an electrolytic copper plate mode, Cr is added in a form of intermediate alloy CuCr25, Zr is added in a form of intermediate alloy CuZr50, and the intermediate alloys CuCr25 and CuZr50 are wrapped by copper sheets;

s2, smelting;

smelting by adopting a vacuum intermediate frequency induction furnace, firstly, flatly laying a layer of electrolytic copper plate obtained in the step S1 in a crucible of the vacuum intermediate frequency induction furnace, then flatly laying the intermediate alloy CuCr25 and CuZr50 wrapped by the copper sheet obtained in the step S1 on the surface of the electrolytic copper plate, and finally flatly laying the residual electrolytic copper plate at the uppermost end of the crucible, wherein the heating temperature of the vacuum intermediate frequency induction furnace is 1250 ℃, and the vacuum degree is 4 Pa; starting to smelt, and obtaining an alloy solution after smelting is finished;

s3, casting;

casting the alloy solution obtained in the step S2 into a mold, and cooling the alloy solution to room temperature to obtain an alloy ingot; wherein, the casting speed is firstly slow, then fast and then slow during casting, and the casting temperature is controlled to be 1300 ℃;

s4, forging;

s40, heating the alloy cast ingot obtained in the step S3 to 950 ℃, then preheating a forging tool and a clamp to 350 ℃, and starting forging the alloy cast ingot, wherein the initial forging temperature is controlled to be 900 ℃, and the final forging temperature is controlled to be 800 ℃; after the forging treatment is finished, obtaining an alloy blank;

s41, heating the alloy blank obtained in the step S40 to 900 ℃, and then carrying out upsetting and drawing treatment; wherein the upsetting height of the alloy blank is 60% of the original height of the alloy blank, the height after drawing is 3 times of the height before drawing, and the upsetting and drawing processes are repeated for 4 times; obtaining an alloy blank;

s42, punching the alloy blank obtained in the step S41 by using a conical punch to obtain a cylindrical blank; then, carrying out primary reaming on the cylindrical blank, and finally carrying out closing-up treatment on one end of the cylindrical blank after reaming to obtain a blank of the inner wall of the combustion chamber; wherein, the hole expanding and the closing diameter are carried out according to the designed diameter of the blank on the inner wall of the combustion chamber;

s5, solution heat treatment;

heating the blank of the inner wall of the combustion chamber obtained in the step S42 to 900 ℃, wherein the heating rate is 10 ℃/min, and the heat preservation treatment is carried out for 30 min; continuously heating to 980 ℃, wherein the heating rate is 5 ℃/min; then, carrying out heat preservation treatment on the combustion chamber inner wall blank for 120min at the temperature of 980 ℃, discharging the combustion chamber inner wall blank after heat preservation is finished, adding water into the combustion chamber inner wall blank, and cooling the combustion chamber inner wall blank to room temperature at the cooling speed of 3 ℃/s;

s6, cold forging;

upsetting the blank of the inner wall of the combustion chamber processed in the step S5, wherein the upsetting height is the design height of the blank of the inner wall of the combustion chamber; secondly, carrying out secondary reaming treatment on the blank of the inner wall of the upset combustor, wherein the size of the secondary reaming is carried out according to the design size of the blank of the inner wall of the combustor; finally, shaping the blank on the inner wall of the combustion chamber; the secondary reaming of the blank on the inner wall of the combustion chamber is carried out on the trestle, and the blank is continuously replaced by a large-diameter punch as the radial wall thickness of the blank on the inner wall of the combustion chamber is continuously reduced; through the operation, the forming resistance of the inner hole of the blank on the inner wall of the combustion chamber can be reduced, and meanwhile, the material flow is facilitated; placing the inner wall blank of the combustion chamber into a pickling solution at 40 ℃ for etching and cleaning, wherein the pickling solution is a mixture consisting of 3% of sulfuric acid, 2% of hydrochloric acid and 2% of potassium carbide solution in percentage by mass according to a volume ratio of 1:1: 2; the blank on the inner wall of the combustion chamber is pickled, so that oxide skins on the surface of the blank on the inner wall of the combustion chamber can be effectively removed, and meanwhile, the smoothness of the blank on the inner wall of the combustion chamber is improved;

s7, secondary finishing;

firstly, roughly turning the blank of the inner wall of the combustion chamber processed in the step S6, removing large machining allowance, reducing the wall thickness, then carrying out aging heat treatment on the blank of the inner wall of the combustion chamber after rough turning, then carrying out performance detection on the blank of the inner wall of the combustion chamber after aging heat treatment, and finely turning the blank of the inner wall of the combustion chamber qualified through detection to obtain a blank of the inner wall of the combustion chamber; the aging heat treatment comprises the following specific operations: 1) firstly, heating the blank on the inner wall of the combustion chamber to 400 ℃, wherein the heating rate is 8 ℃/min, and keeping the temperature for 30 min; then, the temperature is continuously increased to 460 ℃, and the temperature increasing rate is 4 ℃/min; 2) keeping the temperature of the blank on the inner wall of the combustion chamber at 460 ℃ for 5 hours; 3) discharging the blank on the inner wall of the combustion chamber after heat preservation, and cooling the blank to room temperature in the air;

s8, detecting a finished product;

and (5) carrying out size detection and appearance detection on the combustion chamber inner wall blank obtained in the step S7, then detecting the surface quality of the combustion chamber inner wall finished product through dye penetrant inspection, finally boxing, checking boxing information and checking the packaging box.

Example 4: a manufacturing method of an inner wall blank of a combustion chamber of an aerospace engine comprises the following steps:

s1, blending;

respectively weighing 1.2% of Cr according to the mass percent; 0.3% of Zr and the balance of Cu; wherein, Cu is added in an electrolytic copper plate mode, Cr is added in a form of intermediate alloy CuCr25, Zr is added in a form of intermediate alloy CuZr50, and the intermediate alloys CuCr25 and CuZr50 are wrapped by copper sheets;

s2, smelting;

smelting by adopting a vacuum intermediate frequency induction furnace, firstly, flatly laying a layer of electrolytic copper plate obtained in the step S1 in a crucible of the vacuum intermediate frequency induction furnace, then flatly laying the intermediate alloy CuCr25 and CuZr50 wrapped by the copper sheet obtained in the step S1 on the surface of the electrolytic copper plate, and finally flatly laying the residual electrolytic copper plate at the uppermost end of the crucible, wherein the heating temperature of the vacuum intermediate frequency induction furnace is 1250 ℃, and the vacuum degree is 4 Pa; starting to smelt, and obtaining an alloy solution after smelting is finished;

s3, casting;

casting the alloy solution obtained in the step S2 into a mold, and cooling the alloy solution to room temperature to obtain an alloy ingot; wherein, the casting speed is firstly slow, then fast and then slow during casting, and the casting temperature is controlled to be 1300 ℃;

s4, forging;

s40, heating the alloy cast ingot obtained in the step S3 to 950 ℃, then preheating a forging tool and a clamp to 350 ℃, and starting forging the alloy cast ingot, wherein the initial forging temperature is controlled to be 900 ℃, and the final forging temperature is controlled to be 800 ℃; after the forging treatment is finished, obtaining an alloy blank;

s41, heating the alloy blank obtained in the step S40 to 900 ℃, and then carrying out upsetting and drawing treatment; wherein the upsetting height of the alloy blank is 60% of the original height of the alloy blank, the height after drawing is 3 times of the height before drawing, and the upsetting and drawing processes are repeated for 4 times; obtaining an alloy blank;

s42, punching the alloy blank obtained in the step S41 by using a conical punch to obtain a cylindrical blank; then, carrying out primary reaming on the cylindrical blank, and finally carrying out closing-up treatment on one end of the cylindrical blank after reaming to obtain a blank of the inner wall of the combustion chamber; wherein, the hole expanding and the closing diameter are carried out according to the designed diameter of the blank on the inner wall of the combustion chamber;

s5, solution heat treatment;

heating the blank of the inner wall of the combustion chamber obtained in the step S42 to 900 ℃, wherein the heating rate is 10 ℃/min, and the heat preservation treatment is carried out for 30 min; continuously heating to 980 ℃, wherein the heating rate is 5 ℃/min; then, carrying out heat preservation treatment on the combustion chamber inner wall blank for 120min at the temperature of 980 ℃, discharging the combustion chamber inner wall blank after heat preservation is finished, adding water into the combustion chamber inner wall blank, and cooling the combustion chamber inner wall blank to room temperature at the cooling speed of 3 ℃/s;

s6, cold forging;

upsetting the blank of the inner wall of the combustion chamber processed in the step S5, wherein the upsetting height is the design height of the blank of the inner wall of the combustion chamber; secondly, carrying out secondary reaming treatment on the blank of the inner wall of the upset combustor, wherein the size of the secondary reaming is carried out according to the design size of the blank of the inner wall of the combustor; finally, shaping the blank on the inner wall of the combustion chamber;

s7, secondary finishing;

firstly, roughly turning the blank of the inner wall of the combustion chamber processed in the step S6, removing large machining allowance, reducing the wall thickness, then carrying out aging heat treatment on the blank of the inner wall of the combustion chamber after rough turning, then carrying out performance detection on the blank of the inner wall of the combustion chamber after aging heat treatment, and finely turning the blank of the inner wall of the combustion chamber qualified through detection to obtain a blank of the inner wall of the combustion chamber; the aging heat treatment comprises the following specific operations: 1) firstly, heating the blank on the inner wall of the combustion chamber to 400 ℃, wherein the heating rate is 8 ℃/min, and keeping the temperature for 30 min; then, the temperature is continuously increased to 460 ℃, and the temperature increasing rate is 4 ℃/min; 2) keeping the temperature of the blank on the inner wall of the combustion chamber at 460 ℃ for 5 hours; 3) discharging the blank on the inner wall of the combustion chamber after heat preservation, and cooling the blank to room temperature in the air; and (3) carrying out phosphating treatment on the blank of the inner wall of the combustion chamber, and specifically operating as follows: placing the combustion chamber inner wall blank into phosphating solution for 10min, dripping for 1min, washing with clear water for 3min, and allowing the phosphating solution to contain Zn (NO)3)2·6H2O、Ni(NO3)2·6H2The mixture consists of O, citric acid, silicate solution and deionized water according to the volume ratio of 1:1:2:1: 4; the corrosion resistance of the combustion chamber inner wall blank can be improved by carrying out phosphating treatment on the combustion chamber inner wall blank, so that the performance of the space engine is improved; finally, stainless steel shot with the diameter of 0.02mm is adopted, and surface treatment is carried out on the blank on the inner wall of the combustion chamber for 15min under the conditions that the spraying distance is 3cm and the spraying pressure is 0.5 MPa; through the operation, the surface strength of the combustion chamber inner wall blank can be improved, so that the service life of the combustion chamber inner wall blank in an extreme environment is prolonged, and the reliability of the space engine is improved;

s8, detecting a finished product;

and (5) carrying out size detection and appearance detection on the combustion chamber inner wall blank obtained in the step S7, then detecting the surface quality of the combustion chamber inner wall finished product through dye penetrant inspection, finally boxing, checking boxing information and checking the packaging box.

Example 5: a manufacturing method of an inner wall blank of a combustion chamber of an aerospace engine comprises the following steps:

s1, blending;

respectively weighing 1.2% of Cr according to the mass percent; 0.3% of Zr and the balance of Cu; wherein, Cu is added in an electrolytic copper plate mode, Cr is added in a form of intermediate alloy CuCr25, Zr is added in a form of intermediate alloy CuZr50, and the intermediate alloys CuCr25 and CuZr50 are wrapped by copper sheets;

s2, smelting;

smelting by adopting a vacuum intermediate frequency induction furnace, firstly, flatly laying a layer of electrolytic copper plate obtained in the step S1 in a crucible of the vacuum intermediate frequency induction furnace, then flatly laying the intermediate alloy CuCr25 and CuZr50 wrapped by the copper sheet obtained in the step S1 on the surface of the electrolytic copper plate, and finally flatly laying the residual electrolytic copper plate at the uppermost end of the crucible, wherein the heating temperature of the vacuum intermediate frequency induction furnace is 1250 ℃, and the vacuum degree is 4 Pa; starting to smelt, and obtaining an alloy solution after smelting is finished;

s3, casting;

casting the alloy solution obtained in the step S2 into a mold, and cooling the alloy solution to room temperature to obtain an alloy ingot; wherein, the casting speed is firstly slow, then fast and then slow during casting, and the casting temperature is controlled to be 1300 ℃;

s4, forging;

s40, heating the alloy cast ingot obtained in the step S3 to 950 ℃, then preheating a forging tool and a clamp to 350 ℃, and starting forging the alloy cast ingot, wherein the initial forging temperature is controlled to be 900 ℃, and the final forging temperature is controlled to be 800 ℃; after the forging treatment is finished, obtaining an alloy blank;

s41, heating the alloy blank obtained in the step S40 to 900 ℃, and then carrying out upsetting and drawing treatment; wherein the upsetting height of the alloy blank is 60% of the original height of the alloy blank, the height after drawing is 3 times of the height before drawing, and the upsetting and drawing processes are repeated for 4 times; obtaining an alloy blank; in the process of drawing the alloy blank, the alloy blank is rotated by 15 degrees every time the alloy blank is drawn, then the alloy blank is hammered and pressed for a circle, and then the next drawing is carried out until the alloy blank is drawn to the required length, and the generation of the defect of end cracking in the process of drawing the alloy blank can be avoided through the operation; the diameter elongation ratio of the alloy blank is controlled to be 3, and the refinement degree and the distribution uniformity of crystal grains in the alloy blank are improved by controlling the diameter elongation ratio of the alloy blank;

s42, punching the alloy blank obtained in the step S41 by using a conical punch to obtain a cylindrical blank; then, carrying out primary reaming on the cylindrical blank, and finally carrying out closing-up treatment on one end of the cylindrical blank after reaming to obtain a blank of the inner wall of the combustion chamber; wherein, the hole expanding and the closing diameter are carried out according to the designed diameter of the blank on the inner wall of the combustion chamber; in the primary reaming process of the cylinder blank, firstly, a small punch is used for punching one end of the cylinder blank, then the cylinder blank is turned over by 180 degrees, a large punch is used for punching the other end of the cylinder blank, and finally a through hole is formed in the cylinder blank; through the operation, the step formed inside the pore channel in the punching process can be effectively avoided, and the inner hole forming rate of the cylinder blank is improved;

s5, solution heat treatment;

heating the blank of the inner wall of the combustion chamber obtained in the step S42 to 900 ℃, wherein the heating rate is 10 ℃/min, and the heat preservation treatment is carried out for 30 min; continuously heating to 980 ℃, wherein the heating rate is 5 ℃/min; then, carrying out heat preservation treatment on the combustion chamber inner wall blank for 120min at the temperature of 980 ℃, discharging the combustion chamber inner wall blank after heat preservation is finished, adding water into the combustion chamber inner wall blank, and cooling the combustion chamber inner wall blank to room temperature at the cooling speed of 3 ℃/s;

s6, cold forging;

upsetting the blank of the inner wall of the combustion chamber processed in the step S5, wherein the upsetting height is the design height of the blank of the inner wall of the combustion chamber; secondly, carrying out secondary reaming treatment on the blank of the inner wall of the upset combustor, wherein the size of the secondary reaming is carried out according to the design size of the blank of the inner wall of the combustor; finally, shaping the blank on the inner wall of the combustion chamber; the secondary reaming of the blank on the inner wall of the combustion chamber is carried out on the trestle, and the blank is continuously replaced by a large-diameter punch as the radial wall thickness of the blank on the inner wall of the combustion chamber is continuously reduced; through the operation, the forming resistance of the inner hole of the blank on the inner wall of the combustion chamber can be reduced, and meanwhile, the material flow is facilitated; finally, placing the inner wall blank of the combustion chamber into a pickling solution at 60 ℃ for etching and cleaning, wherein the pickling solution is a mixture of 9% of sulfuric acid, 5% of hydrochloric acid and 7% of potassium carbide solution in percentage by mass according to a volume ratio of 1:1: 2; the blank on the inner wall of the combustion chamber is pickled, so that oxide skins on the surface of the blank on the inner wall of the combustion chamber can be effectively removed, and meanwhile, the smoothness of the blank on the inner wall of the combustion chamber is improved;

s7, secondary finishing;

firstly, roughly turning the blank of the inner wall of the combustion chamber processed in the step S6, removing large machining allowance, reducing the wall thickness, then carrying out aging heat treatment on the blank of the inner wall of the combustion chamber after rough turning, then carrying out performance detection on the blank of the inner wall of the combustion chamber after aging heat treatment, and finely turning the blank of the inner wall of the combustion chamber qualified through detection to obtain a blank of the inner wall of the combustion chamber; the aging heat treatment comprises the following specific operations: 1) firstly, heating the blank on the inner wall of the combustion chamber to 400 ℃, wherein the heating rate is 8 ℃/min, and keeping the temperature for 30 min; then, the temperature is continuously increased to 460 ℃, and the temperature increasing rate is 4 ℃/min; 2) keeping the temperature of the blank on the inner wall of the combustion chamber at 460 ℃ for 5 hours; 3) discharging the blank on the inner wall of the combustion chamber after heat preservation, and cooling the blank to room temperature in the air; then carrying out phosphating treatment on the blank of the inner wall of the combustion chamber, and specifically operating as follows: placing the combustion chamber inner wall blank into phosphating solution for 30min, dripping for 2min, washing with clear water for 5min, and allowing the phosphating solution to contain Zn (NO)3)2·6H2O、Ni(NO3)2·6H2The mixture consists of O, citric acid, silicate solution and deionized water according to the volume ratio of 1:1:2:1: 4; the corrosion resistance of the combustion chamber inner wall blank can be improved by carrying out phosphating treatment on the combustion chamber inner wall blank, so that the performance of the space engine is improved; finally, stainless steel shot with the diameter of 0.05mm is adopted, and surface treatment is carried out on the blank on the inner wall of the combustion chamber for 35min under the conditions that the spraying distance is 4cm and the spraying pressure is 0.7 MPa; through the operation, the surface strength of the combustion chamber inner wall blank can be improved, so that the service life of the combustion chamber inner wall blank in an extreme environment is prolonged, and the reliability of the space engine is improved;

s8, detecting a finished product;

and (5) carrying out size detection and appearance detection on the combustion chamber inner wall blank obtained in the step S7, then detecting the surface quality of the combustion chamber inner wall finished product through dye penetrant inspection, finally boxing, checking boxing information and checking the packaging box.

Test example: the performance of the combustion chamber inner wall blanks prepared in the embodiments 1 to 5 of the invention was tested, and the test results are shown in table 1;

table 1: influence of different preparation conditions on the performance of the combustion chamber inner wall blank;

as can be seen from the data in table 1, in example 2, compared with example 1, in the process of alloy blank drawing, each time the alloy blank is drawn, the alloy blank is rotated by 5 °, then the alloy blank is hammered and pressed for one circle, and then the next drawing is performed until the alloy blank is drawn to the required length, so that the generation of end cracking defects in the process of alloy blank drawing can be avoided; by controlling the diameter-draw ratio of the alloy blank, the refinement degree and the distribution uniformity of crystal grains in the alloy blank are improved; in the primary reaming process of the cylinder blank, firstly, a small punch is used for punching one end of the cylinder blank, then the cylinder blank is turned over by 180 degrees, a large punch is used for punching the other end of the cylinder blank, and finally a through hole is formed in the cylinder blank; the step formed in the inner part of the pore channel in the punching process can be effectively avoided, and the inner hole forming rate of the cylinder blank is improved, so that the mechanical strength of the blank on the inner wall of the combustion chamber is improved; compared with the embodiment 1, in the secondary process of the blank of the inner wall of the combustion chamber, the blank of the inner wall of the combustion chamber is continuously replaced by a punch with a large diameter along with the continuous reduction of the radial wall thickness of the blank of the inner wall of the combustion chamber; through the operation, the forming resistance of the inner hole of the blank on the inner wall of the combustion chamber can be reduced, and meanwhile, the material flow is facilitated; the blank on the inner wall of the combustion chamber is pickled, so that oxide skins on the surface of the blank on the inner wall of the combustion chamber can be effectively removed, and meanwhile, the smoothness of the blank on the inner wall of the combustion chamber is improved; compared with the embodiment 1, the embodiment 4 has the advantages that the corrosion resistance of the combustion chamber inner wall blank can be improved by carrying out phosphating treatment on the combustion chamber inner wall blank, so that the performance of the space engine is improved; the surface strength of the combustion chamber inner wall blank can be improved by carrying out shot blasting treatment on the combustion chamber inner wall blank, so that the service life of the combustion chamber inner wall blank in an extreme environment is prolonged, and the reliability of the space engine is improved; example 5 compared with examples 1-4, the mechanical properties of the prepared combustion value inner wall blank are optimized due to comprehensive optimization of each favorable condition.

15页详细技术资料下载
上一篇:一种医用注射器针头装配设备
下一篇:一种固体火箭发动机燃烧的试验设备

网友询问留言

已有0条留言

还没有人留言评论。精彩留言会获得点赞!

精彩留言,会给你点赞!