Construction device and method for external filler wall end constructional column without peripheral protection

文档序号:318778 发布日期:2021-11-30 浏览:22次 中文

阅读说明:本技术 无外围防护的外部填充墙端部构造柱的施工装置及方法 (Construction device and method for external filler wall end constructional column without peripheral protection ) 是由 张林聪 尤雪春 柏清龙 王益栋 张明明 王敬峰 于 2021-09-02 设计创作,主要内容包括:本发明公开一种无外围防护的外部填充墙端部构造柱的施工装置,包括多个预埋于混凝土梁底且与构造柱位置对应的预埋钢筋接驳器,每一预埋钢筋接驳器穿设固定呈竖直状的构造柱主筋,该些构造柱主筋的外侧封模木模板,木模板的外侧固定多个呈竖直状的小木方衬垫并通过卡箍卡紧。本发明还公开一种施工方法包括:混凝土梁浇筑施工阶段时,根据构造柱主筋的规格,预先在构造柱位置对应的混凝土梁底预埋钢筋接驳器;在填充墙砌筑阶段,构造柱周围的墙体砌筑完成并预留马牙槎后,将构造柱主筋与预埋钢筋接驳器进行机械连接,构造柱下部仍采用传统植筋工艺;构造柱主筋绑扎完毕后,使用木模板封模,木模板外侧使用小木方衬垫,以卡箍卡紧后浇筑混凝土。(The invention discloses a construction device of an external infilled wall end constructional column without peripheral protection, which comprises a plurality of embedded steel bar connectors which are embedded at the bottom of a concrete beam and correspond to the positions of constructional columns, wherein each embedded steel bar connector is fixedly penetrated with a vertical constructional column main steel bar, the outer sides of the constructional column main steel bars are sealed with a wood formwork, and a plurality of vertical small batten gaskets are fixed on the outer sides of the wood formwork and are clamped tightly through a hoop. The invention also discloses a construction method, which comprises the following steps: when the concrete beam is poured, according to the specification of a main reinforcement of a constructional column, a reinforcement connector is pre-embedded at the bottom of the concrete beam corresponding to the position of the constructional column; in the filling wall building stage, after the building of the wall body around the constructional column is finished and the serrated racking is reserved, mechanically connecting the main reinforcement of the constructional column with the embedded reinforcement connector, and still adopting the traditional reinforcement planting process at the lower part of the constructional column; after the main reinforcement of the constructional column is bound, a wooden template is used for sealing the mould, and a small batten gasket is used on the outer side of the wooden template to pour concrete after the clamping of a hoop.)

1. The utility model provides a construction equipment of outside infilled wall tip constructional column of no peripheral protection, its characterized in that, it includes a plurality of pre-buries at the bottom of the concrete beam and plugs into the ware with the corresponding embedded bar of constructional column position, each the embedded bar plugs into the ware and all wears to establish and is fixed with the constructional column owner muscle that is vertical form, and the outside seal mould of these some constructional column owner muscle has the plank sheathing, the outside of plank sheathing is fixed with a plurality of little flitch liners that are vertical form and passes through the clamp chucking.

2. The apparatus for constructing an end construction column of an exterior filler wall without exterior protection as claimed in claim 1, wherein the cross-section of the wooden form is L-shaped.

3. A construction method of an external infilled wall end constructional column without peripheral protection is characterized by comprising the following steps:

s1, pre-embedding a steel bar connector at the bottom of the concrete beam corresponding to the position of the constructional column according to the specification of the main steel bar of the constructional column during the concrete beam pouring construction stage;

s2, in the filling wall building stage, after the building of the wall around the constructional column is finished and the serrated racking is reserved, mechanically connecting the main reinforcement of the constructional column with the embedded steel bar connector, and still adopting the traditional reinforcement planting process at the lower part of the constructional column;

and S3, after the main reinforcement of the constructional column is bound, sealing the formwork by using a wood formwork, using a small batten gasket on the outer side of the wood formwork, and pouring concrete after the wood formwork is tightly clamped by a clamp.

Technical Field

The invention relates to a construction method of a constructional column, in particular to a construction device and a construction method of an external filler wall end constructional column without peripheral protection.

Background

At present, with the acceleration of the urbanization process of China, the scales of urban infrastructure, real estate development and shed house area transformation are continuously enlarged, and more building sites are arranged in cities. In the construction process, the peripheral protection system of the high-rise residence adopts more and more construction sites with attached lifting scaffolds, and compared with the traditional floor-type overhanging scaffold protection system, the peripheral protection system has the advantages of safety, quality, attractiveness and material saving. The attached lifting scaffold can be attached to an engineering structure and can climb along with the engineering structure layer by depending on self lifting equipment and devices. However, when the attached lifting scaffold continuously climbs along with the main structure, the structure at the lower part is exposed and lacks peripheral protection, and even if a safety net is arranged to reduce the negative influence caused by falling objects, in the construction stage of the infilled wall, particularly the construction of the wall body at the periphery of the structure and the operation of embedding bars and pouring of related constructional columns, although an operator ties a safety belt, certain risks still occur. Particularly, when an operator plants the steel bars on the upper part of the constructional column at the end part of the external filling wall, the concrete structure can be damaged by punching of the electric hammer, and the operator is very easy to fall off.

Disclosure of Invention

Aiming at the problems and the defects in the prior art, the invention provides the construction device and the construction method of the external filler wall end constructional column without peripheral protection, which have the advantages of simple structure, simple and convenient operation, cost saving, safety and effectiveness.

The invention solves the technical problems through the following technical scheme:

the invention provides a construction device of an external infilled wall end constructional column without peripheral protection, which is characterized by comprising a plurality of embedded steel bar connectors which are embedded at the bottom of a concrete beam and correspond to the constructional column in position, wherein each embedded steel bar connector is fixedly provided with a vertical constructional column main steel bar in a penetrating way, the outer side of the constructional column main steel bars is sealed by a wood template, and the outer side of the wood template is fixedly provided with a plurality of vertical small batten gaskets and is clamped by a hoop.

Preferably, the cross section of the wood formwork is L-shaped.

The invention also provides a construction method of the external filler wall end constructional column without peripheral protection, which is characterized by comprising the following steps of:

s1, pre-embedding a steel bar connector at the bottom of the concrete beam corresponding to the position of the constructional column according to the specification of the main steel bar of the constructional column during the concrete beam pouring construction stage;

s2, in the filling wall building stage, after the building of the wall around the constructional column is finished and the serrated racking is reserved, mechanically connecting the main reinforcement of the constructional column with the embedded steel bar connector, and still adopting the traditional reinforcement planting process at the lower part of the constructional column;

and S3, after the main reinforcement of the constructional column is bound, sealing the formwork by using a wood formwork, using a small batten gasket on the outer side of the wood formwork, and pouring concrete after the wood formwork is tightly clamped by a clamp.

On the basis of the common knowledge in the field, the above preferred conditions can be combined randomly to obtain the preferred embodiments of the invention.

The positive progress effects of the invention are as follows:

1. all raw materials used by the construction method are materials commonly used in construction sites, are easy to obtain and do not need to be purchased additionally.

2. The construction method is similar to the traditional constructional column construction method and is easy to master.

3. The construction method cancels the top embedded steel bar of the external filler wall end constructional column without peripheral protection, and adopts the later stage of the embedded steel bar connector to mechanically connect the main steel bar of the constructional column with the embedded steel bar connector, thereby greatly reducing the potential safety hazard caused by artificial steel bar embedding at the dangerous empty part.

Drawings

FIG. 1 is an elevation of a method of constructing an exterior infill wall end construction column without perimeter protection.

Fig. 2 and 3 are detailed node diagrams of a construction method of an external infilled wall end constructional column without peripheral protection.

The concrete beam, the concrete slab, the filler wall, the constructional column, the embedded steel bar connector, the constructional column main reinforcement, the wood formwork, the small batten liner, the clamp, the concrete top plate, the concrete beam, the concrete slab, the filler wall, the constructional column, the embedded steel bar connector, the concrete beam, the concrete slab, the filler wall, the constructional column, the concrete pre-cast steel bar connector, the concrete beam, the filler wall, the constructional column main reinforcement, the wood formwork, the small batten liner, the clamp and the concrete top plate are sequentially connected, wherein the concrete beam, the concrete slab, the filler wall, the constructional column and the concrete top plate are sequentially connected, and the concrete beam is arranged on the concrete beam, the concrete slab, the filler wall, the constructional column and the concrete slab

Detailed Description

In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are some, but not all, embodiments of the present invention. All other embodiments, which can be obtained by a person skilled in the art without any inventive step based on the embodiments of the present invention, are within the scope of the present invention.

As shown in fig. 1-3, the embodiment provides a construction apparatus for an external infilled wall end constructional column without peripheral protection, which includes a plurality of pre-embedded steel bar connectors 5 pre-embedded at the bottom of a concrete beam 1 and corresponding to the positions of constructional columns 4, each pre-embedded steel bar connector 5 is fixedly provided with a vertical constructional column main bar 6 in a penetrating manner, the outer side of the constructional column main bars 6 is sealed by a wood formwork 7, the outer side of the wood formwork 7 is fixedly provided with a plurality of vertical small batten gaskets 8 and is clamped by a clamp 9, and the cross section of the wood formwork 7 is L-shaped.

The embodiment also provides a construction method of the external filler wall end constructional column without peripheral protection, which comprises the following steps:

and S1, pre-embedding a steel bar connector 5 at the bottom of the concrete beam 1 corresponding to the position of the constructional column 4 in advance according to the specification of the constructional column main steel bar 6 in the concrete beam pouring construction stage.

S2, in the filling wall building stage, after the wall building around the constructional column 4 is finished and the serrated racking is reserved, mechanically connecting the constructional column main reinforcement 6 with the embedded steel bar connector 5, and still adopting the traditional bar planting process on the lower part of the constructional column 4.

And S3, after the main reinforcement 6 of the constructional column is bound, sealing the formwork by using a wood formwork 7, clamping the outer side of the wood formwork 7 by using a small batten gasket 8 by using a clamp 9, and pouring concrete.

While specific embodiments of the invention have been described above, it will be appreciated by those skilled in the art that these are by way of example only, and that the scope of the invention is defined by the appended claims. Various changes and modifications to these embodiments may be made by those skilled in the art without departing from the spirit and scope of the invention, and these changes and modifications are within the scope of the invention.