Supporting device for plain river dredging engineering and construction method thereof

文档序号:776990 发布日期:2021-04-09 浏览:5次 中文

阅读说明:本技术 一种平原河道疏通工程的支撑装置及其施工方法 (Supporting device for plain river dredging engineering and construction method thereof ) 是由 郭万红 李云松 刘婉玎 王龙 胡群革 杨浩 李永兵 吴宝阁 马信 刘天祥 于 2020-12-24 设计创作,主要内容包括:本发明公开了一种平原河道疏通工程的支撑装置及其施工方法,包括固定座、支撑架、和支撑机构,定位条限位固定杆,固定杆设有固定块,固定块设有固定槽,固定座设有连接块,固定块两侧的连接块中通有固定螺栓,固定螺栓设于固定槽中,固定螺栓限位固定块,支撑架设有支撑杆,支撑架设有设有卡套,支撑杆设有卡杆,卡杆设有卡套中,支撑杆设有导向块,支撑杆设有滑槽,相邻支撑杆之间设有挡水机构;方法采用六个步骤。本发明能够阻断河水,便于跨河道路的疏通和清理,有效缩短施工周期,步骤简单,施工方便,能够有效提高施工效率和施工效果,缩短工期。(The invention discloses a supporting device for plain river dredging engineering and a construction method thereof, and the supporting device comprises a fixed seat, a supporting frame and a supporting mechanism, wherein a positioning bar limit fixed rod is provided with a fixed block, the fixed block is provided with a fixed groove, the fixed seat is provided with a connecting block, a fixing bolt is communicated with the connecting blocks on two sides of the fixed block, the fixing bolt is arranged in the fixed groove, the fixing bolt limits the fixed block, the supporting frame is provided with a supporting rod, the supporting frame is provided with a clamping sleeve, the supporting rod is provided with a clamping rod, the clamping rod is arranged in the clamping sleeve, the supporting rod is provided with a guide block; the method adopts six steps. The method can block river water, is convenient for dredging and cleaning a river-crossing road, effectively shortens the construction period, has simple steps and convenient construction, can effectively improve the construction efficiency and the construction effect, and shortens the construction period.)

1. The utility model provides a strutting arrangement of plain river dredging engineering which characterized in that: comprises a fixed seat, a supporting frame and a supporting mechanism, wherein the supporting mechanism is arranged on the supporting frame, the supporting frame is provided with a fixed rod and a guide rod, the fixed seat is provided with a guide groove and a butt joint groove, the guide rod is arranged in the guide groove, the fixed rod is arranged in the butt joint groove, the butt joint groove is provided with a positioning strip, the positioning strip limits the fixed rod, the fixed rod is provided with a fixed block, the fixed block is provided with a fixed groove, the fixed seat is provided with a connecting block, fixing bolts are communicated in the connecting blocks at two sides of the fixing block and are arranged in the fixing grooves, the fixing bolt limits the fixing block, the support frame is provided with a support rod, the support frame is provided with a clamping sleeve, the support rod is provided with a clamping rod, the clamping rod is arranged in the clamping sleeve, the support rod is provided with a guide block, and a water retaining mechanism is arranged between every two adjacent support rods.

2. The supporting device for plain river dredging engineering according to claim 1, wherein: the fixing base is provided with a sliding block, the sliding block is connected with the fixing base in a sliding mode, the connecting block is arranged in the sliding block and connected with the sliding block in a sliding mode, the fixing groove is provided with a clamping block, the clamping block is limited by the fixing bolt, the clamping block is provided with convex teeth, the connecting block is provided with concave teeth, and the concave teeth are clamped with the convex teeth.

3. The supporting device for plain river dredging engineering according to claim 1, wherein: the utility model discloses a water-retaining mechanism, including water retaining mechanism, sealing strip, breakwater and sealing strip, the breakwater mechanism is equipped with the slide bar, the bracing piece is equipped with the spout, the slide bar is located in the spout, the slide bar with spout sliding connection, water retaining mechanism includes connecting rod, breakwater and sealing strip, the breakwater is equipped with draw-in groove and seal groove, the breakwater is equipped with two among the draw-in groove, the sealing strip is located among two seal grooves, the breakwater is equipped with the adapter sleeve, the adapter sleeve is located on the connecting rod, adapter sleeve threaded connection has the tight bolt in top, the tight bolt in top the connecting rod.

4. The supporting device for plain river dredging engineering according to claim 3, wherein: the sealing strip is equipped with the fixed strip, the seal groove is equipped with the constant head tank, the fixed strip is equipped with the location bellying, the location bellying is located in the constant head tank, the adapter sleeve is equipped with the connection piece, and is adjacent be equipped with the chucking bolt between the connection piece.

5. The supporting device for plain river dredging engineering according to claim 1, wherein: the support frame is equipped with the support groove, supporting mechanism includes carriage, seals pole and backup pad, the carriage with seal the pole and rotate and be connected, the carriage is equipped with first recess, the shrouding is equipped with the second recess, the backup pad is located first recess with in the second recess.

6. The supporting device for plain river dredging engineering according to claim 5, wherein: the sealing rod is provided with a convex block, the fixing frame is provided with a mounting groove, the convex block is arranged in the mounting groove, the mounting groove is provided with a pin, and the pin penetrates through and fixes the convex block.

7. The supporting device for plain river dredging engineering according to claim 1, wherein: the support frame is equipped with supporting component, supporting component includes two horizontal poles, a threaded rod and two lock nut, the both ends of threaded rod respectively with horizontal pole threaded connection, the both ends threaded connection of threaded rod lock nut, lock nut chucking in on the horizontal pole, two be equipped with the connecting plate between the horizontal pole, the connecting plate is located on the threaded rod, the horizontal pole is equipped with the spread groove, the connecting plate is located in the spread groove.

8. The construction method of the supporting device for the plain river dredging project according to claim 1, characterized by comprising the following steps:

a. erecting a support frame:

excavating a foundation pit at the designated positions of the river banks on the two sides, then pouring a concrete pile, fixing a fixed seat on the concrete pile after the concrete pile is dried, then clamping a support frame into the fixed seat, sliding a sliding block, sliding a fixed bolt into a fixed groove, then clamping a clamping block into the fixed seat, and screwing the fixed bolt to complete erection and fixation of the support frame;

b. assembling a water retaining mechanism:

assembling the water retaining mechanism on the shore to facilitate the subsequent installation of the water retaining mechanism;

c. and (3) installing a water retaining mechanism:

firstly, driving a support rod into a soil layer punched at the side of a fixed seat, clamping a clamping rod of the support rod into a clamping sleeve, then continuously pressing the support rod into the soil layer, wherein the top surface of the support rod is level with the top surface of a support frame, then screwing a bolt on the support rod and the support frame for fixing, then cleaning the preset installation position of a water retaining mechanism, cleaning a riverbed and excavating a notch at the bank side, sliding the assembled water retaining mechanism into a chute, then knocking the water retaining mechanism to press the water retaining mechanism into the bottom of the riverbed, and then fixing the water retaining mechanism by using the bolt to prevent the water retaining mechanism from floating;

d. dismantling an original road:

starting a water pump to pump off river water in the water retaining mechanisms, then excavating an original river-crossing road by using an excavator, and cleaning and carrying the whole original road in a manner of matching with manual cleaning and carrying, so as to ensure that no garbage is left in a river bed between the water retaining mechanisms;

e. the support mechanism is installed:

mounting a support assembly on a support frame, aligning a convex block of a cross rod to a mounting groove, then rotating a threaded rod to enable the convex block of the cross rod to be clamped into the mounting groove, screwing a locking nut to clamp the cross rod after the cross rod is clamped, clamping a connecting plate on the cross rod to fix, splicing a support mechanism on a river bank, clamping the support plate into a support frame and fixing the support frame, and then hoisting the support frame onto a support frame and fixing the support frame;

f. dismantling the water retaining mechanism:

and firstly loosening the puller bolt to enable the water baffle to be drawn out from the water retaining rod, overflowing river water from the gap of the water baffle to enter, drawing the water baffle out from the water retaining rod after the water levels on the two sides of the water baffle are leveled, drawing the sealing strip out from the water retaining rod, then dismounting the connecting rod, and recycling the connecting rod and the water retaining rod.

9. The construction method of the supporting device for the plain river dredging project according to claim 8, characterized in that: step b, the detailed steps of assembling the water retaining mechanism are as follows: the connecting sleeve of the water bar is sleeved into the connecting rod, then the water baffle and the sealing strip are respectively arranged in the water bar, then the connecting sleeve is fastened to clamp the water baffle from head to tail in sequence, then the clamping bolt is screwed to ensure the clamping of the sealing strip, and then the connecting sleeve … … is fastened until all the water baffle and the sealing strip are fixed.

Technical Field

The invention belongs to the technical field of river channel treatment, and particularly relates to a supporting device for plain river channel dredging engineering and a construction method thereof.

Background

Water is a blood vessel of a city, can moisten life and shape urban qi, and can reflect the health degree of the city. At present, the river pollution in China reaches the place which has to be treated, and particularly, the water quality of rivers around cities is influenced by factors such as domestic sewage of residents, industrial sewage discharge, point-to-point source pollution of agricultural production, abandoned rivers of municipal garbage and the like, so that the ecological functions of the urban rivers are seriously lost. River water overflows through the water culvert pipe buried underground at the lower part of the road, the water culvert pipe invades the effective flood discharge section of the river channel, the overflow capacity of the water culvert pipe is low, certain influence is caused on safety flood discharge, and the road influencing river channel flood discharge needs to be dismantled so as to ensure the flood discharge capacity of the river channel. The existing river-crossing road dredging engineering mostly needs to dismantle original roads and erect passing bridges with strong overflowing capacity to guarantee traffic capacity, however, when the river-crossing roads are dismantled, engineering garbage is easy to generate and falls into river channels to be difficult to clean, so that the river channels are polluted, and the engineering period needs to be prolonged by salvage and cleaning.

Disclosure of Invention

The invention aims to solve the technical problems in the prior art, and provides a supporting device for plain river dredging engineering and a construction method thereof, which can block river water, facilitate dredging and cleaning of river-crossing roads, avoid polluting river channels, effectively shorten construction period, ensure the overflowing capacity and traffic capacity of river channels, have simple steps and convenient construction, can effectively improve construction efficiency and construction effect, and shorten construction period.

In order to solve the technical problems, the invention adopts the following technical scheme:

the utility model provides a strutting arrangement of plain river dredging engineering which characterized in that: the fixing base, the support frame, and supporting mechanism, supporting mechanism locates on the support frame, the support frame is equipped with dead lever and guide bar, the fixing base is equipped with guide way and butt joint groove, the guide bar is located in the guide way, the dead lever is located in the butt joint groove, the fixed slot is equipped with the location strip, the spacing dead lever of location strip, the dead lever is equipped with the fixed block, the fixed block is equipped with the fixed slot, the fixing base is equipped with the connecting block, it has fixing bolt to lead to in the connecting block of fixed block both sides, fixing bolt locates in the fixed slot, the spacing fixed block of fixing bolt, the support frame is equipped with the bracing piece, the support frame is equipped with the cutting ferrule, the bracing piece is equipped with the. Play through manger plate mechanism and block river temporarily at river course mediation in-process, the clearance of the former river road of striding of being convenient for, the engineering rubbish of avoiding in the clearance process falls into the river, be convenient for clear up, shorten engineering cycle, and simultaneously, support frame and fixing base adopt the connected mode of fixing bolt and fixed block to connect, convenient connection, excellent in connection effect, the quick of the support frame of being convenient for erects, be convenient for construct, the support frame utilizes the guide bar to play the guide effect simultaneously, so as to be convenient for can be about the fixed mounting of dead lever, guarantee the setting of dead lever in the fixing base, on the other hand can play certain supporting role, improve the bearing capacity of support frame, can also guarantee the installation accuracy and the installation effect of support frame. The water retaining mechanism is arranged on the supporting rod, and the bearing capacity and the stability of the water retaining structure can be improved.

Further, the fixing base is equipped with the slider, slider and fixing base sliding connection, and in the slider was located to the connecting block, connecting block and slider sliding connection, the fixed slot was equipped with the fixture block, the spacing fixing bolt of fixture block, the fixture block was equipped with the dogtooth, and the connecting block is equipped with the concave tooth, the mutual block of concave tooth and dogtooth. Slider and fixing base sliding connection for fixing bolt need not tear out, realizes spacing to the fixed block through sliding, removes spacing convenience, and the installation and the demolition of the support frame of being convenient for have improved the efficiency of construction, and fixing bolt's setting is compared directly to wear to establish the bolt to the hole simultaneously, and is more convenient, can avoid the inaccurate problem in hole. Simultaneously after locking fixing bolt, can further promote fixing bolt's chucking effect by the block of dogtooth and concave tooth, guarantee the fixed effect of support frame, also can make the fixture block by the chucking simultaneously, be difficult for taking out.

Furthermore, the water retaining mechanism is provided with a sliding rod, the supporting rod is provided with a sliding groove, the sliding rod is arranged in the sliding groove and is in sliding connection with the sliding groove, the water retaining mechanism comprises a connecting rod, a water retaining plate and a sealing strip, the water retaining rod is provided with a clamping groove and two sealing grooves, the water retaining plate is provided with two clamping grooves, the sealing strip is arranged in the two sealing grooves, the water retaining rod is provided with a connecting sleeve, the connecting sleeve is sleeved on the connecting rod, the connecting sleeve is in threaded connection with a puller bolt, the puller bolt is used for. The water retaining mechanism is connected with the supporting rod in a sliding connection mode, the water retaining mechanism can be conveniently pressed into river water, the installation of the water retaining mechanism is facilitated, and the installation accuracy of the water retaining mechanism is guaranteed. The sealing strip can play sealed effect, guarantees the sealed effect of mechanism at that time, avoids leaking, simultaneously, can adopt the sealing strip of different thickness according to the wide setting of river course, guarantees that the whole length of manger plate mechanism can adapt to different river course widths, has guaranteed the reuse of manger plate mechanism. Utilize the connection form of connecting rod and adapter sleeve, can concatenate all breakwaters and be whole, improve bulk strength, can make things convenient for the installation of connecting rod and breakwater simultaneously. The setting of the tightening bolt is adopted, so that the position of the water retaining rod is more flexibly set, and the general applicability is improved.

Further, the sealing strip is provided with a fixing strip, the sealing groove is provided with a positioning groove, the fixing strip is provided with a positioning protruding portion, the positioning protruding portion is arranged in the positioning groove, the connecting sleeve is provided with a connecting sheet, and a clamping bolt is arranged between every two adjacent connecting sheets. Set up the fixed strip in the sealing strip for comparatively soft sealing strip has a rigid support, and setting that can be better improves sealed effect between the water bar, and the chucking sealing strip can be guaranteed to the connection piece. The positioning groove and the positioning protruding portion are arranged, so that the sealing strip can be conveniently positioned and installed, and the installation effect and the sealing effect are improved.

Further, the support frame is equipped with the support groove, and supporting mechanism includes carriage, seals pole and backup pad, and the carriage rotates with sealing the pole and is connected, and the carriage is equipped with first recess, and the shrouding is equipped with the second recess, and the backup pad is located in first recess and the second recess. Utilize the setting of carriage and closing rod, can connect into the backup pad wholly, make things convenient for whole hoist and mount, can effectively practice thrift the required time of construction, adopt the block form of first recess and second recess simultaneously, connect conveniently, carriage and shrouding rotate to be connected for carriage and shrouding are connected conveniently, improve the connection effect of carriage and shrouding.

Further, the seal pole is equipped with the lug, and fixed frame is equipped with the mounting groove, and in the mounting groove was located to the lug, the round pin post was located to the mounting groove, and the round pin post passes the lug and fixes the lug. The fixing of the sealing rod is realized through the convex block and the pin column, the use is convenient, the connection is quick, and the fixing support plate can be better.

Further, the support frame is equipped with supporting component, and supporting component includes two horizontal poles, a threaded rod and two lock nut, the both ends of threaded rod respectively with horizontal pole threaded connection, the both ends threaded connection lock nut of threaded rod, lock nut chucking is equipped with the connecting plate between two horizontal poles on the horizontal pole, the connecting plate is located the threaded rod, the horizontal pole is equipped with the spread groove, the connecting plate is located in the spread groove. The supporting component can support the supporting plate in the middle of the supporting frame, and the bearing capacity of the supporting plate is improved. And supporting component adopts detachable mechanism, can make when not setting up convenient former mediation of crossing the river road demolish, avoids the support frame to exert an influence to demolising, has improved the efficiency of demolising, and simultaneously, the support frame can support the manger plate subassembly, has also made things convenient for the demolition of crossing the river road, improves the efficiency of construction. The threaded rod uses the middle part as the limit, one end is positive screw thread, one end is reverse thread, make when rotating the threaded rod, two horizontal poles can remove or move dorsad in opposite directions simultaneously, the use of horizontal pole has been made things convenient for, make the card that the horizontal pole can be better on the support frame, it is more convenient to use, lock nut can play the locking effect, guarantee the supporting component chucking on the support frame, the connecting plate card is on the threaded rod, can play the support to the backup pad of top, improve the supporting effect of backup pad, can paste on the bottom surface of backup pad, effectively avoid the backup pad to warp.

A construction method of a supporting device for plain river dredging engineering is characterized by comprising the following steps:

a. erecting a support frame:

excavation foundation ditch at the assigned position of both sides river bank, later pour the concrete pile, after the concrete pile is done admittedly, fix the fixing base on the concrete pile, later go into the fixing base with the support frame card, the slider that slides, slide fixing bolt in the fixed slot, later the fixture block of card income in the fixing base to tighten fixing bolt, accomplish the erection of support frame and fix. The erection of support frame can make things convenient for the installation of manger plate mechanism on the one hand, has guaranteed the installation effect and the bulk strength of manger plate mechanism, guarantees the manger plate ability, simultaneously, at former river-crossing road demolishs the in-process, can conveniently cross the demolishment of river road, plays certain supporting role, makes things convenient for the clearance of rubbish. And the support frame is erected conveniently in the process of erection, the construction efficiency is improved, and the time required by construction can be saved.

b. Assembling a water retaining mechanism:

and the water retaining mechanism is assembled on the shore so as to facilitate the subsequent installation of the water retaining mechanism. The shore-spliced water retaining mechanism improves the connection effect of the water retaining mechanism and avoids the water leakage.

c. And (3) installing a water retaining mechanism:

the supporting rod is firstly driven into a soil layer which is punched at the fixed seat, the clamping rod of the supporting rod is clamped into the clamping sleeve, then the supporting rod is continuously pressed into the soil layer, the top surface of the supporting rod is level with the top surface of the supporting frame, then the bolt is screwed on the supporting rod and the supporting frame for fixing, then the position where the water retaining mechanism is installed in a preset mode is cleaned, a riverbed is cleaned, a groove opening is dug at the bank, the assembled water retaining mechanism slides in from the sliding groove, then the water retaining mechanism is knocked to be pressed into the bottom of the riverbed, the water retaining mechanism is fixed through the bolt, and floating of the water retaining mechanism is avoided. In the water retaining mechanism installation, set up the bracing piece earlier, the water retaining mechanism of being convenient for transects the river, the construction of being convenient for, the riverbed bottom clearance then can guarantee after taking out the river, the manger plate is difficult for the infiltration with the river in the outside, has guaranteed that follow-up is the normal clear of dog.

d. Dismantling an original road:

and starting a water suction pump to suck the river water in the water retaining mechanisms, then excavating the original river-crossing road by using an excavator, and cleaning and carrying the whole original road in a manner of matching with manual work, thereby ensuring that no garbage is left in the riverbed between the water retaining mechanisms. The original road is dismantled, the overflowing area of the river channel can be guaranteed, the strong overflowing capacity can be guaranteed in the flood season, and the safety is guaranteed.

e. The support mechanism is installed:

installing supporting component on the carriage, aim at the mounting groove with the lug of horizontal pole earlier, later rotate the threaded rod for the lug card of horizontal pole goes into the mounting groove, screws up lock nut chucking horizontal pole after the horizontal pole chucking, fixes the connecting plate card on the horizontal pole again, splices supporting mechanism on the river bank, goes into the carriage with the backup pad card and fixes finishing, later with the carriage hoist and mount to the support frame, and fixed. After the supporting mechanism is spliced on the bank, the supporting mechanism only needs to be hoisted by utilizing a crane, is very convenient to install, is compared with gradual installation on a supporting frame, can guarantee the safety of constructors, and can improve the construction efficiency.

e. Dismantling the water retaining mechanism:

and firstly loosening the puller bolt to enable the water baffle to be drawn out from the water retaining rod, overflowing river water from the gap of the water baffle to enter, drawing the water baffle out from the water retaining rod after the water levels on the two sides of the water baffle are leveled, drawing the sealing strip out from the water retaining rod, then dismounting the connecting rod, and recycling the connecting rod and the water retaining rod. After the river-crossing supporting bridge is erected, the water retaining mechanism can be dismantled, the water levels on the two sides of the water retaining plate are firstly leveled in the dismantling process, the water retaining plate can be conveniently dismantled, the safety of constructors who dismantle the operation is guaranteed, the water retaining plate is also thick in dismantling, the connecting rod and the water retaining rod are integrally dismantled, and construction is convenient.

Further, the step b is that the detailed steps of assembling the water retaining mechanism are as follows: the connecting sleeve of the water bar is sleeved into the connecting rod, then the water baffle and the sealing strip are respectively arranged in the water bar, then the connecting sleeve is fastened to clamp the water baffle from head to tail in sequence, then the clamping bolt is screwed to ensure the clamping of the sealing strip, and then the connecting sleeve … … is fastened until all the water baffle and the sealing strip are fixed. The water retaining mechanism is installed and fixed step by step, the fixing effect of the water retaining mechanism can be guaranteed, the integral connection strength and the sealing effect of the water retaining mechanism are guaranteed, and follow-up construction can be facilitated.

Due to the adoption of the technical scheme, the invention has the following beneficial effects:

according to the river channel dredging device, river water is temporarily blocked in the river channel dredging process through the water blocking mechanism, the original river crossing road is convenient to clean, engineering garbage in the cleaning process is prevented from falling into the river water, the cleaning is convenient, the engineering period is shortened, meanwhile, the support frame and the fixing base are connected in a fixing bolt and fixing block connecting mode, the connection is convenient, the connection effect is good, the support frame is convenient to erect quickly, the construction is convenient, meanwhile, the support frame plays a guiding role through the guide rod, the fixing installation of the fixing rod is convenient, the setting of the fixing rod in the fixing base is guaranteed, on the other hand, a certain supporting function can be achieved, the bearing capacity of the support frame is improved, and the installation accuracy and the installation effect of the support frame. The water retaining mechanism is arranged on the supporting rod, and the bearing capacity and the stability of the water retaining structure can be improved. The river water can be blocked, dredging and cleaning of a river-crossing road are facilitated, the river channel is not polluted, the construction period is effectively shortened, and the overflowing capacity and the traffic capacity of the river channel are ensured.

The invention adopts a, the erection of a supporting frame: b. assembling a water retaining mechanism: c. and (3) installing a water retaining mechanism: d. dismantling an original road: e. the support mechanism is installed: f. the water retaining mechanism is detached, the steps are six, the steps are simple, the construction is convenient, the construction efficiency and the construction effect can be effectively improved, and the construction period is shortened.

Drawings

The invention will be further described with reference to the accompanying drawings in which:

fig. 1 is a schematic structural diagram of a supporting device for plain river dredging engineering according to the invention;

FIG. 2 is a schematic structural view of the fixing base of the present invention;

FIG. 3 is a schematic structural view of the stand of the present invention;

FIG. 4 is a schematic view of the connection structure of the supporting frame and the fixing base of the present invention;

FIG. 5 is a schematic structural view of a fixture block according to the present invention;

FIG. 6 is a schematic view of the structure of the fixing bolt and the slider according to the present invention;

FIG. 7 is a schematic structural view of a water retaining mechanism according to the present invention;

FIG. 8 is a schematic structural view of the sealing tape of the present invention;

FIG. 9 is a schematic structural view of the connection between the water bar and the sealing strip in the present invention;

FIG. 10 is a schematic view of the support rod of the present invention;

FIG. 11 is a schematic view of the cross bar and threaded rod connection of the present invention;

FIG. 12 is a schematic view of a support assembly according to the present invention;

fig. 13 is a schematic structural view of the support frame of the present invention.

In the figure, 1-the mounting seat; 2-a support frame; 3-a support mechanism; 4-fixing the rod; 5-a guide rod; 6-a guide groove; 7-butt joint groove; 8-positioning strips; 9-fixing block; 10-a fixed groove; 11-connecting blocks; 12-a fixing bolt; 13-a support bar; 14-a ferrule; 15-clamping rod; 16-a guide block; 17-a chute; 18-a water retaining mechanism; 19-a slide block; 20-fixture block; 21-convex teeth; 22-concave teeth; 23-a slide bar; 25-a connecting rod; 26-a water bar; 27-a water baffle; 28-a sealing strip; 29-card slot; 30-a sealing groove; 31-a connecting sleeve; 32-tightening the bolt; 33-a fixation bar; 34-a positioning groove; 35-positioning boss; 36-a connecting piece; 37-clamping the bolt; 38-support groove; 39-a support frame; 40-sealing the rod; 41-a support plate; 42-a first groove; 43-a second groove; 44-bumps; 45-mounting grooves; 46-a pin; 47-a support assembly; 48-a cross-bar; 49-threaded rod; 50-locking nut; 51-a connecting plate; 52-connecting the slots.

Detailed Description

As shown in fig. 1 to 13, the supporting device for plain river dredging engineering of the invention comprises a fixed seat 1, a supporting frame 2 and a supporting mechanism 3, wherein the supporting mechanism 3 is arranged on the supporting frame 2, the supporting frame 2 is provided with a fixed rod 4 and a guide rod 5, the fixed seat 1 is provided with a guide groove 6 and a butt joint groove 7, the guide rod 5 is arranged in the guide groove 6, the fixed rod 4 is arranged in the butt joint groove 7, the butt joint groove is provided with a positioning strip 8, the positioning strip 8 limits the fixed rod 4, the fixed rod 4 is provided with a fixed block 9, the fixed block 9 is provided with a fixed groove 10, the fixed seat 1 is provided with a connecting block 11, a fixed bolt 12 is communicated in the connecting block 11 at two sides of the fixed block 9, the fixed bolt 12 is arranged in the fixed groove 10, the fixed bolt 12 limits the fixed block 9, the supporting frame 2 is provided with a supporting rod 13, the supporting frame, the support rods 13 are provided with sliding grooves 17, and a water retaining mechanism 18 is arranged between the adjacent support rods 13. Play through manger plate mechanism 18 and block river temporarily at river course mediation in-process, the clearance of the former river road of striding of being convenient for, the engineering rubbish of avoiding in the clearance process falls into the river, be convenient for clear up, shorten engineering cycle, and simultaneously, support frame 2 and fixing base 1 adopt fixing bolt 12 and fixed block 9's connected mode to be connected, convenient connection, excellent in connection effect, the quick erection of support frame 2 of being convenient for, be convenient for construct, support frame 2 utilizes guide bar 5 to play the guide effect simultaneously, so that can be about the fixed mounting of dead lever 4, guarantee the setting of dead lever 4 in fixing base 1, on the other hand can play certain supporting role, improve the bearing capacity of support frame 2, can also guarantee the installation accuracy and the installation effect of support frame 2. The water retaining mechanism 18 is arranged on the support rod 13, and can improve the bearing capacity and stability of the water retaining structure.

Fixing base 1 is equipped with slider 19, slider 19 and 1 sliding connection of fixing base, and during slider 19 was located to connecting block 11, connecting block 11 and slider 19 sliding connection, fixed slot 10 was equipped with fixture block 20, the spacing fixing bolt 12 of fixture block 20, and fixture block 20 is equipped with dogtooth 21, and connecting block 11 is equipped with concave tooth 22, the mutual block of concave tooth 22 and dogtooth 21. Slider 19 and fixing base 1 sliding connection for fixing bolt 12 need not tear out, realizes spacing to fixed block 9 through sliding, removes spacing convenience, and the installation of the support frame 2 of being convenient for with demolish has improved the efficiency of construction, and fixing bolt 12's setting compares directly to wear to establish the bolt to the hole simultaneously, and is more convenient, can avoid the inaccurate problem in hole. Simultaneously behind locking fixing bolt 12, can further promote fixing bolt 12's chucking effect by the block of dogtooth 21 and concave tooth 22, guarantee support frame 2's fixed effect, also can make fixture block 20 by the chucking simultaneously, be difficult for taking out.

The water retaining mechanism 18 is provided with a slide bar 23, the support rod 13 is provided with a slide groove 17, the slide bar 23 is arranged in the slide groove 17, the slide bar 23 is connected with the slide groove 17 in a sliding manner, the water retaining mechanism 18 comprises a connecting rod 25, a water retaining rod 26, a water retaining plate 27 and a sealing strip 28, the water retaining rod 26 is provided with a clamping groove 29 and a sealing groove 30, the water retaining plate 27 is provided with two clamping grooves 29, the sealing strip 28 is arranged in the two sealing grooves 30, the water retaining rod 26 is provided with a connecting sleeve 31, the connecting sleeve 31 is sleeved on the connecting rod 25, the connecting sleeve 31 is in threaded connection with a puller bolt 32, the puller bolt 32. The water retaining mechanism 18 is connected with the support rod 13 in a sliding connection mode, so that the water retaining mechanism 18 can be conveniently pressed into river water, the installation of the water retaining mechanism 18 is facilitated, and the installation precision of the water retaining mechanism 18 is ensured. Sealing strip 28 can play sealed effect, guarantees the sealed effect of mechanism at that time, avoids leaking, simultaneously, can adopt the sealing strip 28 of different thickness according to the wide setting of river course, guarantees that the whole length of manger plate mechanism 18 can adapt to different river course widths, has guaranteed the reuse of manger plate mechanism 18. Utilize the connection form of connecting rod 25 and adapter sleeve 31, can concatenate all breakwaters 26 and be whole, improve bulk strength, can make things convenient for the installation of connecting rod 25 and breakwaters 26 simultaneously. By adopting the tightening bolt 32, the position of the water bar 26 is more flexibly set, and the universality is improved.

The sealing strip 28 is provided with a fixing strip 33, the sealing groove 30 is provided with a positioning groove 34, the fixing strip 33 is provided with a positioning bulge 35, the positioning bulge 35 is arranged in the positioning groove 34, the connecting sleeve 31 is provided with connecting pieces 36, and a clamping bolt 37 is arranged between every two adjacent connecting pieces 36. The fixing strip 33 is arranged in the sealing strip 28, so that the soft sealing strip 28 has a rigid support and can be better arranged between the water retaining rods 26, the sealing effect is improved, and the connecting piece 36 can ensure that the sealing strip 28 is clamped. The positioning groove 34 and the positioning boss 35 are arranged to facilitate positioning and installation of the sealing strip 28, and installation effect and sealing effect are improved.

The support frame 2 is provided with a support groove 38, the support mechanism 3 comprises a support frame 39, a seal rod 40 and a support plate 41, the support frame 39 is rotatably connected with the seal rod 40, the support frame 39 is provided with a first groove 42, the seal plate is provided with a second groove 43, and the support plate 41 is arranged in the first groove 42 and the second groove 43. Utilize the setting of carriage 39 and seal pole 40, can connect into whole with backup pad 41, make things convenient for integral hoisting, can effectively practice thrift the required time of construction, adopt the block form of first recess 42 and second recess 43 simultaneously, it is convenient to connect, and carriage 39 rotates with the shrouding to be connected for carriage 39 and shrouding are connected conveniently, improve the connection effect of carriage 39 and shrouding.

The sealing rod 40 is provided with a convex block 44, the fixing frame is provided with a mounting groove 45, the convex block 44 is arranged in the mounting groove 45, the mounting groove 45 is arranged in a pin 46, and the pin 46 penetrates through the convex block 44 and fixes the convex block 44. The fixing of the seal rod 40 is realized through the convex block 44 and the pin 46, the use is convenient, the connection is quick, and the support plate 41 can be better fixed.

The support frame 2 is equipped with supporting component 47, and supporting component 47 includes two horizontal poles 48, a threaded rod 49 and two lock nut 50, and the both ends of threaded rod 49 respectively with horizontal pole 48 threaded connection, threaded connection lock nut 50 at the both ends of threaded rod 49, lock nut 50 chucking are equipped with connecting plate 51 between two horizontal poles 48 on horizontal pole 48, and connecting plate 51 is located on threaded rod 49, and horizontal pole 48 is equipped with spread groove 52, and connecting plate 51 is located in spread groove 52. The supporting component 47 can support the supporting plate 41 in the middle of the supporting frame 2, so that the bearing capacity of the supporting plate 41 is improved. And supporting component 47 adopts detachable mechanism, can make when not setting up convenient former river-crossing road's mediation demolish, avoids support frame 2 to exert an influence to demolising, has improved the efficiency of demolising, and simultaneously, support frame 2 can support the manger plate subassembly, has also made things convenient for river-crossing road's demolition, improves the efficiency of construction. Threaded rod 49 uses the middle part as the boundary, one end is positive screw, one end is the reverse thread, make when rotating threaded rod 49, two horizontal poles 48 can remove in opposite directions or remove dorsad simultaneously, the use of horizontal pole 48 has been made things convenient for, make the card that horizontal pole 48 can be better on support frame 2, it is more convenient to use, lock nut 50 can play the locking effect, guarantee supporting component 47 chucking on support frame 2, connecting plate 51 card is on threaded rod 49, can play the support to the backup pad 41 of top, improve the supporting effect of backup pad 41, can paste on the bottom surface of backup pad 41, effectively avoid backup pad 41 to warp.

A construction method of a supporting device for plain river dredging engineering comprises the following steps:

a. the support frame 2 is erected:

excavation foundation pit at the assigned position of both sides river bank, later concreting pile, after the concrete pile is done admittedly, fix fixing base 1 on the concrete pile, later with support frame 2 card income fixing base 1, slide block 19, slide fixing bolt 12 in fixed slot 10, later block 20 in fixing base 1 card income to screw up fixing bolt 12, accomplish the erection of support frame 2 and fix. The erection of the support frame 2 can make things convenient for the installation of the water retaining mechanism 18 on the one hand, guarantees the installation effect and the bulk strength of the water retaining mechanism 18, guarantees the water retaining capacity, and simultaneously, in the original river-crossing road dismantling process, can conveniently cross the river-crossing road dismantling, plays certain supporting role, makes things convenient for the clearing and transportation of rubbish. And the support frame 2 is convenient to erect in the erecting process, the construction efficiency is improved, and the time required by construction can be saved.

b. Assembling the water retaining mechanism 18:

and assembling the water retaining mechanism 18 on the shore for subsequent installation of the water retaining mechanism 18. The water retaining mechanism 18 is spliced on the shore, so that the connection effect of the water retaining mechanism 18 is improved, and the water leakage condition is avoided.

c. Installation of the water blocking mechanism 18:

firstly, a support rod 13 is driven into a soil layer punched at the side of a fixed seat 1, a clamping rod 15 of the support rod 13 is clamped into a clamping sleeve 14, then the support rod 13 is continuously pressed into the soil layer, the top surface of the support rod 13 is level with the top surface of a support frame 2, then bolts are screwed on the support rod 13 and the support frame 2 for fixing, then the position where a water retaining mechanism 18 is installed in advance is cleaned, a riverbed is cleaned, a groove opening is dug at the bank, the assembled water retaining mechanism 18 slides into the groove 17, then the water retaining mechanism 18 is knocked to be pressed into the bottom of the riverbed, and then the water retaining mechanism 18 is fixed by the bolts, so that the water retaining mechanism 18 is prevented from floating. In the water retaining mechanism 18 installation, set up bracing piece 13 earlier, the water retaining mechanism 18 of being convenient for is horizontal river, the construction of being convenient for, and the river bed bottom clearance then can guarantee after taking out the river, and the manger plate is difficult for the infiltration with regard to the river in the outside, has guaranteed that follow-up is the normal clear of dog.

d. Dismantling an original road:

and starting a water suction pump to pump off the river water in the water retaining mechanisms 18, then excavating the original river-crossing road by using an excavator, and cleaning the whole original road by matching with manual cleaning and carrying to ensure that no garbage is left in the riverbed between the water retaining mechanisms 18. The original road is dismantled, the overflowing area of the river channel can be guaranteed, the strong overflowing capacity can be guaranteed in the flood season, and the safety is guaranteed.

e. The supporting mechanism 3 is installed:

installing supporting component 47 on support frame 2, aim at mounting groove 45 with the lug 44 of horizontal pole 48 earlier, later rotate threaded rod 49 for the lug 44 of horizontal pole 48 blocks into mounting groove 45, screw up lock nut 50 chucking horizontal pole 48 after the horizontal pole 48 chucking, fix connecting plate 51 card on horizontal pole 48 again, splice supporting mechanism 3 on the river bank, block supporting plate 41 in the carriage 39 and fixed finishing, later with carriage 39 hoist and mount to support frame 2, and fixed. After the supporting mechanism 3 is spliced on the bank, the crane is only needed to be used for hoisting, the installation is very convenient, the crane is compared with the gradual installation on the supporting frame 2, the safety of constructors can be guaranteed, and the construction efficiency can be improved.

f. And (3) dismantling the water retaining mechanism 18:

the puller bolt 32 is loosened firstly, so that the water baffle 27 can be drawn out from the water baffle 26, river water overflows from the gap of the water baffle 27 and enters, after the water level at the two sides of the water baffle 27 is leveled, the water baffle 27 is drawn out from the water baffle 26, the sealing strip 28 is drawn out from the water baffle 26, then the connecting rod 25 is dismounted, and the connecting rod 25 and the water baffle 26 are recovered. After the river-crossing supporting bridge is erected, the water retaining mechanism 18 can be dismantled, the water levels on the two sides of the water retaining plate 27 are firstly leveled in the dismantling process, the water retaining plate 27 can be conveniently dismantled, the safety of constructors who dismantle the operation is guaranteed, the water retaining plate 27 is also thick when being dismantled, the connecting rod 25 and the water retaining rod 26 are integrally dismantled, and construction is convenient.

Step b, the detailed steps of assembling the water retaining mechanism 18 are as follows: the connecting sleeve 31 of the water bar 26 is sleeved in the connecting rod 25, then the water baffle 27 and the sealing strip 28 are respectively arranged in the water bar 26, then the connecting sleeve 31 is fastened to clamp the water baffle 27 from the top to the bottom in sequence, then the clamping bolt 37 is screwed to ensure the clamping of the sealing strip 28, and then the connecting sleeve 31 … … is fastened until all the water baffle 27 and the sealing strip 28 are fixed. The water retaining mechanism 18 is installed and fixed step by step, the fixing effect of the water retaining mechanism 18 can be guaranteed, the integral connection strength and the sealing effect of the water retaining mechanism 18 are guaranteed, and subsequent construction can be facilitated.

According to the invention, the water retaining mechanism 18 is used for temporarily blocking river water in the river dredging process, so that the original river crossing road can be conveniently cleaned, engineering garbage in the cleaning process is prevented from falling into the river water, the cleaning is convenient, the engineering period is shortened, meanwhile, the support frame 2 and the fixing base 1 are connected in a connection mode of the fixing bolt 12 and the fixing block 9, the connection is convenient, the connection effect is good, the support frame 2 can be conveniently and quickly erected and is convenient to construct, meanwhile, the support frame 2 plays a guiding role by utilizing the guide rod 5, so that the fixing installation of the fixing rod 4 is convenient, the arrangement of the fixing rod 4 in the fixing base 1 is ensured, on the other hand, a certain supporting role can be played, the bearing capacity of the support frame 2 is improved, and the installation accuracy and the installation. The water retaining mechanism 18 is arranged on the support rod 13, and can improve the bearing capacity and stability of the water retaining structure. The river water can be blocked, dredging and cleaning of a river-crossing road are facilitated, the river channel is not polluted, the construction period is effectively shortened, and the overflowing capacity and the traffic capacity of the river channel are ensured.

The invention adopts a, a support frame 2 is erected: b. assembling the water retaining mechanism 18: c. installation of the water blocking mechanism 18: d. dismantling an original road: e. the supporting mechanism 3 is installed: f. the water retaining mechanism 18 is detached, the steps are six, the steps are simple, the construction is convenient, the construction efficiency and the construction effect can be effectively improved, and the construction period is shortened.

The above is only a specific embodiment of the present invention, but the technical features of the present invention are not limited thereto. Any simple changes, equivalent substitutions or modifications made based on the present invention to solve the same technical problems and achieve the same technical effects are within the scope of the present invention.