Ship crane bracket and highlight lamp mast integrated installation method

文档序号:101082 发布日期:2021-10-15 浏览:52次 中文

阅读说明:本技术 一种船舶吊机托架与强光灯桅一体化安装方法 (Ship crane bracket and highlight lamp mast integrated installation method ) 是由 宋锋 王忠强 李永福 吴安 戴天凌 陈一强 倪庆健 姜志强 喻义华 季建洲 童南 于 2021-06-28 设计创作,主要内容包括:本发明提供一种船舶吊机托架与强光灯桅一体化安装方法,包括以下步骤:步骤一、确定吊机托架的安装位置;步骤二、制作吊机托架和强光灯灯座;首先制作吊机托架柱体和安装在吊机托架柱体顶部的吊臂支撑座,将吊机托架柱体用与吊臂支撑座焊接为一体,制作操作平台,操作平台沿所述吊机托架柱体的周向设置,操作平台位于所述吊机托架柱体的上部,将所述强光灯灯座安装于所述操作平台的外侧部;步骤三、安装加强肘板、登乘直梯及直梯保护圈;步骤四、强度校核;对吊机托架与灯座平台的整体强度进行有限元分析。本发明将强光灯桅集成于吊机托架上,有效地缩减了甲板所需布置空间,并可省去强光灯桅的制造成本及绑扎稳索的采购成本,节约了船舶的制造成本。(The invention provides an integrated mounting method of a ship crane bracket and a highlight lamp mast, which comprises the following steps: step one, determining the installation position of a crane bracket; step two, manufacturing a crane bracket and a strong light lamp holder; firstly, manufacturing a crane bracket column body and a suspension arm supporting seat arranged at the top of the crane bracket column body, welding the crane bracket column body and the suspension arm supporting seat into a whole, manufacturing an operating platform, wherein the operating platform is arranged along the circumferential direction of the crane bracket column body, is positioned at the upper part of the crane bracket column body, and is used for installing a highlight lamp holder at the outer side part of the operating platform; step three, installing a reinforced toggle plate, a boarding straight ladder and a straight ladder protection ring; fourthly, checking the strength; and carrying out finite element analysis on the integral strength of the crane bracket and the lamp holder platform. The invention integrates the strong light mast on the crane bracket, effectively reduces the arrangement space required by the deck, saves the manufacturing cost of the strong light mast and the purchasing cost of binding the stable cable, and saves the manufacturing cost of the ship.)

1. A ship crane bracket and highlight lamp mast integrated installation method is characterized by comprising the following steps:

firstly, determining the installation position of a crane bracket on a deck;

step two, manufacturing a crane bracket and a strong light lamp holder; firstly, a crane bracket column body and a suspension arm supporting seat arranged at the top of the crane bracket column body are manufactured, the crane bracket column body and the suspension arm supporting seat are welded into a whole, then an operating platform is manufactured, the operating platform is arranged along the circumferential direction of the crane bracket column body and is positioned at the upper part of the bracket column body, and the highlight lamp holder is arranged at the outer side part of the operating platform;

step three, installing a reinforced toggle plate, a boarding straight ladder and a straight ladder protection ring, wherein the reinforced toggle plate is connected with the lower end surface of the operating platform and the crane bracket column, the boarding straight ladder is arranged along the height direction of the crane bracket column, and the straight ladder protection ring is arranged around the outside of the boarding straight ladder;

fourthly, checking the strength; and carrying out finite element analysis on the overall strength of the crane bracket and the lamp holder platform, and judging whether the overall strength meets the requirements.

2. The integrated installation method of the ship crane bracket and the glare light mast as claimed in claim 1, wherein in the first step, the installation position of the crane bracket is 2-8 m away from the hook.

3. The integrated installation method of the boat crane bracket and the glare light mast of claim 1, wherein in the second step, the channel width of the operating platform is larger than 600 mm.

4. The integrated installation method of the ship crane bracket and the glare light mast as claimed in claim 1, wherein in the third step, the vertical ladder guard ring extends to the top of the operation platform, and a channel notch is formed on one side of the vertical ladder guard ring facing the operation platform.

Technical Field

The invention relates to the technical field of ship construction, in particular to an integrated mounting method of a ship crane bracket and a highlight lamp mast.

Background

According to the requirements of OCIMF industry specifications on the transportation of goods of a liquid cargo ship, a liquid transportation operation area of the LNG ship is generally provided with a hose crane for hoisting tools, maintaining equipment and the like, and the hose crane is generally composed of two parts, namely a crane body and a bracket for storing a suspension arm. Meanwhile, according to the recommendation of arrangement of LNG ship cargo conveying areas in the SIGTTO industry standard, a strong light mast is required to be arranged on a deck of an operation area to illuminate night operation. The hose crane and the mast of the strong light lamp are indispensable devices and are all arranged near the gas collection platform. Meanwhile, the pipelines on the deck are dense, the crane bracket and the highlight lamp mast are large in size and should be separated from each other to avoid interference, but the crane bracket and the highlight lamp mast are functionally required to be close to each other, and a helicopter hovering area nearby limits the space, so that the area is always a difficult point in arrangement. The conventional method is to place the two parts at a certain distance, the highlight lamp mast cannot block the rotation of the crane, and the lamp mast is more or less blocked by the crane bracket to illuminate after being far away, so that the illumination effect is influenced to a certain extent. In addition, the occupied areas of the LNG carrier and the LNG carrier are large, the anti-wave cable is required to be pulled, the occupied areas are large, and great difficulty is brought to deck arrangement of crowded LNG carriers.

Disclosure of Invention

In view of the above-mentioned shortcomings of the prior art, the present invention provides an integrated installation method of a ship crane bracket and a glare light mast, which is used for solving the problem of crowded arrangement of the crane bracket and the glare light mast in the prior art.

In order to achieve the above and other related objects, the present invention provides an integrated mounting method for a boat crane bracket and a highlight lamp mast, comprising the steps of:

firstly, determining the installation position of a crane bracket on a deck;

step two, manufacturing a crane bracket and a strong light lamp holder; firstly, manufacturing a crane bracket column body and a suspension arm supporting seat arranged at the top of the crane bracket column body, welding the crane bracket column body and the suspension arm supporting seat into a whole, then manufacturing an operating platform, wherein the operating platform is arranged along the circumferential direction of the crane bracket column body, is positioned at the upper part of the bracket column body, and is used for installing the highlight lamp holder at the outer side part of the operating platform;

step three, installing a reinforced toggle plate, a boarding straight ladder and a straight ladder protection ring, wherein the reinforced toggle plate is connected with the lower end surface of the operating platform and the crane bracket column, the boarding straight ladder is arranged along the height direction of the crane bracket column, and the straight ladder protection ring is arranged around the outside of the boarding straight ladder;

fourthly, checking the strength; and carrying out finite element analysis on the overall strength of the crane bracket and the lamp holder platform, and judging whether the overall strength meets the requirements.

As a preferable technical scheme, in the first step, the installation position of the crane bracket is 2-8 m away from the lifting hook, and the distance between the position of the floodlight arranged on the crane bracket and the edge of the deck is 0-100 mm.

As a preferred technical solution, in the second step, the width of the channel of the operation platform is greater than 600 mm.

As a preferable technical scheme, in the third step, the straight ladder protection ring extends to the top of the operation platform, and a channel notch is formed in one side, facing the operation platform, of the straight ladder protection ring.

As described above, the integrated mounting method of the present invention has the following advantageous effects:

(1) the invention integrates the strong light mast on the crane bracket, effectively reduces the arrangement space required by the deck, saves the manufacturing cost of the strong light mast and the purchasing cost of binding the stable cable, and saves the manufacturing cost of the ship.

(2) According to the invention, after the high-light lamp masts are reduced, deep fusion welding during installation of each high-light lamp mast is reduced, welding seam inspection and spray painting of a mast body structure are reduced, and the construction period is shortened.

(3) The invention avoids the defects that the position of the strong light mast is too close to the crane bracket and the strong and stable cable of the light mast is difficult to install, thereby avoiding the problem of vibration of the strong light mast in the sailing process of a ship.

(4) The strong light mast is integrated on the crane bracket and is closer to a broadside operation area, so that the lighting effect of the strong light mast is enhanced.

Drawings

Fig. 1 is a layout structure diagram of a bracket and a strong light mast of an LNG ship crane in the prior art.

Fig. 2 is a layout structure diagram of the bracket and the strong light mast of the LNG ship crane of the present invention.

Fig. 3 is a schematic view of an installation structure of the bracket and the strong light mast of the LNG ship crane of the present invention.

Fig. 4 is a view of fig. 3 in the direction B.

Fig. 5 is a view in the Y direction of fig. 3.

Wherein the reference numerals are specified as follows: the crane comprises a crane bracket column 1, a crane arm supporting seat 2, an operating platform 3, a boarding vertical ladder 4, a vertical ladder guard ring 5 and a highlight lamp holder 6.

Detailed Description

The following description of the embodiments of the present invention is provided for illustrative purposes, and the present invention is not limited to the embodiments described herein.

Please refer to fig. 1 to 5. It should be understood that the structures, ratios, sizes, and the like shown in the drawings and described in the specification are only used for matching with the disclosure of the specification, so as to be understood and read by those skilled in the art, and are not used to limit the conditions of the present invention, so that the present invention has no technical significance. In addition, the terms "upper", "lower", "left", "right", "middle" and "one" used in the present specification are for clarity of description, and are not intended to limit the scope of the present invention, and the relative relationship between the terms and the terms is not to be construed as a scope of the present invention.

The embodiment provides a method for integrally installing a bracket of a ship crane and a mast of a strong light lamp, which comprises the following steps:

firstly, determining the installation position of a crane bracket on a deck; the installation position of the crane bracket can meet the requirements of storing the suspension arm and filling lubricating oil, and can also cover the requirement of strong light mast illumination. And the balance with a nearby pipeline and a cable model is also needed, and the avoidance of a channel is considered. Generally speaking, the crane carriage is 2m to 8m from the hook, which facilitates boom storage and lubricant filling. The strong light arranged on the crane bracket is 0-100 mm away from the edge of the deck, so that the lighting requirement can be met to the maximum extent. The arrangement interference needs to be noticed that the passage of the personnel normally riding the crane bracket can not be shielded by the parts such as pipes, cables and the like, and meanwhile, the position of the crane bracket can not block the walkway of the normal passage of the shipman on the deck.

Step two, manufacturing a crane bracket and a strong light lamp holder 6; firstly, a crane bracket column 1 and a suspension arm supporting seat 2 installed at the top of the crane bracket column 1 are manufactured, the crane bracket column 1 and the suspension arm supporting seat 2 are welded into a whole, then an operating platform 3 is manufactured, the operating platform 3 is arranged along the circumferential direction of the crane bracket column 1, the operating platform 3 is positioned at the upper part of the crane bracket column 1, and the highlight lamp holder 6 is installed at the outer side part of the operating platform 3; the size of the operation platform 3 is considered in arrangement, which can meet the space required by normal lubricating oil filling, and generally, the channel width of the operation platform 3 is more than 600 mm. The arrangement of the strong light lamp holder 6 needs to consider that as many lamps as possible are close to the edge of the deck and project to the operation area of the gas collecting platform, so that the lighting efficiency is highest, the height of the light arrangement platform needs to consider avoiding the dangerous area of the deck, the general deck surface is 2.4m upwards to be the dangerous area, and if a fan for ventilating the dangerous cabin exists nearby, the light arrangement platform needs to avoid the center of the fan by 4.5 m. In addition, the arrangement direction of the ascending vertical ladder 4 selected at the bottom of the crane bracket can not interfere with nearby pipes, connecting cables and the like, and can not block the main passing channel of the deck.

Step three, installing a reinforced toggle plate, riding a straight ladder 4 and a straight ladder guard ring 5, wherein the reinforced toggle plate is connected with the lower end surface of the operating platform 3 and the crane bracket column 1, the riding the straight ladder 4 is arranged along the height direction of the crane bracket column 1, the straight ladder guard ring 5 is arranged around the outside of the riding the straight ladder 4, the straight ladder guard ring 5 extends to the top of the operating platform 3, and a channel notch is formed in one side, facing the operating platform 3, of the straight ladder guard ring 5. Therefore, the traffic is ensured, and the safety of the personnel is well protected.

Fourthly, checking the strength; after the highlight lamp mast and the crane bracket are integrated, finite element analysis is carried out on the overall strength of the highlight lamp mast, and structural parameters of the bracket are optimized, such as the thickness of a 1 plate of the crane bracket column body, the diameter of the column body, the form of a reinforcing toggle plate and the like. The strength calculation analysis is carried out on the crane bracket and the whole ship structure according to the data such as the bracket maximum overturning moment, the turning moment, the vertical force and the like provided by a crane manufacturer, and the standard requirements of corresponding classification society are met.

The foregoing embodiments are merely illustrative of the principles of the present invention and its efficacy, and are not to be construed as limiting the invention. Any person skilled in the art can modify or change the above-mentioned embodiments without departing from the spirit and scope of the present invention. Accordingly, it is intended that all equivalent modifications or changes which can be made by those skilled in the art without departing from the spirit and technical spirit of the present invention be covered by the claims of the present invention.

9页详细技术资料下载
上一篇:一种医用注射器针头装配设备
下一篇:一种海洋通信用信号收发装置

网友询问留言

已有0条留言

还没有人留言评论。精彩留言会获得点赞!

精彩留言,会给你点赞!