Intelligent construction site construction's accurate measuring device based on BIM

文档序号:1019348 发布日期:2020-10-27 浏览:6次 中文

阅读说明:本技术 一种基于bim的智慧建造现场施工的精准测量装置 (Intelligent construction site construction's accurate measuring device based on BIM ) 是由 彭正斌 于 2020-08-04 设计创作,主要内容包括:本发明公开了一种基于BIM的智慧建造现场施工的精准测量装置,具体涉及建筑施工测量领域,包括底座,所述底座的上方设有顶座,且顶座的外侧设有圆环,所述圆环与顶座贯穿设置,所述圆环的顶端设有测绘主机,所述顶座的内侧设有驱动测绘主机转动的驱动组件,所述顶座的内部垂直插设有三个伸缩杆,三个所述伸缩杆的顶端均设有基座,所述顶座的内部设有驱动顶座升降的升降组件;所述驱动组件包括设置通过轴承固定安装在圆环内侧的齿圈。本发明使得整个精准测量装置可根据测绘的需要进行自动的高度、方向的快速调节,无需人工修正机器位置,能够最大程度地精准获取建筑施工信息,操作快速,效率高。(The invention discloses an accurate measuring device for intelligent construction site construction based on BIM (building information modeling), and particularly relates to the field of building construction measurement, which comprises a base, wherein a top seat is arranged above the base, a circular ring is arranged on the outer side of the top seat, the circular ring and the top seat are arranged in a penetrating manner, a surveying and mapping host is arranged at the top end of the circular ring, a driving assembly for driving the surveying and mapping host to rotate is arranged on the inner side of the top seat, three telescopic rods are vertically inserted into the top seat, bases are arranged at the top ends of the three telescopic rods, and a lifting assembly for driving the top seat to lift is arranged in the top seat; the driving assembly comprises a gear ring fixedly arranged on the inner side of the circular ring through a bearing. The invention enables the whole accurate measurement device to automatically and rapidly adjust the height and the direction according to the surveying and mapping requirements without manually correcting the position of the machine, can accurately acquire the construction information to the maximum extent, and has the advantages of rapid operation and high efficiency.)

1. The utility model provides an accurate measuring device of site operation is built to wisdom based on BIM, includes base (1), its characterized in that: the lifting device is characterized in that a top seat (2) is arranged above the base (1), a circular ring (3) is arranged on the outer side of the top seat (2), the circular ring (3) and the top seat (2) are arranged in a penetrating mode, a surveying and mapping host (4) is arranged at the top end of the circular ring (3), a driving assembly for driving the surveying and mapping host (4) to rotate is arranged on the inner side of the top seat (2), three telescopic rods (5) are vertically inserted into the top seat (2), connecting lines among the three telescopic rods (5) form a regular triangle structure, bases (9) are arranged at the top ends of the three telescopic rods (5), and a lifting assembly for driving the top seat (2) to lift is arranged inside the top seat (2);

the driving assembly comprises a gear ring (17) fixedly mounted on the inner side of a circular ring (3) through a bearing, a gear (16) is connected to the inner bottom wall of the top seat (2) in a shaft mode, the gear (16) is meshed with the gear (17), a second motor (22) is connected to the upper portion of the gear (17) in a shaft mode, a circle of sliding groove (18) is formed in the upper surface of the circular ring (3), a sliding seat (19) is arranged on the upper surface of the gear ring (17), the sliding seat (19) penetrates through the sliding groove (18) to be connected with the surveying and mapping host (4), and a groove (29) matched with the surveying and mapping host (4) is formed in the outer side wall of one side of the top seat;

the lifting component comprises fixed pulleys (6) arranged at the top ends of three telescopic rods (5), the inner sides of the three bases (9) are respectively provided with a take-up pulley (10), a first motor (8) is fixedly arranged on the inner side wall of the base (1), the outer parts of two take-up pulleys (10) positioned on the same straight line are inserted with a same main shaft (11), the outer part of the other take-up pulley (10) is inserted with a driven shaft (15), one end of the main shaft (11) is connected with a driving shaft of the first motor (8), a belt pulley group (12) is arranged between one end of the main shaft (11) far away from the first motor (8) and the driven shaft (15), a steel rope (7) is wound on the outer surface of the take-up pulley (10), a first lantern ring (13) is arranged at the position of the outer side wall of the top seat (2) corresponding to the three telescopic rods (5), the end part of the steel rope (7) is provided with a hanging ring (14) which is sleeved with the first lantern ring (13).

2. The BIM-based intelligent construction site construction precision measuring device of claim 1, wherein: and a second lantern ring (21) is fixedly arranged on one side of the top end of each of the three telescopic rods (5).

3. The BIM-based intelligent construction site construction precision measuring device of claim 1, wherein: the bottom end of the surveying and mapping host (4) is fixedly provided with a rotating seat (25), and the rotating seat (25) is in shaft connection with the sliding seat (19).

4. The BIM-based intelligent construction site construction precision measuring device of claim 3, wherein: and a damping block (26) is fixedly arranged between the bottom of the surveying and mapping host (4) and the rotating seat (25).

5. The BIM-based intelligent construction site construction precision measuring device of claim 1, wherein: the outer side wall of the surveying and mapping host (4) is fixedly provided with a control panel (24), and a programmable controller is arranged in the surveying and mapping host (4).

6. The BIM-based intelligent construction site construction precision measurement device of claim 5, wherein: the mapping host (4) is in wireless communication connection with the BIM platform through a programmable controller.

7. The BIM-based intelligent construction site construction precision measuring device of claim 1, wherein: the outer side wall of the base (1) is uniformly provided with a plurality of embedded blocks (20), and the outer part of the base (1) is embedded with a sealing cover (23).

8. The BIM-based intelligent construction site construction precision measurement device of claim 7, wherein: the inner side wall of the sealing cover (23) is provided with an embedding groove (27) which is correspondingly embedded with the embedding block (20), and the outer side wall of one side of the sealing cover (23) is fixedly provided with a handle (28).

Technical Field

The invention relates to the field of building construction measurement, in particular to an intelligent building site construction accurate measurement device based on BIM.

Background

With the development of information technology, software auxiliary means have penetrated into each stage of construction engineering, however, in the whole life cycle of engineering construction, the problems of untimely information transmission and sharing, inaccuracy and the like also exist, and the BIM technology well solves the problem;

the BIM technology is a data tool applied to engineering design, construction and management, the core of BIM is to provide a complete and actual building engineering information base for the model by establishing a virtual building engineering three-dimensional model and utilizing a digital technology, the information base not only contains geometric information, professional attribute and state information describing building components, but also contains state information of non-component objects, such as space and motion behaviors, the information integration degree of the building engineering is greatly improved by means of the three-dimensional model containing the building engineering information, and therefore a platform for exchanging and sharing the engineering information is provided for related stakeholders of the building engineering project, and various related information data of the building engineering project in the BIM technology are collected by means of various information collection and surveying and mapping measuring devices.

The multi-angle in the survey and drawing position of present survey and drawing measuring equipment for building site operation is adjusted and is needed artifical manual regulation, needs to spend time behind the regulation measuring equipment and carries out the leveling, wastes time and energy, leads to measurement of efficiency low, adjusts improper can influence measuring result and appear the deviation, influences the accurate nature of result, for this reason, we have provided an intelligent site operation's accurate measuring device of building based on BIM.

Disclosure of Invention

Therefore, the invention provides a BIM-based intelligent construction site construction precision measurement device, and aims to solve the problems that the multi-angle adjustment of the surveying and mapping directions of the conventional surveying and mapping measurement equipment for construction site construction needs manual adjustment, the adjustment of the measurement equipment needs time and labor for leveling, the measurement efficiency is low, the improper adjustment can influence the deviation of the measurement result, and the precision of the result is influenced.

In order to achieve the above purpose, the invention provides the following technical scheme:

an accurate measuring device for intelligent construction site construction based on BIM comprises a base, wherein a top seat is arranged above the base, a circular ring is arranged on the outer side of the top seat, the circular ring and the top seat are arranged in a penetrating mode, a surveying and mapping host is arranged at the top end of the circular ring, a driving assembly for driving the surveying and mapping host to rotate is arranged on the inner side of the top seat, three telescopic rods are vertically inserted into the top seat, connecting lines among the three telescopic rods form a regular triangle structure, bases are arranged at the top ends of the three telescopic rods, and a lifting assembly for driving the top seat to lift is arranged inside the top seat;

the driving assembly comprises a gear ring fixedly arranged on the inner side of the circular ring through a bearing, a gear is connected to the inner bottom wall of the top seat in a shaft mode and is meshed with the gear, a second motor is connected to the upper portion of the gear in a shaft mode, a circle of sliding groove is formed in the upper surface of the circular ring, a sliding seat is arranged on the upper surface of the gear ring and penetrates through the sliding groove to be connected with a surveying and mapping host, and a groove matched with the surveying and mapping host is formed in the outer side wall of one side of the top seat;

lifting unit is including setting up the fixed pulley on three telescopic link top, and is three the inboard of base all is equipped with the take-up pulley, the fixed first motor that is equipped with of inside wall of base, and the outside of two take-up pulleys that are located same straight line is pegged graft and is had same main shaft, another the outside of take-up pulley is pegged graft and is had the driven shaft, the one end of main shaft is connected with the drive shaft of first motor, be equipped with the pulley group between the one end that first motor was kept away from to the main shaft and the driven shaft, the surface of take-up pulley is around being equipped with the steel cable, the position department that the lateral wall of footstock corresponds three telescopic link is equipped with first lantern ring, the tip of steel.

Furthermore, three top one side of telescopic link all is fixed and is equipped with the second lantern ring.

Furthermore, the bottom end of the surveying and mapping host is fixedly provided with a rotating seat, and the rotating seat is in shaft connection with the sliding seat.

Furthermore, a damping block is fixedly arranged between the bottom of the surveying and mapping host machine and the rotating seat.

Further, the fixed control panel that is equipped with of lateral wall of survey and drawing host computer, and survey and drawing host computer embeds programmable controller.

Further, the mapping host is in wireless communication connection with the BIM platform through the programmable controller.

Furthermore, a plurality of embedding blocks are uniformly distributed on the outer side wall of the base, and a sealing cover is embedded outside the base.

Furthermore, the inside wall of closing cap is equipped with the caulking groove of inlaying the dress with the abaculus is corresponding, the fixed handle that is equipped with of one side lateral wall of closing cap.

The invention has the following advantages:

1. through the drive assembly and the lifting unit who sets up for the survey and drawing host computer can carry out the lift and the horizontally rotation of vertical direction, makes whole accurate measuring device can carry out automatic height, the quick adjustment of direction according to the needs of survey and drawing, need not artifical correction machine position, can the accurate building construction information that acquires of at utmost, and the operation is quick, and is efficient.

2. Through the closing cap that sets up, the top that the closing cap corresponds the base covers for the abaculus looks butt on the caulking groove of closing cap inside wall and the base lateral wall, can, overall structure leakproofness is good, convenient to carry.

Drawings

In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below. It should be apparent that the drawings in the following description are merely exemplary, and that other embodiments can be derived from the drawings provided by those of ordinary skill in the art without inventive effort.

The structures, ratios, sizes, and the like shown in the present specification are only used for matching with the contents disclosed in the specification, so as to be understood and read by those skilled in the art, and are not used to limit the conditions that the present invention can be implemented, so that the present invention has no technical significance, and any structural modifications, changes in the ratio relationship, or adjustments of the sizes, without affecting the effects and the achievable by the present invention, should still fall within the range that the technical contents disclosed in the present invention can cover.

FIG. 1 is a front view provided by the present invention;

FIG. 2 is a schematic view of the internal structure of the base according to the present invention;

FIG. 3 is a top view provided by the present invention;

FIG. 4 is a cross-sectional view of section A-A of FIG. 2 in accordance with the present invention;

FIG. 5 is a front view of a mapping host provided by the present invention;

FIG. 6 is an enlarged view of the structure of portion B of FIG. 1 according to the present invention;

FIG. 7 is a perspective view of a closure provided by the present invention;

in the figure: 1. a base; 2. a top seat; 3. a circular ring; 4. a surveying and mapping host; 5. a telescopic rod; 6. a fixed pulley; 7. a steel cord; 8. a first motor; 9. a base; 10. a take-up pulley; 11. a main shaft; 12. a pulley set; 13. a first collar; 14. a hoisting ring; 15. a driven shaft; 16. a gear; 17. a ring gear; 18. a chute; 19. a slide base; 20. an insert block; 21. a second collar; 22. a second motor; 23. sealing the cover; 24. a control panel; 25. a rotating seat; 26. a damper block; 27. caulking grooves; 28. a handle.

Detailed Description

The present invention is described in terms of particular embodiments, other advantages and features of the invention will become apparent to those skilled in the art from the following disclosure, and it is to be understood that the described embodiments are merely exemplary of the invention and that it is not intended to limit the invention to the particular embodiments disclosed. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.

Referring to the attached drawings 1-6 of the specification, the accurate measuring device for intelligent building site construction based on the BIM comprises a base 1, a top seat 2 is arranged above the base 1, a circular ring 3 is arranged on the outer side of the top seat 2, the circular ring 3 and the top seat 2 are arranged in a penetrating mode, a surveying and mapping host machine 4 is arranged at the top end of the circular ring 3, a driving assembly for driving the surveying and mapping host machine 4 to rotate is arranged on the inner side of the top seat 2, three telescopic rods 5 are vertically inserted into the top seat 2, connecting lines among the three telescopic rods 5 form a regular triangle structure, bases 9 are arranged at the top ends of the three telescopic rods 5, and a lifting assembly for driving the top seat 2 to lift is arranged inside the top seat 2;

the driving assembly comprises a gear ring 17 fixedly mounted on the inner side of the circular ring 3 through a bearing, a gear 16 is connected to the inner bottom wall of the top seat 2 in a shaft mode, the gear 16 is meshed with the gear 17, a second motor 22 is connected to the upper portion of the gear 17 in a shaft mode, a circle of sliding groove 18 is formed in the upper surface of the circular ring 3, a sliding seat 19 is arranged on the upper surface of the gear ring 17, the sliding seat 19 penetrates through the sliding groove 18 to be connected with the surveying and mapping host 4, and a groove 29 matched with the surveying and mapping host 4 is formed in the outer side wall of one side of the top seat;

lifting unit is including setting up the fixed pulley 6 on 5 tops of three telescopic link, and is three the inboard of base 9 all is equipped with take-up pulley 10, the fixed first motor 8 that is equipped with of inside wall of base 1, and the outside that is located two take-up pulleys 10 on the same straight line is pegged graft and is had same main shaft 11, another the outside of take-up pulley 10 is pegged graft and is had driven shaft 15, the one end of main shaft 11 is connected with first motor 8's drive shaft, be equipped with pulley group 12 between the one end that first motor 8 was kept away from to main shaft 11 and driven shaft 15, the surface of take-up pulley 10 is around being equipped with steel cable 7, the position department that the lateral wall of footstock 2 corresponds three telescopic link 5 is equipped with first lantern ring 13, the tip of steel cable 7 is equipped with rings 14.

Furthermore, a second lantern ring 21 is fixedly arranged on one side of the top ends of the three telescopic rods 5.

Further, the bottom end of the surveying and mapping host 4 is fixedly provided with a rotating seat 25, and the rotating seat 25 is coupled to the sliding seat 19.

Further, the shock absorption block 26 is fixedly arranged between the bottom of the surveying and mapping host machine 4 and the rotating seat 25, so that when the surveying and mapping host machine 4 moves, the shock can be reduced.

Further, the outer side wall of the surveying and mapping host 4 is fixedly provided with a control panel 24, and a programmable controller is arranged in the surveying and mapping host 4.

Furthermore, the surveying and mapping host 4 is in wireless communication connection with the BIM platform through the programmable controller, uploads measured data to the BIM platform, then establishes a virtual building engineering three-dimensional model, and provides a complete building engineering information base consistent with actual conditions for the model by using a digital technology, thereby greatly improving the information integration degree of the building engineering.

The implementation scenario is specifically as follows: firstly, pulling the surveying and mapping host 4 to make the rotating seat 25 at the bottom end rotate with the sliding seat 19 to ensure that the surveying and mapping host 4 and the sliding seat 19 are arranged vertically, then, controlling the surveying and mapping host 4 to be opened by the control panel 24, simultaneously, pulling the three telescopic rods 5 in the base 1 to the longest state, drawing out the steel rope 7 from the fixed pulley 6 at the top end of each telescopic rod 5, and ensuring that the hanging ring 14 at the end part of the steel rope 7 is hung with the corresponding first sleeve ring 3 at the outer side of the top seat 2, when the surveying and mapping height of the surveying and mapping host 4 needs to be adjusted, firstly, controlling the first motor 8 to be started by the control panel 24, driving the main shaft 11 to rotate to drive the belt pulley set 12 to transmit by the first motor 8, enabling the driven shaft 15 to also rotate, further enabling the two take-up pulleys 10 on the main shaft 11 and the take-up pulley 10 at the, the vertical lifting of the top seat 2 on the three telescopic rods 5 is realized, and meanwhile, when the surveying and mapping direction of the surveying and mapping host 4 is to be adjusted, firstly, the control panel 24 controls the second motor 22 to start, the driving gear 16 drives the gear ring 17 to rotate, so that the sliding seat 19 on the gear ring 7 slides in the sliding groove 18 to drive the surveying and mapping host 4 to perform horizontal circular motion, the adjustment of the surveying and mapping direction is realized, the building construction information is obtained to the maximum extent, finally, the surveying and mapping host is in wireless communication connection with the BIM platform through a programmable controller, the measured data is uploaded to the BIM platform, then a virtual three-dimensional building engineering model is established, a complete building engineering information base consistent with the actual situation is provided for the model by utilizing a digital technology, and the information integration degree of the building engineering is greatly improved;

whole accurate measuring device can carry out automatic height, the quick adjustment of direction according to the needs of survey and drawing, need not artifical correction machine position, can the furthest accurate building construction information that acquires, operates fast, efficient.

Referring to the attached fig. 1 and 7 of the specification, in the accurate measurement device for intelligent building site construction based on BIM of this embodiment, a plurality of inserts 20 are uniformly distributed on the outer side wall of the base 1, and a sealing cover 23 is embedded on the exterior of the base 1.

Furthermore, the inner side wall of the sealing cover 23 is provided with an embedding groove 27 which is correspondingly embedded with the embedding block 20, and the outer side wall of one side of the sealing cover 23 is fixedly provided with a handle 28, so that the sealing cover is convenient to carry.

The implementation scenario is specifically as follows: after 4 surveys and draws of survey and drawing host computer, pull survey and drawing host computer 4, make the rotation seat 25 and the slide 19 production rotation of its bottom, survey and drawing host computer 4 is taken into in the footstock 2, then, the rings 14 with the steel cable 7 tip on three telescopic link 5 take off from first lantern ring 13, hang on the second lantern ring 21 on telescopic link 5, then, compress three telescopic link 5 to the shortest, make footstock 2 and 3 laps of ring on base 1 simultaneously, cover the top that the closing cap 23 corresponds base 1, make the caulking groove 27 of closing cap 23 inside wall and the abaculus 20 looks butt on the base 1 lateral wall, can, the overall structure leakproofness is good, and convenient to carry.

The working principle is as follows: referring to the attached drawings 1-6 of the specification, when the surveying and mapping height of the surveying and mapping host 4 needs to be adjusted, firstly, the control panel 24 controls the first motor 8 to be started, the first motor 8 drives the main shaft 11 to rotate to drive the belt pulley set 12 to transmit, so that the driven shaft 15 also rotates, and then after the two take-up pulleys 10 on the main shaft 11 and the take-up pulley 10 at the driven shaft 15 rotate simultaneously, the steel rope 7 is wound, and the top base 2 is vertically lifted on the three telescopic rods 5;

meanwhile, when the surveying and mapping direction of the surveying and mapping host 4 is required to be adjusted, firstly, the control panel 24 controls the second motor 22 to be started, the driving gear 16 drives the gear ring 17 to rotate, so that the sliding seat 19 on the gear ring 7 slides in the sliding groove 18 to drive the surveying and mapping host 4 to perform horizontal circular motion, the surveying and mapping direction is adjusted, the building construction information is obtained to the maximum extent, the whole accurate measuring device can automatically and quickly adjust the height and the direction according to the surveying and mapping requirements, the position of a machine is not required to be manually corrected, the building construction information can be accurately obtained to the maximum extent, and the operation is quick and the efficiency is high;

refer to description attached figure 1, 7, survey and drawing host 4 is surveyed and drawn, pull survey and drawing host 4, make the rotation seat 25 and the slide 19 production of its bottom rotate, survey and drawing host 4 is taken in footstock 2, then, take off the rings 14 of the steel cable 7 tip on three telescopic link 5 from first lantern ring 13, hang on the second lantern ring 21 on telescopic link 5, then, compress three telescopic link 5 to the shortest, make footstock 2 and ring 3 overlap joint on base 1 simultaneously, cover the top that closing cap 23 corresponds base 1, make caulking groove 27 of closing cap 23 inside wall and the abaculus 20 looks butt on the base 1 lateral wall, can, overall structure leakproofness is good, and convenient to carry.

Although the invention has been described in detail above with reference to a general description and specific examples, it will be apparent to one skilled in the art that modifications or improvements may be made thereto based on the invention. Accordingly, such modifications and improvements are intended to be within the scope of the invention as claimed.

10页详细技术资料下载
上一篇:一种医用注射器针头装配设备
下一篇:用于光电传感器和激光雷达传感器的外壳

网友询问留言

已有0条留言

还没有人留言评论。精彩留言会获得点赞!

精彩留言,会给你点赞!