Automatic guiding device for leaked materials

文档序号:1224406 发布日期:2020-09-08 浏览:4次 中文

阅读说明:本技术 一种漏料自动导出装置 (Automatic guiding device for leaked materials ) 是由 王勇 朱立新 于士峰 王全 程勇 谢洪强 马守斌 龙剑 于 2020-07-08 设计创作,主要内容包括:本发明公开了一种漏料自动导出装置,涉及矿山设备技术领域。该漏料自动导出装置,包括车厢、振板承重墙、振板和导灰板,所述振板承重墙上方活动设置有振板,所述振板底面按宽度中线分布设置有悬挂筋板,所述悬挂筋板的下端设置有输灰溜槽,所述输灰溜槽上设置有输灰溜槽接头部位。该漏料自动导出装置,结构简单,设计合理,结构紧凑,节约资源,合理利用有限的空间,安全环保,通过振动放矿机自身动力源将收集的漏料与振动放矿机内部的物料一并输送到外运的车厢内,减轻职工的劳动强度,避免电气、人员、环境因漏料而污染环境,同时节约二次倒运堆料场使用大型装载设备和调集激振电机车空车皮的费用。(The invention discloses an automatic leaked material guiding device, and relates to the technical field of mining equipment. The automatic leaked material guiding device comprises a carriage, a vibration plate bearing wall, a vibration plate and an ash guiding plate, wherein the vibration plate is movably arranged above the vibration plate bearing wall, the vibration plate bottom surface is provided with a suspension rib plate according to the width central line distribution, the lower end of the suspension rib plate is provided with an ash conveying chute, and the ash conveying chute is provided with an ash conveying chute joint part. This automatic guiding device of hourglass material, simple structure, reasonable in design, compact structure, resources are saved, the limited space of rational utilization, safety ring protects, carry the carriage of outward transport in the lump with the inside material of leaking material and the vibration ore drawing machine of collecting through vibration ore drawing machine self power supply, alleviate worker's intensity of labour, avoid electric, personnel, environment because of leaking the material polluted environment, practice thrift the secondary simultaneously and fall to transport the expense that the stockyard used large-scale loading equipment and collected excitation electric locomotive empty wagon.)

1. The utility model provides an automatic guiding device of hourglass material which characterized in that: comprises a carriage (4), a vibration plate bearing wall (5), a vibration plate (6) and an ash guide plate (1), wherein the vibration plate (6) is movably arranged above the vibration plate bearing wall (5), the bottom surface of the vibration plate (6) is provided with a hanging rib plate (3) according to the width central line distribution, the lower end of the hanging rib plate (3) is provided with an ash conveying chute (2), the ash conveying chute (2) is provided with an ash conveying chute joint part (10), the notch part of the ash conveying chute (2) is fixedly provided with angle steel (16), the bottom of the vibration plate (6) is provided with an excitation motor (8), the vibration plate bearing wall (5) is fixedly provided with a hook (11) towards one side of the ash conveying chute (2) through an expansion screw (15), the ash guide plate (1) is movably arranged on the hook (11) through a hanging part (9), and the spatial position is positioned between the ash conveying chute (2) and the vibration plate (6) and at the two sides of the hanging rib plate (3), and an ash guide plate back plate (14) is fixedly arranged on the ash guide plate (1).

2. The automatic leaked material guiding device as claimed in claim 1, wherein: the ash guide plate hanging part (9) is composed of a hook (11), a hanging lug (12) and a hanging lug base (13).

3. The automatic leaked material guiding device as claimed in claim 1, wherein: the ash guide plate (1) is formed by combining an A section, a B section, a C section, a D section and an E section.

4. The automatic leaked material guiding device as claimed in claim 1, wherein: the ash conveying chute (2) is formed by combining an F section, a G section, an H section and a J section.

5. The automatic leaked material guiding device as claimed in claim 1, wherein: and hooks (11) are fixedly arranged on the vibration plate bearing walls (5) at two sides below the vibration plate (6) and face the wall surface at one side of the ash conveying chute (2).

6. The automatic leaked material guiding device as claimed in claim 1, wherein: the ash guide plate (1) is movably arranged on the hook (11) through a hanging part (9), the spatial position of the ash guide plate is positioned between the ash conveying chute (2) and the vibration plate (6) and on two sides of the hanging rib plate (3), and the ash guide plate (1) with a certain included angle with the vibration plate bearing wall (5) is installed at the bottom of the vibration plate (6) in a hanging manner and is positioned in the ash conveying chute (2) below the middle of the ash guide plate (1) on two sides.

Technical Field

The invention relates to the technical field of mining equipment, in particular to an automatic leaked material guiding device.

Background

The vibration ore drawing machine is one of important devices of large mine ore transfer loading trains in China at present. Mine) to the feed bin through the car, utilize the vibration board of the vibration ore drawing machine below the feed bin through the mode of vibration, with the ore in the feed bin along the board that shakes 15 with the ground slope, slide in the train carriage of outward transport through the vibration of vibration ore drawing machine. The vibration ore drawing machine has the following serious defects in the loading process due to the design problem:

1. because the vibration ore drawing machine is in the design, the ore can produce a lot of fine particles and powdery ores under the condition that the ores collided with each other in the processes of blasting and transporting are secondarily crushed by crushing equipment without considering the process that the ores are loaded on a vehicle, when the vibration ore drawing machine is used for loading and transporting a train, a large amount of powdery and granular materials fall down from gaps between adjacent vibrating plates arranged inside the vibration ore drawing machine, and a vibrating plate bin below the vibrating plates is enabled to be granular and dust everywhere.

2. If the vibration ore drawing machine after the work hours, will cause the board back that shakes, shake subaerial granule and dust below the board storehouse very much, contain a large amount of metal dusts in these ore dusts, inside this narrow and small space, install electrical equipment, the dust falls into the electrical equipment outside will influence electric radiating effect and can increase electrical equipment's circuit trouble simultaneously, seriously influences safety in production.

3. In the operation process, the vibrating plate bin below a vibrating plate of the vibrating ore drawing machine, and particles and dust falling on the ground below the vibrating plate bin need to be cleaned every 8 hours, a shovel with slow material leakage needs to be moved to an outlet of the vibrating plate bin from the innermost part in the long and narrow vibrating plate bin below the vibrating plate manually, then the shovel is thrown to the ground with the height drop of nearly three meters, and the falling materials thrown to the ground are then transported to a specified stockyard through a small manual cart for the second time. The cleaning of the vibrating plate bin below the vibrating plate of the primary vibrating ore drawing machine and the ground outside the vibrating plate bin requires about three hours of work of two workers, the vibrating ore drawing machine is in a parking state within the three hours, the workers can work, great physical injury is brought to the cleaning workers while production is severely restricted, and serious influence is caused to the surrounding environment due to serious material leakage.

4. Vibration plate storehouse, the subaerial material of clearing up out of plate storehouse outside of shaking of vibrating below the board of vibration ore drawing machine pile up appointed region, the material of clearing up out all is more tiny granule and dust, need prevent dust and outward transport to it, need coordinate the production dispatch in-process of outward transport to the material of clearing up out, coordinate outward transport vehicle, dispatch excitation electric locomotive empty wagon to stockyard, transport away through large-scale excavator loading, cause secondary pollution to the environment at the in-process of shipment.

Disclosure of Invention

Technical problem to be solved

Aiming at the defects of the prior art, the invention provides an automatic guiding device for leaked materials, which solves the problems that when a vibrating ore drawing machine is designed, in the process of loading ores, a lot of fine particles and powdery ores are generated when the ores collide with each other in blasting and conveying are secondarily crushed by crushing equipment, so that when the vibrating ore drawing machine is used for loading and conveying a train, a lot of powdery and granular materials fall down at gaps between adjacent vibrating plates arranged in the vibrating ore drawing machine, the vibrating plate bins below the vibrating plates are all particles and dust, and meanwhile, after the vibrating ore drawing machine works for several hours, the particles and dust on the back of the vibrating plates and on the ground below the vibrating plate bins are more, the ore dust contains a lot of metal dust, and electric equipment is arranged in a narrow space, the dust falls into the electrical equipment outside and will influence electric radiating effect and can increase electrical equipment's circuit trouble simultaneously, seriously influence safety in production, and shake the board storehouse below the board that shakes at the in-process vibration ore drawing machine shaking, shake every 8 hours of subaerial granule and the dust that drops below the board storehouse, need clear up the operation to its position, need artifical in the board storehouse that shakes of board storehouse long and narrow below the board that shakes, will move to the board storehouse exit that shakes earlier of a slow spade of leaking material from the inside, reuse spade throws the ground of nearly three meters height drops, the blanking of throwing ground is again through the manpower small handcart secondary to specified stockyard. Cleaning the vibrating plate bin below the vibrating plate of the primary vibrating ore drawing machine and the ground outside the vibrating plate bin requires about three hours of work of two workers, the vibratory ore drawing machine is in a parking state within the three hours, workers can work, great physical damage is brought to cleaning workers while production is severely restricted, serious material leakage causes serious influence on the surrounding environment, and a vibrating plate bin below a vibrating plate of the vibrating ore drawing machine, and a material stacking designated area cleaned on the ground outside the vibrating plate bin, the materials cleaned are all fine particles and dust, and need to be dustproof and transported outside, production scheduling needs to be coordinated in the process of transporting the cleaned materials outside, vehicles need to be transported outside, empty wagons of the shock excitation electric locomotive are dispatched to a stockyard, the large excavator is used for loading and transporting, and secondary pollution is caused to the environment in the loading and transporting process.

(II) technical scheme

In order to achieve the purpose, the invention is realized by the following technical scheme: the utility model provides an automatic guiding device of hourglass material, includes the carriage, shakes board bearing wall, shakes the board and leads the hawk, shake board bearing wall top activity and be provided with the board that shakes, shake the board bottom surface and be provided with according to width central line distribution and hang the gusset, the lower extreme that hangs the gusset is provided with the ash conveying chute, be provided with ash conveying chute joint position on the ash conveying chute, the fixed angle steel that is provided with in notch position distribution of ash conveying chute, the bottom of shaking the board is provided with shock excitation motor, shake board bearing wall and pass through the fixed couple that is provided with of inflation screw towards ash conveying chute one side wall, it sets up on the couple through hanging the position activity to lead the hawk, and spatial position is in ash conveying chute and shakes between the board and hang the both sides of gusset, it is fixed to be provided with the hawk.

Preferably, the ash guide plate hanging part consists of a hook, a hanging lug and a hanging lug base.

Preferably, the ash guide plate is formed by combining an A section, a B section, a C section, a D section and an E section.

Preferably, the ash conveying chute is formed by combining an F section, a G section, an H section and a J section.

Preferably, the vibration plate bearing walls on two sides below the vibration plate face the wall surface on one side of the ash conveying chute and are fixedly provided with hooks.

Preferably, the ash guide plate is movably arranged on the hook through a hanging part, the spatial position of the ash guide plate is positioned between the ash conveying chute and the vibration plate and on two sides of the hanging rib plate, and the ash guide plate which form a certain included angle with the bearing wall of the vibration plate are hung and arranged at the bottom of the vibration plate and are positioned in the ash conveying chute below the middle of the ash guide plates on two sides.

(III) advantageous effects

The invention provides an automatic material leakage guiding device. The method has the following beneficial effects: this automatic guiding device of hourglass material, simple structure, reasonable in design, compact structure, resources are saved, the limited space of rational utilization, safety ring protects, carry the carriage of outward transport in the lump with the inside material of vibration ore drawing machine with the hourglass material of collection through vibration ore drawing machine self power supply in), alleviate worker's intensity of labour, avoid electric, personnel, environment because of leaking the material polluted environment, practice thrift the secondary simultaneously and fall to transport the windrow and use large-scale loading equipment and collect the expense of excitation electric locomotive empty wagon.

Drawings

FIG. 1 is a front view of the apparatus of the present invention;

FIG. 2 is an isometric view of the present invention;

FIG. 3 is a schematic view of the hanging portion of the dust guide plate according to the present invention;

FIG. 4 is a sectional view taken along line A-A of FIG. 1;

FIG. 5 is an enlarged view of a portion of FIG. four of the present invention;

FIG. 6 is an assembled view of the dust guide plate of the present invention;

fig. 7 is a schematic structural view of the ash chute of the present invention.

In the figure: 1. a dust guide plate; 2. an ash conveying chute; 3. hanging a rib plate; 4. a carriage; 5. a vibrating plate bearing wall; 6. a vibrating plate; 7. leaking the materials; 8. an excitation motor; 9. a hanging part of the ash guide plate; 10. the joint part of the ash conveying chute; 11. hooking; 12. hanging a lug; 13. a suspension loop base; 14. a dust guide plate back plate; 15. an expansion screw; 16. angle steel; 17. partial view.

Detailed Description

The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.

Referring to fig. 1-7, the present invention provides a technical solution: automatic guiding device leaks material, its characterized in that: comprises a carriage 4, a vibration plate bearing wall 5, a vibration plate 6 and an ash guide plate 1, wherein the ash guide plate 1 is movably arranged on a hook 11 through a hanging part 9, the spatial position is positioned between an ash conveying chute 2 and the vibration plate 6 and at two sides of a hanging rib plate 3, the ash guide plate 1 and the vibration plate bearing wall 5 form a certain included angle, the ash guide plate 1 is hung and installed at the bottom of the vibration plate 6 and is arranged at the ash conveying chute 2 below the middle of the ash guide plates 1 at two sides, the ash guide plate 1 is formed by combining an A section, a B section, a C section, a D section and an E section, the vibration plate 6 is movably arranged above the vibration plate bearing wall 5, the hook 11 is fixedly arranged on the wall surface of the vibration plate bearing wall 5 at two sides below the vibration plate 6 and facing the ash conveying chute 2, hanging rib plates 3 are distributed on the bottom surface of the vibration plate 6 according to a width central line, the ash conveying chute 2 is arranged at the lower end of the hanging rib plates 3, be provided with ash conveying chute joint position 10 on the ash conveying chute 2, the fixed angle steel 16 that is provided with in notch position distribution of ash conveying chute 2, the bottom of vibrating plate 6 is provided with exciting motor 8, the fixed couple 11 that is provided with through inflation screw 15 towards ash conveying chute 2 one side wall of vibrating plate bearing wall 5, it sets up on couple 11 through hanging position 9 activity to lead hawk 1, it hangs position 9 by couple 11 to lead hawk, hangers 12 and hangers base 13 are constituteed, spatial position is in between ash conveying chute 2 and the vibrating plate 6 and hangs the both sides of gusset 3, it is fixed with and leads hawk backplate 14 to lead hawk 1.

During operation, leaked materials collected in the ash conveying chute are automatically conveyed to an outward-conveying carriage through vibration of the vibrating ore drawing machine during operation.

The working process comprises two processes of collecting materials and guiding out, the leaked materials which leak through the gap of the vibrating plate slide into the ash conveying chute along the ash guide plates hung on the bearing walls of the vibrating plates at two sides below the vibrating plate, and the collecting process is completed. The ash conveying chute automatically conveys the collected leaked materials into a carriage for loading ores through vibration of the vibration ore drawing machine during working, and the leaked materials are guided out.

The automatic guiding device for the leaked materials is characterized in that the ash conveying chute is connected to the middle seam of the back face of the vibrating plate through the hanging rib plate, and a certain inclination angle is kept between the ash conveying chute and the horizontal ground. Firstly, the hook is fixed on the bearing walls of the vibrating plates on the two sides of the vibrating plate according to requirements, then the ash guide plate is hung on the hook, and the ash guide plate and the ash conveying chute are kept parallel.

The automatic material leakage guiding device does not need to be additionally provided with a power mechanism. The leaked materials 7 collected in the ash conveying chute 2 are automatically conveyed to the carriage 4 for outward transportation through the vibration of the vibrating ore drawing machine during working, the times of cleaning a stockyard by using large-scale loading machinery and a shock excitation electric locomotive are reduced, the waste of production resources and electric power resources is saved, and adverse factors influencing the surrounding environment are avoided.

10页详细技术资料下载
上一篇:一种医用注射器针头装配设备
下一篇:用于送料机构的转轴定位结构及送料机构

网友询问留言

已有0条留言

还没有人留言评论。精彩留言会获得点赞!

精彩留言,会给你点赞!