Project construction project service declaration and tabulation method

文档序号:1505367 发布日期:2020-02-07 浏览:4次 中文

阅读说明:本技术 一种工程建设项目业务申报制表方法 (Project construction project service declaration and tabulation method ) 是由 宋勇 陈兆亮 宁方刚 于 2019-10-31 设计创作,主要内容包括:本发明特别涉及一种工程建设项目业务申报制表方法。该工程建设项目业务申报制表方法,将工程建设项目中的表单映射封装到模块,工程建设项目联审系统利用一表制表单与子表单之间设置的映射关系进行业务收件,实现一表制表单与子表单之间信息项的自动解析和映射,从而最大程度的实现表单之间数据信息项的共享与复用。该工程建设项目业务申报制表方法,将工程建设项目中的表单映射封装到模块,体现出了一个表单到多个表单的动态关系,只要填报了一表制的表单,就可以利用表单的映射关系实现一表制表单信息到子表单信息的自动映射。(The invention particularly relates to a project construction project service declaration and tabulation method. The project construction project service declaration and tabulation method maps and encapsulates the forms in the project construction project to the module, the project construction project joint review system utilizes the mapping relation set between a tabulation form and the sub-forms to carry out service receiving, and automatic analysis and mapping of the information items between the tabulation form and the sub-forms are realized, so that sharing and multiplexing of the data information items between the forms are realized to the greatest extent. The project construction project service declaration form making method maps and encapsulates the forms in the project construction project into the module, embodies the dynamic relation from one form to a plurality of forms, and can realize the automatic mapping from the form information to the sub-form information by using the mapping relation of the forms as long as the form is filled.)

1. A project construction project service declaration tabulation method is characterized in that: the forms in the engineering construction project are mapped and packaged to the modules, the engineering construction project joint review system utilizes the mapping relation set between one tabulation form and the sub-forms to carry out service receiving, automatic analysis and mapping of information items between the tabulation form and the sub-forms are achieved, and therefore sharing and multiplexing of data information items between the forms are achieved to the greatest extent.

2. The project construction project business declaration tabulation method of claim 1, comprising the steps of:

the first step, carding out information items which can be shared and multiplexed among items, and forming a tabulation form of each stage;

secondly, after the carding of a tabulation form is finished, configuring a form mapping relation between the tabulation form and the sub-forms as an automatic analysis mapping basis;

and thirdly, after the configuration of the form mapping relation is completed, the declaration person fills in the data information item of a tabulation form, and the form mapping and packaging module can realize the automatic analysis and mapping from the tabulation form to the sub-forms.

3. The project construction project business declaration tabulation method of claim 2, characterized in that: in the first step, the staff combs a tabulation form in stages according to the project category and the divided stages.

4. The project construction project business declaration tabulation method of claim 3, wherein: in the first step, the information items which can be shared and multiplexed among the items are firstly combed out, and then personalized fields of each sub-form are added, so that a form of the stage is formed.

5. The project construction project business declaration tabulation method of claim 4, wherein: and in the second step, the mapping relation of the information items of the sorted tabulation form mapped to the sub-form is dynamically configured in the system through the form mapping management function provided by the system.

6. The project construction project business declaration tabulation method of claim 5, wherein: and in the third step, in the process of receiving the service, according to a tabulation form information item filled by the declaration person, the system automatically analyzes the relevant information of a tabulation form, reads the preset form mapping relation, and then realizes the automatic mapping from the information item of the tabulation form to the sub-form.

7. The project construction project business declaration tabulation method of claim 6, characterized in that: and in the third step, after the mapping from the one-form to the sub-form is completed, the relevant information in the sub-form can automatically realize assignment without repeated filling by the user.

8. The project construction project business declaration tabulation method of claim 7, characterized in that: when the subforms have the information items which can not be shared and reused and need to be filled independently, the declaration personnel fills the corresponding information items independently from the subforms, and the information items and the automatically mapped information items form a project engineering construction project service declaration form together; or an individual mapping relation can be established between the report form and the individual information items in the sub-forms, and the declaration personnel only needs to map the report form to the corresponding sub-forms after filling in the report form.

Technical Field

The invention relates to the technical field of engineering construction project service declaration, in particular to an engineering construction project service declaration tabulation method.

Background

Construction project (construction project), a specific process consisting of a set of interrelated controlled activities with start and stop dates to meet specified requirements, which are carried out to complete various projects (civil engineering, construction engineering, installation engineering, etc.) of new construction, reconstruction, extension of an statutory project, including planning, surveying, designing, purchasing, construction, commissioning, completion acceptance, transfer, etc.

When the engineering construction project business application is reported, a large amount of forms need to be filled in. The forms contain huge amounts of data and information, and cover various aspects in engineering construction projects. Because the forms have huge information amount, the declaration personnel need to fill in a plurality of sub-forms one by one, which is time-consuming, labor-consuming and easy to make mistakes.

Today, the field of government affair services is rapidly developed, project construction projects are infinite, and the traditional single item circulation can not meet the requirement of project declaration business of the project construction projects. Under the large background, the problem that the simplification and optimization of project construction project declaration flow is in urgent need to be solved.

In the traditional business declaration process, the declaration persons declare each item independently and one by one, and a form is filled in each declaration. With the continuous development of the reform to the depth, the project construction project adopts the multi-project co-operation to solve the problem of the project co-operation. However, when multiple items are selected for declaration at one time, in the process of filling in the form, the form of each item has some common information items, if integration optimization is not performed, a phenomenon of repeated redundancy of a large number of information items occurs, and a false image that the declaration is not different from a single declaration item but is simply superimposed in number is caused to a declaration person.

Through long-term research, technicians find that a tabulation form is different for each category and each stage, and the information items of the item sub-forms are also different. In order to solve the problem of redundancy of a large number of information items in a multi-event co-office, a module is needed to realize dynamic configuration of mapping relationships between a tabulation form and sub-forms, and to allow an implementer to dynamically modify the mapping relationships according to actual conditions.

Based on the situation, the invention provides a project construction project service declaration and tabulation method. The method aims to solve the problems of time consumption, labor consumption and easy error of manual filling of a large amount of repeated and redundant information in engineering construction project service declaration, realizes sharing and multiplexing of information items to the maximum extent, and provides a scheme for sharing data among forms, thereby reducing the filling times of declaration personnel and improving the filling efficiency.

Disclosure of Invention

The invention provides a simple and efficient project construction project service declaration and tabulation method for making up the defects of the prior art.

The invention is realized by the following technical scheme:

a project construction project service declaration tabulation method is characterized in that: the forms in the engineering construction project are mapped and packaged to the modules, the engineering construction project joint review system utilizes the mapping relation set between one tabulation form and the sub-forms to carry out service receiving, automatic analysis and mapping of information items between the tabulation form and the sub-forms are achieved, and therefore sharing and multiplexing of data information items between the forms are achieved to the greatest extent.

The invention relates to a project construction project service declaration and tabulation method, which comprises the following steps:

the first step, carding out information items which can be shared and multiplexed among items, and forming a tabulation form of each stage;

secondly, after the carding of a tabulation form is finished, configuring a form mapping relation between the tabulation form and the sub-forms as an automatic analysis mapping basis;

and thirdly, after the configuration of the form mapping relation is completed, the declaration person fills in the data information item of a tabulation form, and the form mapping and packaging module can realize the automatic analysis and mapping from the tabulation form to the sub-forms.

In the first step, the staff combs a tabulation form in stages according to the project category and the divided stages.

In the first step, the information items which can be shared and multiplexed among the items are firstly combed out, and then personalized fields of each sub-form are added, so that a form of the stage is formed.

And in the second step, the mapping relation of the information items of the sorted tabulation form mapped to the sub-form is dynamically configured in the system through the form mapping management function provided by the system.

And in the third step, in the process of receiving the service, according to a tabulation form information item filled by the declaration person, the system automatically analyzes the relevant information of a tabulation form, reads the preset form mapping relation, and then realizes the automatic mapping from the information item of the tabulation form to the sub-form.

And in the third step, after the mapping from the one-form to the sub-form is completed, the relevant information in the sub-form can automatically realize assignment without repeated filling by the user.

When the subforms have the information items which can not be shared and reused and need to be filled independently, the declaration personnel fills the corresponding information items independently from the subforms, and the information items and the automatically mapped information items form a project engineering construction project service declaration form together; or an individual mapping relation can be established between the report form and the individual information items in the sub-forms, and the declaration personnel only needs to map the report form to the corresponding sub-forms after filling in the report form.

The invention has the beneficial effects that: the project construction project service declaration form making method maps and encapsulates forms in a project construction project to a module, embodies the dynamic relation from one form to a plurality of forms, and declarers can realize the automatic mapping from the form information to the sub-form information by using the preset mapping relation between the forms as long as the declarers fill a form;

meanwhile, the same information item in the sub-form is not required to be repeatedly filled by the declaration person in the declaration process, the problem of repeated filling of the same information item is solved, real-time sharing of data is provided for the declaration person to the greatest extent, repeated filling of the same information item can be reduced to the greatest extent, user experience is improved, errors caused by repeated manual filling can be avoided, work efficiency is remarkably improved, and the method is suitable for popularization and application.

Detailed Description

In order to make the technical problems, technical solutions and advantageous effects to be solved by the present invention more apparent, the present invention is described in detail below with reference to the embodiments. It should be noted that the specific embodiments described herein are only for explaining the present invention and are not used to limit the present invention.

The project construction project service declaration and tabulation method maps and encapsulates the forms in the project construction project to the module, the project construction project joint review system utilizes the mapping relation set between a tabulation form and the sub-forms to carry out service receiving, and automatic analysis and mapping of the information items between the tabulation form and the sub-forms are realized, so that sharing and multiplexing of the data information items between the forms are realized to the greatest extent.

The project construction project service declaration and tabulation method comprises the following steps:

the first step, the information items which can be shared and multiplexed among all matters in the same stage are combed out to form a tabulation form of each stage;

secondly, after the carding of a tabulation form is finished, configuring a form mapping relation between the tabulation form and the sub-forms as an automatic analysis mapping basis;

and thirdly, after the configuration of the form mapping relation is completed, the declaration person fills in the data information item of a tabulation form, and the form mapping and packaging module can realize the automatic analysis and mapping from the tabulation form to the sub-forms.

In the first step, the staff combs a tabulation form in stages according to the project category and the divided stages.

In the first step, the information items which can be shared and multiplexed among the items are firstly combed out, and then personalized fields of each sub-form are added, so that a form of the stage is formed.

And in the second step, the mapping relation of the information items of the sorted tabulation form mapped to the sub-form is dynamically configured in the system through the form mapping management function provided by the system.

And in the third step, in the process of receiving the service, according to a tabulation form information item filled by the declaration person, the system automatically analyzes the relevant information of a tabulation form, reads the preset form mapping relation, and then realizes the automatic mapping from the information item of the tabulation form to the sub-form.

And in the third step, after the mapping from the one-form to the sub-form is completed, the relevant information in the sub-form can automatically realize assignment without repeated filling by the user.

In the third step, when information items which can not be shared and reused and need to be filled independently exist in the sub-form, the declaration personnel independently fill corresponding information items from the sub-form, and the information items and the automatically mapped information items form a project service declaration form together; or an individual mapping relation can be established between the report form and the individual information items in the sub-forms, and the declaration personnel only needs to map the report form to the corresponding sub-forms after filling in the report form.

Compared with the prior art that the declaration persons independently fill in the sub-form lists one by one for each item for declaration, the project construction project service declaration and tabulation method has the following characteristics:

firstly, automatic analysis and mapping of information items between a tabulation form and a sub-form can be realized, and a worker only needs to concentrate on configuration of the mapping relation of the information items of the tabulation form and the sub-form;

secondly, when a declaration person performs service declaration, only a tabulation form needs to be filled in, and the system can realize automatic analysis and mapping of information items from the tabulation form to the sub-forms according to the configuration content, so that the work handling efficiency is greatly improved;

thirdly, the same information item in the sub-form is not required to be repeatedly filled in by the declaring person in the declaring process, the problem of repeated filling of the same information item is solved, real-time sharing of data is provided for the declaring person to the greatest extent, repeated filling of the same information item can be reduced to the greatest extent, user experience is improved, errors caused by repeated manual filling can be avoided, and work efficiency is remarkably improved.

The above-described embodiment is only one specific embodiment of the present invention, and general changes and substitutions by those skilled in the art within the technical scope of the present invention are included in the protection scope of the present invention.